Central EngineeringDesign (Electrical) Engineering Process
Bertina ChanWeina Lin
Hsiao-Yun LuSankarbharathy Ponnusamy
Susu Wang
![Page 2: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/2.jpg)
Overview
Company OverviewDesign Engineering
Design Engineering Process (DEP)Problems with Current ProcessRecommendationsConclusion
![Page 3: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/3.jpg)
Company Overview
• One of the largest investor-owned, energy-delivery companies in US
• Annual revenue of $13 billion and total assets of $34 billion approximately
• It owns and operates the world’s largest district steam system
• Provides electricity and gas as well
![Page 4: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/4.jpg)
Design Engineering
• Consists of Electrical Design, Mechanical Concept/3D Design, & Transmission/Civil Design
• Ensures safe, reliable design operation and maintenance of the system
• Provides design schematics of all Company electric, gas, and steam generating plants, electrical substations, and transmission and commercial facilities
![Page 5: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/5.jpg)
Design Engineering Process(Electrical)
• Scope &Budget Oversee &Upgrade Project Scope of Work Works on the
project
• Match
Not match
Match
Not match
Top management
Engineering Department
EngineerElectrical Design
Scope review
Drawing layouts
As-built
Final package
Review & comments
Upgrade & Construct
Review &Field walk
Agreement
As-built
![Page 6: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/6.jpg)
Problems with Current Process
Miscommunications
Schematics (Drawings) vs. Real Field Conditions
Human Resources – Age Gap within the Designers
![Page 7: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/7.jpg)
Cause & Effect Diagram
• Identify the possible root causes, the basic reasons for a specific effect, problem or condition
• Helps determine root causes
• Increases process knowledge
• Identifies areas for collecting data
• Analyze existing problem
![Page 8: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/8.jpg)
Cause & Effect Layout
Lag in project time
Miscommunication
Age gap
Bad field conditions
CAUSE EFFECT
![Page 9: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/9.jpg)
Recommendations
• Miscommunication– Project Checkpoints strategically placed
within certain stages of the DEP.
• Schematics vs. Real Field Conditions– A full-time Designer at the station to upgrade
existing drawings to current field conditions– Current Designers assigned to on-going
projects will update drawings during construction
![Page 10: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/10.jpg)
Recommendations (cont’d)
• Human Resources – Age Gap– Hire retirees to give seminars/classes to
incoming and present employees– Pair experienced designers with
inexperienced designers
![Page 11: Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang](https://reader035.vdocuments.site/reader035/viewer/2022080914/56649cdf5503460f949a8cea/html5/thumbnails/11.jpg)
Conclusion
If the necessary changes are implemented:
• Detailed training guide for new employees
• Duration of DEP would be decreased and run smoother.
• Department would spend less than $8 million on outside services