certificate of completion - copy

2
ANNEX “A” __________________ (Date) CERTIFICATE OF COMPLETION Project/Location: Contractor : THIS IS TO CERTIFY that the above-stated project has been satisfactorily completed on _____________ in accordance with Plans and Specifications of the Contract based on the Final Inspection Report of the Inspectorate Team dated ___________________ THIS CERTIFICATION does not relieved the Contractor of his obligations and responsibilities in undertaking repair works on my defect or failure that may occur in any action of the project during the one year Warranty Period starting from the date of completion as herein stated. Neither is he relieved of his obligations and responsibilities pursuant to the provisions of P.D. 1759. OIC, District Engineer CONFORME:

Upload: rotsen-kho-yute

Post on 06-Apr-2016

15 views

Category:

Documents


3 download

DESCRIPTION

pro-Forma of COC

TRANSCRIPT

Page 1: Certificate of Completion - Copy

ANNEX “A”

__________________ (Date)

CERTIFICATE OF COMPLETION

Project/Location:

Contractor :

THIS IS TO CERTIFY that the above-stated project has been satisfactorily completed on _____________ in accordance with Plans and Specifications of the Contract based on the Final Inspection Report of the Inspectorate Team dated ___________________

THIS CERTIFICATION does not relieved the Contractor of his obligations and responsibilities in undertaking repair works on my defect or failure that may occur in any action of the project during the one year Warranty Period starting from the date of completion as herein stated. Neither is he relieved of his obligations and responsibilities pursuant to the provisions of P.D. 1759.

OIC, District Engineer

CONFORME:

Contractor