Cedar Ridge Estates
Green View Realty LLC
Is Pleased to Present:
Application for Comprehensive Permit
40B Residential Development
Hearing Agenda
1. Review of Project Program
2. Wetland Discussion
3. Drainage / Stormwater Management
4. Questions & Answers
Revised Future Hearing Agenda
1. Overview of Project (Tonight)2. Drainage, Stormwater Management, Wetlands
Enhancements, & Site Improvements3. Environmental Issues – History & Proposed
Solutions4. Traffic, Public & Fire Safety5. Utilities – Water Supply & Wastewater Disposal6. Other Regulatory Permitting & Covenants
CEDAR RIDGE ESTATESLocus Plan
Holliston, Massachusetts
Stormwater Management
Deep Sump Catchbasins
Vortechnic Water Quality Systems
Bio-retention Systems (Raingardens)
Vortechnics System
The industry leading system in hydrodynamic separation that utilizes a
combination of vortex motion and flow controls to remove sediment, oil and debris from polluted stormwater runoff.
Consistently Provides 80% TSS Removal
Vortechnics System
Bio-Detention Systems (Constructed Wetlands)
Constructed wetlands are excavated basins with irregular perimeters and undulating bottom contours into which wetland vegetation is purposely placed to enhance pollutant removal from stormwater runoff.Primarily:
A constructed wetland may be use to maximize pollutant removal from stormwater runoff and also help to control stormwater flows.
It may be used to control stormwater flows, with increased pollutant removal capabilities.Secondary:
Preservation and restoration of the natural balance between surface waters and groundwaters, increased wildlife habitats, and higher property values than if the same area was turned in to a regular stormwater basin.
Constructed Wetlands
Questions & Comments
Green View Realty, LLC