cedar park - loopnet · building(sustainable((cedar park the shops at east park medical office...

21
Building Sustainable Cedar Park The Shops at East Park Medical Office & Retail Space William J. Harrell 17300 Henderson Pass, Suite 290 San Antonio, Texas 78232 Office - (210) 499-4242 Cell - (210) 393-6644 Email - [email protected]

Upload: others

Post on 20-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Building  Sustainable    

Cedar Park The Shops at East Park

Medical Office & Retail Space

William J. Harrell

17300 Henderson Pass, Suite 290 San Antonio, Texas 78232 Office - (210) 499-4242 Cell - (210) 393-6644 Email - [email protected]

1.          Project  Overview    ●    Introduc+on    ●    The  Project  Site    ●    About  Cedar  Park    ●    Benefits  of  Tenancy    ●    Project  Responsibili+es  

 2.   Maps,  Renderings  and  Plans  

 ●    Site  Plan  (Phase  1-­‐3)    ●    Rendering,  Eleva+on    ●    Floor  Plan  

 3.   Process  and  Schedule  

 ●    Introduc+on    ●    Suite  Development  Process    ●    Projected  Development  Schedule  

 4.        Building  Shell  Improvements  

 ●    TI  Overview    ●    Shell  Space  Items    ●    Tenant  Improvement  Items  

 5.   Exhibits  

 ●    Tenant  Interest  Survey    ●    LeOer  of  Intent    ●    Preliminary  Design  Ques+onnaire  

Contents

Cedar Park The Shops at East Park

Medical Office & Retail Space

The  Shops  at  East  Park    Project  Overview    IntroducHon  The   Shops   at   East   Park   are   being   developed   in   the   burgeoning   community   of   Cedar   Park,   Texas,   northwest   of  Aus+n.    It  is  a  mul+-­‐phased  development  ini+a+ve  that  will  meet  the  Medical  Office  and  Retail  needs  of  residents  in  this  growing  community.        

Phase  I  will  contain  approximately  9,730  square  feet  of  space  and  will  feature  physician  offices,  restaurant  and  retail  space  to  meet  the  needs  of  the  community.    Phase  II  will  include  an  addi+onal  9,730    square  feet  of  space  similar  to  the  Phase   I   layout.    Phase   III    of  The  Shops  at  East  Park  will   include  9,730  square  feet  of  mixed  medical  office  and  retail  use  as  well.    Upon  comple+on  of  all   three  phases,  project  will   contain  approximately  29,190    square   feet  of  medical  office,   retail,   restaurant  and  day  care   facili+es   in   three  buildings.    The  en+re  project’s  design  will     feature  contemporary   architecture   sustainably     built   with   local   materials   which   will   aid   the   strategic   performance   of  companies   in   retaining   employees,   reducing   absenteeism,   promo+ng   the   organiza+on’s   image,   improving  organiza+onal  produc+vity,  and  reducing  building  opera+ng  costs.    

Leswee  Wong,  AIA,  EDAC,  NCARB,  LEED-­‐AP  Director  of  Healthcare  Planning  &  Design  

Project  Overview  The  Project  Site    The  Shops  at  East  Park  is  uniquely  located  on  the  corner  of  Vista  Ridge  and  East  Park  Street  across  from  Henry  Middle  School,  Vista  Ridge  High  School,  John  Gupton  Stadium    and  Reagan  Elementary  School.    hOp://hms.leanderisd.org/  hOp://vrhs.leanderisd.org/  hOp://www.leanderisd.org/users/0001/docs/Athle+cs/Gupton_map.pdf  hOp://reagan.leanderisd.org/    This  ideal  loca+on  will  be  well  suited  to  medical  doctors  and  tenants  who’s  pa+ents  and  clients  include  families,  children  of  all  ages,  teachers  and  workers.        Medical   marke+ng   efforts   will   target   pediatricians,   pediatric   den+sts,   orthodon+sts,   family   physicians,   general   den+sts,  ophthalmologists,  psychiatrists,  dermatologists,  sports  medicine  and  other  related  medical  specialists  including  veterinarian.    Retail  marke+ng   efforts  will   target   those   retailors   and   service   businesses  which  will  meet   the   needs   of   children,   teachers,  families,  schools  and  the  community.    Businesses  which  will  be  targeted  will  include  but  not  be  limited  to  sit  down  eateries,  counseling   and   guidance   services,   studios   for   art,   dance,   gymnas+cs,   drama,   music   lessons,   hobby   instruc+on,   health   or  physical  fitness  clubs,  driving  schools,  indoor  sports  and  recrea+on,  coffee  shop,  hair  and  nail  care.    As  each  category  is  pre-­‐leased  efforts  will  be  made  to  have  and  maintain  a  well  rounded  Town  Center  able  to  serve  the  needs  of  the  community.  

Project  Overview  The  Project  Site    

Round  Rock  

Downtown  Aus+n  

Bright  Star  Academy  

John  Gupton  Stadium  

Henry  Middle  School  Vista  Ridge  High  School  

Reagan  Elementary  School  

1.  2.  3.  4.  

5.  6.  7.  8.  

Primrose  School  Parmer  Montessori  Academy  SapienHa  Montessori  School  

9.  10.  11.  12..  

Cedar  Park  Montessori  School  Park  Regional  Medical  Center  North  AusHn  Montessori  Brushy  Creek  Montessori  

13.  14.  15.      

Rainbow  StaHon  Rutledge  Elementary  Patsy  Sommer  Elementary  

Vista  Ridge  High  School  1,923  Students  

Henry  Middle  School  1,518  Students  

Reagan  Elementary  School  820  Students  

John  Gupton  Stadium,  SeaHng  10,200  Home  of  Cedar  Park  Timberwolves,    Vista  Ridge  Rangers  and  many  community  events.  

East  Park  St

reet  

Vista  Ridge  

The  Project  Site  

Project  Overview  About  Cedar  Park    Cedar   Park   is   one   of   the   fastest-­‐growing   suburbs   in   America   according   to   Forbes   magazine,   and   it’s   no   wonder   why.    Located  just  17  minutes  from  downtown  AusHn,  Texas,  this  city  has  grown  by  more  than  400%  in  the  last  decade.    Now  the  third  largest  city  in  the  AusHn  area  with  a  populaHon  exceeding  54,000  within  its  city  limits,  the  City  of  Cedar  Park  a\racts  residents  from  all  over  the  globe  because  of  its  unique  charm,  close  proximity  to  AusHn  and  the  Texas  Hill  Country,  and  the  beauty  surrounding  the  Lower  Colorado  River  Lake  System.    Cedar  Park  has  860  acres  of  park  space  and  has  been  named  one  of  the  “Top  Ten  Places  to  Raise  a  Family”  by  Family  Circle  magazine.    There  is  truly  something  for  everyone  here.    If  you  like  hiking,  bicycling  ,  water  sports,   live  music,  fine  wine,  great  food,  shopping,  or  any  other  acHvity,  you  will  find  it   in  or  very  close  to  Cedar  Park.    Cedar  Park   is   located  in  the  exemplary-­‐rated  Leander   Independent  School  District,  and  is  home  to  the  AusHn  Community  College   Cypress   Creek   campus.     There   are   other   insHtuHons   for   higher   learning   located   near   Cedar   Park   including   the  University  of  Texas  at  AusHn,  Concordia  University,  Southwestern  University  Georgetown,  Huston-­‐Tillotson  University,  St.  Edward’s  University,  Texas  A&M  Health  Sciences  Center,  and  Texas  State  University  Round  Rock  Campus.    More  than  two-­‐thirds  of  Cedar  Park  ciHzens  have  at   least  some  college  educaHon  and  nearly  half  hold  a  four-­‐year  degree  or  be\er.    The  largest  porHon  of  our  populaHon  is  under  the  age  of  40  years  old  and  the  median  household  income  is  $74,156.  

     1  mile  3  mile  5  mile  2012  Average  Household  Income  $119,408  $104,329  $93,986  2012  Total  Housing  Units    1,736  19,899  65,599  2012  Popula+on    5,050  51,778  174,785    

Project  Overview  Benefits  of  Tenancy    We  spend  over  90  percent  of  our  lives  indoors.    Buildings  either  can  be  the  cause  of  illness  or  consciously  designed  and  built  in  ways  that   contribute   to  beOer  health.     Buildings   are  one  of   the  heaviest   consumers  of   natural   resources   and  energy   and  account   for  significant  co2  emissions  and  electricity  consump+on.    Green  buildings,  on  the  other  hand,  can  be  designed  to  consume  less  energy  and  water,  which  in  turn  can  lower  opera+ng  and  maintenance  costs,   lead  to  higher  occupant  sa+sfac+on,  and  lower  greenhouse  gas  emissions.    So,  as  the  building  owner,  we  want  to  provide  you  a  place  to  be  healthy  and  efficient.  

Sustainable  Building  

Following  are  some  of  the  sustainable  strategies  we  are  implemenHng  for  our  buildings:    ●    Day  ligh+ng:    Increase  interior  environmental  quality  and  decrease  electric  ligh+ng  use  by  having  good  fenestra+on.  ●    Solar  Control:    Minimize  peak  loads  for  cooling  and  increase  thermal  comfort.    Use  solar  energy  for  site  and  building            exterior  ligh+ng.    Reduce  light  pollu+on.  ●    High  performance  envelope:    Balance  heat  loss  and  radiant  comfort  with  thermal  performance  by  using  a  high              performance  Low-­‐E  insulated  glass  system.    Air  +ght  construc+on  and  moisture  control.      ●    Energy-­‐efficient  building  system:    The  building  envelope  will  be  air  +ght  with  a  high  insula+ve  value,  which  is              preven+ng  thermal  bridges  and  excessive  solar  gain.  ●    Low  VOC  materials:    The  building  features  low  VOC-­‐emimng  materials,  including  paint,  sealants  and  adhesives  for              +les,  and  panels.  ●    Water  efficiency:    Recycled  condensate  and  roof  rainwater  storage  for  irriga+on.    Implement  high  efficiency  plumbing              fixtures.  ●    Recycled  and  regional  materials:    A  large  por+on  of  the  material  on  the  building’s  exterior  will  be  made  of  recycled              materials.    Most  of  the  building  materials  will  be  regional  materials,  like  limestone,  boulders  and  stucco.  ●    Heat  island  reduc+on:    Use  of  a  modified  bitumen  roofing  system  with  white  sheet  topping  to  reduce  heat  gain.    Parking  lot            is  well  screened  with  trees  and  shrubbery.  ●    Site  strategies:    Filtra+on  and  deten+on  of  storm  water  runoff  to  reduce  storm  water  impact.                Dedicated  outdoor  areas  of  respite  for  staff  and  occupants.  ●    Waste  reduc+on:    Reduce  landfill,  recycle  and  reuse  construc+on  waste  material.                Use  regional  landscaping  or  drought  tolerant  plan+ng.  ●    Design,  construc+on,  and  opera+ons:    Op+mize  efficiency  on  planning  and  layout.  ●    Leadership:    Healthier  Building  Ini+a+ve.  ●    Environmental  stewardship:    Improve  environmental  quality.  

Project  Overview  Benefits  of  Tenancy    Key  Concepts:    ●    The  right  amount  of  ligh+ng  and  controllable  temperature  will  enhance  people  comfort  and  produc+vity.  ●    Supply  occupant’s  access  to  daylight,  windows,  and  contact  with  nature  to  provide  significant  physical  and              psychological  benefits  and  improve  job  sa+sfac+on.  ●  Good  indoor  air  quality  and  controlled  moisture  in  the  building  infrastructure  can  reduce  exposure  to          indoor  pollutants,  and  increased  energy  efficiency.  

How  can  sustainability  benefit  your  organizaHon?      Economic  Benefits:    •   Reduce  opera+ng  costs  •   Reduced  risk  brings  decreased  insurance  premiums  •   Easier  Hiring  of  the  Best  Talent  •   Higher  Reten+on  of  Top  Talent  •   Increases  Employee  Produc+vity  

Health  Benefits:  • Reduce  air  pollu+on  that  originates  from  the  building  itself  or      people  commu+ng  to  the  facility.  •   Use  of  fewer  toxic  materials  • Health  benefits  to  pa+ents,  staffs,  and  visitors  from  natural  ligh+ng.  

   

Project  Overview  Project  ResponsibiliHes    The  developer  will  oversee  all  aspects  of  project  development  and  management  as  outlined  below:    

 ●    Conduct  pre-­‐leasing    ●    Secure  construc+on  and  permanent  financing    ●    Guarantee  project  financing  when  required  by  lenders    ●    Oversee  and  coordinate  building  shell  design  and  development    ●    Oversee  and  coordinate  tenant  suite  design  and  development  (services  available  if  needed)    ●    Oversee  and  coordinate  the  development  team,  including:    general  contractor,  architects,    

                                                       engineers,  suite  planners  and  designers  (if  needed)    Tenant  responsibili+es  include:    

 ●    Signing  7-­‐10    year  leases    ●    Responding  with  suite  design  input  and  approvals  in  a  +mely  fashion  (if  needed)    ●    Contribu+ng  addi+onal  funds  for  interior  improvements  in  excess  of  the  TI  allowance    

                                                       provided  by  developer,  if  required  to  meet  tenant  specifica+ons.  

Master  Plan  –  Site  Plan  

Phase  I  

Phase  2  

Phase  3   Leased  

Leswee  Wong,  AIA,  EDAC,  NCARB,  LEED-­‐AP  Director  of  Healthcare  Planning  &  Design  

Building  Exterior  Design  -­‐  Rendering  

Building Sustainable Sustainable means not just Green, but also Livable.

Leswee  Wong,  AIA,  EDAC,  NCARB,  LEED-­‐AP  Director  of  Healthcare  Planning  &  Design  

Process  and  Schedule  IntroducHon    Establishing  early  and  frequent  communica+on  with  prospec+ve  tenants  who  are  interested  in  leasing  space  in  our  project  is  of  great  importance….long  before  ground  is  broken,  while  we  are  working  with  the  architect  to  develop  the  building’s  design.    In  this  way,  we  can  ensure  the  facility  is  designed  with  input  from  the  tenants  who  will  be  there.        Accordingly,  we  will  want  to  gain  insight  from  you  about  such  topics  as:    

 ●    Your  prac+ce’s  present  and  planned  volume  and  an+cipated  space  needs    ●    Complementary  physician  specialists  you  would  like  to  see  in  the  building    ●    Ameni+es  that  would  appeal  to  your  pa+ents  and  staff  

 We  intend  for  each  project  we  develop  to  be  the  premier  facility  in  the  area,  offering  ameni+es  and  services  not  found  in  compe+ng  buildings.    This  aOen+on  to  detail  and  communica+on  in  the  early  stages  of  the  design  and  construc+on  process  ensures  +mely,  efficient  and  professional  comple+on  of  our  development  projects.    

Process  and  Schedule  Suite  Development  Process  

Owner    Collects  Le\er  of  Intent  and  Deposit  from  Physicians  and/or  Tenant  

Owner  and  Tenant  Execute  Lease  Agreements  Owner  Obtains  a  Conceptual  Space  Plan  

Owner  Obtains  Suite  Design  and  Preliminary  ConstrucHon  Budget  

Tenant  Completes  a  Preliminary  Design  QuesHonnaire  

Owner  Obtains  ConstrucHon  Documents  and  Final  Suite  ConstrucHon  Budget  

Owner  and  Tenant  Execute  any  Lease  Amendments  

Owner  Obtains  Suite  Building  Permit  

Owner  Coordinates  Suite  ConstrucHon  

Lease  Commencement  Date  

Occupancy  

Tenant  Pays  Excess  ConstrucHon  Costs  (if  necessary)  

Tenant  Selects  All  Suite  Finishes    

Tenant  Approval  

Tenant  Approval  

20%  Walk  Through  By  Tenant    

ConstrucHon  Budget  Revised  for  Change  Orders  (if  necessary)    

Punch  List  –  Tenant  Pays  Excess  ConstrucHon  Costs  For  Change  Orders  (if  necessary)    

Tenant  Obtains  Suite  Design  and  Preliminary  ConstrucHon  Budget  

Tenant  Obtains  ConstrucHon  Documents  and  Final  Suite  ConstrucHon  Budget  

VREP  Approval  

Tenant’s  RepresentaHve  Obtains  Suite  Building  Permit  

Tenant’s  RepresentaHve  Coordinates  Suite  ConstrucHon    

VREP  Approval  

Lease  Commencement  Date  

Occupancy  

Tenant  Designs  and  Builds  Their  Own  Suite  

VREP  Designs  and  Builds  Tenants  Suite    

Legend  

Building  Shell  Improvements  TI  Overview    Development  projects  are  built  with  two  components:    shell  space  and  tenant  improvements  (TIs).    Shell  space  typically  includes    finishes  to  the  envelope  of  the  building  and  to  the  floor  (but  not  the  suite)  level,  all  funded  by  the  Landlord  as  part  of  its  development  cost.    TIs  includes  finishes  inside  tenant  suites  as  well  as  connec+ons  to  various  building  services  that  have  been  brought  to  the  floor  level  during  construc+on  of  the  shell.  

Building  Improvements  Shell  Space  Items    In  typical  medical  office  and  retail  space  development,    “shell  space”  includes  such  items  as:  

 ●    Project  site  work  and  building  access    ●    Main  building  architectural  and  engineering  costs  and  permimng  fees    ●    The  building  envelope:    exterior  walls,  windows,  and  roof    ●    Building  signage  (exterior  monument  and  direc+onal  signage)    ●    Roof  and  exterior  wall  insula+on    ●    Building  systems:    Main  service  line  for  Electrical  and  Plumbing.      ●    Plumbing  risers  at  appropriate  loca+ons  throughout  the  building  to  which  tenants  connect  for              plumbing  in  their  suites  (as  part  of  TI  expense)    ●    Water  service  to  the  floor  to  which  tenants  connect  for  water  service  in  their  suites    

                                                       (as  part  of  TI  expense)    ●    Main  Electrical  panel  and  disconnect  for  tenants  to  connect  for  electrical  service  in  their      

                                                       suites  (as  part  of  TI  expense)    ●    Sprinkler  system  –  main  riser  to  which  tenants  connect  for  branch  distribu+on  of  sprinklers  in    

                                                       their  suites  (as  part  of  TI  expense)    ●    Telecom  service  to  the  building  (cabling  to  individual  suites  is  part  of  TI  expense)  

Tenant  Improvements  Tenant  Improvement  Items    In  the  same  typical  medical  office  and  retail    space  development,  “tenant  improvement”  includes  such  items  as:  

 ●    Individual  suite  architectural  and  engineering  costs    ●    Permimng  costs  for  the  individual  suite  (municipal  fees  based  on  a  percentage  of  suite    

                                                       construc+on  cost)    ●    Plumbing  and  water  service  distribu+on  from  floor  level  to  suite  and  rooms    ●    Plumbing  fixtures  and  installa+on    ●    Electrical  distribu+on  from  main  panel  on  floor  to  suite  and  rooms    ●    Electrical  fixtures  and  installa+on    ●    Roof  top  unit(s)  for  HVAC  installa+on  to  suite  and  rooms    ●    HVAC  fixtures  and  installa+on    ●    Sprinkler  distribu+on  from  main  riser  at  floor  to  suite  and  rooms    ●    Sprinkler  heads  and  installa+on    ●    Telecom  cabling  from  main  floor  wiring  to  suite  and  rooms    ●    All  drywall  inside  the  suite    ●    Doors,  frames  and  hardware  inside  the  suite    ●    Millwork  (wood)  and  casework  (laminate)  cabinets  and  trim    ●    Paint,  wall  coverings,  flooring,  ceiling  grid  and  +les    ●    Specialty  accents:    toilet  accessories,  mirrors  and  sliding  glass  doors    ●    Specialized  needs:    medical  gas,  extra  structural  support  for  heavy    

                                                       equipment  or  files,  dedicated    circuits,  sound  insula+on,  etc.    ●    Suite  signage  

Tenant  Improvements  -­‐  conHnued  Tenant  Improvement  Items    As  part  of  the  lease  transac+on,  the  Landlord  will  provide  a  “TI  allowance”  –  an  amount  of  money  per  rentable  square  foot  leased  –  to  be  used  by  each  new  tenant  towards  finish-­‐out  of  his  or  her  suite.    The  TI  allowance  typically  compares  very  favorably  with  other  developers  in  the  market  who  offer  TI  allowances  for  finish-­‐out  of  medical  and  retail  space.    The  TI  allowance  may  or  may  not  cover  the  en+re  cost  of  the  tenant’s  finishes.    Factors  that  can  escalate  TI  expense  include  the  amount  of  millwork,  casework,  cabinetry  and  plumbing  desired  by  the  tenant;  and  the  grade  level  of  flooring,  wall  coverings  and  accents  chosen.    The  single  most  important  ac+on  a  tenant  can  take  to  gain  the  most  value  in  a  TI  allowance  is  to  sign  his  or  her  lease  early.    The  reason  is,  (if  you  choose  the  same  builder  as  the  Landlord  for  the  building  shell)  TIs  can  be  bid  in  volume  as  part  of  the  ini+al  bid  package  on  the  building  shell  and  there  can  be  as  much  as  a  15%-­‐20%  efficiency  effect  gained.      Finally,  there  are  other  expenses  a  tenant  will  need  to  consider,  which  are  neither  shell  nor  TI  costs  but  which  you    will  typically  incur  to  make  your  office  fully  opera+onal.    Such  items  include  telephones,  computers,  furniture,  medical  equipment  and  examina+on  tables.    Restaurants  would  be  kitchen  equipment,  tables  and  chairs.  

The  Shops  at  East  Park    Vista  Ridge  &  Park  Lane  Cedar  Park,  TX  78613  

 AMENITIES  ●    Located  at  the  main  intersec+on  serving  the  Silverado  Ranch  and  Forest  Oaks  Master  Planned  Communi+es  ●    Walking  distance  to  Henry  Middle  School,  Vista  Ridge  High  School,  Reagan  Elementary  and  John  Gupton  Stadium    SIZE  ●    Approximately  29,190    square  feet  of  neighborhood  medical  office  and  retail  space      (Phase  I  -­‐    9,730  square  feet)  

 AVAILABLE  ●    Suite  sizes  available  from  1,500  to  9,730  square  feet    LEASE  RATE  ●    $22.00  per  square  foot  per  year    NNN  ●    $9.00  per  square  foot  es+mated  for  2014    TI  Allowance  ●    $35.00  per  square  foot  

Leswee  Wong,  AIA,  EDAC,  NCARB,  LEED-­‐AP  Director  of  Healthcare  Planning  &  Design  

William J. Harrell

17300 Henderson Pass, Suite 290 San Antonio, Texas 78232 Office - (210) 499-4242 Cell - (210) 393-6644 Email - [email protected]

The Shops at East Park Medical Office & Retail Space

Building  Sustainable    

Contact Information:

William J. Harrell

17300 Henderson Pass, Suite 290 San Antonio, Texas 78232 Office - (210) 499-4242 Cell - (210) 393-6644 Email - [email protected]