STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above) Sr. No Tender No. Item /nature of work Mode of tender Dt. of publication of NIT Types of bidding ( single /two bid system ) Last date of receipt of tender Nos. of tenders received Nos. and name of parties qualified after technical evaluation Nos. & names of parties not qualified after technical evaluation Whether contract awarded to lowest tenderer evaluated L1 Contract No. & date. Name of contractor. Value of contract (In Crores /Lakhs) Scheduled date of completion of supplies. Actual date of start of work Actual date of completion Remarks/ Reason for delay if any, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 CE/C/I-JP Dy. CE/C/I-JP 1 Dy.CE/C/ GC/2012 /T-28 Residual earth work in bank, Cutting and lead bank utilising cut spoils for widening construction of BG formation including side drains, trolley refuses, cess wall etc. and other ancillary works between Sikar(Incl.)-Loharu (Incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project. Open tender 11.7.12 Single Packet system 14.08.12 02 - - yes 19/NWR/Dy. CE/C-GC/JP /2012- 13/JP-SIKR- CUR & SIKR- LHU dt. 21.12.12 M/s BharwalLal Bijarnia, JaulsaKua Road, Near Tagore B. Ed. College, Tegore Nagar, Kuchaman City, Distt. Nagour. 119.22 Lakhs 03.01.13 Ext. 30.08.15. 21.09.2012 31.8.15 Final bill under process. 2 Dy. CE /C/ GC/NWR/ 2012/T- 24R-1 Construction including Fabrication of FOBs and platform shelters in SIKAR-LOHARU section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project. Open tender 10.12.12 Single Packet system 11.01.13 06 - - Yes 28/ NWR/Dy. CE/C-GC/JP /2012- 13/JP-SIKR- CUR & SIKR- LHU dt. 27.07.13 M/s Rishab Construction (Pvt.) Ltd. 53-54, Shopping Centre, Janata Colony, Jaipur 695.22 Lakhs 07.10.13 Ext. 28.02.15. 05.04.13 28.02.15 Contractor sign final bill under protest 3 Dy. CE /C/ GC/NWR/ 2014/T- 48R Construction of toe wall, Pitching on high bank, Road works, construction of Over Head water Tank at Jhunjhunu &Chirawa and other misc. works from Jhunjhunu (incl.) to Loharu (incl.) required for successful commissioning of the Jhunjhunu-Loharu section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project. Open tender 17.01.15 Single Packet system 17.02.15 05 - - Yes 38/ NWR/Dy. CE/C-GC/JP /2015- 16/JP-SIKR- CUR & SIKR- LHU dt. 10.06.15. M/s Jai Mata Di Energy Systams, V. P. O. - Narodara, Teh. - Laxmangarh, Distt.- Sikar (Raj) 323.78 Lakhs 10.09.15 Ext. 30.9.16 18.4.15 30.9.16 Final bill under process. 4 Dy. CE /C/ GC/ NWR/ 2014/T- 51R Construction of 44 Nos. of Type –II quarters (8 Nos. at Nua Railway Station, 18 Nos. at Jhunjhunu Railway Station & 18 Nos. at Chirawa Railway Station) and other related works in Open tender 23.3.15 Single Packet system 23.4.15 06 - - - 41/ NWR/Dy. CE/C-GC/JP /2014- 15/JP-SIKR- CUR & SIKR- LHU dt. 23.10.15. M/s V. K. Construction Co., 2 D 37, Jawahar Nagar, Shri Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015

Upload: truongnhi

Post on 11-Mar-2018

236 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1

CE/C/I-JP Dy. CE/C/I-JP

1 Dy.CE/C/

GC/2012

/T-28

Residual earth work in

bank, Cutting and lead

bank utilising cut

spoils for widening

construction of BG

formation including

side drains, trolley

refuses, cess wall etc.

and other ancillary

works between

Sikar(Incl.)-Loharu

(Incl.) stations of

Sikar- Loharu section

in connection with

Jaipur-Sikar-Loharu &

Sikar-Churu GC

project.

Open

tender

11.7.12 Single

Packet

system

14.08.12 02 - - yes 19/NWR/Dy.

CE/C-GC/JP

/2012-

13/JP-SIKR-

CUR & SIKR-

LHU dt.

21.12.12

M/s BharwalLal

Bijarnia,

JaulsaKua Road, Near

Tagore B. Ed. College,

Tegore Nagar,

Kuchaman City,

Distt. Nagour.

119.22

Lakhs

03.01.13

Ext.

30.08.15.

21.09.2012 31.8.15 Final bill

under

process.

2 Dy. CE

/C/

GC/NWR/

2012/T-

24R-1

Construction including Fabrication of FOBs and platform shelters in SIKAR-LOHARU section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project.

Open

tender

10.12.12 Single

Packet

system

11.01.13 06 - - Yes 28/

NWR/Dy.

CE/C-GC/JP

/2012-

13/JP-SIKR-

CUR & SIKR-

LHU dt.

27.07.13

M/s Rishab

Construction (Pvt.)

Ltd.

53-54, Shopping

Centre,

Janata Colony,

Jaipur

695.22

Lakhs

07.10.13

Ext.

28.02.15.

05.04.13 28.02.15 Contractor

sign final bill

under

protest

3 Dy. CE

/C/

GC/NWR/

2014/T-

48R

Construction of toe

wall, Pitching on high bank, Road works, construction of Over Head water Tank at Jhunjhunu &Chirawa and other misc. works from Jhunjhunu (incl.) to Loharu (incl.) required for successful commissioning of the Jhunjhunu-Loharu section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project.

Open

tender

17.01.15 Single

Packet

system

17.02.15 05 - - Yes 38/

NWR/Dy.

CE/C-GC/JP

/2015-

16/JP-SIKR-

CUR & SIKR-

LHU dt.

10.06.15.

M/s Jai Mata Di

Energy Systams,

V. P. O. - Narodara,

Teh. - Laxmangarh,

Distt.- Sikar (Raj)

323.78

Lakhs

10.09.15

Ext.

30.9.16

18.4.15 30.9.16 Final bill

under

process.

4 Dy. CE

/C/ GC/

NWR/

2014/T-

51R

Construction of 44 Nos. of Type –II quarters (8 Nos. at Nua Railway Station, 18 Nos. at Jhunjhunu Railway Station & 18 Nos. at Chirawa Railway Station) and other related works in

Open

tender

23.3.15 Single

Packet

system

23.4.15 06 - - - 41/

NWR/Dy.

CE/C-GC/JP

/2014-

15/JP-SIKR-

CUR & SIKR-

LHU dt.

23.10.15.

M/s V. K. Construction

Co.,

2 D 37, Jawahar

Nagar,

Shri Ganganagar -

335001

926.07

Lakhs

30.04.17

Ext.

30.9.17

05.09.2015

Page 2: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2

connection with Gauge conversion of Sikar- Loharu section

5 NWR/S&

C/T-60

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications on cess along the track in

Sikar - Churu section and at temporary ballast depot at Laxmangarh Sikar station & Rashidpur Khori Halt station on Sikar - Churu section and Loading in Railway Hoppers in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Open

tender

29.6.15 Two bid

system

19.8.15 04 1.

M/s YSCC

NKA (JV)

299/8 Alwar

Road Bya

pass, Sohna,

Disstt.

Gurgoa.

01 (One)

M/s YSCC

NKA (JV)

299/8

Alwar Road

Bya pass,

Sohna,

Disstt.

Gurgoa

Yes NWR/S&C/C

A/ 146, dt.

15.12.2015.

M/S J.K.Construction

Co., New market,

Naya bazar Nokha,

Bikaner Raj

1456.15

Lakhs

18.4.2017

Ext.

31.8.17

28.10.2015

6 NWR/SC/

JP-RGS-

CHURU/

CIVIL-

1011405

02

Dismantling of existing MG track, Laying and linking of Broad gauge main line, looplines / Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Zone-I (Km. 0.00 to Km. 48.70), including Sikar, Laxmangarh Sikar & Fatehpur shekhawati yards in Sikar -Churu section in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project.

Open

tender

28.8.15 Single

Packet

system

30.9.15 05 - - - 42/

NWR/Dy.

CE/C-GC/JP

/2014-

15/JP-SIKR-

CUR & SIKR-

LHU dt.

26.12.15.

M/s ISC Project Pvt.

Ltd.,

“S-2,” The Meropole,

Adjacent to INOX,

Bund Garden Road,

Pune – 411 001

948.07

Lakhs

08.5.2017

Ext. 31.8.17

12.11.15

7 NWR/SC/

JP-RGS-

CHURU/

CIVIL-

1011405

05

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines / Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Zone-II (Km. 48.70 to Km. 90.46), including Ramgarh

Open

tender

15.9.15 Single

Packet

system

19.10.15 02 - - - 45/

NWR/Dy.

CE/C-GC/JP

/2015-

16/JP-SIKR-

CUR & SIKR-

LHU dt.

22.02.16.

M/s

BhanwarLalBijarnia,

Village -Rajpura,

Post- Prewari, Teh-

Nawa, Distt.- Nagaur

808.49

Lakhs

11.5.2017

30.9.17

20.11.15

Page 3: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

3

shekhawati, Bissau & Churu yards in Sikar -Churu section in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project.

8 NWR/SC/

JP-RGS-

Churu/

Civil-

1011411

01

Earth work in filling and cutting in bank for making BG formation,

supplying and laying Blanketing material on new bank/diversion, Construction of station building, Platforms, trolley refuses, ballast wall, construction of Over Head water Tank at Fatehpur shekhawati & Lachhmangarh sikar stations, Fabrication & erection of Platform shelters /Small shelters and other misc. works from Sikar (incl.) to Churu (incl.) in connection with SIKR-CUR Gauge Conversion.

Open

tender

10.8.15 Two bid

system

15.9.15 06 Yes NWR/S&C/C

A/ 151, dt.

15.02.2016.

M/s Prem Fabricators

Plot No. 426, Near

Jyoti Power,

B/H Steel Town,

Moriya

Changodar,

Ahmedabad.

2472.03

Lakhs

10.06.17

Ext.

15.7.17

11.12.15

9 DY.

CE/C/GC

/NWR/20

15/T-55

Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site using Mobile Flash Butt Welding Plant in Jaipur –Sikar - Churu section in connection with Jaipur – Sikar – Loharu & Sikar – Churu GC project.

Open

tender

29.6.15 Single

Packet

system

20.08.15 03 - - - 46/

NWR/Dy.

CE/C-GC/JP

/2016-

17/JP-SIKR-

CUR & SIKR-

LHU dt.

22.09.2016.

M/s Navketan Pvt.

Ltd., 1 A. J. C. Bose

Road, Kolkata – 700

020.

814.56

Lkahs

22.12.17 25.5.2016

10 NWR/SC/

JP-SIKR-

CHURU/

Civil/101

3000100

3

Construction of Road under Bridge / Limited Height Sub-Way in lieu of 24 Nos. level crossing in Sikar-DundlodMukandgarh Section & 16 Nos. level crossing and 4 Nos. Balancing culverts in Sikar – Laxmangarh Sikar Section.

Open

tender

21.11.15 Two bid

system

23.12.15 06 01 M/s

Gurukrupa

Kalyan JV

2A,2nd

Floor,Navn

ath Soc-2,

B/H,

Shradhade

ep Soc, Nr.

Sharda

School,

Singanpor-

Causway

Road,

Surat-

395004.

Yes NWR/S&C/

CA/153, Dt.

15.6.2016

M/s AE-MHK (JV)

First Floor, Divine

India Building, Near

R.T.O Office, By Pass

Road, Post-Savgadh

(Panpur),

Himmatnagar-383001

Dist. S.K. (Gujarat).

6363.98

Lakhs

22.3.2018 1.5.2016

Page 4: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

4

11 NWR/SC/

JP-SIKR-

CHURU/

Civil/101

3000100

4

Construction of Road under Bridge / Limited Height Sub-Way in lieu of 33 Nos. level crossing and 4 Nos. of Bridges along with 7 Nos Balancing culverts in Laxmangarh Sikar - Churu Section.

Open

tender

21.11.15 Two bid

system

23.12.15 03 - - Yes NWR/S&C/

CA/154, Dt.

23.6.2016

M/s Supreme - Modi

(JV) 9, Leela Mansion,

Raj Bhawan Road,

Civil Line - Jaipur

302006

5876.06

Lakhs

22.3.2018 24.3.16

12 NWR/SC/

JP-RGS-

Churu/

Civil-

1011418

06

Construction of 60 nos staff quarters in Sikar-Churu section, Construction of running room at CUR, construction of PF & PF shelters & extension of FOB, RCC OH tank and other miscellaneous Civil work at Sikar, Civil works related to L-xings and related Electric works in Sikar-Churu section and other ancillary works in connection with SIKR-CUR Gauge Conversion project.

Open

tender

26.2.16 Two bid

system

30.3.16 04 01 M/s

Rajendra

Singh

Bhamboo

Infra Pvt.

Ltd. 108,

First Floor,

Neel kanth,

Neelkanth

Building ,

Gandhipath

, Vaishali

Nagar,

Jaipur

yes NWR/S&C/

CA/159, Dt.

28.9.2016

M/s Gurukrupa

Enterprises,

2A,2nd Floor,Navnath

Soc-2

B/H,

ShradhadeepSoc,

Nr. Sharda School,

Singanpor-Causway

Road, Surat

1948.67

lakhs

15.9.2017 18.7.16

13 NWR/SC/

JP-RGS-

Churu

/Civil-

1011405

07

Providing in situ Glued joints of G-3 (L) type as per RDSO drawings for 60 kg & 52 kg rails with all fittings etc complete in Jaipur - Sikar - Churu section in connection with Jaipur - Sikar - Loharu & Sikar - Churu Gauge Conversion project.

Open

tender

18.5.16 Single

Packet

system

22.06.16 05 01 M/s

Diamond

Steel

Industries,

Plot No.

879,

Sector-16,

Faridabad

Yes 48/

NWR/Dy.

CE/C-GC/JP

/2016-

17/JP-SIKR-

CUR & SIKR-

LHU dt.

11.01.2017.

M/s Creative

Engineers,

F/189, Road No. 5,

Indraprastha

Industrial Area,

Kota

160.21

Lacks

14.3.2019 18.10.16

14 NWR/SC/

JP-RGS-

Churu/

Civil-

1011405

08

NWR/SC/JP-RGS-Churu/Civil-101140508 – Welding of Rail Joints by SKV process in Jaipur- Sikar & Sikar-Churu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Open

tender

10.6.16 Single

Packet

system

14.07.16 02 - - Yes 49/

NWR/Dy.

CE/C-GC/JP

/2016-

17/JP-SIKR-

CUR & SIKR-

LHU dt.

11.01.2017.

M/s OberoiThermit

Pvt., Ltd. Plot No.3,

Sector 8B, IIE, Sidcul,

Haridwar -249403

349.73

Lacks

18.10.18 26.12.16

Page 5: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

5

DY. CE/C/II-JP

1 NWR/

S&C/FL

Shed/T/

1

Fabrication & erection of

structural steel covering

shed at Phulera.

Open

tender

5.9.2014 One bid

system

10.10.2014 2 2 - Yes NWR/S&C/FL

Shed/CA/01

dated

20.3.2015

M/s M.H. Khanusiya

Himmatnagar (Guj.)

7.17 Cr 17.12.14 1.1.2015 30.12.16 Work

completed.

2 NWR/

S&C/JP-

SIKR/T/

7

Supplying & stacking 65

mm gauge stone

ballast…. JP-SIKR

section.

Open

tender

2.9.2015 Two packet

system

14.10.2015 7 4 3 Yes Dy

CE/C/II/CA/N

WR/S&C/JP-

SIKR/T/7/01

Dated

17.3.2016

M/s MFL-Sidharth-

Parikshit Chandra

Das (JV) Gurgaon.

9.84 Cr. 1.12.15 1.1.2016 29.12.17 Work in

progress.

3 NWR/

S&C/JP-

SIKR/T/

10

Construction of major &

Minor Bridges in C/w GC

of JP-SIKR section.

Open

tender

-

Two packet

system

18.8.2015

13 7 6 Yes, NWR/S&C/CA

/152 dated

25.2.2016

M/s Sona Builders,

Unjha (Guj.)

37.14 Cr. 17.11.15 1.12.15 16.11.17 Work in

progress .

4 NWR/

S&C/JP-

SIKR/T/

11

Earth work in

embankment cutting etc.

and construction

/alteration of service

building JP-SIKR section.

Open

tender

Two packet

system

25.8.2015

14 7 7 Yes NWR/S&C/CA

/150 dated

29.1.2016-

M/s Jandu

Construction

Company, Hisar.

34.18 Cr. 17.11.15 25.11.15 16.11.17 Work in

progress .

5 NWR/

SC/JP-

RGS-

Churu/

Civil-

102141

001

Construction of LHS Sub

way (LHS)/RUB---LC (52

nos) between JP-SIKR

section.

Open

tender

Two packet

system

9.12.15 9 6 3 Yes NWR/S&C/CA

/151 dated

01.7.2016

M/s SGCCL-MMPL (JV)

Jaipur.

68.65

Cr.

23.3.16 1.4.16 22.3.18 Work in

progress .

6 NWR/

SC/JP-

RGS-

Churu/

Civil-

102140

801

Dismantling of existing of

MG track, Laying and

Linking of BG main line---

---Jaipur to Sikar GC

work

Open

tender

Two packet

system

- 8 5 3 Yes NWR/S&C/CA

/161 dated

19.10.2016

M/s KIEL-BLB (JV),

Jaipur

26.21 Cr 8.8.2016 8.8.2016 15.12.17 Work in

progress .

7 NWR/

SC/JP

/Civil-

102160

601R

Construction of PF,FOB PF

shelter ----JP Yard

remodeling & JP-SIKR GC.

Open

tender

Two packet

system

-26.7.2016 6 5 4 Yes NWR/SC/JP

/Civil-

102160601R/

01 date

11.11.2016

M/s Sanjeev Brothers

Jaipur

18.48 Cr 30.9.16 30.9.16 7.9.2017 Work in

progress

Page 6: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

6

Dy. CE/C/III-JP

Dy. CE/C/IV-JP

1 NWR/S&

C/LHS/

RE-FL-

Madar/T/

1

Construction of road

under bridges / limited

height subways (35 Nos)

in Rewari–Phulera( RPC)

section

Open

tender

Two

packet

system

- Yes NWR/S&C/C

A/143 dated

08.7.2015

M/s S.B. Poonia Const.

Co. (JV), Hissar.

51.06 Crore. 28.4.17 5.5.2015 28.12.17 Work in

progress.

2 NWR/

S&C/LHS

/RE-FL-

Madar/T/

2

Construction of road

under bridges / limited

height subways (32 Nos)

in Rewari – Phulera(

RPC) section

Open

tender

Two

packet

system

- Yes NWR/S&C/C

A/144 dated

16.7.2015

M/s S.B. Poonia Const.

Co. (JV), Hissar.

43.74 Crore. 28.4.17 10.5.15 28.12.17 Work in

progress.

3 NWR/SC/

MD-FL-

RGS/Civil

-

1039980

1

Residual composite work

for Construction of 118

Nos Staff quarters

between RE-RGS-FL

section.

Open

tender

Two

packet

system

- Yes NWR/SC/MD

-FL-

RGS/Civil-

10399801/C

A/03 dated

21.11.2016

M/s Sammer Const.

Co. 15/65 West

Punjabi Bagh New

Delhi

11.41 Cr. 21.6.2017 28.6.16 21.6.17 Work in

progress

4 Construction of Club

House at Jagatpura

Jaipur

Open

tender

Two

packet

system

- Yes NWR/S&C/C

A/168 dated

8.5.2017

M/s P.K.Jain Jaipur 19.00 Cr. 16.2.18 1.3.17 16.2.18 Work in

progress

1. Tender No.NWR/SC/JP/ Civil-102990301

RGS Detour in

connection with DFCCIL

work- Construction of

Viaduct (157x18.30m),

Major (5x18.30m &

3x18.30) and Minor

Bridges, earth work in

bank/cutting including

Blanketing material,

Track works for Broad

Gauge line, Supplying &

putting ballast in track,

Transportation of P.

Way materials and

other ancillary works in

Ringus- in connection

with RGS Detour.

Open

tender

6.3.2016 Two bid

system

12.4.2016 9 7 - Yes NWR/S&C/

CA/158

Dated

9.9.2016

M/s AT PLT MHK (JV)

First Floor, Divine

India Building, Nr.

RTO Office, By Pass

Road, Himatnagar-

383001, Dist- S.K.

(Gujrat)

108.92 Cr 23.6.18 20.7.16 23.6.18 Work in

progress.

Page 7: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7

CE/C/II-JP

Dy. CE/C/I-UDZ

1 UDZ-

HMT/

GC/EW/T

/4

Construction of Minor

bridges & earthwork

form Km. 207/0 to

250/0 in connection with

UDZ-HMT section GC

Project .

Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/

CA/113 dtd.

21.10.11

M/s Rahee-Triveni

(J/V), Kolkatta

2286.41

07.02.13

30.11.13

31.07.14

31.03.15

31.12.15

30.06.16

30.12.16

31.07.17

31.10.17

23.08.11 Work in

Progress

2 UDZ-HMT/

GC/MB/T-

13-R-1

Substructures of major

bridges from Udaipur to

Dungarpur.

Open 13.11.14 Two bid

system

17.12.14 05 02 Yes NWR/S&C/

CA/ 142 dtd.

30.06.15

M/s Murali Krishna Const. Co, Hyderabad

6814.86 23.04.17

31.12.17

09.05.15 Work in

progress

3 UDZ-HMT/

GC/EW/T-

20

Construction of Minor

bridges & earthwork

from Km. 121/0 to160/0

in c/w UDZ-HMT section

GC Project

Open 08.05.15 Two bid

system

12.06.15 03 02 01 Yes NWR/S&C/

CA/ 145 dtd.

23.11.2015

M/S M.G.

Contractors, Pvt., Ltd., Panchkula

6402.75 13.03.17

30.06.17

31.12.17

28.09.15 Work in

Progress

4 NWR/SC/

UDZ-HMT/

(GC)/Civil-

20414112

2

Extension of existing sick

line, and other ancillary

works at Udaipur

Open 13.09.15 Single 19.10.15 06 06 0 Yes Dy.

CE/C/UDZ/C

A/32 dated

10.03.16

M/s Prem

Fabricators,

Ahmedabad-382110

565.12 31.12.16

15.04.17

30.06.17

30.09.17

15.02.16 Work in

Progress

5 NWR/SC/ UDZ-HMT (GC)/Civil-204140627

Construction of station

buildings, S&T

structures, and

ancillary works in

connection with UDZ-

HMT GC project

Open 05.04.16 Two bid

system

11.05.16 01 01 0 Yes NWR/S&C/

CA/ 162 dtd.

24.10.16

M/s Jainsons

Construction Co. JV,

Jodhpur

5933.53 01.02.18 14.09.16 Work in

Progress

6 NWR/SC/

UDZ-HMT

(GC)/Civil-

20414042

6

Supply & stacking 50

mm stone track ballast

in UDZ-HMT section

Open 06.0216 Two bid

system

16.03.16 04 02 02 Yes Dy.

CE/C/UDZ/C

A/34 dated

20.10.17

M/s Choyash Infra

Solution Joint

Venture Pvt., Ltd.,

Dungarpur

1345.41 30.06.18 10.09.16 Work in

Progress

7 NWR/SC/ UDZ-HMT (GC)/Civil-204141129

Transportation of PSC

sleepers from sleeper

factory to site in UDZ-

HMT section

Open 05.06.16 Single

packet

19.07.16 04 04 04 No Dy.

CE/C/UDZ/C

A/35 dated

24.12.2016

M/s J.K Construction Co., New Market Nokha

267.84 24.04.17

25.12.17

19.04.17 Work in

Progress

8 NWR/SC/ UDZ-HMT (GC)/Civ

il-2041401

Balance work of

construction, minor

bridges and earth work

in UDZ-HMT section.

Open 30.05.16 Two bid

system

05.07.16 02 02 0 Yes NWR/S&C/

CA/ 163 dtd.

08.12.1016

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

4526.41 30.08.18 15.09.16 Work in

Progress

Page 8: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

8

28

9 NWR/SC/ UDZ-HMT (GC)/Civil-204140124

Construction of minor

bridges and earth work

in cutting and filling

between Umra and

Zawar stations in

connection with UDZ-

HMT GC Project

Open 02.06.16 Two bid

system

12.07.16 05 02 03 Yes NWR/S&C/

CA/ 164 dtd.

08.12.2016

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

6980.98 11.09.18 01.10.16 Work in

Progress

10 NWR/SC/ Construction/Civil-20430001030

Construction of 49 Nos.

Road Under Bridges and

8 Nos. Road Over

Bridges in UDZ-HMT

section

Open 14.09.16 Two bid

system

18.10.16 04 03 01 Yes NWR/S&C/

CA/ 166 dtd.

14.03.2017

M/s Rachana - MI

(JV), Ahmedabad-

(Gujarat).

6623.63 22.12.18 01.01.17 Work in

progress

11 NWR/SC/ UDZ-HMT (GC)/Civil-204140334

Constriction of Super

structure of 32 Nos

Major bridge in UDZ-

HMT section

Open 04.12.16 Two bid

system

11.01.17 04 04 0 Yes - M/s Rachana - MI

(JV), Ahmedabad-

(Gujarat).

5674.62 26.02.19 08.03.17 Work in

progress

12 NWR/SC/ UDZ-HMT (GC)/Civil-204140533

Providing in situ Glued

joints of G-3 (L) type in

UDZ-HMT section

Open 20.10.16 Single

Packet

07.12.16 05 05 0 Yes - M/s. Tirupati Metal

Fabricators,

Faridabad

148.97 15.02.19 Work yet to

start

13 TNWR/SC/ UDZ-HMT (GC)/Civil-204140535

Supply of stone Ballast

in UDZ-HMT section

Open 21.12.20 Single

Packet

25.01.17 06 06 0 Yes Dy. CE/C/

UDZ/CA/26

dated

26.05.2017

M/s. B. B.

Construction,

Khurja-Distt.

Bulandshahr

801.13 02.09.18 24.03.17 Work in

progress

14 NWR/SC/ UDZ-HMT (GC)/Civil-205140539

Laying and linking of

track in UDZ-HMT

section.

Open 31.12.16 Single

Packet

10.02.17 02 02 0 Yes Dy. CE/C/

UDZ/CA/40

dated

17.04.17

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

861.39 02.03.18 28.03.17 Work in

progress

15 NWR/SC/ UDZ-HMT (GC)/Civil-204140839

Laying and linking of

track in UDZ-HMT

section. from Km 160 to

Km 225 In UDZ-HMT

section

Open 29.12.16 Two packet 02.02.17 04 04 0 Yes - M/s BLB--SNCC JV,

, Jodhpur (Raj)-

342001

1128.55 02.04.19 16.05.17 Work in

progress

Page 9: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

9

Dy. CE/C/II-UDZ

1. ender No. NWR/SC/AII-COR-UDZ/Civil-204141902

Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902 – Earth work in bank/cutting including blanketing material, construction strengthening, rebuilding, extension of Major bridges, Minor bridges ……..and other ancillary works, in Mavli (incl)- Barisadri (incl) section in connection with Mavli Junction to Barisadri to Barisadri GC Project.

Open 19.02.16 Two bid

20.04.16 13 Nos. 5 NIL YES Contract agreement No. NWR/S&C/CA/160 dated 30.09.2016

M/s Gurukrupa Kalyan JV 2A, 2nd Floor, Navnath Sec-2, B/H, Shradhadeep Society, Nr. Sharda School, Singanpore-Causway Road

Rs. 137.40 Cr

15.06.18 01.07.16 In progress.

Work terminated on 25.09.2017

2. T. No. NWR/SC/AII-COR-UDZ/Civil-304140803-R

Flash Butt Welding of 60Kg / 52Kg New / SH Rails at Depot / Site using Mobile Flash Butt Welding Plant in Mavli – Bari Sadri section in connection with Mavli–Badi Sadri gauge conversion project

Open 10.10.16 single bid

25.11.16 2 Nos. 01 No 01 No Yes Acceptance letter No.UDZ/MVJ-BI/GC/Welding/T-3R Dated 20.02.17

M/s Railtech Infraventure Pvt.Ltd., 147/91-A Old Bairahana, Allahabad-211003 (UP)

Rs.03.93 Cr

19.08.18 Yet to start

Page 10: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10

Dy. CE/C/Dungarpur

1. Dy.CE/C/

UDZ/DNR

P-

RTM/FLS/

2011/T/1

Carrying out final

location of survey &

….other preliminary

activities in connection

with new BG line

between DNRP-RTM via

Banswara

Open 1/6/11 &

30/6/11

(NIT & First

corrig.)

Single 15-07-

2011

10 NA NA Yes NWR/S&C/

CA/114 Dt.

27-02-12

M/s S.M.Consultants,

Bhubneswar

4.99 Cr

Excl. 1st 0.60

Cr.

13/11/12

Extended

up to

30.06.2017

14/11/2011 -

Work in

progress

2. Dy.

CE/C/DN

RP/ RTM-

DNRP/EW

/ NL/T-8

E/W in cutting and

filling for formation &

all other ancillary works

etc. from Km. 0.00 to

Km. 17.00 between

Dungarpur-Nawa Gaon

station in c/with DNRP-

RTM New BG Rail Line

Project.

Open 23-01-2013 Two

Packet

06-03-

2013

15 5 10 Yes NWR/S&C/

CA/129

Dt. 31-10-

13

Accepted

on

10.07.13

M/s Nayak

Infrastructure Pvt.

Ltd., Guwahati

56.74 Cr.

Ex.SCA

8.05 Cr.

09-07-15

Further

extended

upto

09.07.2017

06-11-2013 - Work in

progress.

3. T. No.

Dy. CE/C/

DNRP/

RTM-

DNRP/MB

/NL/T/ 10

– Const. of minor

bridges, RUB & other

ancillary works etc.

from Km. 0.00 to 17.00

bet. Dungarpur to

Nawa Gaon stations in

c/with DNRP-RTM New

BG Rail Line Project.

Open 10-09-2013 Two

Packet

23-10-

2013

8 6 2 Yes NWR/S&C/

CA/137 Dt.

30-06-

2014

accepted

on

04.04.2014

M/s Gannon Dunkerley & Co. Ltd., Ahmedabad

38.06 Crore 03-04-2016

Further

Extended

upto

31.03.18

14.11.2014 - Work in

progress.

4 T. No.

UDZ-

HMT/GC/E

W/T-3R

UDZ-HMT GC PROJ.

Construction of Minor

bridges & earthwork

from Km. 270/0 to

320/0 in connection

with UDZ-HMT section

GC Project

Open 08.05.15 Two bid

system

12.06.15 06 01 05 Yes NWR/S&C/

CA/148

dated

12.01.2016

Accepted

on

20.10.15

M/s Royal Infra

Engineering Pvt. Ltd., Surat

2706.07 19.04.17 27.11.15 Work in

Progress

5 NWR/SC/

UDZ-

HMT/GC/Ci

vil/204140

532

Flash Butt welding of

60 Kg/52 Kg. New / SH

Rails at Depot/ Site

using Mobile Flash Butt

Welding Plant in DNRP-

HMT Section.

Open Single

Packet

23.11.16 02 01 01 Yes Under

execution M/s Railtech

Infraventure Pvt. Ltd. 147/91-A, Old Bairahana Allahabad – 211003 (UP)

531.70 Lakhs 21.08.2018 --- -- Work to be

started.

6 NWR/SC/

UDZ-

HMT/GC/Ci

vil/205140

541

Dismantling of existing

MG track, laying and

linking of BG ML, LL

etc. bet. Km. 270.00 to

Km. 320.00 in c/with

DNRP-HMT Section.

Open - Single 01.02.2017 04 Nos. 1 1 Yes Under

execution M/s Bhanwar Lal Bijarnia, Vill. Rajpura, Post Prewari, Tehsil Nawa, Distt. Nagaur (Raj.)

890.85 Lakhs 27.02.2018 --- -- Work in

progress.

Page 11: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11

Dy. CE/C/BNSW

1. Dy. CE/C/BNSW/DNR

P-RTM/NL/

T/7

Construction of Minor bridges, Road under bridges & other ancillary works etc. from Km. 106.00 to 123.00 between Banswara and Arbhit Khatumbi station in c/with Banswara New BG Rail Link Project.

Open - 30.10.13 - - - Yes NWR/S&C/ CA/138 Dt. 25/08/2014

M/s Gannon Dunkerley & Co. Ltd., 301-303, Prshna Arcade, 3rd Floor, Opp. Doctor House, Near Parimal Crossing, GG Road, Ahmedabad.

Rs. 3716.07 Lakhs

03.04.2016 Work is in progress.

2. Dy. CE/C/BNSW/NL/ RTM-

DNRP/T/

4

Earthwork in cutting and filling for formation as per BG standard profile & all other

ancillary works i.e. roofing wall, drains, toe walls, A one pitching etc. from Km. 106 to Km. 123.00 bet. Banswara & Arbhit Khatambi station in c/with Ratlam-Dungarpur via Banswara New BG Line Project.

Open 21.01.13 - - - Yes NWR/S&C/CA/130 Dt. 01/11/2013

M/s AMRIL-ESSCON (JV) ‘ SAIKRUPA’ D.No. 8.3.833, Plot No. 37 & 38 Phase-I, Kamalgiri Colony, Hyderabad.

Rs. 6219.53 Lakhs

25.07.2015 - - Progress held up due to non available of land.

DY. CE/C/RTM

1 Dy.CE/C/BNSW/ DNRP-RTM/NL/T-9

Construction of Office Accommodation for Dy.CE/C/RTM & Officers Rest House at Ratlam in c/w Construction of New BG Line between DNRP-RTM via Banswara.

Open 23.10.13 Single 12.12.13 3 Nos. - - Yes Dy.CE/C/RTM/CA/02 dt.21.04.14

M/S Kirti Contractors & Engineers, 168, Samta Parisar, Ratlam (MP)

Rs. 124.14 Lacs

09.09.14 Extension given up 31.12.2016

11.03.2014 Work is in progress.

Page 12: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12

2 Dy.CE/C/RTM/ DNRP-

RTM/NL/T-2

Construction of minor bridges,Road under bridges (RUB) & other

ancillary works from 142.85 to 163.00 km between Chotti Sarvan -Shivgarh stations in c/w Construction of DNRP-RTM via Banswara.New BG Rail line project

Open 16.06.2014 Two bid 23.07.14 5 Nos. 01No 04(four) Yes NWR/S&C/CA/141 dated 16.03.2015

M/S Gannon Dunkerley & Co.Ltd. 301-303,Prema

Acrcade,3rd Floor, Opp Doctor House, Near Parimal Crossing,C.G.Road,Ahemdabad-380006

Rs.42.89 Cr 17.12.2016 10.08.2015 Work is in progress.

3 Dy.CE/C/RTM/ DNRP-RTM/NL/T-3

Earth work in cutting and filling for formation as per BG standard profile, Construction of RCC box type bridges and all other ancillary works i.e. retaining wall, drain, toe wall, stone pitching etc from Km.142.85 to 163.00 km between Chotti Sarwan & Shivgarh stations in connection with Ratlam - Dungarpur via Banswara New BG line project.

Open 26.03.15 Two bid 05.05.2015 06(six) 04(four) 02(two) Yes NWR/S&C/CA/147 dated 21.12.2015

MMS Infratech Pvt.Ltd.,New Anjar-370110(Gujarat)

Rs. 53.66 Cr. 06.09.2017 15.10.2015 Work is in progress.

4 Dy.CE/C/RTM/ DNRP-RTM/NL/T-5

Earthwork in cutting and filling for formation as per B.G. standard profile and all other ancillary works i.e. retaining wall, drain, toe wall, stone pitching

etc. from Km 163.00 to 184.600 & Ratlam connectivity between Chandra Berda & Ratlam stations in connection with Ratlam-Dungarpur via Banswara new BG line project.

Open 11.05.2015 Two bid 24.06.2015 05(Five) 02(two) 03(three) Yes NWR/S&C/CA/149 dated 29.01.2016

M/S Mehta Saiyyed(JV) 104, LIC Colony, Vaishali Nagar Ajmer(Raj) Pin 30 5001

Rs. 58.71 Cr. 05.11.2017 07.11.2015 Work is in progress.

Page 13: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

13

CE/C/III-JP

Dy. CE/C/I-Ajmer

1 AII/BNGM-RAS /NL/T/11 R2

Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P-way materials, construction of station building & platform and other ancillary works between Bangurgram and Ras stations in connection with Bangurgram-Ras New Broad Gauge Line Project.

Open 05.10.12 Single 09.11.12 1 Nos. - - Yes Dy. CE(C)/AII/BNGM-RAS/CA/85 dated 20/11/2013

M/s. Bhanwar Lal Bijarnia, Village-Rajpura, Tehsil-Nawa, District-Nagaur (Raj.)

667.49 Lakhs 17/09/2013, 28/02/2014, 31/05/2014, 30/09/2014, 31/01/2015, 31/05/2015, 30/10/2015 & 31/12/2015

02/09/13 - Work completed.

2 AII/Const./DFCCIL/T/3-R2

Shifting of track between Madar & Durai stations & shifting MG yard at Marwar Jn.

i.c.w. DFC.

Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes NWR/S&C/CA/60 dated 26/12/2013

M/s. Ravi Infra build Pvt. Ltd., 95, Hiran Magri, Sector-11, Udaipur

3216.99 Lakhs

04/02/2015, 30/04/2016 & 31/12/2016

14/12/13 - Work held up for want of dispute free land.

3 AII/Const

./DFCCIL/T/6

Construction of station

building & staff quarters in c/w shifting of utilities for DFCCIL.

Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes NWR/S&C/C

A/61 dated 27/12/2013

M/s. Rama

Construction company, H-240, Ashok Vihar Phase-I New Delhi

4117.03

Lakhs

05/03/2015,

31/12/2015, 30/06/2016, 31/12/2016, 30/06/2017

15/09/13 - Work under

progress.

4 AII/Const./LHS/T/3

Providing Limited Height Subways in lieu of existing Level Crossings between Madar & Haripur stations of Madar - Marwar Section in connection with

elimination of existing level crossing gates.

Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes NWR/S&C/CA/64 dated 20/02/2014

M/s. Lall Construction Co. AA-105, Shalimar Bagh, Delhi-110088

4577.17 Lakhs

15/12/2015, 31/03/2017 & 31/10/2017

18/02/14 - Work under progress.

Page 14: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

14

5 AII/Const./Loco/ Mod/T/7

Improvement to drainage system in Loco Workshop by the

construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of Loco Workshop, Ajmer

Open 21/10/14 Two Bid 26/11/14 07 (Seven)

04 (Four) 1.0 JCC Infra Projects Pvt.

Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012 3.0 M/s. B. L. Infra Projects Pvt. Ltd., B-8/6, Sector-3, Rohini, New Delhi -110085. 4.0 M/s. Satish & Amit Infra Structure 2/108, Royal Green, Near Sirsi Mod, Post office Sirsi, Jaipur.

Yes NWR/S&C/ CA/70 dated 29/07/2015

Prem Fabricator's, 426, Near Jyoti Power, Behind Steel

Town, Moriya, Chandgodar, Ahmedabad-382110

1326.88 Lakhs

04/02/2016, 30/06/2016, 30/08/2016,

31/10/2016 & 15/12/2016

17/02/15 - Work completed, final

variation under preparation.

Page 15: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

15

6 AII/Const./C&W/ Mod./T/6

Improvement to drainage system in C&W Workshop by the

construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of C&W Workshop, Ajmer

Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four) 1.0 Varaha Infra Limited,

Umesh Smriti-6, Jalam Vilas Scheme, Poata B. Road, Jodhpur (Raj.)-342006. 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012. 3.0 JCC Infra Projects Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 4.0 M/s. Raj Kumar Gupta Contractors, III-J/59, Nehru Nagar, Ghaziabad-201001.

Yes Dy. CE(C)/AII/CA/91 dated

30/07/2015

Prem Fabricator's, 426, Near Jyoti Power, Behind Steel

Town, Moriya, Chandgodar, Ahmedabad-382110

948.74 Lakhs 21/01/2016, 31/12/2016 30/06/2017

04/02/15 - Work in progress.

Page 16: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

16

7 NWR/SC/AII-BNGM

/Civil - 308151801

Earth work in bank/cutting including Blanketing material,

Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, Dismantling of existing Buildings, Platforms & Steel structures etc., .... in connection with Ajmer-Bangurgram BG Doubling project.

Open 02/03/16 Double packet

12/04/16 06 (Six) 02 (Two) M/s. Rajendra Singh

Bhamboo Infra Pvt. Ltd. 108, First Floor, Neel Kanth Building, Gandhi Path, Vaishali Nagar, Jaipur – 302021 and M/s. Balajee-Modi (JV), 9, Leela Mension, Raj Bhawan Road, Civil Lines, Jaipur-302006 Jaipur-302006

Yes NWR/S&C/CA/74 dated 30/08/2016

M/s. Shivakriti-Shri Mohangarh (JV), 7th Floor, Ajmer Puliya,

Jaipur-302006

11337.76 Lakh

23/06/2018 20/07/16 - Work in progress.

8 NWR/SC/Bangurgram-Guriya-Patch/ Civil-308151801

Earth work in bank/cutting including Blanketing materials, Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, dismantling of existing buildings, platforms & steel structures etc., ... in connection with

Bangurgram - Guriya BG Doubling project.

Open 28/06/16 Double packet

10/08/16 05 (Five) 01 (One) VPRPL-RBIPL "Guriya" (JV) H-1, First Floor Shivalik Complex, Near Gol Building, Sardarpura, Jodhpur (Rajasthan) 342001

Yes NWR/S&C/CA/76 dated 24/01/2017

M/s. H.S. Mehta Infra – JCC Infra Projects (JV), 761/30, Aklank House, Tikam Ganj Ajmer – 305001

16161.54 Lakh

10/11/2018 20/11/16 - Work in progress.

Page 17: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

17

9 NWR/SC/MD-/Civil-

308421801

Providing pit line with or without catwalk, washing apron,

overhead water tank, extension of existing bridges, extension of existing shed, construction of service buildings and dismantling of existing track, laying & linking of new track & turnouts etc. in Madar yard in connection with shifting of coach maintenance facility from Ajmer to Madar project

Open 29/04/16 Double packet

28/06/16 7 (Seven) 2 (One) M/s. Ali Mohd. Abdul Mazid, Near

Jama Masjid, Mohalla Vyaparian, Bikaner-334001 (Rajasthan) Varindera Constructions Limited, 408-409, Suneja Tower-I, District Cenre, Janakpuri, New Delhi.

Yes NWR/S&C/CA/75 dated 29/09/2016

M/s. M. H. Khanusiya, First Floor, Divine India

Building, Near RTO office, By Pass Road, Post-Savgadh, (Panpur) Himmatnagar-383001 Dist.-S.K. (Gajarat)

2643.75 Lakh 06/09/2017 15/09/16 - Work in progress.

Dy. CE/C/II-Ajmer

1 AII/Const. / LHS/T/2

Construction of Limited Height Subway in lieu of existing LC No. 58, 60, 61, 62, 64, 65, 66, 67, 68, 69, 71, 72 & 73(13 Nos) between stations Marwar to Rani of Marwar-Palanpur Section in connection with elimination of level crossing gates.

Open 21.02.2013 Single 28.03.2013 01 Nos. 1st Lowest M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).

NIL Yes NWR/S&C/CA/58 dated 18/11/2013

M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).

1790.49 Lakhs

31/12/2014, 30/09/2015, 30/09/2016, 30/09/2016, 31/12/2016, 31/05/2017 & 30/11/2017

14/09/2013 - Work under progress

2 AII/GRI-MJ/BGD/T/1

Earthwork in embankment for cutting & filling, Blanketing for bank, Addition, alteration and construction of S&T structures, Pass. Platform, Platform Shelters, station Building, staff Quarters,

water Huts, toilets, Hand Pumps, FOBs, TMC Rest house etc. between Guriya–Marwar Jn. stations (both excl.) and Officer Rest House at Mawar Jn. Station in connection with Guriya-Marwar Jn. BG Patch Doubling Project.

Open 30.08.12 Single 16.10.12 07 Nos. 1st Lowest M/s. Braham Prakash Modi, 74 Sudarshanpura, Industrial Area, Baisgodam,

Jaipur-06

NIL Yes NWR/S&C/CA/51 dated 14/03/2013

M/s. Braham Prakash Modi, 74 Sudarshanpura, Industrial Area, Baisgodam, Jaipur-06

3541.71 Lacs.

30/09/2014, 30/04/2015, 31/07/2015, 30/10/2015, 31/12/2015, 30/04/2016, 30/06/2016, 31/12/2016, 31/03/2017 &

30/06/2017

31/12/2012 30/06/2017 Work completed.

Page 18: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

18

3 AII/GRI-MJ/BGD/T/2

Construction of Important/Major Bridges including

earthwork, blanketing on the approaches between stations Guriya to Marwar Junction with Railway’s/Contractor’s design & drawing in connection with Guriya-Marwar Junction BG Patch Doubling Project.

Open 21.01.2013 Single 26.02.2013 06 Nos. 1st Lowest M/s.PNC Infratech

Ltd.-Jain Construction Company (JV) 761/30, Aklank House, Near Mal Godown, Tikam Ganj, Ajmer

NIL Yes NWR/S&C/CA/62 dated 06/01/2014

M/s. PNC Infratech Ltd.-Jain Construction

Company (JV) 761/30, Aklank House, Near Mal Godown, Tikam Ganj, Ajmer

3240.43 Lakhs

28/01/2015, 31/12/2015, 30/09/2016,

31/12/2016, 15/02/2017 & 31/07/2017

06/12/2013 - Work under progress.

4 AII/Const./FLS/T/1

Marking out of center line, taking levels including all details, Carrying out Geotech investigation, designing of foundation and sub – structures / super structure of Minor / Major bridges/LHS, preparation of land plans & proposal, Preparation of L-section & yard plans etc. & submitting detailed working drawings in connection with Bangurgram to Guriya & Marwar to Rani Doubling projects and Various shifting of utility works of DFCCIL & LHS works between Kishangarh & Palanpur stations.

Open 17.09.2012 Single 09.11.2012 03 Nos. 2nd Lowest M/s. S. M. Consultants, Plot No.-130, S.M. Tower, Mancheswar Industrial Estate, Rasulgarh, Bhubneshwar (Odisha)

M/s. BPC India, Nataraj Bhawan, P.O.Khamarchandi, P.S. Haripal, Dist.-Hooghly, West Bengal

Yes NWR/S&C/CA/57 dated 07/11/2013

M/s. S. M. Consultants, Plot No.-130, S.M. Tower, Mancheswar Industrial Estate, Rasulgarh, Bhubneshwar (Odisha)

183.38 Lakhs 06/07/2013, 30/11/2013, 31/03/2014, 31/10/2014,30/04/2015, 31/08/2015, 31/12/2015, 30/04/2016, 31/08/2016 & 30/04/2017

02/02/2013 - Work under progress

5 AII/Const/FBW/T/1

Flash butt Welding of 60/52 Kg. New/SH,(72/90 UTS ) Rail joints by using mobile flash butt welding plant in connection with various sanctioned works of Ajmer unit of construction organization.

Open 11.10.2012 Single 19.11.2012 01 No. 1st Lowest M/s. The India Thermit Corpn. Ltd., 84/22, Fazal Ganj, Kanpur-208012.

NIL Yes Dy. CE(C)/AII/FBW/CA/85 dated 21/10/2013

M/s. The India Thermit Corpn. Ltd., 84/22, Fazal Ganj, Kanpur-208012

699.04 Lakhs 18/03/2015, 18/03/2016, 18/03/2017 & 18/03/2018

13/11/2013 - Work in progress

Page 19: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

19

6 AII/Const./LHS/T/4

Providing Limited Height Subway (17 Nos.) in lieu of existing

level crossings between Haripur & Marwar Jn. stations of Ajmer - Marwar Jn. section in connection with elimination of existing level crossing gates.

Open 11.07.14 Two packet system

13.08.2014 07 Nos. 1st Lowest M/s. PNC Infratech

Ltd.-JCC Infraprojects Pvt. Ltd. (JV) 761/30, Aklank House, Near Mal Godown, Tikam Ganj, Ajmer

04 (Four) Yes NWR/S&C/CA/68 Dt. 09-03-2015

M/s. PNC Infratech Ltd.-JCC Infraprojects Pvt.

Ltd. (JV) 761/30, Aklank House, Near Mal Godown, Tikam Ganj, Ajmer

3529.60 Lakhs

18/05/2016 & 30/06/2017

11/09/2015 - Work under progress

7 AII/Const./LHS/T/5

Providing Limited Height Subways (19 Nos.) in lieu of existing level crossings between Rani & Keshavganj stations of Marwar Jn. – Palanpur section in connection with elimination of existing level crossing gates.

Open 21.02.2013 Two packet system

13.08.2014 04Nos. 1st Lowest M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).

03 (Three) Yes NWR/S&C/CA/66 Dt. 27-02-2015

M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).

3908.17 Lacs 18/05/2016, 13/03/2017 & 31/12/2017

03/12/2014 - Work under progress

8 AII/Const./LHS/T/6

Providing Limited Height Subways in lieu of existing level crossings between Swaroopganj & Palanpur stations of Marwar Jn. - Palanpur section in connection

with elimination of existing level crossing gates.

Open 21.02.2013 Two packet system

13.08.2014 04 Nos. 1st Lowest M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11,

Udaipur-313002 (Raj.).

03 (Three) Yes NWR/S&C/CA/67 dated 27/02/2015

M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).

3873.36 Lacs.

18/05/2016, 31/03/2017 & 31/03/2018

18/12/2014 - Work under progress

9 AII/GRI-MJ/BGD/T/6

Construction of Minor Bridges including other ancillary work between station Guriya (excluding) - Marwar Jn. (excluding) in connection with Guriya - Marwar Junction BG patch doubling project.

Open 07/07/2014 Two packet system

13/08/14 04 Nos. 1.0 (One) 1.0 M/s. Ashish Construction Co.- SP Infracon (JV) 211, Shivam Complex, Opp. Hetarth Party Plot, Science City Road, Sola, Ahmedabad - 380061.

Yes NWR/S&C/CA/69 dated 09/03/2015.

M/s. JCC InfraProjects Pvt. Ltd., 761/30, "Aklank House", Tikam Ganj, Ajmer (Raj.).

2169.63 Lakhs

29/02/2016, 30/06/2016, 31/12/2016 & 31/07/2017

01/03/2015 - Work under progress.

Page 20: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

20

10 AII/GRI-MJ/BGD/T/8-R

Dismantling of existing BG track, laying and linking of Broad gauge

main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P-Way materials and other ancillary works between Guriya – Marwar Jn. Section in connection with Guriya - Marwar Jn. BG Patch Doubling Project.

Open 28/07/2015 Single packet system

31/08/15 5 Nos. 1.0 (One) 1.0 JCC Infra Projects

Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer

No - M/s. Jhawar Sales Corporation, Rani Bazar, Bikaner-

334001 (Raj.)

976.32 Lakhs 28/05/2017 & 31/07/2017

- 30/06/17 Work completed.

11 AII/MJ-RN/BGD/T/1

Earth work in bank/cutting including Blanketing material, Construction of Important/Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures on stations and in section, Dismantling of various Buildings, Platforms & Steel structures etc, Track works for Broad Gauge line, Supplying & putting ballast in track, Transportation of P.

Way materials and other ancillary works in Marwar Junction to Rani section in connection with Marwar Jn.-Rani (both including) BG Patch Doubling project.

Open 09/08/2015 Two packet system

06/10/15 13 Nos. 7.0 (Seven) 1.0 M/s. Gawar – Lakhlan (JV) 402, Diamond Tower, Purani Chungi, Ajmer Road, Jaipur2.0 M/s. Kalindee – Paras JV, 2nd Floor Building No. 9 A, Cyber City, DLF

Phase – III, Gurgaon – 1220023.0 M/s. Ravi - HG (JV) 95, Hiran Magri, Sector-11, Udaipur – 3130024.0 M/s. Gannon Dunkerley & Co. Ltd. 301-303, Prerna Arcade, Opp. Doctor House, Near parimal Crossing, C.G. Road, Ahmedabad- 3800065.0 M/s. VRC –

Yes NWR/S&C/CA/71 dated 22/02/2016

M/s. VPRPL – RBIPL (JV) H-1, first Floor Shivalik Complex, Near Gol Building, Sardarpura, Jodhpur (Raj.) – 342001

15262.94 Lakh

29/12/2017 25/02/2016 - Work under progress.

Page 21: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

21

SIL (JV), 16, Opp. Metro Pillar

No. 190, Paschim Vihar Extension, Rohtak Road, Delhi 1100636.0 M/s. BPL-BCPL (JV) Ekta House, Nr. Shripath Apartment, Jalaram-II, University Road, Rajkot – 360007

12 NWR/SC/Guriya-Marwar /Civil-309151109

Miscellaneous works between Guriya to Marwar Jn. doubling project.

Open 20/09/2016 Single packet system

24/10/16 04 Nos. 04 (Four) NIL Yes Dy. CE(C)/AII/Const./GRI-MJ/CA/4 dated 30/03/2017

M/s K.B. Enterprises, 2, Matra Chhaya, Opp. Chambal Power House, Hawa Sarak, Jaipur-302006

814.54 Lakhs 20/05/2017 & 19/08/2017

03/12/2016 - Work under progress.

Page 22: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

22

CE/C/IV-JP

Dy. CE/C/I-Jodhpur

11.. TT..NNoo.. JJUU//

CCOONNSSTT//

1155//22001111--1122

AAcccceepptteedd

oonn––

1177..0099..1122

WWoorrkk ooff rreemmooddeelliinngg ooff

JJUU yyaarrdd iinncclluuddiinngg aallll

wwoorrkk rreellaatteedd ttoo PP..

wwaayy,, AATT wweellddiinngg

OOppeenn 2255..0033..1122 SSiinnggllee 2266..0044..1122 0044 SShh..GGiirrddhhaarrii

RRaamm SS//oo SShh..

SSaajjjjaann RRaamm,,

JJooddhhppuurr

MM//ss PP..CC..

SShhaarrmmaa,,

NNooiiddaa ((UU..PP..))

LL--11 DDyy..CCEE//CC//

JJUU//0033//22001122--

1133,, ddttdd..

1133..1122..1122

SShh..GGiirrddhhaarrii RRaamm SS//oo

SShh.. SSaajjjjaann RRaamm,,

JJOODDHHPPUURR

113322..0022 1166..0066..1133

3311..1100..1133

3300..0044..1144

3311..1122..1144

2288..0022..1155

2200..0033..1155

3311..1122..1155

3311..1122..1166

1155..0099..1166

1111..1111..1122 WWoorrkk

pphhyyssiiccaallllyy

ccoommpplleetteedd &&

ffiinnaall bbiillll

uunnddeerr

pprroocceessss..

--

22.. JJUU//CCoonnsstt..//

TT--1188//1133--1144//

RROOBB//CC--

2211//NNAACC

CCoonnssttrruuccttiioonn ooff

ccoommpplleettee RROOBB ((22 llaannee))

iinnccll..aapppprrooaacchheess iinn lliieeuu

ooff eexxiissttiinngg LLCC NNoo..CC--2211

oonn MMTTDD--FFLL sseecc aatt NNAACC

ssttaattiioonn

OOppeenn tteennddeerr 0088..1111..1133 TTwwoo ppaacckkeett

ssyysstteemm

1133..1122..1133 0099 NNooss.. 0066 NNooss..

11.. VViisshhnnuu

PPrraakkaasshh RR

PPuunnggaalliiaa

22.. RRaacchhaannaa

CCoonnsstt..

CCoo..

33.. PPrraavveeeenn

GGuullaattii

IInnffrraa--

ssttrruuccttuurree

ss PPvvtt..

LLttdd..

44.. SSoonnaa

BBuuiillddeerrss,,

55.. RRaakkeesshh

CCoonnsstt..

CCoo..

66.. MM//ss JJaaiinn

CCoonnsstt..

CCoo..

0033 NNooss..

11.. SShhrreeee

GGaauuttaamm

CCoonnssttrruuccttiioo

nn CCoo.. LLttdd..,,

22.. MM//ss MMaaaann

RRaannaa ((JJVV)),,

33.. MM//ss DDRRAA--

BBSSPP

CCoonnssttrruuccttiioo

nn ((JJVV)),,

LL--11

NNWWRR//SS&&CC//CCAA

--6655,, ddttdd..

2200..1100..22001144

MM//ss VViisshhnnuu PPrraakkaasshh RR

PPuunngglliiaa LLiimmiitteedd,, HH--11

FFiirrsstt FFlloooorr SShhiivvaalliikk

CCoommpplleexx,, NNeeaarr GGooll

BBuuiillddiinngg,, SSaarrddaarrppuurraa,,

JJooddhhppuurr

1188..8888 CCrr.. 0033..0077..1166

3300..0099..1166

1155..1122..1166

1155..0011..1177

3311..0011..1177

0088..0077..1144 WWoorrkk

ccoommpplleetteedd

&& RROOBB

ccoommmmiissssiioonn

eedd bbyy

HHoonn’’bbllee

MMooSSRR oonn

1100..0022..1177

FFiinnaall bbiillll

ppaasssseedd oonn

2211..0088..1177

33.. TT..NNoo.. JJUU//

CCoonnsstt..//

TT--0066RR//

22001144--

1155//LLHHSS

RRUUBBss iinn lliieeuu ooff LLCCss,, iinn

sseeccttiioonn ooff MMTTDD--BBKKNN ((0044

NNooss..)),, MMTTDD BByyee PPaassss

((0011 NNoo..)) && MMTTDD--FFLL ((0011

NNoo..)) oonn JJUU ddiivviissiioonn

OOppeenn

TTeennddeerr

0055..1111..1144 SSiinnggllee

TTeennddeerr

0099..1122..1144 0044 NNooss.. MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

CC--117711

KKaannttaa

KKhhaattuurriiaa

CCoolloonnyy,,

BBiikkaanneerr

-- LL--11 DDyy..CCEE//CC//

JJUU//1133//22001144--

1155//LLHHSS,, ddttdd..

1188..0044..22001155..

MM//ss SShhrreeee KKaarrnnii

TTrraaddeerrss,,

CC--117711 KKaannttaa KKhhaattuurriiaa

CCoolloonnyy,,

BBiikkaanneerr

662244..1155 llaaccss.. 2277..0044..1166

3311..0088..1166

1177..0044..1155 WWoorrkk

ccoommpplleetteedd

WWoorrkk

pphhyyssiiccaallllyy

ccoommpplleetteedd,,

ffiinnaall vvaarriiaattiioonn

ssuubbmmiitttteedd ttoo

HHQQ ffoorr aaddmm..

aapppprroovvaall

44.. JJUU//CCoonnsstt..//TT--

2222//1144--

1155//SSttdd..IIIIRR//

MMTTDD--BBKKNN

AAllll CCiivviill && PP..WWaayy wwoorrkk

cc//wwiitthh SSttdd--IIII wwoorrkk iinn

MMTTDD--BBKKNN && RRKKBB--PPLLCC

sseecc

OOppeenn

TTeennddeerr

2211..1111..1144 SSiinnggllee

TTeennddeerr

2233..1122..1144 0022 NNooss.. MM//ss BBhhaannwwaarr

LLaall BBiijjaarrnniiaa,,

VViillllaaggee--

RRaajjppuurraa,,

PPoosstt--

PPrreewwaarrii,,

MM//ss JJaaii MMaattaa

DDee EEnneerrggyy

SSyysstteemm,,

LLaaxxmmaannggaarrhh

ssiikkaarr

LL--11 DDyy..CCEE//CC//

JJUU//1144//22001155--

1166//SSttdd--IIIIRR,,

ddttdd..

1111..0066..1155..

MM//ss BBhhaannwwaarr LLaall

BBiijjaarrnniiaa,,

VViillllaaggee--RRaajjppuurraa,, PPoosstt--

PPrreewwaarrii,,

TTeehhssiill-- NNaawwaa,, DDiisstttt..

NNaaggoouurr

771155..8800 llaaccss.. 0033..1100..1166

3311..0033..1177

3311..0088..1177

1100..0044..1155 WWoorrkk iinn

pprrooggrreessss

--

Page 23: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

23

TTeehhssiill-- NNaawwaa,,

DDiisstttt..

NNaaggoouurr

((RRaajjaasstthhaann))

((RRaajjaasstthhaann))

55.. JJUU//CCoonnsstt..//77

44--WW--

2266//22001155--

1166//SSttdd..IIIIRR//

RRKKBB--PPLLCC

SSuuppppllyyiinngg aanndd ssttaacckkiinngg

ooff 2200880000 ccuumm SSttoonnee

bbaallllaasstt ffoorr SSttdd..IIIIRR wwoorrkk

iinn RRKKBB--PPLLCC sseeccttiioonn

OOppeenn

TTeennddeerr

0055..0066..1155 SSiinnggllee

TTeennddeerr

1100..0077..1155 0044 NNooss.. MM//ss JJ..KK..

CCoonnsstt..CCoo..

NNookkhhaa,,

•• AA..KK.. GGuuppttaa

&& CCoo..,, ,,

DDEELLHHII

•• MM//ss

HHaannuummaann

CCoonnssttrruuccttii

oonn CCoo..,,

NNookkhhaa

•• MM//ss SShhrreeee

SShhyyaamm

EEnnggiinneeeerriinn

gg CCoo,,

CChhuurruu

LL--11 DDyy..CCEE//CC//

JJUU//1199// 22001155--

1166//SSttdd..IIIIRR//

RRKKBB--PPLLCC,,

ddttdd..

3300..0011..1166

MM//ss JJ..KK.. CCoonnssttrruuccttiioonn

CCoo..,,

NNeeww MMaarrkkeett,, NNookkhhaa,,

DDiissttrriicctt –– BBiikkaanneerr

114422..8844 llaaccss.. 1100..0055..1166

3311..0077..1166

1155..1111..1166

..0099..22001155 WWoorrkk

ccoommpplleetteedd

FFiinnaall bbiillll

uunnddeerr

pprroocceessss

66.. JJUU//CCoonnsstt..//

TT--2277//22001155--

1166//SSttdd..IIIIRR//

RRKKBB--PPLLCC

AAllll CCiivviill && PP..WWaayy wwoorrkk

cc//wwiitthh SSttdd--IIII wwoorrkk iinn

RRKKBB--PPLLCC sseecc

OOppeenn

TTeennddeerr

1111..0066..1155 SSiinnggllee 1155..0077..1155 0011 NNoo.. MM//ss BBhhaannwwaarr

LLaall BBiijjaarrnniiaa,,

VViillllaaggee--

RRaajjppuurraa,,

PPoosstt--

PPrreewwaarrii,,

TTeehhssiill-- NNaawwaa,,

DDiisstttt..

NNaaggoouurr

((RRaajjaasstthhaann))

-- LL--11 DDyy..CCEE//CC//

JJUU//1188// 22001155--

1166//SSttdd..IIIIRR,,

ddttdd..

0066..0011..1166

MM//ss BBhhaannwwaarr LLaall

BBiijjaarrnniiaa,,

VViillllaaggee--RRaajjppuurraa,, PPoosstt--

PPrreewwaarrii,,

TTeehhssiill-- NNaawwaa,, DDiisstttt..

NNaaggoouurr

((RRaajjaasstthhaann))

667799..8844 llaaccss.. 1155..0033..1177

0088//22001177

1188..0099..1155 WWoorrkk iinn

pprrooggrreessss

77.. JJUU//CCoonnsstt..//TT--

2255//22001155--

1166//SSttdd IIIIRR

PPrroovviiddiinngg ““IINN SSIITTUU””

GGlluueedd IInnssuullaatteedd JJooiinnttss

ooff GG--33 ((LL)) ttyyppee ffoorr 5522

kkgg//6600 kkgg rraaiillss iinn cc//ww

SSttddIIIIRR wwoorrkk iinn MMTTDD--

BBKKNN && RRKKBB--PPLLCC sseeccttiioonn..

OOppeenn

TTeennddeerr

0055..0066..1155 SSiinnggllee 1100..0077..1155 0033 MM//ss TTiirruuppaattii

MMeettaall

FFaabbrriiccaattoorrss,,

11443333 SSeeccttoorr

1166,,

FFaarriiddaabbaadd--

112211000022

((HHaarryyaannaa))

•• DDyynnaammiicc

EEnnggiinneeeerrssKK

oottaa..

•• CCrreeaattiivvee

EEnnggiinneeeerrss

KKoottaa --

LL--11 DDyy..CCEE//CC//

JJUU//1177// 22001155--

1166//SSttdd..IIIIRR,,

ddttdd.. 0066..0011--

22001166

MM//ss TTiirruuppaattii MMeettaall

FFaabbrriiccaattoorrss,,

11443333 SSeeccttoorr 1166,,

FFaarriiddaabbaadd--112211000022

((HHaarryyaannaa))

332200..0011 llaaccss.. 3311..0033..1188 1177..1122..1155 WWoorrkk iinn

pprrooggrreessss

--

88.. NNWWRR//SSCC//MMTT

DD--

DDEEMMUU//CCiivviill--

331100116611880011

CCoonnssttrruuccttiioonn ooff aallll CCiivviill

WWoorrkkss aanndd aallll aalllliieedd

wwoorrkk ffoorr DDEEMMUU

mmaaiinntteennaannccee ffaacciilliittiieess

aatt MMeerrttaa RRooaadd

OOppeenn tteennddeerr 3311..0077..1155 SSiinnggllee 0044..0099..1155 0088 ((EEiigghhtt)) •• MM//ss KKaalluu

RRaamm

CCoonnttrraaccttoorr

JJooddhhppuurr

((JJVV))

•• MM//ss

SSppaacceecchhee

mm

KKeerraarraamm

•• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

HHiimmmmaatt

nnaaggaarr

•• MM//ss SShhrreeee

HHaarrsshhaa

CCoonnsstt

SSaannjjeeeevv

BBrrootthheerrss

LL--11 DDyy..CCEE//CC//

JJUU//______//

22001155--

1166//DDEEMMUU,,

ddttdd.. ..............1155

MM//ss PPrreemm FFaabbrriiccaattoorrss,,

MMoorriiyyaa,, CChhaannggooddaarr,,

AAhhmmeeddaabbaadd

1166..4477 CCrr.. 0066..0066..1177

3311..0088..1177

1111..1122..1155 WWoorrkk iiss iinn

pprrooggrreessss

Page 24: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

24

AAmmiitt ((JJVV))

JJooddhhppuurr..

•• MM//ss PPMMPP

IInnffrraatteecchh

PPvvtt LLttdd

SSoollee AADDII..

•• MM//ss

BBhhaarraatt

SSuunn PPiippee

&& CCoonnsstt..

CCoo.. JJaaiippuurr..

((JJVV)) JJaaiippuurr

•• MM//ss TT..SS..RR..

MMaannuusshhrreeee

((JJVV))

HHyyddeerraabbaadd

99.. NNWWRR//SSCC//RRKK

BB--JJSSMM//CCiivviill--

33110033000000110000

44

LLNN--MMJJ sseecc.. --RRUUBBss iinn

lliieeuu ooff LLCCss ((1122 NNooss LLCCss

uunnddeerr PPiinnkk BBooookk iitteemm

NNoo.. 9933 ooff 22001155--1166))

OOppeenn tteennddeerr 0099..1122..1155 SSiinnggllee 1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss

RRaacchhaannaa--

SSNNCCCC JJVV

•• MM//ss JJaayy

JJaawwaann

CCoonnsstt.. CCoo

•• MM//ss SSaattiisshh

KKeerraa RRaamm

AAmmiitt

•• MM//ss

MMoohhaannllaall

MMaannaaggaannllaa

ll KKaakkrreecchhaa

•• MM//ss JJCCCC

IInnffrraa

•• MM//ss MM..HH..

KKhhaannuussiiyyaa

•• MM//ss RRaammaa

KKiisshhaann

•• MM//ss

RRaacchhaannaa--

SSNNCCCC JJVV

•• MM//ss JJaayy

JJaawwaann

CCoonnsstt.. CCoo

•• MM//ss SSaattiisshh

KKeerraa RRaamm

AAmmiitt

•• MM//ss

MMoohhaannllaall

MMaannaaggaannllaall

KKaakkrreecchhaa

•• MM//ss JJCCCC

IInnffrraa

•• MM//ss RRaammaa

KKiisshhaann

LL--11 DDyy..CCEE//CC//

JJUU//2233// 22001166--

1177//LLHHSS// LLNN--

MMJJ,, ddttdd..

1122..0077..1166

MM//ss MM..HH..KKhhaannuussiiyyaa,,

HHiimmaannttnnaaggaarr--338833000011

DDiisstt-- SS..KK..((GGuujjrraatt))

1122..7711 CCrr.. 0011..1111..1177 1122..0055..1166 WWoorrkk iiss iinn

pprrooggrreessss

1100.. NNWWRR//SSCC//JJUU//

CCiivviill ––

33110033000000110000

55

PPPPRR--BBAARRAA sseecc-- RRUUBBss iinn

lliieeuu ooff LLCCss ((2222 NNooss.. LLCCss

uunnddeerr PPiinnkk BBooookk iitteemm

NNoo.. 110033 ooff 22001155--1166))

OOppeenn tteennddeerr 0099..1122..1155 TTwwoo ppaacckkeett

ssyysstteemm

1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss

RRaakkeesshh

CCoonnssttrruuccttii

oonn CCoo.. JJVV

RRaajjkkoott

•• MM//ss

DDRRAAIIPPLL ––

XXTTPPLL JJ..VV..

AAhhmmeeddaabbaa

dd

•• MM//ss

RRaacchhaannaa ––

BBhhaannwwaarr

LLaall

BBiijjaarrnniiaa JJVV

NNaaggoouurr

•• MM//ss JJCCCC

IInnffrraapprroojjee

•• MM//ss RRaakkeesshh

CCoonnssttrruuccttiioo

nn CCoo.. JJVV

RRaajjkkoott

•• MM//ss DDRRAAIIPPLL

–– XXTTPPLL JJ..VV..

AAhhmmeeddaabbaadd

•• MM//ss

RRaacchhaannaa ––

BBhhaannwwaarr

LLaall BBiijjaarrnniiaa

JJVV NNaaggoouurr

•• MM//ss JJCCCC

IInnffrraapprroojjeecctt

ss PPrriivvaattee

LLiimmiitteedd,,

AAjjmmeerr

•• MM//ss MMHHKK

RRPPPPLL ((JJVV))

HHiimmaattnnaaggaarr

•• MM//ss PPCCCC ––

LL--11 NNWWRR//SS&&CC//CCAA

//7722//22001166--

1177//LLHHSS,, ddttdd

0066..0077..1166

MM//ss SShhrreeee KKaarrnnii

TTrraaddeerrss,, BBiikkaanneerr

((RRaajjaasstthhaann)) 333344000011

2211..1199 CCrr.. 0011..1111..1177 1166..0055..1166 WWoorrkk

ccoommpplleetteedd

FFiinnaall bbiillll

uunnddeerr

pprreeppaarraattiioonn

Page 25: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

25

ccttss PPrriivvaattee

LLiimmiitteedd,,

AAjjmmeerr

•• MM//ss MMHHKK

RRPPPPLL ((JJVV))

HHiimmaattnnaaggaa

rr

•• MM//ss PPCCCC ––

HHaarriittaa

CCoonnssttrruuccttii

oonn

CCoommppaannyy

((JJVV)) HHiissaarr

HHaarriittaa

CCoonnssttrruuccttiioo

nn CCoommppaannyy

((JJVV)) HHiissaarr

1111.. NNWWRR//SSCC//MMTT

DD--

BBKKNN//CCIIVVIILL--

33110033000000110000

22--RR

MMTTDD--BBKKNN sseeccttiioonn-- RRUUBB

iinn lliieeuu ooff LLCCss,, ((1166 NNooss..

ooff LLCCss uunnddeerr PPiinnkk BBooookk

iitteemm NNoo.. 9977 && 110044 ooff

22001166--1177))

OOppeenn tteennddeerr 1177..0077..1166 TTwwoo ppaacckkeett

ssyysstteemm

1199..0088..1166 0044 ((FFoouurr)) •• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyy

aa,,

HHiimmaattnnaagg

aarr

•• MM//ss JJMMEESS

–– MMGGCC

((JJVV))

VV..PP..OO.. ––

NNaarrooddaarraa

•• MM//ss PPCCCC

–– HHaarriittaa

CCoonnssttrruuccttii

oonn CCoo..

((JJVV)),,

HHiissaarr

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss JJMMEESS

–– MMGGCC

((JJVV)) VV..PP..OO..

–– NNaarrooddaarraa

•• MM//ss PPCCCC ––

HHaarriittaa

CCoonnssttrruuccttii

oonn CCoo..

((JJVV)),, HHiissaarr

LL--11 -- MM//ss MM..HH.. KKhhaannuussiiyyaa,,

HHiimmaattnnaaggaarr

11882233..4455 0066..0044..1188 1100..0011..1177 WWoorrkk iinn

pprrooggrreessss

1122.. NWR/SC/RK

B-JSM/Civil-

3103000100

3-R

RRKKBB--JJSSMM sseeccttiioonn-- RRUUBB

iinn lliieeuu ooff LLCCss,, (20 Nos.

LCs under Pink Book

item No. 98 & 108 of

2016-17).

OOppeenn tteennddeerr 0033..0088..1166 TTwwoo ppaacckkeett

ssyysstteemm

0066..0099..1166 0044 ((FFoouurr)) •• MM//ss

RRaacchhaannaa

–– SSNNCCCC

JJVV,,

JJooddhhppuurr..

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyy

aa,,

SSuunnsshhiinnee

IInnffrraassttuucctt

hheerr ((JJVV)),,

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

SSuunnsshhiinnee

IInnffrraassttuucctthh

eerr ((JJVV)),,

HHiimmaattnnaaggaa

rr

•• MM//ss SSBB ––

JJaaggttaajjii

((JJVV)),, NNeeww

DDeellhhii ––

LL--11 MM//ss RRaacchhaannaa –– SSNNCCCC

JJVV,, JJooddhhppuurr

22116622..3344 1133..0055..1188 1155..0011..1177 WWoorrkk iinn

pprrooggrreessss

Page 26: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

26

HHiimmaattnnaagg

aarr

•• MM//ss SSBB ––

JJaaggttaajjii

((JJVV)),, NNeeww

DDeellhhii ––

111100001188

111100001188

1133.. 4103000010

06

NNWWRR//SSCC//RRUUBB//CCiivviill--

441100330000000011000066 ––

BBaarrmmeerr--MMuunnaabbaaoo

sseeccttiioonn -- RRooaadd uunnddeerr

bbrriiddggeess iinn lliieeuu ooff LLeevveell

CCrroossssiinnggss ((0077 NNoo.. LLCCss

uunnddeerr PPBB iitteemm NNoo..110000

ooff 22001166--1177))

OOppeenn tteennddeerr 0066..1111..22001166 SSiinnggllee 0088..1122..1166 0044 ((FFoouurr)) •• MM//ss

JJaaggttaajjii

IInnffrraassttrruucc

ttuurree,, JJGG--

IIIIII//7733--AA,,

VViikkaassppuurrii,,

NNeeww DDeellhhii

111100001188

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss MM..HH..

KKhhaannuussiiyyaa,,

HHiimmaattnnaaggaa

rr

•• MM//ss

BBhhaannwwaarrllaall

VViillll--

RRaajjppuurraa,,

PPoosstt

PPrreewwaarrii,,

DDiisstttt..

NNaaggoouurr

LL--11 -- MM//ss JJaaggttaajjii

IInnffrraassttrruuccttuurree,, JJGG--

IIIIII//7733--AA,, VViikkaassppuurrii,,

NNeeww DDeellhhii 111100001188

887755..7777 0022--0099--1188 -- -- NNOOCC ffrroomm

aarrmmyy iiss ssttiillll

aawwaaiitteedd..

1144.. NWR/SC/RU

B/Civil-

4103000100

7

NWR/SC/RUB/Civil-

41030001007 samdari-

BBaarrmmeerr sseeccttiioonn -- RRooaadd

uunnddeerr bbrriiddggeess iinn lliieeuu ooff

LLeevveell CCrroossssiinnggss ((1133 NNoo..

LLCCss uunnddeerr PPBB iitteemm NNoo..

7733 ooff 22001166--1177 && 0044 NNoo..

LLCCss uunnddeerr PPBB iitteemm NNoo..

110000 ooff 22001166--1177))

OOppeenn tteennddeerr 0066..1111..22001166 TTwwoo ppaacckkeett

ssyysstteemm

0088..1122..1166 0044 •• MM//ss MM..HH..

KKhhaannuussiiyy

aa,,

HHiimmaattnnaagg

aarr

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss JJMMEESS

–– MMGGCC

((JJVV))

VV..PP..OO.. ––

NNaarrooddaarraa

•• MM//SS

RRaammaakkiisshh

aann AAsshhookk

kkuummaarr

((JJVV)) 220055,,

SSaarrddaarrppuurr

aa JJUU..

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

••

LL--11 NWR/SC/RUB

/Civil-

4103000100

7

MM//SS RRaammaa kkiisshhaann

AAsshhookk kkuummaarr ((JJVV)) 220055,,

SSaarrddaarrppuurraa JJUU..

22224411..3333 0066..1100..22001188 NNOOCC ffrroomm

aarrmmyy iiss ssttiillll

aawwaaiitteedd..

1155.. NWR/SC/RO

B/Civil-

4103000090

86

NWR/SC/ROB/Civil-

410300009086

construction of

complete ROB including

Approaches in lieu of

OOppeenn tteennddeerr TTwwoo ppaacckkeett

ssyysstteemm

1100..0033..1177 0088 •• MM//ss MM..HH..

KKhhaannuussiiyy

aa,,

HHiimmaattnnaagg

aarr

•• MM//ss

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• MM//ss

RRaacchhaannaa

LL--11 - •• MM//SS SSoonnaa BBuuiillddeerrss--

RRCC PPaatteell JJVV

MMeehhssaannaa

33669999..1144 0044..0077..1199 -- -- --

Page 27: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

27

existing LC No. C- 56 at

JM: 77/2-3 and C- 109

at KM: 145/9 – 146/0

on SMR-BLDI section

RRaacchhaannaa

AAnnkklleesshhww

aarr

•• MM//ss SShhrreeee

KKaarrnnii

TTrraaddeerrss,,

BBiikkaanneerr

•• LLaall CCoonnsstt..

CCoommppaannyy

•• MM//SS SSoonnaa

BBuuiillddeerrss--

RRCC PPaatteell

JJVV

MMeehhssaannaa

•• RRaavvii iinnffrraa

bbuuiilldd

pprroojjeeccttss

PPvvtt.. LLttdd..

UUddaaiippuurr

•• RRaaddhhee

aassssoocciiaattee

ss

MMeehhssaannaa

•• VVPPRRPPLL--

RRBBIIPPLL

SSaammddaarrii

JJVV

AAnnkklleesshhwwaa

rr

•• VVPPRRPPLL--

RRBBIIPPLL

SSaammddaarrii JJVV

•• RRaaddhhee

aassssoocciiaatteess

MMeehhssaannaa

Dy. CE/C/II-JU

1. NWR/SC/Thaiyat/Civil-310111802

Construction of all Civil

work & all other misc.

works between Thaiyat

Hamira – Sanu new BG

line project (56.250

kms.).

Open

temder

11.09.15 Two packet

17.11.15 07 M/s SCC JV

PMP

Infratech, A-

Block, A-104,

Ganesh

Meridian,

Ahmedabad

4 Nos

M/s DRD MI

JV

M/s Bhaniyana

Const. JV

M/S Apex

Termic PVT

(JV)

M/S Ravi-HG

(JV)

L-1 NWR/SC

/CA/73 dt.

17.08.16

M/s SCC JV PMP

Infratech, A-Block, A-

104, Ganesh Meridian,

Ahmedabad

11733.94 22.03.18 27.04.16 Work in

progress

2. NWR/SC/Thi

yat/Civil-319110604

Work of modification of

existing rooms for office

set up at Jaisalmer

under Dy.CE(C)-II/

Jodhpur’s unit

Open

tender

04.03.16 Single 12.04.16 02 M/s B.S.

Construction

s,2-A, LGF,

Rishabh

Corporate

Tower,

Karkardoom

Cummunity

Centre, New

Delhi-110092

01

M/s

S.D.Builders

Jaisalmer

L-1 Dy.CE/C/

JU/CA/02,

dtd.

25.08.16

MM//ss BB..SS..

CCoonnssttrruuccttiioonnss,,22--AA,,

LLGGFF,, RRiisshhaabbhh

CCoorrppoorraattee TToowweerr,,

KKaarrkkaarrddoooomm

CCuummmmuunniittyy CCeennttrree,,

NNeeww DDeellhhii

105.50 2266..0022..1177

3300..0099..1177

08.07.16 Work in

progress,

-

3. NWR/SC/Thi

yat/Civil-

Providing “IN SITU”

Glued Insulated Joint in

Open

tender

27.1216 Singal 02.02.17 5 M/s Creative

Engineers, F-

1.M/sDyna

mic

L-1 Dy.CE/C/

JU/CA/

M/s Creative

Engineers, F-189,

173.15 30.05.19 - - -

Page 28: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

28

319110507-R

c/w. Thaiyat Hamira–

Sanu new BG line

project & Marwar Jn.-

Rani section in MJ-Rani

BG Patch Doubling

project

189, Road

No. 5,

Indraprasth

lnd Area,

Kota (Raj.)

324005

Engineers

2 M/s

Kushal

Engineering

3 .M/s

Tirupati

Metal

Fabricators

4. M/s

Diamond

Steel Ind.

dtd. Road No. 5,

Indraprasth lnd Area,

Kota (Raj.) 324005

Page 29: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

29

Dy. CE/C/BKN

1 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR

Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.

Open tender

17.09.311 single 17.10.11 2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

Yes 173-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat

Rs 534.82 lakhs

01.06.12 05.01.12 30.06.16 Contract terminated on 10.06.2016.Final variation in process.

2 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station

yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project

Open tender

20.01.12 single 22.02.12 2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

Yes 178-NWR/Dy CE/C-I/BKN Dt 18.08.2012

M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003

Rs 531.61 lakhs

25.12.12 24.05.12 05.06.17 Work completed.

Page 30: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

30

3 Const/BKN/09(R)/2011-

12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.

Construction and modification of station buildings, platform,

platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

20.01.12 single 28.03.12 04 nos Tender awarded to evaluated

L-1 .

Tender awarded to evaluated L-

1.

Yes 177-NWR/Dy CE/C-II/BKN

Dt 07.08.12.

M/S Maheshwari Construction Co Bikaner Road,

Nokha(Bikaner)

Rs 647.31 lakhs

03.03.13 06.07.12 31.07.16 Final bill under Technical

checking.

4 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012

Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project

Open tender

26.05.12 single 27.06.12 05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 20/NWR/Dy CE/C/BKN/2012-13/SRPR-SGNR Dated 19.10.2012

M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur

Rs137.94 lakhs

28.12.12 07.09.12 31.03.14 Contract terminated. Final variation in process.

5 Tender No. NWR/SC/SURP-HMH-SGNR/Civil-412140609 dated 27.10.2015

Construction of Gang shelters, development of circulating area, white washing & painting work on newly constructed station buildings & level crossing duty huts and other residual works between Diplana ( excluding) km 88 to Suratpura ( including) km 175 section and misc. works in Officers /Subordinate Rest House at Sadulpur in connection with Suratpura- Hanumangarh- Sri Ganganagar gauge conversion project

Open tender

31.10.15 single 26.03.14 04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 28/NWR/Dy CE/C/BKN/2015-16 Dated 03.02.2016

M/S Shree Shyam Engineering Co.,29, Poonia Colony,Churu (Rajasthan)

Rs 184.30 lakhs

02.04.16 04.12.15 30.06.16 Final variation under finance vetting.

Page 31: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

31

6 Tender No. NWR/SC/

Sadulpur-Bikaner/Civil-412140107 Dated 29.10.2015

Earthwork in cutting and filling, Construction of minor Bridges/ Road

under Bridges, Limited Height Subway in lieu of LC No 8, toe wall, pitching, Rooms for S & T structure at takeoff point and other ancillary works from takeoff point on Ratangarh- Bikaner section to Km 1/500, in Ratangarh to Sardarshahar section in connection with Ratangarh- Sardarshahar gauge conversion project

Open tender

02.11.15 Two packet 04.12.15 07 nos Tender awarded to evaluated

L-1 .

Tender awarded to evaluated L-

1.

Yes 31/NWR/Dy CE/C/BKN/2015-16

Dated 31.03.2016

M/S BPL-MCPL (JV), A/9, Kumud Apartment, Near

Amco Bank, Off. C.G.Road, Navrangpura, Ahmedabad-380009

Rs 1084.47 lakhs

01.11.16 25.02.16 15.08.17 Work completed.

7 Tender No. NWR/SC/BNW/Civil-412161111 dated

02.01.16

Earthwork in embankment, construction of minor bridge & S & T structure, supplying of stone ballast and linking of track and

other ancillary works in connection with “Provision of Bhiwani Bye Pass Railway line.

Open tender

06.01.16 single 10.02.16 05 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 32/NWR/Dy CE/C/BKN/2016-17 Dated 30.08.2016

M/S Shree Shyam Engineering Co.,29, Poonia Colony, Churu (Rajasthan)

Rs 136.08 lakhs

01.11.16 02.05.16 30.09.17 work is in progress.

8 Tender No. NWR/SC/EI at BNW, STD & LGH/2016-17/Civil-412160503 dated 05.07.2016

Providing in Situ Glued Insulated Joints of G-3 (L) type for 52 kg/60 kg rails as per RDSO drawing No. T-671/T-2572 and confirming to the specfication as per instructions contained in Manual for Glued insulated rails joints in connection with EI works at Bhiwani and Satrod and RRI work at Lalgarh and at any other location in the jursidiction of Bikaner Construction unit.

Open tender

08.07.16 single 10.08.16 04 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes PG yet to be submitted.

M/S Tirupati Metal Fabricators, 1433, Sector -16, Faridabad (Haryana)-121002

Rs 102.58 lakhs

23.04.17 24.09.16 23.03.18 work is in progress.

Page 32: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

32

9 Tender No. NWR/SC/

Sadulpur-Bikaner/ 2016-17/ Civil - 412140102 dated 22.07.2016

Earthwork in banks and cutting for formation including side drains,

trolley refuges, toe walls/retaining wall, stone pitching etc. and other miscellaneous works between Ratangarh Junction cabin km 0.00 at km 329/6-7 on Ratangarh – Bikaner section) to Sardarshahar (including) km 46/750 in connection with Ratangarh- Sardarshahar gauge conversion project.

Open tender

24.07.16 single 29.08.16 04 Nos Tender awarded to evaluated

L-1 .

Tender awarded to evaluated L-

1.

Yes PG yet to be submitted.

M/S Gurukrupa Enterprises, 2A,2nd Floor, Navnath

Soc.2,B/H, Shradhadeep Soc.,Sharda School Road , Singanpor-Causway Road, Surat-395004

Rs 784.49 lakhs

27.03.17 15.10.16 15.11.17 work is in progress.

CE/C/HQ-JP

Dy. CE/C/DO

1 DO/GG

C/NL/1

8

Construction of Broad Gauge

Formation & Minor Bridges

from Chainage 41000.00 to

45000.00 between Dausa

and Lalsot in connection

with Dausa- Gangapur City

New Broad Gauge line

project.

Open t

ender

Single packet

system

14/1

1/2

007 Yes NWR/S&C/CA/97

dated

03/03/2008

M/s Atlanta-

ARSS (JV)

Bhubneshwar

(Orissa)

17.95 Crore 30/07/09

extended

upto

30/06/2014

14/03/08 - Work short

closed vide

HQ’s letter

dated

18/06/2014.

Final

measurement

s under

process

2 DO/GG

C/NL/2

1

Construction of BG

formation and Minor Bridge

from chanaige 45000 to

60000 bet. Lalsot and

Gangapur City in connection

with DO-GGC New B G line

Project O

pen

tender

24/0

9/2

007

Single Packet

system

02/1

1/2

007 3 Yes NWR/S&C/CA/95

dated

18/02/2008

M/s. ARSS

Infrastructure

Projects

Limited,

Bhubaneshwa

r

8.41

Crores

20/03/09

Extended

upto

30/06/15

15/03/08 - Contract has

been short

closed. Final

bill under

process

3 DO/GG

C/NL/2

2

Construction of BG

formation and Minor Bridge

from chanaige 60000to

75000 bet. Lalsot and

Gangapur City in connection

with DO-GGC New B G line

Project

O

pen t

ender

24/0

9/2

007 Single Packet

system

02/1

1/2

007 3 Yes Dy.

CE/C/I/JP/CA/17

dated

29/02/2008

M/s. ARSS

Infrastructure

Projects

Limited,

Bhubaneshwa

r

6.71 Crores 10/03/09

Extended

upto

30/06/2014

10/03/08 - Final variation

has been

vetted and

sanctioned.

Final bill

being

submitted to

A/c shortly.

Page 33: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

33

4 DO/GG

C/NL/3

1

Construction of ROBs across

Railway track at chainage

37034,83925 & 37925 and

drainage over pass at

chainage 36960 & 37520

between salempura to

Udaikalan station

inconnection with Dausa-

Gangapurcity new BG line

project Open t

ender

Single packet

system

16/0

2/2

010

11 - - Yes NWR/S&C/CA/10

5 dated

22/11/2010

M/s Shree

Ram Kripa

Construction

Jaipur

13.44 Crore 29/02/2012.

Extended up

to

30/04/2016

- - Work

completed.

Final bill

under

process.

5 DO/GG

C/NL/3

0

Construction of single line

13 standard straight

alignment tunnel in soil and

rock including cut and cover

portion between chainage

38/720 to 40/840 including

side drain and other

approaches of tunnel

between Didwana- Lalsot

Railway station in

connection with Dausa-

Gangapurcity new BG line

project. Open t

ender

Single packet

system

27/0

7/2

009

12 - - Yes NWR/S&C/CA/10

6 dated

29/12/10

M/s Valecha-

Transtonelstr

oey (J/V)

Mumbai

53.02 Crore 27/09/2012.

Extended

upto

31/12/2015

- - Work

terminated on

07/07/2015.

Final bill is

under

technical

check..

6 DO/GG

C/NL/4

0

Laying and linking of BG

track and transportation of

P.Way material, PSC

sleepers etc between Dausa-

Deedwana section in

connection with Dausa-

Gangapurcity new BG line

project. Open t

ender

28/0

3/2

011

Single packet

system

18/0

5/2

011

6 - - Yes

Dy.CE/C/DO/CA/

56 dated

18/10/11

M/s Goel

Brothers Rail

Infra Pvt.

Ltd., Bareilly.

5.66 Crore 01/08/2012.

Extended

upto

31/10/2014

13/09/11 Work under

disputes.

7 DO/GG

C/NL/1

0(R&C)

R

Construction of broad gauge

formation from chainage

15000 to 28000 in

connection with Dausa

Gangapurcity new line

project(Risk & cost tender). Open t

ender

Single packet

system

11/0

1/2

013

2

- - Yes Dy.CE/C/DO/CA/

68 dated

16/04/13

M/s MCD Pvt.

Ltd., &

Aastha

Construction

Co.(JV),

Jaipur

3.30 Crore 05/07/13

Extended

upto

15/10/2014

08/04/2013 - Completed.

Final

measurement

s under

process.

8 DO/GG

C/NL/6

0R

Construction of minor

bridges from chainage 00 to

30000 between Dausa-

Lalsot in connection with

Dausa- Gangapurcity new

BG line project open t

ender

Single packet

system

20/1

1/2

013

3 - - yes Dy.CE/C/DO/CA/

74 dated

14/03/2014

M/s Shree

Ram Kripa

Constructions

, Jaipur

Rs.4.74 Crore 10/06/2014

Extended

upto

31/12/2015

26/12/2014 Work

completed.

Final

measurement

s under

process.

9 DO/GG

C/NL/5

3

Construction of 3 nos Low

Over Pass at LC No. 4, 26 &

27 on Dausa- Gangapurcity

secton

Open t

ender

Two packet

system

06/0

9/1

3

4 - - Yes NWR/S&C/CA/13

6 dated

03/06/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.10.44 Crore 08/04/15

extended

upto

28/02/2017

- - Work in

progress.

Page 34: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

34

10 DO/GG

C/NL/5

6

Construction of Road Over

Bridge at LC No. 5B on

Dausa- Gangapurcity

section

Open t

ender

Two packet

system

06/0

9/1

3

6 - - Yes NWR/S&C/CA/13

4 dated

16/05/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.13.43 Crore 12/07/15

extended

upto

30/05/2017

- - Work

completed.

Final variation

under

approval with

HQ.

11 DO/GG

C/NL/5

7

Construction of Road Over

Bridge at LC No. 24B on

Dausa- Gangapurcity

section O

pen t

ender

Two packet

system

06/0

9/1

3

4 - - Yes NWR/S&C/CA/13

5 dated

19/05/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.13.75 Crore 09/07/15

Extended

upto

31/03/2017

- - Agreement

executed.

Work held up

for want of

funds and

approval of

MoRTH

12 AWR-

BKI/Do

ubling/

T/2

Earthwork in bank/cutting

including blanketing

material, construction of

major/minor bridges

including drop/curtain

walls, LHS, construction

S&T structures, platform

walls, PF shelters, FOB,

water huts, Staff quarters

etc. supply of stone ballast

and dismantling of existing

BG track, laying and linking

of Broad gauge main line,

loop lines including points

and crossings of various

yards spreading of ballast,

tamping of track

transportation of P. Way

material and other ancillary

works between Alwar-

Bandikui section in

connection with AWR-BKI

Doubling project.

Open

Two packet

system

21/0

3/2

016

8 6 2 Yes

NWR/S&C/CA/15

7 dated

05/09/2016

M/s NG

Project Ltd.-

M/s. Deem

Construction

Co. Pvt. Ltd

(JV), Jaipur

Rs.118.24

Crore 17/05/18 - -

Work in

progress.

13 NWR/S

C/DO-

GGC/C

IVIL/5

14110

468

Supplying and stacking

machine crushed stone

ballast in stacks as per

Railway’s specifications

between Dausa &

Gangapurcity stations in

connection with Dausa-

Gangapurcity new line

project

open

Two packet

system

31/0

8/1

6

2 - 2 Yes

Dy.

CE/C/DOCA/81

dated

23/12/2016

M/s J.K.

Construction

Co., Nokha,

Distt Bikaner

Rs.14.33

Crore 06/04/18 - -

Work in

progress

Page 35: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

35

14 NWR/S

C/DO-

GGC/C

IVIL/5

14111

804

Construction of balance work of single line BG standard straight alignment tunnel in soil and rock including cut & cover portion, side drains, protection works on approaches of tunnel and other ancillary works from chainage 38600 to 40900 between Didwana & Lalsot Railway stations in connection with Dausa- Gangapurcity new BG line project

Open

Two Packet

system

20/0

6/2

016

5 3 2 Yes

NWR/S&C/CA.16

5 dated

01/02/17

M/s TCL-UTM

JV, Gurgoan Rs.54.46 Crore 22/03/18 - -

Work in

progress

15 NWR/S

C/LHS/

CIVIL/

51430

00100

1

Construction of kimited Height sub-way (08 nos) in lieu of level crossings in Dausa- Gangapurcity new line section in connection with elimination of level crossings O

pen

Two Packet

system

07/0

9/2

016

8 5 3 Yes

Dy. CE/

C/DO/CA/86

dated 10/03/17

M/s JMES-

KDC-

JPIS(JV),

Beawar,

Ajmer

Rs.10.00 Crore 04/02/2018 - - Work in

progress

16 NWR/S

C/DO-

GGC/C

IVIL/5

14110

201

Misc. balance works like finishing work of quarters, station buildings, platforms and construction of LHS providing platform covering, cess repairing, circulating area etc. between Dausa & Deedwana stations in connection with Dausa- Gangapurcity new line project

Open

Two Packet

System

13/1

0/2

016

7 5 2 Yes

Dy. CE/

C/DO/CA/83

dated 28/01/17

M/s. MCDPL-

Sunrise Infra

Project (JV),

Ajmer Road,

Jaipur

Rs.9.70 Crore

15/05/17

Extended

upto

30/09/2017

- - Work in

progress

17 NWR/S

C/Alwa

r-

Bandik

ui/Civil

/51415

0803-

R

Flash butt welding of 60/ 53kg New/SH (72/90UTS) Rail joints by using mobile flash butt welding plant in connection with Alwar- Bandikui and Dausa- Gangapurcity new line project.

Open t

ender

Two packet

system

28/1

0/2

016

1 1 0 Yes

Dy. CE/

C/DO/CA/85

dated 06/03/17

M/s Railtech

Infraventure

Pvt. Ltd.

Allahabad

Rs.11.15 Crore 15/05/2018 - - Work in

progress

Page 36: CE/C/I-JP Dy. CE/C/I-JP - Indian Railway Ganganagar - 335001 926.07 Lakhs 30.04.17 Ext. 30.9.17 05.09.2015 STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE

STATEMENT SHOWING THE DETAILS OF WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF SEPTEMBER, 2017 (Rs. 1 Crore above)

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

36

For CAO/C/JP

18 NWR/S

C/DO-

GGC/C

IVIL/5

14110

869-R

Balance work of laying & linking of Broad Gauge main line loop lines including points & crossings in yards, spreading of ballast, tamping of track transportation of P-Way material and other ancillary works between Dausa- Gangapurcity new line project

Open

Single packet

system

23/1

1/2

016

- - - Yes

Dy. CE/

C/DO/CA/84

dated 17/02/17

M/s P.C.

Sharma,

Noida.

Rs.3.93 Crore

05/06/17

Extended

upto

31/07/17

- - Work in

progress

19 NWR/S

C/DO-

GGC/C

IVIL/5

14110

170

Balance earthwork and blanketing work including side drain, trolley refuges

pitching diversion road etc. from chainage 67400 to 92670 between Piplai village and Gangapurcity in connection with Dausa- Gangapurcity new line project

Open

Two packet

system

17/0

4/2

017

2 1 1 Yes

M/s. KB-Shiv

Om (JV),

New Delhi.

Rs.13.60

Crore 20/06/18 - -

Work in

progress