cba project implementation in niger

15
CBA PROJECT IMPLEMENTATION IN NIGER MAI MOUSSA Katiella Abdou GEF/SGP National Coordinator NIGER

Upload: doane

Post on 05-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

CBA PROJECT IMPLEMENTATION IN NIGER. MAI MOUSSA Katiella Abdou GEF/SGP National Coordinator NIGER. Portfolio of existing SGP community projects. Opportunities for building resilience to CC in GEB. Soil &Water reclaiming/management Irrigated cropping system for cash crops - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CBA PROJECT IMPLEMENTATION IN   NIGER

CBA PROJECT IMPLEMENTATION IN

NIGER

MAI MOUSSA Katiella AbdouGEF/SGP National Coordinator

NIGER

Page 2: CBA PROJECT IMPLEMENTATION IN   NIGER

2

CBA Preparatory Workshop

Portfolio of existing SGP community projects

Focal area

TotalMain objectives of the SGP

projects ????

LD 15Land reclaiming including dunes by planting trees for food production and livestock

Food security/diversification by improving production system

BD 9 Biodiversity preservation by ecotourism and medicinal plants

Health care and Income Generating Activities

CC 8Promotion of affordable and non pollutant energy for domestic use and cash crops production

Use of Clean and renewable energy for food production and improving livelihood

IW 3 Preserve IW against pollution and silting for sustainable water management

Combat silting for sustainable water management for food production

Mtp 4 Capacity building of all SGP stakeholders on GEF focal areas and

Capacity building and public awareness on adaptation measures and the GEF SPA

Page 3: CBA PROJECT IMPLEMENTATION IN   NIGER

3

CBA Preparatory Workshop

Opportunities for building resilience to CC in GEB• Soil &Water reclaiming/management

• Irrigated cropping system for cash crops• Community subsistence food banks• Vicinity Radio for cropping calendars• Community Bank for animal nutrients and animal

health Create well established and managed animal grazing area

• Reforestation and tree planting for land management

• Increasing productive land by fixing dunes• Preserve grazing area by combating wild fire

Page 4: CBA PROJECT IMPLEMENTATION IN   NIGER

4

CBA Preparatory Workshop

Opportunities for co-financing1. VÉTÉRINAIRE SANS

FRONTIÈRE 2. OXFAM United Kingdom

3. ICRISAT (CGIAR)

4. SWIZERLAND Cooperation

5. LWR

6. National Food Security Board

7. Special Programme of the President of the Republic

1. Livestock improvement System

2. Public Health and sanitation

3. GEF Desert Margin Program(Alternative Crops for Sahel)

4. Supporting local governance and welfare

5. Food security and training

6. Support for Food security for vulnerable group

7. Food security and women credit scheme

Page 5: CBA PROJECT IMPLEMENTATION IN   NIGER

5

CBA Preparatory Workshop

1. Updating the list of potential partners in the CBA sites.

2. Confirmation of the starting of the CBA to the Partners

3. Documentation of the projects implemented by the partners in the vulnerable area

4. To organize a strategic meeting with partner including NCC members

5. Planning of joint appraisal mission of potential CBA projects

Modalities for engaging Donors

Page 6: CBA PROJECT IMPLEMENTATION IN   NIGER

6

CBA Preparatory Workshop

NSC Modification

1.The GEF/SGP NSC has been extended to a representative of NCCCV and the NAPA expert

2.The UNDP is represented, on behalf of the RR or DRR, in the NCC

3.The NCC is the decision body for the CBA

Page 7: CBA PROJECT IMPLEMENTATION IN   NIGER

7

CBA Preparatory Workshop

1. NGOs, CBOs, Local councils, Women organizations and all other relevant bodies in the selected districts will be involved in making proposal and implementing projects

2. NGOs at national level will also be involved when the project require particular expertise to address major issues at the local level.

3. The SGP grantees in the CBA districts will mentor the potential CBA grantees

Country Programme Development

Page 8: CBA PROJECT IMPLEMENTATION IN   NIGER

8

CBA Preparatory Workshop

1. Once the CBA Strategy is adopted, all the potential local bodies will be trained in the GEF SPA and adaptation concerns.

2. The NCC members will be a part of the trainers.

3. The outcomes of the training should include understanding of project requirements, capacity for successful proposal writing, and introduction to CBA-specific M&E requirements

Country Programme Development (Con’t)

Page 9: CBA PROJECT IMPLEMENTATION IN   NIGER

9

CBA Preparatory Workshop

Strategies and Support for Project Development

1. The CBA will be launched at the district level and potential grantees will be trained on the SPA requirements, guidelines of writing proposal etc.

2. Gov extension services will help potential proponents in making proposal

3. Donors/Int’l NGO can help communities to make proposal when they are willing to co finance the project

Page 10: CBA PROJECT IMPLEMENTATION IN   NIGER

10

CBA Preparatory Workshop

4.Use our convention with US Peace corps to help communities in making good proposal

5.The CBA PA will help and assist potential grantees in improving the quality of their projects

6.Site visits for project ex ante evaluation

Strategies and Support for Project Development

Page 11: CBA PROJECT IMPLEMENTATION IN   NIGER

11

CBA Preparatory Workshop

Mains steps of launching CBA at country level1. The GEF/SGP/ NC informed the UNDP CO and NSC and

all SGP stakeholders on the aims and the implementation of the CBA

2. The GEF/SGP NC and its NSC the NCCCV/NAPA Committee were met to define the TORs and composition of the CBA NCC.

3. Put in place the joint/extended CBA NCC

4. NAPA documents have been reviewed and the most vulnerable districts have been selected

5. A consultant was selected and a field visit conducted in the selected vulnerable districts in order to define the adaptation priorities at local level

Page 12: CBA PROJECT IMPLEMENTATION IN   NIGER

12

CBA Preparatory Workshop

6. The consultant has submitted the draft of the CBA prodoc based on the field consultation

7. The CBA NCC has reviewed the prodoc and submit it to the national workshop for its validation.

8. The CBA Country prodoc including the selected pilot sites has been finalized and adopted

9. CBA draft CPS has been discussed within the NCC and sent to the CBA Management Unit (NYC) for consideration

Mains steps of launching CBA at country level

Page 13: CBA PROJECT IMPLEMENTATION IN   NIGER

13

CBA Preparatory Workshop

Major issues beyond CBA

1. To test the suitability and the adequacy of the local adaptation techniques used and find affordable alternative solutions.

2. To set or reinforce the Research-Action-Development units that will develop affordable alternative technologies to be used at the community level to address adaptation issues.

3. To set a capacity building mechanism of vulnerable communities in order to adopt the appropriate technologies.

Page 14: CBA PROJECT IMPLEMENTATION IN   NIGER

14

CBA Preparatory Workshop

4. To set rural community radio (vicinity) to inform populations on weather forecasting in order to allow them to adjust their cropping calendars.

5. The suitability of adaptation mechanisms VS social and cultural threats environments.

6. Willingness of communities to adopt or not technologies which are not productive in short term.

Major issues beyond CBA

Page 15: CBA PROJECT IMPLEMENTATION IN   NIGER

THANK YOU