cec international corporation india pvt. ltd. · jatinga junction to harangajao of nh-54 in the...
TRANSCRIPT
CEC International Corporation India Pvt. Ltd.
1
Company ProfileFounded : December 29, 1945
Capital : USD 200 Million
Headquarters : No.95 Dun Hua South Road,
Manpower : 1051 in Taiwan817 in India
Headquarters : No.95 Dun Hua South Road, Section 2, Taipei 106, Taiwan
Tel 886-2-3701-1000
Fax 886-2-3701-2888
Indian Office : 9th Floor, DLF Tower 9A, Next to Ericsson Building, DLF City Ph-III, Gurgaon – 122002Tel: 0124-4588888Fax 886 2 3701 2888
Web: www.cec.com.twTel: 0124-4588888Fax: 0124-4588897
Major Business
Civil Eng. and ConstructionHigh Speed Rail and MRTBuilding Construction
Real Estate & Community Development
Environmental Engineering EPC / BOT
India / Vietnam / Saudi Arabia
2
FACTSHEET
We got registered in Delhi in December 2005 and started fully operational office by April 2006. Since then, we have signed many large scale infrastructure projects with government as well as private entities to help them in building transportation infrastructure.
2007 Awarded Delhi Metro project between Green Park and Udyog Bhawan, having twin tunnels of 8 kms and 6.25 meters outer diameter with four under ground stations, INDIA
2007 Four laning of Hyderabad-Bangalore Section from km293.4 to km 336 of NH-7 in the State of Andhra Pradesh -ADB-II/C-12, INDIA/ ,
2007 Four laning of Hyderabad-Bangalore Section from km336 to km 376 of NH-7 in the State of Andhra Pradesh -ADB-II/C-13, INDIA
2007 Outer Ring Road in Hyderabad; Construction of six/eight lane access controlled Expressway as Outer Ring Road to Hyderabad City. Package No-II (From Km 11.000 to 24.380), INDIA
2006 Contract Package AS-21 (EW-II), Assam; Construction of 4-Lane Highway from km 165/400 to km 190/587 of Jatinga Junction to Harangajao of NH-54 in the State of Assam, INDIA
2006 C t t P k AS 22 (EW II) A C t ti f 4 L Hi h f k 140/700 t k 164/080 f2006 Contract Package AS-22 (EW-II), Assam; Construction of 4-Lane Highway from km 140/700 to km 164/080 of Nrimbanglo to Jatinga Junction Section of NH-54 in the State of Assam, INDIA
2006 Konkan Railway Project - Construction of Civil Works (km30/000 - km50/400) of Single BG Line on Katra-Loale Section Under USBRL Project.
2006 SEZ in Andhra Pradesh - Construction of all the buildings covering Factory Buildings, Office Buildings and Utility Buildings for Apache Footwear company, production house for Adidas Shoe, in various phases.
2005 East West NH Corridor Project- Package EWII (RJ-7), Rehabilitation and Upgrading of Km 253.000 to Km 316 000 of NH-76 to 4-Lane Configuration in the State of Rajasthan316.000 of NH-76 to 4-Lane Configuration in the State of Rajasthan.
Projects in India and AsiaProject Client Contract Amount Type of Work Year Status
MRTS: Udhyog Bhawan & Green Park stations Delhi Metro Rail Corp., India 203M. USD tunnel./station 2007~2010 under construction
EW Corridor project EWII(RJ-7), India NHAI, India 94 M. USD Highway 2005~2008 under construction
Outer Ring Road in Hyderabad, India Hyderabad G.C. L. 74 M. USD Highway 2007~2008 under construction
EW-II - AS-21,As-22, Assam, India NHAI, India 123 M. USD Highway 2006~2009 under construction
Hyderabad-Bangalore, Andhra Pradesh NHAI, India 111 M. USD Highway 2007~2009 under construction
Viaduct on BG Line of Katra-Loale Section Konkan Railway Corp. Ltd. 57 M. USD Railway 2007~2009 under construction
Adidas SEZ in Andhra Pradesh Apache Investment Holding 6 75 M USD Office / Factory Building 2008 completionAdidas SEZ in Andhra Pradesh Apache Investment Holding 6.75 M. USD Office / Factory Building 2008 completion
Postal center of Riyadh Saudi Arabia - office building ~1983 completion
MOIE Headquarter, Riyadh Saudi Arabia - office building ~1980 completion
Vietnam Highway No.5 MOTC, Vietnam 25 M. USD freeway 1994~1997 completion
Pan-Horizon Garden Service Apartment Pan-Horizon Co. Vietnam Service Apartment 1998 completion
…..
41 USD = 30 NTD
Civil Eng. & ConstructionProject Client Contract Amount Type of Work Year Status
Yunlin Hushan reservior dam Water Resource 5.3 B. NTD dam/earthwork 2007~2013 under construction
E/W C802Z Guanyin san tunnel Freeway Bureau 2.2 B. NTD tunnel 2004~2008 under construction
E/W expressway E802~E806 Highway Bureau 2 3 B NTD bridge/earthwork 1997~2004 completionE/W expressway E802 E806 Highway Bureau 2.3 B. NTD bridge/earthwork 1997 2004 completion
E/W expressway E507 Highway Bureau 2.0 B. NTD bridge/earthwork 1998~2002 completion
Airport underground tunnel Taipei City 3.1 B. NTD tunnel 1997~2002 completion
Macarthur No.1 bridge & approach Taipei City 2.3 B. NTD steel arch bridge /steel bridge 1998~2001 completion
2 d f C348 F B 2 B NTD l/ h k/b id 199 2001 l i2nd freeway C348 Freeway Bureau 2.7 B. NTD tunnel/earthwork/bridge 1997~2001 completion
2nd freeway Bi-tan bridge & #5 tunnel Freeway Bureau 2.2 B. NTD PC arch bridge /tunnel 1990~1996 completion
Miaoli Hsin Dong bridge Miaoli County 479 M. NTD steel cable-stay bridge 1996~1998 completion
. . . . .
51 USD = 30 NTD
HSR and MRTProject Client Contract Amount Type of Work Year Status
Taipei MRT CR580A Taipei City 8.1 B. NTD tunnel/station 2005~2011 under construction
Taipei MRT CB420 Taipei City 3.0 B. NTD tunnel/station 2002~2007 completion
Taiwan High Speed Rail S250 THSRC 5.2 B. NTD station 2002~2005 completionTaiwan High Speed Rail S250 THSRC 5.2 B. NTD station 2002 2005 completion
Taiwan High Speed Rail S295 THSRC 3.3 B. NTD station 2002~2005 completion
Taiwan High Speed Rail C260 THSRC 19.2 B. NTD tunnel / bridge 2000~2004 completion
Taiwan High Speed Rail C270 THSRC 21.9 B. NTD bridge 2000~2004 completion
T i i MRT CD550 T i i Cit 13 1 B NTD t l/ t ti /d t/E&M 2001 2003 l tiTaipei MRT CD550 Taipei City 13.1 B. NTD tunnel/station/depot/E&M 2001~2003 completion
Taipei MRT CP261 Taipei City 4.1 B. NTD tunnel/station 1992~1999 completion
Taipei MRT CN256 Taipei City 2.6 B. NTD tunnel/station 1991~1999 completion
. . . . .
61 USD = 30 NTD
Building ConstructionProject Client Contract Amount Type of Work Year of Completion Status
Banciao Bridge up to zenith FRG/CEC 3.1 B. NTD luxury residential building 2007~2010 under construction
Dream House Essential Con. & Develop. Co 544 M. NTD luxury residential building 2006~2008 under construction
Camp David in Taipei Fubon Land Develop Co 989 M NTD luxury residential building 2005 2008 under constructionCamp David in Taipei Fubon Land Develop. Co 989 M. NTD luxury residential building 2005~2008 under construction
Taipei New Art Hua Hui Co. 1.1 B. NTD luxury residential building 2005~2008 under construction
Fubon Tien-mu Building Fubon Land Develop. Co. 548 M. NTD luxury residential building 2006~2007 under construction
Corning Taichung 1&2 Fluor Daniel E. I. 1.8 B. NTD high tech. factory 2004~2005 completion
Quanta Lungtan LCD line3 Quanta Display I. 12.0 B. NTD high tech. factory 2004~2005 completion
Pfizer Danshui Parson Brinckerhoff I. 506 M. NTD office building 2003~2005 completion
Fubon Jenai Ming Tong &Tao Yi 865 M. NTD luxury residential building 2003~2005 completion
Macoto Bank Headquarter building Macoto Bank 1.7 B. NTD office building 2002~2004 completionq g g p
Duanhua S. Rd. Office Building TSRC, PEWC, CEC 1.1 B. NTD office building 1998~2002 completion
Hsinyi Fubon International Hall Fubon Land Develop. Co. 1.1 B. NTD luxury residential building 2000~2001 completion
Toseva Plant & Office Toseva Trading Co. 192 M. NTD plant/ office building 1999~2001 completion
T i A B ildi USI APC MC 459 M NTD ffi b ildi 1999 2001 l tiTai An Building USI, APC, MC 459 M. NTD office building 1999~2001 completion
Rule the World Construction Fu Sin Constru. Co. 189 M. NTD office building 1998~2000 completion
Ever New Biotech Inc. Plant & Office Ever New Biotech Inc. 195 M. NTD Plant & Office 1995~2000 completion
Hsin Yu Cogeneration Plant & Office Hsin Yu Cogeneration Co 158M. NTD plant/ office building 1998~1999 completion
Shulin Jenai hospital Jenai hospital 128 M. NTD hospital 1997~1999 completion
Hsinyi Hsinchi Building Kung Her Constru. Co 1.6 B. NTD office building 1995~1999 completion
Youth's Discipline Commercial/ Residential Building
Universal Cement Real Estate Co.
1.1 B. NTD commercial/ residential 1995~1999 completion
7
. . . . .
1 USD = 30 NTD
Building Construction
8
Real Estate DevelopmentProject Investor Investment Type of Building Year Status
Banciao Bridge up to zenith FRG/CEC 3.3 B. NTD Luxury residential building 2007~2011 under construction
The First Garden FB/CEC 0.8 B. NTD Office building / Luxury residential building 2005~2007 completion
Dazhi Commercial Complex CEC 3.0 B. NTD Outlet/shop/restaurant 2004~2005 completion
Century Palace CEC 1.1 B. NTD Luxury residential building 2002~2005 completion
Dun Hua South Road Office Building PEWC/CEC 8.0 B. NTD Office building 1998~2003 completion
A life of Pleasure Development CEC 1.1 B. NTD Luxury residential building 2000~2002 completion
Artech 21 CEC 1 6 B NTD Office building 2000~2002 completionArtech 21 CEC 1.6 B. NTD Office building 2000 2002 completion
The Time of Excellence Development CEC 1.5 B. NTD Office building 1999~2001 completion
Ming Sheng Building CEC 3.2 B. NTD Office building 1996~1999 completion
. . . . .
91 USD = 30 NTD
Community DevelopmentProject Investor Investment Type of Work Year Status
The Village Phase 2 CEC 13.5 B. NTD Community 2006~2011 under construction
The Village Phase 1 CEC 10.5 B. NTD Community 1996-2007 completion
. . . . . . . . . . . . . . . . . . . .
101 USD = 30 NTD
Village : 76 hectares
Environmental Engg. / EPC / BOTProject Client Contract Amount Type of Work Year Status
Sewage System in Tamshui (BOT)(190 Thousnad population)
Taipei County Capital Cost:3.551 B. NTDrevenue: 16.2 B. NTD
Sewage system (BOT) 2005~2039 under construction
Water Treatment Plant in Baoshan(340 000CMD)
Taiwan Water Co. 844 M. NTD Water Treatment Plant/EPC 2007~2009 under constructionBaoshan(340,000CMD)
Wastewater Treatment Plant in Linkou(23,000CMD)
Taipei County 665 M. NTD Wastewater Treatment Plant/EPC
2004~2007 completion
Wastewater Treatment Plant in Tamshui(28,000CMD)
North Shore Co. 750 M. NTD Wastewater Treatment Plant/EPC
2005~2006 completion
. . . . .
111 USD = 30 NTD
CEC Group
CEC Group BOT Investment
CEC International Corporation India Pvt. Ltd.
121 USD = 30 NTD