c:autosave everley.waterworthrevit 2018 local fileswchph2-gda-v7-zz … · 2020. 7. 31. · gda top...

1
GDA Level 04 4200 GDA Level 05 8400 GDA Level 03 0 GDA Top of Lower Parapet 9820 EXISTING PHASE 1 MAIN ENTRANCE BLOCK F PHASE 2 COURTYARD WARD WARD GDA Level 04 4200 GDA Level 05 8400 GDA Level 03 0 GDA Top of Lower Parapet 9820 GDA Top of Plant Room 13700 BRIDGE LINK SECTION THROUGH MAIN ENTRANCE FOYER PHASE 1B Elevation D Elevation C Elevation B Elevation E Block F Block E Phase 2 Block Existing Phase 1 - - THIS DRAWING (OR ANY PART THEREOF) MAY NOT BE COPIED, TRANSMITTED OR DISCLOSED TO ANY THIRD PARTY OR UNAUTHORISED PERSON WITHOUT THE PRIOR WRITTEN PERMISSION OF GILLING DOD ARCHITECTS. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS PREPARED BY CONSULTANTS AND SUB - CONTRACTORS. DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO PRINTED DIMENSIONS. REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF. © ALL RIGHTS RESERVED. NO PART OF THIS DRAWING MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS WITHOUT THE WRITTEN PERMISSIONS OF THE COPYRIGHT HOLDER ONCE PRINTED AND DISTRIBUTED THIS DOCUMENT IS ASSUMED UNCONTROLLED Drawing Number Project Number Scale Sheet Size Title Project Client A0 Drawing Status Drawn By Checked By Suitability Revision Approved As indicated P03 North Cumbria University Hospitals NHS Trust West Cumberland Hospital, Whitehaven - Phase 2 Phase 2 Block Inpatient Ward Accommodation Proposed Elevations Sheet 2 of 2 8060k WCH - GDA - V7 - Outline Planning BW AG ZZ - DR - A - 05_20 - 0007 S2 SK Rev By Description Date P01 PS First Issue 11/02/20 P02 BW Issued for Comment 29/06/20 P03 BW Issued for OUtline Planning 23/07/20 1 : 100 Elevation E 3 1 : 100 Elevation D 4 0 SCALE 1: 5 4 3 2 1 1 m 100 REFERENCE PLAN Drawing issued for illustrative purposes only

Upload: others

Post on 06-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C:Autosave everley.waterworthRevit 2018 Local FilesWCHPH2-GDA-V7-ZZ … · 2020. 7. 31. · GDA Top of Lower Parapet 9820 WARD PHASE 2 COURTYARD WARD EXISTING PHASE 1 MAIN ENTRANCE

GDA Level 04

4200

GDA Level 05

8400

GDA Level 03

0

GDA Top of Lower Parapet

9820

EXISTING PHASE 1 MAIN ENTRANCE BLOCK F PHASE 2 COURTYARDWARD WARD

GDA Level 04

4200

GDA Level 05

8400

GDA Level 03

0

GDA Top of Lower Parapet

9820

GDA Top of Plant Room

13700

BRIDGE LINK

SECTION THROUGH MAIN ENTRANCE FOYER PHASE 1B

Elevation D

Ele

va

tio

n C

Elevation B

Ele

va

tio

n E

Block F

Block E

Phase 2 Block Existing Phase 1

--

THIS DRAWING (OR ANY PART THEREOF) MAY NOT BE COPIED, TRANSMITTED OR DISCLOSED TO ANY THIRD PARTY OR UNAUTHORISED PERSON WITHOUT THE PRIOR WRITTEN PERMISSION OF GILLING DOD ARCHITECTS.

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS PREPARED BY CONSULTANTS AND SUB-CONTRACTORS.

DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO PRINTED DIMENSIONS.

REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.

© ALL RIGHTS RESERVED. NO PART OF THIS DRAWING MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS WITHOUT THE WRITTEN PERMISSIONS OF THE COPYRIGHT HOLDER

ONCE PRINTED AND DISTRIBUTED THIS DOCUMENT IS ASSUMED UNCONTROLLED

Drawing Number

Project Number

Scale Sheet Size

Title

Project

Client

A0

Drawing Status

Drawn By Checked By

Suitability Revision

Approved

As indicated P03

North Cumbria University HospitalsNHS Trust

West Cumberland Hospital,Whitehaven - Phase 2

Phase 2 BlockInpatient Ward AccommodationProposed Elevations Sheet 2 of 2

8060k

WCH-GDA-V7-

Outline Planning

BW AG

ZZ-DR-A-05_20-0007

S2

SK

Rev By Description Date

P01 PS First Issue 11/02/20

P02 BW Issued for Comment 29/06/20

P03 BW Issued for OUtline Planning 23/07/20

1 : 100

Elevation E3

1 : 100

Elevation D4

0

SCALE 1:

543211

m100

REFERENCE PLAN

Drawing issued for illustrative purposes only