cdf operations report bob wagner, anl dec 15, 2005 cdf weekly meeting
TRANSCRIPT
CDFCDF Operations Report Operations Report
Bob Wagner, ANLDec 15, 2005
CDF Weekly Meeting
15 Dec 2005 Bob Wagner, CDF Weekly Meeting 2
Store Summary (8 - 15 Dec 2005)
StoreStartDate
Duration
(hours)
Initial
Lum(μb-s)-1
Del. Int. Lum. (pb-
1)
Live Int.
Lum. (pb-1)
Int. Lum.w/Si
(pb-1)
Comments
4543Quench
13 Dec
Tue
2.0 41.6 0.24 0.12 48.8%
0.0 0.0%
XTRP Configuration problem
4549Quench
14 DecThu-Sat
11.4 53.0 1.20 1.03 85.9%
0.0 0.0%
Mostly problem free Silicon held
out for stable conditions
Total 4543-
49 13.4 1.44 1.15
79.9%0.0 0.0%
bbbhhtt!Startup has been pretty troublesome for Tevatron
Lost all 4 stores to quenches (including 1 during final protons and 1 during scraping)
As of 10:30 today (15 Dec) Tevatron is off for 24 hours while conditioning B11H separator which is sparking
15 Dec 2005 Bob Wagner, CDF Weekly Meeting 3
Run II Integrated Luminosity
Delivered: ~1443 pb-1
Recorded: ~1156 pb-1
Silicon Good: ~916 pb-1
Delivered: ~1443 pb-1
Recorded: ~1156 pb-1
Silicon Good: ~916 pb-1
15 Dec 2005 Bob Wagner, CDF Weekly Meeting 4
CDF Detector Operations
COT Completed installation of last crate of upgrade TDCs
on Wednesday 14 Dec evening. SL6 has been tripping. Replaced load resistor. Have
connected diagnostics for further study. XFT
SLAM boards fully integrated into DAQ Thursday 8 Dec. Working on SLAM board timing adjustments to minimize bit
transfer errors Plug
Completed Plug Sourcing Friday 9 Dec. Silicon
Keeping silicon out of DAQ configuration until there’s a normal termination store
Took cosmics with silicon on Saturday 10 Dec. Central Calorimeter
Some post-shutdown problems with CCAL13 but seems to be improving as usual after few days of “normal” operations. Reseated TRACER cable for CCAL05 after post-shutdown trouble
Fixed bad CEM Pisa box channel
15 Dec 2005 Bob Wagner, CDF Weekly Meeting 5
Access ReportsConcluded Supervised Access period
last Thursday 8 Dec 2005Four Controlled Accesses past week: Sunday Day 11 Dec – 2.3 hours
Dangling XFT trigger cable reinserted Monday Day 12 Dec – 0.5 hours
Empty Recovery Receptacle for Gravity Induced Ground Water Precipitation
Monday Day 12 Dec – 1.5 hours Silicon ladder diagnostics – found bad power
supply; also usual behavior for one AVDD Wednesday Evening 14 Dec – 3.0 hours
Completed installation of last crate of COT TDC upgrade boards
Pending Access Tasks: Nothing currently