Central Wastewater Treatment Plant Vathia Gonia

Upload: alexandra-holt

Post on 18-Dec-2015

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

Central Wastewater

Treatment Plant

Vathia Gonia

Page 2: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

OBJECTIVESOBJECTIVES

TREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS

TREAT INDUSTRIAL WASTES FROM LARNACA AND NICOSIA DISTRICTS

REUSE THE TREATED EFFLUENT IN AGRICULTURE

Page 3: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

WASTE CLASSIFICATIONWASTE CLASSIFICATION

METAL WASTES 48 m3/day FATS, OILS AND GREASE 35 m3/day STRONG ORGANIC WASTES 75 m3/day WEAK ORGANIC WASTES 215 m3/day DAIRY WASTES 144 m3/day DOMESTIC SEPTAGE 1683 m3/day

Page 4: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

 

CATEGORY OFWASTE

PRE-TREATMENT PROCESSES

DOMESTIC SEPTAGE SCREENING, GRIT REMOVAL

DAIRY WASTES STORAGE, DISSOLVED AIR FLOTATION

FATS, OILS ANDGREASE

SCREENING, GRIT REMOVAL, DISSOLVEDAIR FLOTATION

METAL WASTES SCREENING, GRIT REMOVAL , CHEMICALPRECIPITATION OF METALS

STRONG ORGANICWASTES

SCREENING, GRIT REMOVAL, STORAGEFOR GRADUAL FEED INTO THE SYSTEM

WEAK ORGANICWASTES

TREATED IN THE SAME LINE ASDOMESTIC SEPTAGE

SLUDGE STORAGE AND TRANSFER TO THEAEROBIC DIGESTERS VIA MACERATINGPUMPS

PRE-TREATMENT PRE-TREATMENT

Page 5: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

SECONDARY TREATMENTSECONDARY TREATMENT

BALANCING

OXIDATION DITCHES

FINAL SETTLEMENT TANKS

Page 6: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

TERTIARY TREATMENTTERTIARY TREATMENT

SAND FILTRATION

CHLORINATION

Page 7: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

SLUDGE TREATMENTSLUDGE TREATMENT

THICKENING

AEROBIC DIGESTION

MECHANICAL DEWATERING

Page 8: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

FINANCIAL INFORMATIONFINANCIAL INFORMATION

CONSTRUCTION € 14,1 mill.

OPERATION AND

MAINTENANCE FOR

FIVE YEARS € 2.4 mill.

Page 9: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

VATHIA GONIA CWWTP PROCESS FLOW DIAGRAM

Page 10: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

VATHIA GONIA CWWTP SITE OVERVIEW

Page 11: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

VATHIA GONIA CWWTPSITE OVERVIEW

Page 12: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

TANKER RECEPTION AREA

Page 13: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

SCREENING AREA

Page 14: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

PRE-TREATMENT AREA

Page 15: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

BALANCING TANK

Page 16: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

AERATION TANK

Page 17: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

FINAL SETTLEMENT TANK

Page 18: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

TERTIARY TREATMENT

Page 19: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

SLUDGE TREATMENT

Page 20: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

SLUDGE STORAGE

Page 21: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

STORAGE LAGOON

Page 22: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

IRRIGATION

Page 23: Central Wastewater Treatment Plant Vathia Gonia. OBJECTIVES uTREAT THE DOMESTIC SEPTAGE FROM LARNACA AND NICOSIA DISTRICTS uTREAT INDUSTRIAL WASTES FROM

SLUDGE SPREADING