To: Ronda BlayeDale Bridgfor
CC: Sathya YalvigCraig A. Bartl
MemoSubject: Pro
Che
BackgrounIn the FebruaCompany (Chdetermine if PLake Michiga
In response, unconsolidate(CPT). Two losuccessful atconstituents rcreek. Howev(2015PC-CPTcollected. In dfrom this loca
Purpose The purpose groundwater
Scope of WTo meet this ogroundwater wells to asseattempted anPCL-007-105construction a
r, MDEQ rd, MDEQ
gi, Chemours lett, Chemour
o oposed Piersoemours Monta
nd ary 26, 2015 lhemours), MDPierson Creekan (see Figure
Chemours coed sand and gocations weret one location related to the ver, a “hardpaT-02), and mudiscussions wation.
of this investbeneath Pier
Work objective, AEmonitoring wss groundwat
nd are shown 5 (the last threand IDs will b
rs
on Creek Areaague, Montag
etter from MicDEQ stated thk Landfill conse 1)
onducted vertgravel aquifere selected on
(2015PC-CPPierson Cree
an” was encouultiple attemp
with MDEQ, it
igation is to drson Creek an
COM will subwells at approp
ter quality. Thin Figure 2. T
ee digit numbbe adjusted ba
a Well Clustergue, Michigan
chigan Deparhat further invstituents are
tical aquifer sar on a 5-foot ithe western s
PT-01), and anek Landfill weuntered just a
pts failed to pewas agreed t
determine if Pnd potentially
bcontract a rotpriate screenehe wells will bThe wells are er refers to thased on the li
r PCL-007 n
rtment of Envvestigation waunder-flowing
ampling from interval usingside of Piersonalytical sam
ere not presenabove the watenetrate the hthat Chemou
ierson Creek westward tow
tosonic drillined intervals ae placed in thtentatively ide
he well screenithology enco
A4NDUa
PM
PCA
FG
DJ
ironmental Qas warranted g Pierson Cre
the water tab a 20-ton, tru
on Creek (seeples from thant at that locater table at thhardpan to thers could set a
Landfill relatewards Lake M
g company toand collect grohe vicinity of wentified as PCns bottom dep
ountered.
AECOM 4051 Ogletown RoaNewark DE, 19713 USA aecom.com
Project name: Montague Site
Project ref: Chemours: 507756 AECOM: 60494178
From: George E. Gre
Date: June 23, 2017
uality (MDEQin the area of
eek and poten
ble to the basck-mounted c
e Figure 2). Sat location indation on the whe second loce aquifer. No a well cluster
ed constituenMichigan.
o install threeoundwater sawhere 2015PCCL-007-060, Ppth below gro
ad
8
egory III, AEC
7
Q) to the Chemf Pierson Crentially dischar
se of the cone penetro
Sampling was icated that
western side oation samples couto collect sam
nts are migrat
e adjacent amples from thC-CPT-02 waPCL-007-085ound surface)
1
COM
mours eek to rging to
meter rig
of the
ld be mples
ting in
hese as 5, and ). Actual
Memo Proposed Pierson Creek Area Well Cluster PCL-007
AECOM 2
Figure 3 displays boring logs from monitoring well PCL-05-078 and the two 2015 CPTs (CPT01 and CPT02c on the lithologic logs). These are displayed side-by-side in Figure 3 and are approximately to scale. Their layout is adjusted to approximate actual ground surface elevation. As shown near the right-hand edge of the figure, the following well screen intervals are proposed for PCL-007:
• PCL-007-060 is near the top of the water table.
• PCL-007-085 is a mid-depth well. Samples from similar depths at 2015PC-CPT-01 had detectable (but estimated) concentrations of benzene and toluene.
• PCL-007-105 is projected to be the base of the aquifer and would correspond to roughly the same interval screened by well PCL-005-078. Ground surface at PCL-005-078 is lower; hence, the difference in depth to the base of the aquifer. The base of the aquifer is underlain by a dark gray, plastic clay believed to be lacustrine in origin.
Well Construction Monitoring wells will be installed using a rotosonic rig as this drilling method has been successful at the site. An 8-inch borehole will be drilled using a full-sized truck rig. During the first well installation, the boring will be lithologically described and drilled to the gray clay. This clay is encountered typically at about 130 to 145 feet below ground surface. The rig will core at least 5 feet into this unit (there have been locations where thinner clay layers have had sand beneath them. This will confirm that the well will screen the base of the sand-gravel aquifer).
Tentatively, the deepest well will be identified as PCL-007-140. The proposed screen intervals will be adjusted where field observations indicate conditions different from those based on the CPT data. The intent is to screen across the three most likely flow intervals. The remaining two wells will be installed within 10 feet of the first well and will not require lithologic logging.
All three monitoring wells will be constructed of 2-inch diameter, schedule 40 polyvinyl chloride (PVC) with 10-foot well screens (0.01-inch slot). A filter pack of 20/40 mesh silica sand will be placed around the well screen and extend 2 feet above the top of screen. A minimum 2-foot thick annular seal of bentonite chips or pellets will be placed on the sand pack and allowed to hydrate per manufacturers recommendations before the remaining annual space is filled with cement-bentonite grout to near surface. Wells will be completed with 3-foot-square concrete surface pads and a lockable steel surface casing. The space between the PVC casing and the steel casing will be filled with gravel to near the top of casing and a weep hole will be drilled near the base of the casing to allow condensation to escape. The outside of the steel casing will be painted yellow to reduce corrosion and improve its visibility.
Development After installation, the wells points will be developed by the drilling contractor to remove sediment that may have entered the screen during installation. Well sampling will be performed after the wells have had a period to equilibrate with the aquifer.
Surveying Top of casing and ground surface elevations will be surveyed for the new monitoring wells. Coordinates will be surveyed in Michigan State Plane, South system. These measurements will be used with depth to water measurements to provide hydrogeologic information to determine if Pierson Creek is intercepting groundwater flow and preventing underflow.
A
Www
T
T
tg
Ta
W
Tt
s
8
A A
Memo Proposed Pierso
AECOM
Well SSampling willwells in the swithin a mont
• One
• Matri
• Equip
• Trip b
The equipme(pump) used
Health andThe site-spec
Based on prethe ticks and gloves and Ty
This level of pand safety sta
Waste ManInvestigation-(PSWMP). Th
Schedule The proposedthese wells wmonitoring plsampling for t
If you have a832-422-4423
Sincerely,
George E. GrSenior GeoloAECOM Corp
Attachments:
on Creek Area W
Samplil be performeampling progth of installati
field duplicate
x spike/matrix
pment blank
blank
ent blank will bafter it has be
d Safety cific Health an
evious experiepoison ivy aryvek® covera
personal protaff.
nagement -derived wasthis plan will b
d schedule is will be after thean on a semithe PCL-007
ny questions 3. For other q
regory III ogist/Project Mporation
Figures
Well Cluster PCL-
ing d using low-flram. The threon. During sa
e
x spike duplic
be collected been decontam
nd Safety Pla
ence, it is expre not significalls if condition
ective equipm
te will be manbe developed
for the instale installation annual basis wells would b
or commentsquestions rela
Manager
007
low purge meee new wells ampling, the fo
cate
by passing theminated betwe
n (HASP) will
pected that allantly present.ns are found t
ment (PPE) m
naged in accoprior to field m
lation effort to(approximatefor a period o
be reviewed b
s about the teated to the pro
ethods consiswill be samplollowing qual
e blank watereen wells.
l be develope
l work can be. This may beto differ.
may be adjuste
ordance with amobilization.
o occur in midely August), anof two years (based on the
chnical naturoject, please c
stent with the ed at least onity control sam
r over and/or
ed to ensure s
e performed ine upgraded to
ed after a rev
a Project-Spe
d-late July of 2nd the wells w(until 2H2019results.
re of this scopcontact Sathy
methods usene week aftermples will be
through samp
safe conduct
n Level D. Geo Modified Lev
view of site co
ecific Waste M
2017. The firswill then be ad). At that poin
pe, please conya Yalvigi at 3
ed for other mr developmencollected:
pling equipme
of the work.
enerally, at thivel D includin
onditions by th
Management
st sampling edded to the
nt, the frequen
ntact me at 302-773-4291
3
onitoring nt but
ent
s site, g nitrile
he health
Plan
vent of
ncy of
1.
Memo Proposed Pierson Creek Area Well Cluster PCL-007
AECOM
Figures
FormerManufacturing
Area
Lamo
s Rd
Old C
hann
el Trl
Indian
Bay
Rd
Wilkes Rd
Lau R
d
Willia
m Rd
.
Sunset Ln
Anderson Rd
McFa ll C i r
Lakeshore Dr
Chas
e Rd
Indian
Point
Rd
Clar
k St
Carlson Ct
Lakefront St
Sadony B
ayou Rd
Main
S t
Long Poi nt Rd
Vans
ickle
Rd
Chippewa Dr
Old Channel Trl
Willia
m Rd
.
Ferry St
Lifeg
uard
Rd
AECOMSabre Building, Suite 300
4051 Ogletown RoadNewark, DE 19713
SITE MAPProposed Groundwater Monitoring
Well Cluster PCL-007 West of Pierson CreekChemours Montague Facility
Montague, MichiganTASK NUMBER:
DESIGNED BY:
DRAWN BY:
DATA QUALITY CHECK BY:GEG
CAD
PJC18984840.201010
PROJECT NUMBER:
DATE:
FIGURE NUMBER:
60426164
1
®0 1,200 2,400600
Feet
MAP FORMATTED FOR "B" (11" X 17") SIZE SHEET. TEXT SCALE NOT VALID FOR DIFFERENT PAGE SIZE.
1 inch = 1,200 feet
Illinois Ohio
Wisconsin
Indiana
MichiganSite
Location
2005 NAIP Aerial Source: Credit to Remote Sensing& GIS Research and Outreach Services (RS&GIS),USDA-FSA Aerial Photography Field Office
Area Map
C:\D
uPon
t\Mon
tague
\_GIS
\Pro
ject\6
0426
164_
Prop
GW_M
WPC
L007
_Jun
2017
\Fig1
_Site
Map.m
xdLegend
Pierson Creek - Main ChannelPierson Creek - TributaryChemours Property Line (from ChemoursReal Estate)Road CenterlineFormer Manufacturing AreaWaste Management Unit (WMU) orArea of Concern (AOC)
6/14/2017
PiersonCreek
SadonyBayou
MirrorLake
PiersonCreek
Landfill
LakeMichigan
White Lake
PROPOSED LOCATIO N O FPCL-007
Proposed Groundwater MonitoringWell Cluster PCL-007 West of Pierson Creek
Chemours Montague FacilityMontague, Michigan
TAS K NUMB ER:
DESIG NED BY:
DRAW N B Y:
DATA QU ALIT Y CHECK B Y:GEG
CAD
PJC18984840.201010
PRO JECT NUM BER:
DATE :
FIG URE NUM BER:
60426164
2
2005 Aerial C redit: Remote Sensing & GIS Researchand O utreach Services (RS&GIS), USDA-FSA AerialPhotography Field Office
MAP F O RMATT ED FO R "B" (11 " X 17 ") SIZ E SHEE T. TEX T SCALE NO T VA LID F O R D IF FE RENT PA G E SIZE .
C:\D
uPon
t\Mon
tague
\_GIS
\Proje
ct\60
4261
64_P
ropGW
_MWP
CL00
7_Ju
n201
7\Fig2
_Prop
PCL0
07Lo
c.mxd
LegendPCL-007 ClusterCPT Boring
!A Monitoring Well LocationPierson Creek - Main ChannelPierson Creek - TributaryChemours Property Line (from ChemoursReal Estate)Road CenterlinePierson Creek Landfill Boundary
®0 150 30075
Feet1 inch = 150 feet
ChemoursProperty
Boundary
Map E xten t
AECO MSabre Building, Su ite 300
4051 Ogletow n RoadNewark, DE 19713
6/14/2017
!A!A
!A !A
!A
!A
!A
!A
!A !A
!A
!APCL-5S PCL-5D
PIERSONCREEK
LANDFILL
PCL-6-77
PCL-3-17
PCL-1-67
PCL-2-70
MW-209-67
MW-250-54
PCL-4-17MW-207-55
MW-208-83MW-208-20
2015PC-CPT-02(Incomplete CPT - Installing PCL-007)
2015PC-CPT-01(Completed CPT)
Old Channel Trl
Wilkes Rd
Pierson Creek - Main
Tributary 1
Tributary 4
Tributary 3
Tributary 6
Tributary 5
Tributary 3 - Fork
Tributary 2
---
0' 500' 1000'
NOTES:Each log presented at same vertical scale (ground surface to -120').Approximate vertical difference between PCL-005-078 and 2015 CPTs = ~30 feet.
PCL-005-0452015PC-CPT-01 sample results:J-value of benzene and toluenedetected in 76' and 81.8' samples.All other depths ND for VOCs.