ccna4 discovery exam 2

Upload: visky

Post on 31-May-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Ccna4 Discovery Exam 2

    1/21

    Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    During an evaluation of the currently installed network, the IT staff

    performs a gap analysis to determine whether the existing network infrastructure cansupport the desired new features. At which stage of the Cisco Lifecycle Services

    approach does this activity occur?Prepare Phase

    Plan Phase

    Design Phase

    Implement PhaseOperate Phase

    Optimize Phase

    Scoring Rule For: correctness of response

    2 points for Option 2

    0 points for any other optionMax Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

  • 8/14/2019 Ccna4 Discovery Exam 2

    2/21

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    Which stage of the Cisco Lifecycle Services strategy is usually

    completed before an organization issues a Request For Proposal (RFP) or Request For

    Quotation (RFQ)?Prepare Phase

    Plan Phase

    Design Phase

    Implement PhaseOperate Phase

    Optimize Phase

    Scoring Rule For: correctness of response

    2 points for Option 1

    0 points for any other optionMax Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

  • 8/14/2019 Ccna4 Discovery Exam 2

    3/21

    What is the purpose of SNMP?

    to facilitate the exchange of information between devices and the NMSto monitor and control managed network devices

    to report user logins to a monitoring station

    to verify traffic throughout the network and keep a log of all activity

    Scoring Rule For: correctness of response

    2 points for Option 1

    0 points for any other option

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    During an analysis of a customer network, several possible

    opportunities for network improvement are identified. At which stage of the CiscoLifecycle Services does this process occur?

    Prepare Phase

    Plan Phase

    Design Phase

  • 8/14/2019 Ccna4 Discovery Exam 2

    4/21

    Implement Phase

    Optimize Phase

    Operate Phase

    Scoring Rule For: correctness of response

    2 points for Option 30 points for any other option

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and thescoring rules associated with the item.

    What provides the initial data for the Optimize Phase?

    performance monitoringbusiness goals

    technical goals

    RFP

    Scoring Rule For: correctness of response

    2 points for Option 1

    0 points for any other option

  • 8/14/2019 Ccna4 Discovery Exam 2

    5/21

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and thescoring rules associated with the item.

    Which two statements are true regarding the response to an RFQ?

    (Choose two.)The response should be brief.

    It should strictly conform to the formatting requirements specified by the RFQ.

    Only the items that the contracting company will be addressing should beanswered.

    The response helps the customer compare pricing with other potential contractors.

    The response is more complicated than a response to a RFP.

    Scoring Rule For: correctness of response

    Option 2 and Option 4 are correct.

    1 point for each correct option.0 points if more options are selected than required.

    Max Value = 2

    Close Window

  • 8/14/2019 Ccna4 Discovery Exam 2

    6/21

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and thescoring rules associated with the item.

    What are two disadvantages of using a bottom-up approach insteadof a top-down approach to network design? (Choose two.)

    It can result in an inappropriate network design.

    A new design cannot be implemented right away.

    It does not take into account the business goals of the company.This approach is not commonly practiced and is therefore not as well known.

    It requires tedious and time-consuming meetings with the customer to develop an

    understanding of the organization.

    Scoring Rule For: correctness of response

    Option 1 and Option 3 are correct.1 point for each correct option.

    0 points if more options are selected than required.

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

  • 8/14/2019 Ccna4 Discovery Exam 2

    7/21

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    What is a business constraint that may impact the WAN design of acompany?

    company policy regarding specific operating systems on LAN devices

    current monitoring protocols implemented on end-user devices

    non-availability of end users during implementationcompany policy requiring the use of specific vendor networking equipment due to

    partnerships

    Scoring Rule For: correctness of response

    2 points for Option 4

    0 points for any other optionMax Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

  • 8/14/2019 Ccna4 Discovery Exam 2

    8/21

  • 8/14/2019 Ccna4 Discovery Exam 2

    9/21

  • 8/14/2019 Ccna4 Discovery Exam 2

    10/21

  • 8/14/2019 Ccna4 Discovery Exam 2

    11/21

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    What is the purpose of system-level acceptance testing?to develop an installation plan for the newly designed network

    to train end users and support personnel on the newly installed networkto check that the newly installed network meets the business goals and design

    requirements

    to justify the financial investment required to implement the technology change

    Scoring Rule For: correctness of response

    2 points for Option 3

    0 points for any other optionMax Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

  • 8/14/2019 Ccna4 Discovery Exam 2

    12/21

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    A network engineer working for a contracting company is

    informed of a pre-bid meeting with a potential client. What purpose does the networkengineer have for attending the pre-bid meeting?

    to submit request for proposal responses

    to discuss proposed installation and monitoring plans

    to perform system-level acceptance tests on the current networkto clarify project scope and timelines not included in the original request for

    proposal

    to create a business case outlining reasons for financial investment in a network

    upgrade

    Scoring Rule For: correctness of response

    2 points for Option 40 points for any other option

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    What is a business constraint that may impact the WAN design of a company?

  • 8/14/2019 Ccna4 Discovery Exam 2

    13/21

    company policy regarding specific operating systems on LAN devices

    current monitoring protocols implemented on end-user devices

    non-availability of end users during implementationcompany policy requiring the use of specific vendor networking equipment due to

    partnerships

    Scoring Rule For: correctness of response

    2 points for Option 4

    0 points for any other option

    What is a purpose of establishing a network baseline?

    It provides a statistical average for network performance.

    It manages the performance of network devices.

    It creates a point of reference for future network evaluations.It checks the security configuration of network devices.

    Scoring Rule For: correctness of response2 points for Option 3

    0 points for any other option

    When should a network baseline be performed within the stages of the Cisco Lifecycle

    Services?Prepare Phase

    Plan Phase

    Design PhaseImplement Phase

    Operate Phase

    Scoring Rule For: correctness of response2 points for Option 5

    0 points for any other optio

    Which two items help identify business goals and priorities before a new network project

    starts? (Choose two.)

    installation

  • 8/14/2019 Ccna4 Discovery Exam 2

    14/21

    motivation

    profitability

    trustworthinesscustomer satisfaction

    Scoring Rule For: correctness of responseOption 3 and Option 5 are correct.

    1 point for each correct option.

    0 points if more options are selected than required.

    What are two benefits of using a top-down approach instead of a bottom-up approach to

    network design? (Choose two.)

    incorporates organizational requirementsallows for a quick response to a design request

    requires less time up front to create a network designclarifies design goals from the perspective of applications and network solutions

    facilitates a design by using devices and technologies that are based on previous

    experience

    Scoring Rule For: correctness of response

    Option 1 and Option 4 are correct.

    1 point for each correct option.0 points if more options are selected than required.

    Which software component is installed on network devices that are managed through

    SNMP?

    management agentsmanagement stations

    network management protocol

    Management Information Base (MIB)

    Scoring Rule For: correctness of response

    2 points for Option 1

    0 points for any other option

  • 8/14/2019 Ccna4 Discovery Exam 2

    15/21

  • 8/14/2019 Ccna4 Discovery Exam 2

    16/21

    Scoring Rule For: correctness of response

    Option 1 and Option 3 are correct.

    1 point for each correct option.0 points if more options are selected than required.

    Which two statements best describe the responsibilities of an account manager? (Choose

    two.)

    acts as the primary point of contact between the company and the clientdirects the sales teams and support personnel

    provides technical support to critical clients

    selects the equipment and technologies to be used for the client solution

    acts as the network design lead

    Scoring Rule For: correctness of response

    Option 1 and Option 2 are correct.1 point for each correct option.

    0 points if more options are selected than required.

    A network engineer working for a contracting company is

    informed of a pre-bid meeting with a potential client. What purpose does the networkengineer have for attending the pre-bid meeting?

    to submit request for proposal responses

    to discuss proposed installation and monitoring plansto perform system-level acceptance tests on the current network

    to clarify project scope and timelines not included in the original request for

    proposal

    to create a business case outlining reasons for financial investment in a networkupgrade

    Scoring Rule For: correctness of response2 points for Option 4

    0 points for any other option

    Max Value = 2

  • 8/14/2019 Ccna4 Discovery Exam 2

    17/21

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and thescoring rules associated with the item.

    A major corporation has decided to hire someone to upgrade theirnetwork infrastructure. A network consulting company wants the job. What document

    must the network consulting company obtain to learn about the business goals, the project

    scope, the requirements for the new network and the expected deliverables?Business Case

    Project Plan

    Request for ProposalRequest for Comments

    Scoring Rule For: correctness of response

    2 points for Option 30 points for any other option

    Max Value = 2

    Close Window

  • 8/14/2019 Ccna4 Discovery Exam 2

    18/21

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    A corporation (client) wants a network upgrade and is putting out arequest for services to various network consulting companies (contractors). A RFQ is

    required. Which statement is true concerning the RFQ?sent from the contractors to the client in response to a RFP

    sent from the client to the contractors along with the RFP to provide more specific

    technical details

    sent from the client to the contractors in place of a RFP when the technicalspecifications of a project are known

    sent from the contractors to the client outlining reasons for financial investments

    for the network upgrade

    Scoring Rule For: correctness of response

    2 points for Option 30 points for any other option

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window

  • 8/14/2019 Ccna4 Discovery Exam 2

    19/21

    Which stage of the Cisco Lifecycle Services involves proactive

    management to identify and resolve issues before the organization is affected?

    Prepare PhasePlan Phase

    Design Phase

    Implement PhaseOperate Phase

    Optimize Phase

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and the

    scoring rules associated with the item.

    Why is it important to prioritize business goals when developing

    network design?

    to ensure that the least expensive technologies are implemented first

    to simplify the configuration, administration, and monitoring of the newlyinstalled network

    to anticipate the effects of changes and growth of the business

    to adhere to the best opportunities to contribute to the success of the business

    Scoring Rule For: correctness of response

    2 points for Option 40 points for any other option

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window

  • 8/14/2019 Ccna4 Discovery Exam 2

    20/21

    Which two items help identify business goals and priorities before

    a new network project starts? (Choose two.)

    installation

    motivation

    profitability

    trustworthinesscustomer satisfaction

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and thescoring rules associated with the item.

    A network engineer working for ABC company is writing aresponse to an RFP for a network upgrade and must create an executive summary. Which

    statement describes the basic components of an executive summary?

    quick overview of the problem, the recommended solution, and the justification

    for ABC company doing the jobdetailed description of the solution, including but not limited to, timelines, turn-

    over schedule, warranty information, and emergency recovery information

    detailed description of costs including, the cost of software and hardwarecomponents, licensing requirements, labor cost, and other applicable fees

    multiple page document containing additional information such as detailed lists of

    equipment required, diagrams, company background information, and insurance coverage

    Scoring Rule For: correctness of response

    2 points for Option 1

    0 points for any other optionMax Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.

    Privacy Statement and Trademarks. Close Window

  • 8/14/2019 Ccna4 Discovery Exam 2

    21/21

    Item Information Page - Domain Knowledge - Weighted Score

    Below you will find the question as it was presented during the exam and thescoring rules associated with the item.

    In a network management architecture, which statement best

    describes a management agent?

    communication protocol used between a management station and managed devicestandardized database that a device keeps about itself concerning network

    performance parametershost with the management application loaded that is used by the administrator to

    monitor and configure network devices

    software running on a managed device to collect network information and allow

    that device to be managed by a management station

    Scoring Rule For: correctness of response

    2 points for Option 40 points for any other option

    Max Value = 2

    Close Window

    All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks.