cern f. ruggiero & w. scandale care steering committee, paris, 11/04/2006 high energy high...
Post on 19-Dec-2015
221 views
TRANSCRIPT
F. Ruggiero & W. Scandale
CARE Steering Committee, Paris, 11/04/2006
CERNCERN
High Energy High Intensity Hadron Beams
CARE-HHH Network:coordinators: F. Ruggiero and W.
Scandalerecent activities, workshops, and plans
http://care-hhh.web.cern.ch/care-hhh/
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
CARE-HHH Network: 3 workpackages WP1: Advancements in Accelerator Magnet Technologies (AMT)
• coordinated by L. Rossi (CERN) and L. Bottura (CERN)• keywords: stability and quench limit of LHC insertion magnets,
pulsed magnets for LHC and GSI accelerator complex upgrade, magnets for booster ring, high field magnet design, optimisation of the overall cost
WP2: Novel Methods for Accelerator Beam Instrumentation (ABI)• coordinated by H. Schmickler (CERN) and K. Wittenburg (DESY)• keywords: tools and diagnostic systems for luminosity, wire for
beam-beam compensation, advanced transverse beam diagnostics, feedback loops for orbit, chromaticity and coupling, advanced beam halo diagnostics, remote diagnostics and maintenance of instrumentation
WP3: Accelerator Physics and synchrotron Design (APD)• coordinated by F. Ruggiero (CERN) and F. Zimmermann (CERN)• keywords: Interaction Region design for LHC luminosity
upgrade, optics design for booster synchrotrons, impedance calculations, structured list of intensity limits, electron cloud effects, beam measurements and advanced theoretical studies (including collimation, halo formation, and loss mechanisms)
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
HHH activity/plans in 2006• CARE-HHH coordinators: contributions to
the “Proton Accelerators for the Future” (PAF) CERN Inter-Departmental Working Group, January–March 2006• Preparation of a document for the CERN Council
Strategy Group: Preliminary accelerator plans for maximizing the integrated LHC luminosity, M. Benedikt, R. Garoby, F. Ruggiero, R. Ostojic, W. Scandale, E. Shaposhnikova, and J. Wenninger
• Weekly meetings of the PAF Working Group, intense consultations with several hardware experts and CERN group leaders for a first estimate of future R&D needs in view of the LHC injector complex upgrade
• Discussions with the CERN Director General in view of the open Symposium held in Orsay-Paris on 30 Jan–1 Feb 2006 and in preparation for the Zeuthen workshop of 2–6 May 2006
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
HHH activity/plans in 2006
• CARE-HHH-APD, February 2006: creation of a first web site with alternative LHC IR optics and agreed criteria for new IR magnet aperture requirements in collaboration with HHH-AMT
• CARE-HHH-APD, March 2006: launching the rating of different LHC IR Upgrade scenarios based on three parameters: • LR: Luminosity Reach, defined as LR=E/Eo where
E is the energy deposition margin in the IR magnets and Eo the energy deposition for nominal LHC luminosity of 1034 cm-2 s-1
• TR&D: the estimated R&D time (in years) needed to develop the most critical hardware (proof of principle) and to integrate it in the LHC
• TOP: the estimated time (in years) needed to experimentally validate an upgrade scheme and implement it in routine accelerator operation
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
HHH activity/plans in 2006• CARE-HHH-APD mini-Workshop on Crystal
Channeling, CERN, Geneva, Switzerland, 9–10 March 2006 (attended by about 30 expert)
Topics: Launch of a crystal collimation test in the H8 beam of the SPS north
experimental area Launch of an international collaboration aiming at the preparation
and the running of the H8 experiment Steer a coordinate experimental activity with FNAL on this matter
• Approval by the CERN management of an HHH proposed Crystal Test Facility on a
CERN SPS extracted beam line, in collaboration with INTAS (IHEP, PNPI, JINP) and INFN, with the participation of FNAL
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
vacuum vacuum
S1
S6
S2
Goniometer with crystal holder
Si microstrips with 15 m hit resolution (AMS type)
3.5 m 35 m
p
H8 experiment: proposed layout
v.
S3
S4 S5
• 300 m thick silicon ( ~ 0.3% X0 ) 2.0 rad
• 1 mm scintillator ( ~ 0.2% X0 ) 1.7 rad
• 200 m mylar windows ( ~ 0.07% X0 ) 0.9 rad
• Qualify crystals to be used as primary collimators in FNAL and LHC
• determine probability of crystal channeling and reflection
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
HHH activity/plans in 2006• CARE-HHH-APD CERN-GSI bi-lateral working
meeting on Collective Effects–Coordination of Theory and Experiments, GSI, Darmstadt, Germany, 30–31 March 2006
Topics:• Beam loss and emittance growth caused by
• (1) Space charge and resonance trapping,• (2) Electron cloud and resonance trapping;
• Influence of working point and chromaticity on beam losses;
• Benchmarking of simulation codes & future experiments.
• Impedances - resistive walls and kickers;• Head-tail dynamics and simulation code benchmarking;• Transverse resistive instabilities and other collective
effects;• How does space charge (and electron cloud) affect the
impedance budget in the different CERN and GSI machines?
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
HHH activity/plans in 2006• CARE-HHH-AMT Workshop on Accelerator
Magnet Design and Optimization (WAMDO), CERN, Geneva, Switzerland, 3–6 April 2006
Topics• Examine extensions of classical SC magnet design,
novel ideas, numerical modelling and manufacturing issues for advanced superconducting magnets,
• Specific focus both on high field (>10 T) and Hz range cycled magnets, as envisaged for GSI or possible improvement of LHC injector chain.
• Review superconductors for high field and Hz regime magnet, especially in connection with magnet technology.
• Examine different layouts of IR optics for LHC luminosity upgrade and their implications on magnet design
F. Ruggiero & W. Scandale CARE-HHH Network
CERNCERN
Future CARE-HHH workshops in 2006
• US-LARP Collaboration Meeting, LBNL, Berkeley, CA, 24–28 April 2006
Topics: LHC IR magnets, collimation, beam commissioning
• International Conference co-organized by CARE-HHH-APD on Charged and Neutral Particles Channeling Phenomena (Channeling 2006), Frascati, Italy, 3–7 July 2006
Topics: Coherent phenomena, crystal channeling, application
• CARE-HHH-AMT Second Workshop on SC Pulsed Magnets for Accelerators (ECOMAG-06), Paris, France, October 2006
• CARE-HHH-APD Workshop Towards a Roadmap for the Upgrade of the LHC and GSI Accelerator Complex, IFIC, Valencia, Spain, 2–6 October 2006