cedar mountain septic system suitability studymicrosoft powerpoint - may.ppt created date: 7/13/2006...

24
Cedar Mountain Septic System Cedar Mountain Septic System Suitability Study Suitability Study Kristin May

Upload: others

Post on 25-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Cedar Mountain Septic System Cedar Mountain Septic System Suitability StudySuitability Study

Kristin May

Page 2: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Location

• Southern Utah, East of Cedar City

• Located in Garfield and Kane Counties

• Near Duck Creek Village, Mammoth Creek, and Panguitch Lake

P a n g u i t c hL a k e

D u c k C r e e kV i l l a g e

Cedar City

St. George

Salt LakeCity

Project Area

Page 3: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

NeedNeed

•• State and County officials concerned that State and County officials concerned that septic system density is reaching a critical septic system density is reaching a critical levellevel

•• Development occurring on small building lots, Development occurring on small building lots, with individual septic systemswith individual septic systems

•• Construction of a culinary water systemConstruction of a culinary water system

Page 4: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

NeedNeed

•• Part of the Markagunt PlateauPart of the Markagunt Plateau

•• Contributes to 3 river systemsContributes to 3 river systems•• Cold CreekCold Creek•• Sevier RiverSevier River•• Virgin RiverVirgin River

•• River systems relied upon for agriculture and River systems relied upon for agriculture and culinary water useculinary water use

Page 5: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

NeedNeed•• Two major contamination concerns resulting Two major contamination concerns resulting

from septic system malfunctions are:from septic system malfunctions are:

•• Disease producing organism (pathogen) Disease producing organism (pathogen) contaminationcontamination

•• High nitrate (NOHigh nitrate (NO33--) levels) levels

•• Maintain purity of ground and surface water Maintain purity of ground and surface water

•• No widespread problem currently, but No widespread problem currently, but problems have been identified in the pastproblems have been identified in the past

Page 6: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ProblemsProblems

Proper septic system function Proper septic system function limitations include:limitations include:

•• insufficient soil depthinsufficient soil depth•• excessive slopeexcessive slope•• floodingflooding•• percolation rate that is either too fast or too percolation rate that is either too fast or too

slowslow

Page 7: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ProblemsProblems

•• Percolation rate measured on site using the Percolation rate measured on site using the ““PercPerc”” test by certified soil testertest by certified soil tester

•• Few perc tests fail, despite apparent poor site Few perc tests fail, despite apparent poor site conditionsconditions

Page 8: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ObjectivesObjectives

1)1) Measure the percolation rate of the soils in Measure the percolation rate of the soils in selected areas on Cedar Mountain selected areas on Cedar Mountain

2)2) Assess the suitability of these soils as an Assess the suitability of these soils as an absorption and percolation medium for septic absorption and percolation medium for septic systems absorption fieldssystems absorption fields

3)3) Create a soil suitability map for the areas of Create a soil suitability map for the areas of interest on Cedar Mountaininterest on Cedar Mountain

Page 9: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Areas of ConcernAreas of Concern

Page 10: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

MethodMethod

•• 260 measurements taken at 88 different 260 measurements taken at 88 different sites all on undisturbed Dixie National sites all on undisturbed Dixie National Forest landForest land

•• Measurements were taken at a confining Measurements were taken at a confining layer, like an argillic layer or most often layer, like an argillic layer or most often bedrockbedrock

Page 11: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

MethodGuelph Permeameter

• Made of high impact polycarbonate

• Inner and outer reservoir

• Creates a vacuum

• Borehole is a 2 inch cylindrical hole

Page 12: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Method

• Measure steady-state rate of water recharge in unsaturated soil

• Constant head of water is maintained at 5 and 10 cm

• Calculations made to determine hydraulic conductivity, soil sorptivity, and soil matrix flux potential

• For this Study only focused on the hydraulic conductivity

Page 13: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Guelph Permeameter

Advantages

• Portability

• Speed of measurements (2 to 3 hours per site)

• More repetitions per day than any other Ksat measurement technique

Disadvantages

• Relatively small surface area being measured

• Affected by soil heterogeneity

Page 14: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ResultsResults•• Percolation rates were slower than the allowed Percolation rates were slower than the allowed

(60 min/in) at 21 sites(60 min/in) at 21 sites

•• No sites exceeded the maximum rate of 1 No sites exceeded the maximum rate of 1 min/inmin/in

•• 26 of the 88 sites had a representative value 26 of the 88 sites had a representative value within the allowable limit, but had a range within the allowable limit, but had a range slower than the allowable limitslower than the allowable limit

Page 15: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ResultsResults

•• Ksat increased with clay percentKsat increased with clay percent

•• Soil structure plays a significant but often Soil structure plays a significant but often understated roleunderstated role

•• Rodent burrows, hollow root channels, or Rodent burrows, hollow root channels, or other macro pores affected the resultsother macro pores affected the results

Page 16: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Results

• Raise allowable limit from 60 min/in to 120 min/in

• Passing sites increased from 42 sites to 62 sites

Page 17: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ConclusionsConclusions

•• Slow percolation increase likelihood that Slow percolation increase likelihood that untreated effluent can resurface due to:untreated effluent can resurface due to:•• Capillarity (unsaturated)Capillarity (unsaturated)•• PondedPonded ((saturdatedsaturdated))•• Laterally on a slowlyLaterally on a slowly--permeable layer permeable layer

(lateral flow)(lateral flow)

•• After resurfacing, effluent can contaminate After resurfacing, effluent can contaminate surface water and groundwatersurface water and groundwater

Page 18: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ConclusionsConclusions

•• No sites exhibited Ksat that was too fastNo sites exhibited Ksat that was too fast

•• Resulting in contamination due to effluent Resulting in contamination due to effluent moving though the soil substrate too quicklymoving though the soil substrate too quickly

•• Data indicates that a properly installed septic Data indicates that a properly installed septic system may not pose a threatsystem may not pose a threat

Page 19: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

ConclusionConclusion

•• Measurements only applicable for the layers Measurements only applicable for the layers where they were takenwhere they were taken

•• No means of mechanical digging were No means of mechanical digging were employedemployed

•• Mechanical disturbance could open up Mechanical disturbance could open up fractures in bedrock creating very fast fractures in bedrock creating very fast percolation ratespercolation rates

Page 20: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

M a m m o t h C r e e k

P a n g u i t c hL a k e

Legend

Slope<25%

>25%

Permeability

Depth to bedrock

Flooding

1 0 10.5 Miles

1:69,414

Page 21: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Sw

ai n

s C

r ee

k

S t r a wb

e r r y Cr e e k

D u c k C r e e kV i l l a g e

Legend

Slope<25%

>25%

Permeability

Depth to bedrock

Flooding

1 0 10.5 Miles

1:65,000

Navajo Lake

Page 22: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM
Page 23: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

M a m m o t h C r e e k

P a n g u i t c hL a k e

Legend

Slope<25%

>25%

Permeability

Depth to bedrock

Flooding

1 0 10.5 Miles

1:69,414

Page 24: Cedar Mountain Septic System Suitability StudyMicrosoft PowerPoint - may.ppt Created Date: 7/13/2006 11:09:25 AM

Sw

ai n

s C

r ee

k

S t r a wb

e r r y Cr e e k

D u c k C r e e kV i l l a g e

Legend

Slope<25%

>25%

Permeability

Depth to bedrock

Flooding

1 0 10.5 Miles

1:65,000

Navajo Lake