TensiNet WG Specifications - Eurocode
Recent WG5 meetings
� �
� 8th of February 2012, Virtual
Skype meeting
� 28th of March 2012, Paris
� 25th of April 2012, Virtual
Skype meeting
Vienna, 22 November 2012 3
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Recent WG5 meetings
� �
� 8th of February 2012, Virtual
Skype meeting
� 28th of March 2012, Paris
� 25th of April 2012, Virtual
Skype meeting
� 5th of September 2012,
Paris: comments integrated
in the master document, on
livelink!
Vienna, 22 November 2012 4
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Recent WG5 meetings
� �
� 8th of February 2012, Virtual
Skype meeting
� 28th of March 2012, Paris
� 25th of April 2012, Virtual
Skype meeting
� 5th of September 2012,
Paris: comments integrated
in the master document, on
livelink!
� 25th October 2012, Virtual
Skype meeting
Vienna, 22 November 2012 5
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Vienna, 22 November 2012 6
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Email from Barry Haseltine:� Prepare technical rules in
the form of technical
recommendations as
‘Scientific and Technical
Report’
� an advance version of the
proposed code, not fully
worked up, but giving the
main elements
2
Vienna, 22 November 2012 7
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
� specify the complete design
process for membrane
structures, from the rules for
formfinding over the static
analysis to the membrane
stress verification =
compatible with the Draft
document
Vienna, 22 November 2012 8
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
When will such Scientific and
Technical Report be finalised?
Who will publishing it?
How will the outcome be
integrated into the TC 250
Work Programme?
The mandated work can only
start when TC 250 approved
the conversion of the Scientific
and Technical Report into CEN
Technical specifications�
Vienna, 22 November 2012 9
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
It took 4 years to write the
TensiNet Design Guide in
the framework of a
European-funded thematic
network!
In the Eurocode more topics
will be covered: � Pneumatic structures
� Advanced material
characterisation
� Foils
� �
Vienna, 22 November 2012 10
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Scientific and Technical
Report finalised? 2 years
Some sections progress well
Some not at all � Today + 5th December
� Approve the updates
� Solve the question marks
� Complete Sections 3, 4, 5, 9
and 10� Basis of structural analysis
� Manufacture/fabrication,
handling & packing &
installation
� Inspection/maintenance
Vienna, 22 November 2012 11
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
CEN TC250 meeting
� �
� 15-16 November 2012,
Madrid
Vienna, 22 November 2012 12
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
10 106€/year funding for all
standardisation
The CEN TC250 project
asking for a funding of 4
106€/year: not possible
All CEN-work which we plan
will be mentioned in the
Description Of Work
document
3
Vienna, 22 November 2012 13
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
http://cen.iso.org/livelink/livelink?func=ll&objId=3670687&objAction=browse&sort=name
Vienna, 22 November 2012 14
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Who can read the files on livelink? 15
Vienna, 22 November 2012 15
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
WG5 members
If not listed on
livelink:
please ask the
responsible
person of the
national
standardisation
body to be
registered
Per Athos Eckerbom Firm SE
Roberto Canobbio Firm – Design & Fabricator IT
Giorgio Novati University IT
Farid Sahnoune Technical textiles producer FR
Florence Roudot
Odile Caillat
Céline LA ROSA Service national d'ingénierie aéroportuaire FR
Jean-Marc MARION AIA Ingénierie FR
Jean-Christophe THOMAS University Nantes FR
Marc Malinowsky Firm – Design & Engineering FR
Peter Gosling University of Newcastle UK
Clare Price
Nick Gibson Firm – Design & Engineering UK
Sten Nielsen DK
Frank Jensen Firm – Engineering DK
Guy Buyle Laboratory BE
Marijke Mollaert University BE
Bernd Stimpfle Firm – Design & Engineering DE
Natalie Stranghöner, Jörg Uhlemann University DE
Heidrun Balz-Bögner Laboratory DE
Seethaler Markus Firm DE
Gregor Grunwald
Kai-Uwe Bletzinger Technische Universität München DE
Peter Siemens Technical textiles produces DE
Faruk Bilginoglu Technical textiles producer DE
Andreas Schleifer
Markus Balz Firm – Engineering DE
Ramon Sastre Firm – Design & Engineering ES
Juan Monjo-Carrió University ES
Josep Llorenz University ES
Rogier Houtman Firm - Engineering Nl
Vienna, 22 November 2012 16
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Through livelink the national
mirror committees are informed
about the activities of CEN
TC250 WG5
� They receive the mailings
� Access to the work files
Vienna, 22 November 2012 17
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Partial safety factor γf applied on the action effect
EA 1000,000 kN/m EAfactor 1 EAnew 1000,000 kN/m
load q 1,000 kN/m gf 1 1,000 kN/m
gf effect 1,5
L 5,000 m
prestress p 5,000 kN/m gp 1 5,000 kN/m
sag f 0,259 m
R 12,195 m (L**2+4f**2)/8L circular shape
angle 0,413 2asin(L/2R)
arc length 5,036 m angle*R
axial force N 12,195 kN R*p radial load
strain 0,007 (N-p)/EA
arc length 5,036 m L*(1+strain)
0,000 SLS
horizontal force 11,936 kN cos(angle/2)*N F 17,904 kN
Vienna, 22 November 2012 18
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
4
Vienna, 22 November 2012 19
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Preparation of a JRC
background document� Explain why wind loading on
membrane structures is so
specific and complex
Vienna, 22 November 2012 20
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Preparation of a JRC
background document� Explain why wind loading on
membrane structures is so
specific and complex
� Draft = part of the TensiNet
Design Guide with cp values
for specific shapes is used
(annexes A1 and A2)
Vienna, 22 November 2012 21
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Preparation of a JRC
background document� Explain why wind loading on
membrane structures is so
specific and complex
� Draft = part of the TensiNet
Design Guide with cp values
for specific shapes is used
(annexes A1 and A2)
� Review this document +
provide additional
information
� To be compatible with
Eurocode 1991-1-4
Vienna, 22 November 2012 22
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Make a list of source
documents!
Barry Haseltine can review
draft documents
Make sure the draft is
‘accepted’ by CEN TC250
For a JRC publication:
provide a word document,
a template exists, JRC
does the lay-out
Vienna, 22 November 2012 23
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Steve Denton:
Task 1Incorporate the preparation of
Scientific and Technical
Report on membrane
structures in the overall CEN
TC250 work plan (*)
Also the background document
on wind loading on
membrane structures
Task 2Convert (*) into CEN Technical
specifications
Vienna, 22 November 2012 24
EUROCODESMembrane Structures
TensiNet WG Specifications - Eurocode
Materials & analysis
� Round robin 1 - follow-up of
the design procedures
� Round robin 2 - interpretation
of biaxial & shear test data