Project name: Project for Strenghtening National Rural Transport Program New Activities Loan: IDA-5336 & H8990 Modified Activities Procurement Plan Version: 2015-2 Canceled Activities Status: Approved Activities without Modificatio n Date of Last Change of Status: 19/05/2015 Total days of (between Bid Opening and P.P. - Executing Agency: 2015-2- Method: NCB (National Construction of Sandhikharka- Dharapani-Chujathi Road (7 Km): SNRTP-3-NCB-O-SNRTP-ARG- W-NCB-1.01-UG-0 DTO Arghakhanchi Activity Cancelled Post Review Construction of Sandhikharka- Dharapani-Chujathi Road (12.50 Km): SNRTP-5-NCB-O-SNRTP-ARG- W-NCB-1.02-UG-0 DTO Arghakhanchi Activity Cancelled Post Review Construction of Chama- Samjhanachowk-Khajura-Radhapur Road (11 Km): SNRTP-6-NCB-O-SNRTP-BAN- W-NCB-2.01-UG-0 DTO Banke Activity Cancelled Post Review Construction of Gaighat-Nepaltar- Udayapurgadhi Road (12 Km) SNRTP-7-NCB-O-SNRTP-UDA- W-NCB-30.01-UG- DTO Udayapur Activity Cancelled Post Review Construction of Gaighat-Phatepur Road. (10 Km): SNRTP-8-NCB-O-SNRTP-UDA- W-NCB-30.02-UG- Category Works: Activities ShowHide 20/02/14 07/03/14 N/A 12/05/14 81 26/05/15 07/03/14 N/A 10/05/14 79 26/05/15 N/A 21/01/14 N/A 21/01/14 20/02/14 16/02/14 03/03/14 N/A 12/05/14 85 25/11/15 07/03/14 N/A 13/05/14 82 25/11/15 N/A 17/01/14 N/A 21/01/14 20/02/14 16/02/14 03/03/14 N/A 12/05/14 85 26/05/15 Contract Signature Date End of Contract (Completed N/A 17/01/14 No Objection Documents Publication / Invitation Bid Opening Evaluation of Bids No Objection to Description Reference # Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized

Upload: vutruc

Post on 06-May-2018

219 views

Category:

Documents


1 download

TRANSCRIPT

Project name: Project for Strenghtening

National Rural Transport Program

New

Activities

Loan: IDA-5336 & H8990

Modified

Activities

Procurement Plan Version: 2015-2

Canceled

Activities

Status: Approved

Activities

without

Modificatio

nDate of Last Change of Status:

19/05/2015

Total days of

(between Bid

Opening and

P.P. - Executing Agency: 2015-2-

Method: NCB (National

Construction of Sandhikharka-

Dharapani-Chujathi Road (7 Km):

SNRTP-3-NCB-O-SNRTP-ARG-

W-NCB-1.01-UG-0

DTO Arghakhanchi Activity Cancelled

Post Review

Construction of Sandhikharka-

Dharapani-Chujathi Road (12.50

Km):

SNRTP-5-NCB-O-SNRTP-ARG-

W-NCB-1.02-UG-0

DTO Arghakhanchi Activity Cancelled

Post Review

Construction of Chama-

Samjhanachowk-Khajura-Radhapur

Road (11 Km):

SNRTP-6-NCB-O-SNRTP-BAN-

W-NCB-2.01-UG-0

DTO Banke Activity Cancelled

Post Review

Construction of Gaighat-Nepaltar-

Udayapurgadhi Road (12 Km)

SNRTP-7-NCB-O-SNRTP-UDA-

W-NCB-30.01-UG-

DTO Udayapur Activity Cancelled

Post Review

Construction of Gaighat-Phatepur

Road. (10 Km):

SNRTP-8-NCB-O-SNRTP-UDA-

W-NCB-30.02-UG-

Category Works:  Activities ShowHide

 20/02/14  07/03/14  N/A  12/05/14  81  26/05/15

 07/03/14  N/A  10/05/14  79  26/05/15

 N/A  21/01/14

 N/A  21/01/14  20/02/14

 16/02/14  03/03/14  N/A  12/05/14  85  25/11/15

 07/03/14  N/A  13/05/14  82  25/11/15

 N/A  17/01/14

 N/A  21/01/14  20/02/14

 16/02/14  03/03/14  N/A  12/05/14  85  26/05/15

Contract

Signature

Date

End of

Contract

(Completed

 N/A  17/01/14

No

Objection

Documents

Publication

/ Invitation

Bid

Opening

Evaluation

of Bids

No

Objection

to Description Reference #

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

WB406484
Typewritten Text
96563

DTO Udayapur Activity Cancelled

Post Review

3.Construction of Sandhikharka-

Balkot-Tamghash Rd (25.50 Km)

SNRTP-20-NCB-O-SNRTP-ARG-

W-NCB-1.03-UG-070-71

DTO Arghakhanchi Activity Cancelled

Post Review

4.Construction of Sandhikharka-

Balkot Tamghas Rd (13.50 Km)

SNRTP-21-NCB-O-SNRTP-ARG-

W-NCB-1.04-UG-070-71

DTO Arghakhanchi Activity Cancelled

Post Review

5.Construction of Sandhikhark-

Dharapani-Maidan Rd. (08 Km)

SNRTP-22-NCB-O-SNRTP-ARG-

W-NCB-1.05-UG-070-71

DTO Arghakhanchi Contract under execution

Post Review  N/A  15/03/14  14/04/14  15/05/14  N/A  11/07/14  88

6. Construction of Sandhikhark-

Nuwakot-Asurkot-Pyuthan Rd. (07

Km):

SNRTP-23-NCB-O-SNRTP-ARG-

W-NCB-1.06-UG-070-71

DTO Arghakhanchi Contract under execution

Post Review  N/A  15/03/14  15/04/14  14/05/14  N/A  15/07/14  91

2. Construction of RRM-

Mahendranagar-Hirminiya-Holyia

Road.(06 km)

SNRTP-25-NCB-O-SNRTP-BAN-

W-NCB-2.02-UG-070-71

DTO Banke Activity Cancelled

Post Review

3.Construction of MRM-Titirihiya-

Sohanpur-Udrahapur Road (18.50

Km)

SNRTP-26-NCB-O-SNRTP-BAN-

W-NCB-2.03-UG-070-71

DTO Banke Activity Cancelled

Post Review

4. Construction of Paraspur-

Gaughat Road. (12.75 Km)

SNRTP-27-NCB-O-SNRTP-BAN-

W-NCB-2.04-PM-070-71

DTO Banke Activity Cancelled

Post Review

1. Construction of Bahuwari-

Simraungadh-Aruwa Nadi Road. (10

Km)

SNRTP-28-NCB-O-SNRTP-BAR-

W-NCB-3.01-UG-070-71

DTO Bara Activity Cancelled

Post Review

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 18/03/14  N/A  01/06/14  90  07/03/15

 N/A  17/01/14

 N/A  01/02/14  03/03/14

 16/02/14  03/03/14  N/A  10/05/14  83  25/11/15

 03/03/14  N/A  10/05/14  83  26/05/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 03/03/14  18/03/14  N/A  10/05/14  68  11/05/15

 18/03/14  N/A  10/05/14  68  11/05/15

 N/A  01/02/14

 N/A  01/02/14  03/03/14

 16/02/14  03/03/14  N/A  10/05/14  83  25/11/15

 03/03/14  N/A  10/05/14  83  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 20/02/14  07/03/14  N/A  12/05/14  81  26/05/15 N/A  21/01/14

2. Construction of Kabahigoth-

BariyarpurRoad (10.75 Km)

SNRTP-29-NCB-O-SNRTP-BAR-

W-NCB-3.02-UG-070-71

DTO Bara Activity Cancelled

Post Review

3. Construction of Bahuwari-

Simraungadh-Aruwa Nadi Road.

(5.50 Km)

SNRTP-30-NCB-O-SNRTP-BAR-

W-NCB-3.03-UG-070-71

DTO Bara Activity Cancelled

Post Review

4. Construction of Kabahigoth-

Bariyarpur Road (5.5 Km)

SNRTP-31-NCB-O-SNRTP-BAR-

W-NCB-3.04-UG-070-71

DTO Bara Activity Cancelled

Post Review

1. Construction of MRM-Basgadhi-

Mainapokhar Road,Bardiya Road.

(8.25 Km)

SNRTP-32-NCB-O-SNRTP-BRD-

W-NCB-4.01-UG-070-71

DTO Bardia Activity Cancelled

Post Review

2. Construction of Pushap Lal Marg

Road (16.60 Km)

SNRTP-33-NCB-O-SNRTP-BRD-

W-NCB-4.02-UG-070-71

DTO Bardia Activity Cancelled

Post Review

3. Construction of Laxmana-

Gauripara-Ganeshpur Road

(13.65km)

SNRTP-34-NCB-O-SNRTP-BRD-

W-NCB-4.03-UG-070-71

DTO Bardia Activity Cancelled

Post Review

4.Construction of Rajapur Ring Rd.

(47.25 Km)

SNRTP-35-NCB-O-SNRTP-BRD-

W-NCB-4.04-UG-070-71

DTO Bardia Activity Cancelled

Post Review

1.Construction of Kalakate-

Gadhawa Road(35 Km)

SNRTP-36-NCB-O-SNRTP-

DAN-W-NCB-5.01-UG-070-71

DTO Dang Activity Cancelled

Post Review

2. Construction of Pawan Nagar-

Purandhara Road(5.75 Km)

SNRTP-37-NCB-O-SNRTP-

DAN-W-NCB-5.02-UG-070-71

 03/03/14  N/A  02/05/14  75  20/02/15 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 03/03/14  N/A  02/05/14  75  20/02/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  20/02/15

 03/03/14  N/A  02/05/14  75  26/05/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

DTO Dang Activity Cancelled

Post Review

1. Construction of Bhimdhunga-

Lamidanda-Galchi Road (27.75 Km):

SNRTP-38-NCB-O-SNRTP-

DHA-W-NCB-6.01-UG-070-71

DTO Dharding Activity Cancelled

Post Review

2.Construction of Dhadingbesi-

Salyantar Road (18.50 Km)

SNRTP-39-NCB-O-SNRTP-

DHA W-NCB-6.02-UG-070-71

DTO Dharding Activity Cancelled

Post Review

3. Construction of Dhadingbesi-

Salayantar Road (23.15 Km)

SNRTP-40-NCB-O-SNRTP-

DHA-W-NCB-6.03-PM-070-71

DTO Dharding Activity Cancelled

Post Review

4. Construction of Bhimdhunga-

Lamidanda-Galchi Road (18.50 Km)

SNRTP-41-NCB-O-SNRTP-

DHA-W-NCB-6.04-PM-070-71

DTO Dharding Activity Cancelled

Post Review

1. Construction of Devpura-

Ghodghas-Fulgama-Tulshiyahi Road

(13.20 Km)

SNRTP-42-NCB-O-SNRTP-

DHAN-W-NCB-7.01-UG-070-

71

DTO Dhanusha Activity Cancelled

Post Review

3. Construction of Janakpur-

Manaharpur-Kharihani Road (16.85

Km)

SNRTP-43-NCB-O-SNRTP-

DHAN-W-NCB-7.03-UG-070-

71

DTO Dhanusha Activity Cancelled

Post Review

4. Construction of Devpura-

Ghodghas-Fulgama-Tulshiyahi Road

(4.00 Km)

SNRTP-44-NCB-O-SNRTP-

DHAN-W-NCB-7.04-PM-070-

71

DTO Dhanusha Activity Cancelled

Post Review

5. Construction of Janakpur-

Manaharpur-Kharihani Road (9.15

Km)

SNRTP-45-NCB-O-SNRTP-

DHAN-7.05-W-NCB-PM-070-

71

DTO Dhanusha Activity Cancelled

Post Review

 03/03/14  N/A  02/05/14  75  20/02/15 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  20/02/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 03/03/14  N/A  02/05/14  75  26/05/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 03/03/14  N/A  26/05/14  99  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  20/02/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

1. Construction of Tamghas-

Simaltari-Purkodaha Road (46.00

Km)

SNRTP-46-NCB-O-SNRTP-GUL-

-W-NCB-8.01-UG-070-71

DTO Gulmi Activity Cancelled

Post Review

2. Construction of Ridi-Rudrabeni-

Wamitaksar Road (46.00 Km)

SNRTP-47-NCB-O-SNRTP-GUL-

8.02-W-NCB-UG-070-71

DTO Gulmi Activity Cancelled

Post Review

3. Construction of Rudrabeni-

Dhuseni-Padigaun Road (09.50 Km)

SNRTP-48-NCB-O-SNRTP-GUL-

-W-NCB-8.03-UG-070-71

DTO Gulmi Activity Cancelled

Post Review

1. Construction of Sadakpur-

Bauniya-Joshipur-Vajani Road (25

Km)

SNRTP-49-NCB-O-SNRTP-KAI-

W-NCB-9.01-UG-070-71

DTO Kailali Activity Cancelled

Post Review

2. Construction of Khutiya-Matiyari

Road (10.15 Km)

SNRTP-50-NCB-O-SNRTP-KAI-

W-NCB-9.02-PM-070-71

DTO Kailali Activity Cancelled

Post Review

3. Construction of Jute Pani Nala

Bridge on Sukhad-Khailad-Bhajeni

Road (20 m. Span)

SNRTP-51-NCB-O-SNRTP-KAI-

W-NCB-9.03-BRI-070-71

DTO Kailali Activity Cancelled

Post Review

1. Construction of Suspension

Bridge-Kutiyakavar Road (10.50 Km)

SNRTP-52-NCB-O-SNRTP-KAN-

-W-NCB-10.01-UG-070-71

DTO Kanchanpur Activity Cancelled

Post Review

2. Construction of Parasan-

Tribhuvanbasti-Laxmipur-Belauri

Road (28.50 km)

SNRTP-53-NCB-O-SNRTP-KAN-

-W-NCB-10.02-UG-070-71

DTO Kanchanpur Activity Cancelled

Post Review

3. Construction of Red Cross-

Baghphanta Road (2.50 Km)

SNRTP-54-NCB-O-SNRTP-KAN-

-W-NCB-10.03-UG-070-71

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 18/03/14  N/A  10/05/14  68  11/05/15

 N/A  17/01/14

 N/A  01/02/14  03/03/14

 16/02/14  03/03/14  N/A  02/05/14  75  22/11/14

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 03/03/14  18/03/14  N/A  25/04/14  53  25/11/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  01/02/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15 N/A  17/01/14

DTO Kanchanpur Activity Cancelled

Post Review

4. Construction of Rajmarg-Budha-

Jhajpur-Gauji-Briddhassharam

Road.(6.50 Km)

SNRTP-55-NCB-O-SNRTP-KAN-

-W-NCB-10.04-UG-070-71

DTO Kanchanpur Contract under execution

Prior Review  11/01/14  18/03/14  17/04/14  15/09/14  28/09/14  20/10/14  186

1.Tikkar-Buddhi-Bijgauri-

Hulaki(10.Km)

SNRTP-56-NCB-O-SNRTP-KAP-

W-NCB-11.01-UG-070-71

DTO Kapilbastu Activity Cancelled

Post Review

2.Chakarchauda-Pakadi-Pipara

Rd(19.75km)

SNRTP-57-NCB-O-SNRTP-KAP-

W-NCB-11.02-UG-070-71

DTO Kapilbastu Activity Cancelled

Post Review

3. Imaliya-Maharajgunj-Hardauna

Rd.(23.50 km):

SNRTP-58-NCB-O-SNRTP-KAP-

W-NCB-11.03-UG-070-71

DTO Kapilbastu Activity Cancelled

Post Review

4. Construction of Jahadi- Bikuli-

Bungchi Road:( 2.50 km)

SNRTP-59-NCB-O-SNRTP-KAP-

W-NCB-11.04-UG-070-71

DTO Kapilbastu Activity Cancelled

Post Review

1. Kahukhola-Dudhpokhari Rd. (35

Km):

SNRTP-60-NCB-O-SNRTP-KAS-

W-NCB-12.01-UG-070-71

DTO Kaski Activity Cancelled

Post Review

2. Construction of Chhorepatan-

Kristi-Nirmalpokhar-Bharatpokhari

Road (28.50 km)

SNRTP-61-NCB-O-SNRTP-KAS-

W-NCB-12.02-UG-070-71

DTO Kaski Activity Cancelled

Post Review

3. Construction of Dobilla-Bagmara

Road (11.00 Km)

SNRTP-62-NCB-O-SNRTP-KAS-

W-NCB-12.03-UG-070-71

DTO Kaski Activity Cancelled

Post Review

 16/02/14  03/03/14  N/A  02/05/14  75  25/05/15

 03/03/14  N/A  02/05/14  75  26/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/11/15

 03/03/14  N/A  02/05/14  75  20/02/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 18/03/14  11/05/14  11/05/14  69  10/12/15

 N/A  17/01/14

 25/01/14  01/02/14  03/03/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15 N/A  17/01/14

4. Construction of Naundandada-

Kaskikot-Sarankot Road (11.00 Km)

SNRTP-63-NCB-O-SNRTP-KAS-

W-NCB-12.04-UG-070-71

DTO Kaski Activity Cancelled

Post Review

5. Construction of Kaunkhola-Kaure-

Melbot-Sikles-Dudhpokhari

Road:(10 Km)

SNRTP-64-NCB-O-SNRTP-KAS-

W-NCB-12.05-UG-070-71

DTO Kaski Activity Cancelled

Post Review

6. Construction of Chhorepatan-

Shantistupa (Kalimati-Santistupa

Section) Road.(1.50 km)

SNRTP-65-NCB-O-SNRTP-KAS-

W-NCB-12.06-UG-070-71

DTO Kaski Activity Cancelled

Post Review

7. Construction of Lamachaur-

Kharpani- Macchapuchhare Road

(15.50 km)

SNRTP-66-NCB-O-SNRTP-KAS-

W-NCB-12.07-UG-070-71

DTO Kaski Activity Cancelled

Post Review

1. Construction of Jaleshwor-Rauja-

Bardibas Road (42 Km)

SNRTP-67-NCB-O-SNRTP-

MAH-W-NCB-13.02-UG-070-

71

DTO Mahottari Activity Cancelled

Post Review

2. Construction of Matihani-Pipra-

Bhamarpura-Mahdaiya Tapanpur

Road (22.50 km)

SNRTP-68-NCB-O-SNRTP-

MAH--W-NCB-13.01-UG-070-

71

DTO Mahottari Activity Cancelled

Post Review

1. Construction of Kulekhani-

Phakhel-Humanebhanjang Road

(6.50 Km)

SNRTP-69-NCB-O-SNRTP-

MAK--W-NCB-14.01-UG-070-

71

DTO Makawanpur Activity Cancelled

Post Review

2. Construction of Hetauda-

Padamphokhari -Makari-

Handikhola Road(21 Km)

SNRTP-70-NCB-O-SNRTP-

MAK--W-NCB-14.02-UG-070-

71

DTO Makawanpur Activity Cancelled

Post Review

 16/02/14  03/03/14  N/A  02/04/14  45  25/11/15

 03/03/14  N/A  02/05/14  75  25/05/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 03/03/14  18/03/14  N/A  10/05/14  68  07/12/14

 18/03/14  N/A  10/05/14  68  07/12/14

 N/A  01/02/14

 N/A  01/02/14  03/03/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/05/15

 03/03/14  N/A  02/05/14  75  25/05/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

3. Construction of Daman-

Dandabas-Baikuntha Road.(13 km)

SNRTP-71-NCB-O-SNRTP-

MAK--W-NCB-14.03-UG-070-

71

DTO Makawanpur Activity Cancelled

Post Review

4. Construction of Kulekhani-

Phakhel-Humanebhanjang Road

(7.00 Km)

SNRTP-72-NCB-O-SNRTP-

MAK-W-NCB-14.04-UG-070-

71

DTO Makawanpur Activity Cancelled

Post Review

5. Construction of Hetauda-

Padamphokhari -Makari-

Handikhola Road(3.25 Km)

SNRTP-73-NCB-O-SNRTP-

MAK-W-NCB-14.05-UG-070-

71

DTO Makawanpur Activity Cancelled

Post Review

1. Construction of Daldale-Dhawadi-

Dehgaun Road (36 Km)

SNRTP-74-NCB-O-SNRTP-

NAW-W-NCB-15.01-UG-070-

71

DTO Nawal Parasi Activity Cancelled

Post Review

2. Construction of Maheshpur-

Triveni Road (10.50 Km)

SNRTP-75-NCB-O-SNRTP-

NAW-W-NCB-15.02-UG-070-

71

DTO Nawal Parasi Activity Cancelled

Post Review

3. Construction of Daldale-Dhawadi

Road (10 Km)

SNRTP-76-NCB-O-SNRTP-

NAW-W-NCB-15.03-PM-070-

71

DTO Nawal Parasi Activity Cancelled

Post Review

4. Construction of Panchnagar-

Maheshpur Road (16 Km)

SNRTP-77-NCB-O-SNRTP-

NAW-W-NCB-15.04-PM-070-

71

DTO Nawal Parasi Activity Cancelled

Post Review

1. Construction of Trishuli-Deurali-

Meghang Road (22 Km)

SNRTP-78-NCB-O-SNRTP-

NUW-W-NCB-16.01-UG-070-

71

DTO Nuwakot Activity Cancelled

Post Review

2. Construction of Nuwakot-

Bageshwori-Urleni Road (23.50 Km)

SNRTP-79-NCB-O-SNRTP-

NUW-W-NCB-16.02-UG-070-

71

 03/03/14  N/A  02/05/14  75  25/11/15 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  20/02/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  20/02/15

 03/03/14  N/A  02/05/14  75  26/05/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  22/11/14

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  20/02/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

DTO Nuwakot Activity Cancelled

Post Review

3. Construction of Mandredhunga –

Khargabhanjyang-Gorsyang

–Dangsing Road (12.00 km)

SNRTP-80-NCB-O-SNRTP-

NUW-W-NCB-16.03-UG-070-

71

DTO Nuwakot Contract under execution

Post Review  N/A  04/03/14  06/04/14  14/05/14  N/A  30/05/14  54

1. Construction of Aryabhanjyang-

Rampur Road(6.70 Km)

SNRTP-81-NCB-O-SNRTP-PAL-

W-NCB-17.01-UG-070-71

DTO Palpa Activity Cancelled

Post Review

2. Construction of Bastari-Jhadewa

Road (8 Km)

SNRTP-82-NCB-O-SNRTP-PAL-

W-NCB-17.02-UG-070-71

DTO Palpa Activity Cancelled

Post Review

1. Construction of Atama Ram Path

(24.25 km)

SNRTP-83-NCB-O-SNRTP-PAR-

W-NCB-18.01-UG-070-71

DTO Parsa Activity Cancelled

Post Review

2. Construction of Janata Sadak

(29.50 Km)

SNRTP-84-NCB-O-SNRTP-PAR-

W-NCB-18.02-UG-070-71

DTO Parsa Activity Cancelled

Post Review

3. Construction of Pokhariya-Viswa

Road (13.50 km)

SNRTP-85-NCB-O-SNRTP-PAR-

W-NCB-18.03-UG-070-71

DTO Parsa Activity Cancelled

Post Review

1. Construction of Cherneta-

Puranthanti-Jogitari Road (7.70 Km)

SNRTP-86-NCB-O-SNRTP-PYU-

W-NCB-19.01-UG-070-71

DTO Pyuthan Activity Cancelled

Post Review

2. Construction of Bagdula-Bahane-

Syaulibang Road (9 km)

SNRTP-87-NCB-O-SNRTP-PYU-

W-NCB-19.02-UG-070-71

DTO Pyuthan Activity Cancelled

Post Review

 03/03/14  N/A  26/05/14  91  25/11/15 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  26/05/14  91  25/11/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  25/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  25/11/15

 03/03/14  N/A  02/04/14  45  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  10/12/15

 03/03/14  N/A  02/05/14  75  25/11/15

 N/A  17/01/14

 N/A  17/01/14  16/02/14

3 Construction of Khalanga-Jogitari-

Arghakhanchi Road (7.70 Km)

SNRTP-88-NCB-O-SNRTP-PYU-

W-NCB-19.03-UG-070-71

DTO Pyuthan Activity Cancelled

Post Review

1. Construction of Bogatitar-Simle-

Vorle-Parchyang Road (12 Km)

SNRTP-89-NCB-O-SNRTP-RAS-

W-NCB-20.01-UG-070-71

DTO Rasuwa Activity Cancelled

Post Review

2. Construction of Dharapani-

Rupsepani-Bhorle Road (6 Km):

SNRTP-90-NCB-O-SNRTP-RAS-

W-NCB-20.02-UG-070-71

DTO Rasuwa Activity Cancelled

Post Review

1. Construction of Aurahaiya-

Rampurkhap-Bankul-Himalibas

Road (6 Km):

SNRTP-91-NCB-O-SNRTP-RAU-

W-NCB-21.01-UG-070-71

DTO Rautahat Activity Cancelled

Post Review

2. Construction of Gaur-Ganga

Pipra-Samanpur-Santapur Road

(6.Km)

SNRTP-92-NCB-O-SNRTP-RAU-

W-NCB-21.02-UG-070-71

DTO Rautahat Activity Cancelled

Post Review

3. Construction of Gaur-Banjarha-

Auriya-Dumariya-Bishanpatti-

Inerwari Road (27 Km)

SNRTP-93-NCB-O-SNRTP-RAU-

W-NCB-21.03-UG-070-71

DTO Rautahat Activity Cancelled

Post Review

4. Construction of Rajpur-Akolwa-

Dumariya-Latmari Road ( 9 Km)

SNRTP-94-NCB-O-SNRTP-RAU-

W-NCB-21.04-UG-070-71

DTO Rautahat Activity Cancelled

Post Review

5. Construction of Aurahaiya-

Rampurkhap-Bankul-Himalibas

Road (12 Km)

SNRTP-95-NCB-O-SNRTP-RAU-

W-NCB-21.05-UG-070-71

DTO Rautahat Activity Cancelled

Post Review

 03/03/14  N/A  02/05/14  67  22/11/15 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15

 03/03/14  N/A  02/05/14  67  20/02/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  20/02/15

 03/03/14  N/A  02/05/14  67  20/02/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  20/02/15

 03/03/14  N/A  02/05/14  67  25/11/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  26/05/15 N/A  25/01/14

6. Construction of Gaur-Ganga

Pipra-Samanpur-Santapur Road

(16.Km)

SNRTP-96-NCB-O-SNRTP-RAU-

W-NCB-21.06-UG-070-71

DTO Rautahat Activity Cancelled

Post Review

7. Construction of Gaur-Banjarha-

Auriya-Dumariya-Bishanpatti-

Inerwari Road (8 Km)

SNRTP-97-NCB-O-SNRTP-RAU-

W-NCB-21.07-UG-070-71

DTO Rautahat Activity Cancelled

Post Review

2. Construction of Mahuwa-

Dhabauli-Yaddukwaha-Balabakhar

Road (16.25 Km)

SNRTP-98-NCB-O-SNRTP-

DHAN-W-NCB-7.02-UG-070-

71

DTO Dhanusha Activity Cancelled

Post Review

1. Construction of Madhubaliya-

Bhutaha Road (8.50 Km)

SNRTP-99-NCB-O-SNRTP-RUP-

W-NCB-22.01-UG-070-71

DTO Rupandehi Activity Cancelled

Post Review

2. Construction of Fireline-Lumbini

Road.(9 Km)

SNRTP-100-NCB-O-SNRTP-

RUP-W-NCB-22.02-UG-070-

71

DTO Rupandehi Activity Cancelled

Post Review

3. Construction of Madhubaliya-

Bhutaha Road (8.50 Km)

SNRTP-101-NCB-O-SNRTP-

RUP-W-NCB-22.03-UG-070-

71

DTO Rupandehi Activity Cancelled

Post Review

4. Construction of Fireline-Lumbini

Road.(14.50 Km)

SNRTP-102-NCB-O-SNRTP-

RUP-W-NCB-22.04-UG-070-

71

DTO Rupandehi Activity Cancelled

Post Review

5. Construction ofvDhakdhai-

Khaireni Road. (17 Km)

SNRTP-103-NCB-O-SNRTP-

RUP-W-NCB-22.05-UG-070-

71

DTO Rupandehi Activity Cancelled

Post Review

 03/03/14  N/A  02/05/14  67  26/05/15 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  26/05/15

 03/03/14  N/A  02/05/14  67  20/02/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  26/05/15

 03/03/14  N/A  02/05/14  67  26/05/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  26/05/15

 03/03/14  N/A  02/05/14  67  22/11/15

 N/A  17/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  22/11/15 N/A  25/01/14

1. Construction of Tharmare-

Badagaun-Sanipiply-Chorjhari Road

(7.50 Km)

SNRTP-104-NCB-O-SNRTP-

SAL--W-NCB-23.01-UG-070-

71

DTO Salyan Activity Cancelled

Post Review

2. Construction of Simkhark-

Kupendedaha-Baluwasangharhi

Road.(13.50 Km)

SNRTP-105-NCB-O-SNRTP-

SAL-W-NCB-23.02-UG-070-71

DTO Salyan Activity Cancelled

Post Review

3. Construction of Khalanga-

Simkhark-Baluwasangharhi Road

(24.50 Km)

SNRTP-106-NCB-O-SNRTP-

SAL--W-NCB-23.03-UG-070-

71

DTO Salyan Activity Cancelled

Post Review

1. Construction of Jandaul-Kushaha

Road (24.50 Km)

SNRTP-107-NCB-O-SNRTP-

SAP-W-NCB-24.01-UG-070-

71

DTO Saptari Activity Cancelled

Post Review

2. Construction of Kusha-Belihi

Road (16.50 Km)

SNRTP-108-NCB-O-SNRTP-

SAP-W-NCB-24.02-UG-070-

71

DTO Saptari Activity Cancelled

Post Review

1. Construction of Karmaiya-

Hathiaul Road (20 km)

SNRTP-109-NCB-O-SNRTP-

SAR-W-NCB-25.01-UG-070-

71

DTO Sarlahi Activity Cancelled

Post Review

2. Construction of Kaudena-

Janakinagar Rod (10 km)

SNRTP-110-NCB-O-SNRTP-

SAR-W-NCB-25.02-UG-070-

71

DTO Sarlahi Activity Cancelled

Post Review

1. Construction of Zeromile-

Bariyapatti Road (13 Km)

SNRTP-111-NCB-O-SNRTP-SIR-

W-NCB-26.01-UG-070-71

DTO Siraha Activity Cancelled

Post Review

 03/03/14  N/A  02/05/14  67  25/11/15 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  10/04/14  45  10/12/14

 03/03/14  N/A  10/04/14  45  10/12/14

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15

 03/03/14  N/A  02/05/14  67  25/11/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15

 03/03/14  N/A  10/05/14  75  10/12/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  10/04/14  45  10/12/15 N/A  25/01/14

2. Construction of Lahan -Thadi

Road (9 Km)

SNRTP-112-NCB-O-SNRTP-SIR-

W-NCB-26.02-UG-070-72

DTO Siraha Activity Cancelled

Post Review

3. Construction of Siraha-

Kanchanpur-Mirchaiya Road (4 Km)

SNRTP-113-NCB-O-SNRTP-SIR-

W-NCB-26.03-UG-070-71

DTO Siraha Activity Cancelled

Post Review

4 . Construction of Zeromile-

Bariyarpatti Road (8) Km

SNRTP-114-NCB-O-SNRTP-SIR-

W-NCB-26.04-UG-070-71

DTO Siraha Activity Cancelled

Post Review

5. Construction of Lahan--

Bhagwanpur-Thadi Road (8 Km)

SNRTP-115-NCB-O-SNRTP-SIR-

W-NCB-26.05-UG-070-71

DTO Siraha Activity Cancelled

Post Review

6. Construction of Mainawati Khola

Bridge, Siraha-Pipara Road, Sirah

(25 m span)

SNRTP-116-NCB-O-SNRTP-SIR-

W-NCB-26.06-UG-070-71

DTO Siraha Activity Cancelled

Post Review

1. Construction of Baddichaur-

Guttu Road (28 Km) :

SNRTP-117-NCB-O-SNRTP-

SUR-W-NCB-27.01-UG-070-

71

DTO Surkhet Activity Cancelled

Post Review

2. Construction of Dasharathpur-

Dandagaun Road. (8 km)

SNRTP-118-NCB-O-SNRTP-

SUR-W-NCB-27.02-UG-070-

71

DTO Surkhet Activity Cancelled

Post Review

1. Construction of Badhkhola-

Taksar-Dadegaunda Road (10 Km)

SNRTP-119-NCB-O-SNRTP-

SYA-W-NCB-28.01-UG-070-

71

DTO Syanja Contract under execution

Post Review  N/A  27/01/14  26/02/14  01/05/14  N/A  26/05/14  89

2. Construction of Whalighuwas-

Rampurr Road (7.50 Km)

SNRTP-120-NCB-O-SNRTP-

SYA-W-NCB-28.02-UG-070-

71

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15

 03/03/14  N/A  02/05/14  67  25/11/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15

 03/03/14  N/A  02/05/14  67  26/05/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  26/05/15

 03/03/14  N/A  02/05/14  67  22/11/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  22/11/15

 03/03/14  N/A  02/05/14  67  22/11/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15 N/A  25/01/14

DTO Syanja Contract under execution

Post Review  N/A  27/01/14  26/02/14  28/03/14  N/A  26/05/14  89

3. Construction of Rangkhola-

Biruwa Road. (7.50 Km)

SNRTP-121-NCB-O-SNRTP-

SYA-W-NCB-28.03-UG-070-

71

DTO Syanja Contract under execution

Post Review  N/A  27/01/14  26/02/14  30/03/14  N/A  26/05/14  89

4 . Construction of Nagdanda-

Karkineta Road. (20 Km)

SNRTP-122-NCB-O-SNRTP-

SYA-W-NCB-28.04-UG-070-

71

DTO Syanja Activity Cancelled

Post Review

5. Construction of Whalighuwas-

Rampurr Road (10 Km)

SNRTP-123-NCB-O-SNRTP-

SYA-W-NCB-28.05-UG-070-

71

DTO Syanja Activity Cancelled

Post Review

6. Construction of Mirdi-

JagatBhanjyang-Kinare-Chapakot

Road (7 Km)

SNRTP-124-NCB-O-SNRTP-

SYA-W-NCB-28.06-UG-070-

71

DTO Syanja Activity Cancelled

Post Review

7. Construction of Badhkhola-

Taksar-Dadegaunda Road (8 Km)

SNRTP-125-NCB-O-SNRTP-

SYA-W-NCB-28.07-UG-070-

71

DTO Syanja Activity Cancelled

Post Review

8. Construction of Rangkhola-

Biruwa Road. (5.60 Km)

SNRTP-126-NCB-O-SNRTP-

SYA-W-NCB-28.08-UG-070-

71

DTO Syanja Activity Cancelled

Post Review

1.Bhimad-Bhirkot (Shringa Path) (20

Km)

SNRTP-127-NCB-O-SNRTP-

TAN-W-NCB-29.01-UG-070-

71

DTO Tanahun Activity Cancelled

Post Review

2. Construction of Dulegauda-

Sankhe Raipur (Dhorbarahi Marg)

10 Km

SNRTP-128-NCB-O-SNRTP-

TAN-W-NCB-29.02-UG-070-

71

DTO Tanahun Activity Cancelled

Post Review

 24/02/14  03/03/14  N/A  02/05/14  67  26/05/15

 03/03/14  N/A  02/05/14  67  25/11/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  26/05/15

 03/03/14  N/A  02/05/14  67  26/05/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  26/05/15

 03/03/14  N/A  02/05/14  67  26/05/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15

 03/03/14  N/A  02/05/14  67  25/11/15

 N/A  25/01/14

 N/A  25/01/14  24/02/14

 24/02/14  03/03/14  N/A  02/05/14  67  25/11/15 N/A  25/01/14

3. Construction of Katari-Bahunitar

Road (11 Km)

SNRTP-129-NCB-O-SNRTP-

UDA-W-NCB-30.03-UG-070-

71

DTO Udayapur Activity Cancelled

Post Review

4. Construction of Gaighat-Nepaltar-

Udayapurgadhi Road (8 Km)

SNRTP-130-NCB-O-SNRTP-

UDA-W-NCB-30.04-UG-070-

71

DTO Udayapur Activity Cancelled

Post Review

1. Construction of Sandhikharka-

Dharapani-Chujathi Road (7 Km):

SNRTP-169-NCB-O-SNRTP-

ARG-W-NCB-1.01-UG-070-71

DTO Arghakhanchi Expected

Post Review

2. Construction of Sandhikharka-

Dharapani-Chujathi Road (12.50

Km):

SNRTP-170-NCB-O-SNRTP-

ARG-W-NCB-1.02-UG-070-71

DTO Arghakhanchi Expected

Post Review

3.Construction of Sandhikharka-

Balkot-Tamghash Rd (25.50 Km)

SNRTP-171-NCB-O-SNRTP-

ARG-W-NCB-1.03-UG-070-71

DTO Arghakhanchi Expected

Post Review

1. Construction of Chama-

Samjhanachowk-Khajura-Radhapur

Road (11 Km):

SNRTP-175-NCB-O-SNRTP-

BAN-W-NCB-2.01-UG-070-71

DTO Banke Expected

Post Review

2. Construction of RRM-

Mahendranagar-Hirminiya-Holyia

Road.(06 km)

SNRTP-176-NCB-O-:SNRTP-

BAN-W-NCB-2.02-UG-070-71

DTO Banke Expected

Post Review

3.Construction of MRM-Titirihiya-

Sohanpur-Udrahapur Road (18.50

Km)

SNRTP-177-NCB-O-SNRTP-

BAN-W-NCB-2.03-UG-070-71

DTO Banke Expected

Post Review

4. Construction of Paraspur-

Gaughat Road. (12.75 Km)

SNRTP-178-NCB-O-SNRTP-

BAN-W-NCB-2.04-PM-070-71

 27/03/15  N/A  26/04/15  60  25/04/16 N/A  26/01/15  25/02/15

 10/01/15  10/01/15  N/A  10/01/15  0  08/07/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  10/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 20/02/14  07/03/14  N/A  02/05/14  71  20/02/15

 07/03/14  N/A  02/05/14  71  26/05/15

 N/A  21/01/14

 N/A  21/01/14  20/02/14

DTO Banke Expected

Post Review

1.Construction of Bahuwari-

Simraungadh-Aruwa Nadi Road. (10

Km)

SNRTP-179-NCB-O-SNRTP-

BAR-W-NCB-3.01-UG-070-71

DTO Bara Expected

Post Review

2. Construction of Kabahigoth-

BariyarpurRoad (10.75 Km)

SNRTP-180-NCB-O-SNRTP-

BAR-W-NCB-3.02-UG-070-71

DTO Bara Expected

Post Review

3. Construction of Bahuwari-

Simraungadh-Aruwa Nadi Road.

(5.50 Km)

SNRTP-181-NCB-O-SNRTP-

BAR-W-NCB-3.03-UG-070-71

DTO Bara Expected

Post Review

4. Construction of Kabahigoth-

Bariyarpur Road (5.5 Km)

SNRTP-182-NCB-O-SNRTP-

BAR-W-NCB-3.04-UG-070-71

DTO Bara Expected

Post Review

1. Construction of MRM-Basgadhi-

Mainapokhar Road,Bardiya Road.

(8.25 Km)

SNRTP-183-NCB-O-SNRTP-

BRD-W-NCB-4.01-UG-070-71

DTO Bardia Expected

Post Review

2. Construction of Pushap Lal Marg

Road (16.60 Km)

SNRTP-184-NCB-O-SNRTP-

BRD-W-NCB-4.02-UG-070-71

DTO Bardia Expected

Post Review

3. Construction of Laxmana-

Gauripara-Ganeshpur Road

(13.65km)

SNRTP-185-NCB-O-SNRTP-

BRD-W-NCB-4.03-UG-070-71

DTO Bardia Expected

Post Review

4.Construction of Rajapur Ring Rd.

(47.25 Km)

SNRTP-186-NCB-O-SNRTP-

BRD-W-NCB-4.04-UG-070-71

DTO Bardia Expected

Post Review

 12/03/15  N/A  11/04/15  60  10/10/16 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  11/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/01/16

 12/03/15  N/A  11/04/15  60  11/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 27/03/15  N/A  26/04/15  60  25/04/16

 N/A  11/01/15

 N/A  26/01/15  25/02/15

1.Construction of Kalakate-

Gadhawa Road(35 Km)

SNRTP-187-NCB-O-SNRTP-

DAN-W-NCB-5.01-UG-070-71

DTO Dang Expected

Post Review

2. Construction of Pawan Nagar-

Purandhara Road(5.75 Km)

SNRTP-188-NCB-O-SNRTP-

DAN-W-NCB-5.02-UG-070-71

DTO Dang Expected

Post Review

1. Construction of Bhimdhunga-

Lamidanda-Galchi Road (27.75 Km):

SNRTP-189-NCB-O-SNRTP-

DHA-W-NCB-6.01-UG-070-71

DTO Dharding Expected

Post Review

2.Construction of Dhadingbesi-

Salyantar Road (18.50 Km)

SNRTP-190-NCB-O-SNRTP-

DHA-W-NCB-6.02-UG-070-71

DTO Dharding Expected

Post Review

3. Construction of Dhadingbesi-

Salayantar Road (23.15 Km)

SNRTP-191-NCB-O-SNRTP-

DHA-W-NCB-6.03-UG-070-71

DTO Dharding Expected

Post Review

4. Construction of Bhimdhunga-

Lamidanda-Galchi Road (18.50 Km)

SNRTP-192-NCB-O-SNRTP-

DHA-W-NCB-6.04-UG-070-71

DTO Dharding Expected

Post Review

1. Construction of Devpura-

Ghodghas-Fulgama-Tulshiyahi Road

(13.20 Km)

SNRTP-193-NCB-O-SNRTP-

DHAN-W-NCB-7.01-UG-070-

71

DTO Dhanusha Expected

Post Review

2. Construction of Mahuwa-

Dhabauli-Yaddukwaha-Balabakhar

Road (16.25 Km)

SNRTP-194-NCB-O-SNRTP-

DHAN-W-NCB-7.02-UG-070-

71

DTO Dhanusha Expected

Post Review

3. Construction of Janakpur-

Manaharpur-Kharihani Road (16.85

Km)

SNRTP-195-NCB-O-SNRTP-

DHAN-W-NCB-7.03-UG-070-

71

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/04/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/01/16

 12/03/15  N/A  11/04/15  60  11/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16 N/A  11/01/15

DTO Dhanusha Expected

Post Review

4. Construction of Devpura-

Ghodghas-Fulgama-Tulshiyahi Road

(4.00 Km)

SNRTP-196-NCB-O-SNRTP-

DHAN-W-NCB-7.04-UG-070-

71

DTO Dhanusha Expected

Post Review

5. Construction of Janakpur-

Manaharpur-Kharihani Road (9.15

Km)

SNRTP-197-NCB-O-SNRTP-

DHAN-W-NCB-7.05-UG-070-

71

DTO Dhanusha Expected

Post Review

1. Construction of Tamghas-

Simaltari-Purkodaha Road (46.00

Km)

SNRTP-198-NCB-O-SNRTP-

GUL--W-NCB-8.01-UG-070-71

DTO Gulmi Expected

Post Review

2. Construction of Ridi-Rudrabeni-

Wamitaksar Road (46.00 Km)

SNRTP-199-NCB-O-SNRTP-

GUL--W-NCB-8.02-UG-070-71

DTO Gulmi Expected

Post Review

3. Rudrabeni-Dhuseni-Padigaun

(09.50 Km)

SNRTP-200-NCB-O-SNRTP-

GUL--W-NCB-8.03-UG-070-71

DTO Gulmi Expected

Post Review

1. Construction of Sadakpur-

Bauniya-Joshipur-Vajani Road (25

Km)

SNRTP-201-NCB-O-SNRTP-

KAI-W-NCB-9.01-UG-070-71

DTO Kailali Expected

Post Review

2. Construction of Khutiya-Matiyari

Road (10.15 Km)

SNRTP-202-NCB-O-SNRTP-

KAI-W-NCB-9.02-UG-070-71

DTO Kailali Expected

Post Review

3. Construction of Jute Pani Nala

Bridge on Sukhad-Khailad-Bhajeni

Road (20 m. Span)

SNRTP-203-NCB-O-SNRTP-

KAI-W-NCB-9.03-UG-070-71

DTO Kailali Expected

Post Review

 10/02/15  12/03/15  N/A  11/04/15  60  10/03/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/01/16

 12/03/15  N/A  11/04/15  60  11/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16 N/A  11/01/15

1. Construction of Suspension

Bridge-Kutiyakavar Road (10.50 Km)

SNRTP-204-NCB-O-SNRTP-

KAN--W-NCB-10.01-UG-070-

71

DTO Kanchanpur Expected

Post Review

2. Construction of Parasan-

Tribhuvanbasti-Laxmipur-Belauri

Road (28.50 km)

SNRTP-205-NCB-O-SNRTP-

KAN--W-NCB-10.02-UG-070-

71

DTO Kanchanpur Expected

Post Review

3. Construction of Red Cross-

Baghphanta Road (2.50 Km)

SNRTP-206-NCB-O-SNRTP-

KAN--W-NCB-10.03-UG-070-

71

DTO Kanchanpur Expected

Post Review

1. Construction of Tikkar-Buddhi-

Bijgauri-Hulaki (10.Km)

SNRTP-207-NCB-O-SNRTP-

KAP-W-NCB-11.01-UG-070-

71

DTO Kapilbastu Expected

Post Review

2.Construction of Chakarchauda-

Pakadi-Pipara Rd(19.75km)

SNRTP-208-NCB-O-SNRTP-

KAP-W-NCB-11.02-UG-070-

71

DTO Kapilbastu Expected

Post Review

3. Construction of Imaliya-

Maharajgunj-Hardauna Rd.(23.50

km):

SNRTP-209-NCB-O-SNRTP-

KAP-W-NCB-11.03-UG-070-

71

DTO Kapilbastu Expected

Post Review

4. Construction of Jahadi- Bikuli-

Bungchi Road:( 2.50 km)

SNRTP-210-NCB-O-SNRTP-

KAP-W-NCB-11.04-UG-070-

71

DTO Kapilbastu Expected

Post Review

1. Construction of Kahukhola-

Dudhpokhari Rd. (35 Km):

SNRTP-211-NCB-O-SNRTP-

KAS-W-NCB-12.01-UG-070-

71

DTO Kaski Expected

Post Review

2. Construction of Chhorepatan-

Kristi-Nirmalpokhar-Bharatpokhari

Road (28.50 km)

SNRTP-212-NCB-O-SNRTP-

KAS-W-NCB-12.02-UG-070-

71

 12/03/05  N/A  11/04/05  60  10/10/16 N/A  11/01/05  10/02/05

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

DTO Kaski Expected

Post Review

3. Construction of Dobilla-Bagmara

Road (11.00 Km)

SNRTP-213-NCB-O-SNRTP-

KAS-W-NCB-12.03-UG-070-

71

DTO Kaski Expected

Post Review

4. Construction of Naundandada-

Kaskikot-Sarankot Road (11.00 Km)

SNRTP-214-NCB-O-SNRTP-

KAS-W-NCB-12.04-UG-070-

71

DTO Kaski Expected

Post Review

5. Construction of Kaunkhola-Kaure-

Melbot-Sikles-Dudhpokhari

Road:(10 Km)

SNRTP-215-NCB-O-SNRTP-

KAS-W-NCB-12.05-UG-070-

71

DTO Kaski Expected

Post Review

6. Construction of Chhorepatan-

Shantistupa (Kalimati-Santistupa

Section) Road.(1.50 km)

SNRTP-216-NCB-O-SNRTP-

KAS-W-NCB-12.06-UG-070-

71

DTO Kaski Expected

Post Review

7. Construction of Lamachaur-

Kharpani- Macchapuchhare Road

(15.50 km)

SNRTP-217-NCB-O-SNRTP-

KAS-W-NCB-12.07-UG-070-

71

DTO Kaski Expected

Post Review

1. Construction of Matihani-Pipra-

Bhamarpura-Mahdaiya Tapanpur

Road (22.50 km)

SNRTP-218-NCB-O-SNRTP-

MAH-W-NCB-13.01-UG-070-

71

DTO Mahottari Expected

Post Review

2. Construction of Jaleshwor-Rauja-

Bardibas Road (42 Km)

SNRTP-219-NCB-O-SNRTP-

MAH-W-NCB-13.02-UG-070-

71

DTO Mahottari Expected

Post Review

1. Construction of Kulekhani-

Phakhel-Humanebhanjang Road

(6.50 Km)

SNRTP-220-NCB-O-SNRTP-

MAK--W-NCB-14.01-UG-070-

71

DTO Makawanpur Expected

Post Review

 12/03/15  N/A  11/04/15  60  10/04/16 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/01/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 25/02/15  27/03/15  N/A  26/04/15  60  26/01/16

 27/03/15  N/A  26/04/15  60  25/10/15

 N/A  26/01/15

 N/A  26/01/15  25/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/05  N/A  11/04/05  60  10/10/16

 N/A  11/01/15

 N/A  11/01/05  10/02/05

2. Construction of Hetauda-

Padamphokhari -Makari-

Handikhola Road(21 Km)

SNRTP-221-NCB-O-SNRTP-

MAK--W-NCB-14.02-UG-070-

71

DTO Makawanpur Expected

Post Review

3. Construction of Daman-

Dandabas-Baikuntha Road.(13 km)

SNRTP-222-NCB-O-SNRTP-

MAK--W-NCB-14.03-UG-070-

71

DTO Makawanpur Expected

Post Review

4. Construction of Kulekhani-

Phakhel-Humanebhanjang Road

(7.00 Km)

SNRTP-223-NCB-O-SNRTP-

MAK--W-NCB-14.04-UG-070-

71

DTO Makawanpur Expected

Post Review

5. Construction of Hetauda-

Padamphokhari -Makari-

Handikhola Road(3.25 Km)

SNRTP-224-NCB-O-SNRTP-

MAK--W-NCB-14.05-UG-070-

71

DTO Makawanpur Expected

Post Review

1. Construction of Daldale-Dhawadi-

Dehgaun Road (36 Km)

SNRTP-225-NCB-O-SNRTP-

NAW-W-NCB-15.01-UG-070-

71

DTO Nawal Parasi Expected

Post Review

2. Construction of Maheshpur-

Triveni Road (10.50 Km)

SNRTP-226-NCB-O-SNRTP-

NAW-W-NCB-15.02-UG-070-

71

DTO Nawal Parasi Expected

Post Review

3. Construction of Daldale-Dhawadi

Road (10 Km)

SNRTP-227-NCB-O-SNRTP-

NAW-W-NCB-15.03-UG-070-

71

DTO Nawal Parasi Expected

Post Review

4. Construction of Panchnagar-

Maheshpur Road (16 Km)

SNRTP-228-NCB-O-SNRTP-

NAW-W-NCB-15.04-UG-070-

71

DTO Nawal Parasi Expected

Post Review

1. Construction of Trishuli-Deurali-

Meghang Road (22 Km)

SNRTP-229-NCB-O-SNRTP-

NUW-W-NCB-16.01-UG-070-

71

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  11/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/01/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/01/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16 N/A  11/01/15

DTO Nuwakot Expected

Post Review

2. Construction of Nuwakot-

Bageshwori-Urleni Road (23.50 Km)

SNRTP-230-NCB-O-SNRTP-

NUW-W-NCB-16.02-UG-070-

71

DTO Nuwakot Expected

Post Review

1. Construction of Aryabhanjyang-

Rampur Road(6.70 Km)

SNRTP-232-NCB-O-SNRTP-

PAL-W-NCB-17.01-UG-070-

71

DTO Palpa Expected

Post Review

2. Construction of Bastari-Jhadewa

Road (8 Km)

SNRTP-233-NCB-O-SNRTP-

PAL-W-NCB-17.02-UG-070-

71

DTO Palpa Expected

Post Review

1. Construction of Atama Ram Path

(24.25 km)

SNRTP-234-NCB-O-SNRTP-

PAR-W-NCB-18.01-UG-070-

71

DTO Parsa Expected

Post Review

2. Construction of Janata Sadak

(29.50 Km)

SNRTP-235-NCB-O-SNRTP-

PAR-W-NCB-18.02-UG-070-

71

DTO Parsa Expected

Post Review

3. Construction of Pokhariya-Viswa

Road (13.50 km)

SNRTP-236-NCB-O-SNRTP-

PAR-W-NCB-18.03-UG-070-

71

DTO Parsa Expected

Post Review

1. Construction of Cherneta-

Puranthanti-Jogitari Road (7.70 Km)

SNRTP-237-NCB-O-SNRTP-

PYU-W-NCB-19.01-UG-070-

71

DTO Pyuthan Expected

Post Review

2. Construction of Bagdula-Bahane-

Syaulibang Road (9 km)

SNRTP-238-NCB-O-SNRTP-

PYU-W-NCB-19.02-UG-070-

71

DTO Pyuthan Expected

Post Review

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16 N/A  11/01/15

3 Construction of Khalanga-Jogitari-

Arghakhanchi Road (7.70 Km)

SNRTP-239-NCB-O-SNRTP-

PYU-W-NCB-19.03-UG-070-

71

DTO Pyuthan Expected

Post Review

1. Construction of Bogatitar-Simle-

Vorle-Parchyang Road (12 Km)

SNRTP-240-NCB-O-SNRTP-

RAS-W-NCB-20.01-UG-070-

71

DTO Rasuwa Expected

Post Review

2. Construction of Dharapani-

Rupsepani-Bhorle Road (6 Km):

SNRTP-241-NCB-O-SNRTP-

RAS-W-NCB-20.02-UG-070-

71

DTO Rasuwa Expected

Post Review

1. Construction of Aurahaiya-

Rampurkhap-Bankul-Himalibas

Road (6 Km):

SNRTP-242-NCB-O-SNRTP-

RAU-W-NCB-21.01-UG-070-

71

DTO Rautahat Expected

Post Review

2. Construction of Gaur-Ganga

Pipra-Samanpur-Santapur Road

(6.Km)

SNRTP-243-NCB-O-SNRTP-

RAU-W-NCB-21.02-UG-070-

71

DTO Rautahat Expected

Post Review

3. Construction of Gaur-Banjarha-

Auriya-Dumariya-Bishanpatti-

Inerwari Road (27 Km)

SNRTP-244-NCB-O-SNRTP-

RAU-W-NCB-21.03-UG-070-

71

DTO Rautahat Expected

Post Review

4. Construction of Rajpur-Akolwa-

Dumariya-Latmari Road ( 9 Km)

SNRTP-245-NCB-O-SNRTP-

RAU-W-NCB-21.04-UG-070-

71

DTO Rautahat Expected

Post Review

5. Construction of Aurahaiya-

Rampurkhap-Bankul-Himalibas

Road (12 Km)

SNRTP-246-NCB-O-SNRTP-

RAU-W-NCB-21.05-UG-070-

71

DTO Rautahat Expected

Post Review

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  06/11/16

 12/03/15  N/A  11/04/15  60  11/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/01/16

 12/03/15  N/A  11/04/15  60  10/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

6. Construction of Gaur-Ganga

Pipra-Samanpur-Santapur Road

(16.Km)

SNRTP-247-NCB-O-SNRTP-

RAU-W-NCB-21.06-UG-070-

71

DTO Rautahat Expected

Post Review

7. Construction of Gaur-Banjarha-

Auriya-Dumariya-Bishanpatti-

Inerwari Road (8 Km)

SNRTP-248-NCB-O-SNRTP-

RAU-W-NCB-21.07-UG-070-

71

DTO Rautahat Expected

Post Review

1. Construction of Madhubaliya-

Bhutaha Road (8.50 Km)

SNRTP-249-NCB-O-SNRTP-

RUP-W-NCB-22.01-UG-070-

71

DTO Rupandehi Expected

Post Review

2. Construction of Fireline-Lumbini

Road.(9 Km)

SNRTP-250-NCB-O-SNRTP-

RUP-W-NCB-22.02-UG-070-

71

DTO Rupandehi Expected

Post Review

3. Construction of Madhubaliya-

Bhutaha Road (8.50 Km)

SNRTP-251-NCB-O-SNRTP-

RUP-W-NCB-22.03-UG-070-

71

DTO Rupandehi Expected

Post Review

4. Construction of Fireline-Lumbini

Road.(14.50 Km)

SNRTP-253-NCB-O-SNRTP-

RUP-W-NCB-22.04-UG-070-

71

DTO Rupandehi Expected

Post Review

5. Construction of Dhakdhai-

Khaireni Road. (17 Km)

SNRTP-254-NCB-O-SNRTP-

RUP-W-NCB-22.05-UG-070-

71

DTO Rupandehi Expected

Post Review

1. Construction of Tharmare-

Badagaun-Sanipiply-Chorjhari Road

(36 Km)

SNRTP-255-NCB-O-SNRTP-

SAL--W-NCB-23.01-UG-070-

71

DTO Salyan Expected

Post Review

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  11/01/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

2. Construction of Simkhark-

Kupendedaha-Baluwasangharhi

Road.(13.50 Km)

SNRTP-256-NCB-O-SNRTP-

SAL--W-NCB-23.02-UG-070-

71

DTO Salyan Expected

Post Review

3. Construction of Khalanga-

Simkhark-Baluwasangharhi Road

(32 Km)

SNRTP-257-NCB-O-SNRTP-

SAL--W-NCB-23.03-UG-070-

71

DTO Salyan Expected

Post Review

1. Construction of Jandaul-Kushaha

Road (24.50 Km)

SNRTP-264-NCB-O-SNRTP-

SAP-W-NCB-24.01-UG-070-

71

DTO Saptari Expected

Post Review

2. Construction of Kusha-Belihi

Road (16.50 Km)

SNRTP-265-NCB-O-SNRTP-

SAP-W-NCB-24.02-UG-070-

71

DTO Saptari Expected

Post Review

1. Construction of Karmaiya-

Hathiaul Road (20 km)

SNRTP-266-NCB-O-SNRTP-

SAR-W-NCB-25.01-UG-070-

71

DTO Sarlahi Expected

Post Review

2. Construction of Kaudena-

Janakinagar Rod (10 km)

SNRTP-267-NCB-O-SNRTP-

SAR-W-NCB-25.02-UG-070-

71

DTO Sarlahi Expected

Post Review

1. Construction of Zeromile-

Bariyapatti Road (13 Km)

SNRTP-268-NCB-O-SNRTP-SIR-

W-NCB-26.01-UG-070-71

DTO Siraha Expected

Post Review

2. Construction of Lahan -Thadi

Road (9 Km)

SNRTP-269-NCB-O-SNRTP-SIR-

W-NCB-26.02-UG-070-71

DTO Siraha Expected

Post Review

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/01/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

3. Construction of Siraha-

Kanchanpur-Mirchaiya Road (4 Km)

SNRTP-270-NCB-O-SNRTP-SIR-

W-NCB-26.03-UG-070-71

DTO Siraha Expected

Post Review

4 . Construction of Zeromile-

Bariyarpatti Road (8) Km

SNRTP-271-NCB-O-SNRTP-SIR-

W-NCB-26.04-UG-070-71

DTO Siraha Expected

Post Review

5. Construction of Lahan--

Bhagwanpur-Thadi Road (8 Km)

SNRTP-272-NCB-O-SNRTP-SIR-

W-NCB-26.05-UG-070-71

DTO Siraha Expected

Post Review

6. Construction of Mainawati Khola

Bridge, Siraha-Pipara Road, Sirah

(25 m span)

SNRTP-273-NCB-O-SNRTP-SIR-

W-NCB-26.06-BRI-070-71

DTO Siraha Expected

Post Review

2. Construction of Dasharathpur-

Dandagaun Road. (8 km)

SNRTP-275-NCB-O-SNRTP-

SUR-W-NCB-27.02-UG-070-

71

DTO Surkhet Expected

Post Review

4 . Construction of Nagdanda-

Karkineta Road. (20 Km)

SNRTP-279-NCB-O-SNRTP-

SYA-W-NCB-28.04-UG-070-

71

DTO Syanja Expected

Post Review

8. Construction of Rangkhola-

Biruwa Road. (5.60 Km)

SNRTP-284-NCB-O-SNRTP-

SYA-W-NCB-28.08-UG-070-

71

DTO Syanja Expected

Post Review

1.Bhimad-Bhirkot (Shringa Path) (20

Km)

SNRTP-285-NCB-O-SNRTP-

TAN-W-NCB-29.01-UG-070-

71

DTO Tanahun Expected

Post Review

2. Construction of Dulegauda-

Sankhe Raipur (Dhorbarahi Marg)

10 Km

SNRTP-286-NCB-O-SNRTP-

TAN-W-NCB-29.02-UG-070-

71

 10/01/15  N/A  10/01/15  0  26/05/15 N/A  10/01/15  10/01/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

DTO Tanahun Expected

Post Review

1. Construction of Gaighat-Nepaltar-

Udayapurgadhi Road (12 Km)

SNRTP-287-NCB-O-SNRTP-

UDA-W-NCB-30.01-UG-070-

71

DTO Udayapur Expected

Post Review

2. Construction of Gaighat-

Phatepur Road. (10 Km):

SNRTP-288-NCB-O-SNRTP-

UDA-W-NCB-30.02-UG-070-

71

DTO Udayapur Expected

Post Review

3. Construction of Katari-Bahunitar

Road (11 Km)

SNRTP-289-NCB-O-SNRTP-

UDA-W-NCB-30.03-UG-070-

71

DTO Udayapur Expected

Post Review

4. Construction of Gaighat-Nepaltar-

Udayapurgadhi Road (8 Km)

SNRTP-290-NCB-O-SNRTP-

UDA-W-NCB-30.04-UG-070-

71

DTO Udayapur Expected

Post Review

3. Construction of Karmaiya-

Hathiaul Road (40 km)

SNRTP-326-NCB-O-SNRTP-

SAR-W-NCB-25.03-UG-071-

72

DTO Sarlahi Expected

Post Review

4. Construction of Kaudena-

JanakinagarRoad (15 km)

SNRTP-327-NCB-O-SNRTP-

SAR-W-NCB-25.04-UG-071-

72

DTO Sarlahi Expected

Post Review

1. Construction of Baddichaur-

Guttu (28 Km)

SNRTP-328-NCB-O-SNRTP-

SUR-W-NCB-27.01-UG-070-

71

DTO Surkhet Expected

Post Review

3 Construction of Ratanangla

Dharma Pokhara Rd (20 km)

SNRTP-329-NCB-O-SNRTP-

SUR-W-NCB-27.03-UG-071-

72

DTO Surkhet Expected

Post Review

 12/03/15  N/A  11/04/15  60  14/12/15 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  25/11/16

 03/03/14  N/A  10/04/14  45  10/12/14

 N/A  11/01/15

 N/A  25/01/14  24/02/14

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 16/03/15  N/A  15/04/15  60  14/01/16

 N/A  11/01/15

 N/A  15/01/15  14/02/15

 14/02/15  16/03/15  N/A  15/04/15  60  14/04/16

 16/03/15  N/A  15/04/15  60  14/04/16

 N/A  15/01/15

 N/A  15/01/15  14/02/15

 14/02/15  16/03/15  N/A  15/04/15  60  14/04/16

 10/01/15  N/A  10/01/15  0  26/05/15

 N/A  15/01/15

 N/A  10/01/15  10/01/15

4 Construction of Dhuliya -bit -

Bhedabari Rd (15 km)

SNRTP-330-NCB-O-SNRTP-

SUR-W-NCB-27.04-UG-071-

72

DTO Surkhet Expected

Post Review

5 Construction of Ramghat-Samuji

ghat Rd. (10 km)

SNRTP-331-NCB-O-SNRTP-

SUR-W-NCB-27.05-UG-071-

72

DTO Surkhet Expected

Post Review

5. Construction of Whalighuwas-

Rampur Road (10 Km)

SNRTP-332-NCB-O-SNRTP-

SYA-W-NCB-28.05-UG-070-

71

DTO Syanja Expected

Post Review

6. Construction of Mirdi-

JagatBhanjyang-Kinare-Chapakot

Road (7 Km)

SNRTP-333-NCB-O-SNRTP-

SYA-W-NCB-28.06-UG-070-

71

DTO Syanja Expected

Post Review

7. Construction of Badhkhola-

Taksar-Dadegaunda Road (8 Km)

SNRTP-334-NCB-O-SNRTP-

SYA-W-NCB-28.07-UG-070-

71

DTO Syanja Expected

Post Review

3.Samung-Deurali-Gajarkpt-

Keladighat (15 Km)

SNRTP-335-NCB-O-SNRTP-

TAN-W-NCB-29.03-UG-071-

72

DTO Tanahun Expected

Post Review

2. Dulegauda-Sankhe Raipur

(Dhorbarahi Marg) 10 Km

SNRTP-337-NCB-O-SNRTP-

TAN-W-NCB-29.02-UG-070-

71

DTO Tanahun Expected

Post Review

5. Construction of Damauli-

Pokharibhanjyang-Keshavtar-

Dharampani-Bandipur 20 Km

SNRTP-338-NCB-O-SNRTP-

TAN-W-NCB-29.05-UG-071-

72

DTO Tanahun Expected

Post Review

6. Parsahi-Baluwa River Bridge (50

meter span) across JMK Road

SNRTP-339-NCB-O-SNRTP-

DHAN-W-NCB-7.06-BRI-071-

72

 10/02/15  12/03/15  N/A  11/04/15  60  10/01/16

 10/01/15  N/A  10/01/15  0  10/07/16

 N/A  11/01/15

 N/A  10/01/15  10/01/15

 10/01/15  10/01/15  N/A  10/01/15  0  10/07/16

 10/01/15  N/A  10/01/15  0  10/07/16

 N/A  10/01/15

 N/A  10/01/15  10/01/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  10/04/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/16

 12/03/15  N/A  11/04/15  60  09/11/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/11/16 N/A  11/01/15

DTO Dhanusha Expected

Post Review

7. Construction of Baghchaura

arhari River Bridge 25 meter span)

across JMK Road

SNRTP-340-NCB-O-SNRTP-

DHAN-W-NCB-7.07-BRI-071-

72

DTO Dhanusha Expected

Post Review

4. Sandhikharka-Balkot Tamghas Rd

(13.50 Km)

SNRTP-364-NCB-O-SNRTP-

ARG-W-NCB-1.04-UG-070-71

DTO Arghakhanchi Expected

Post Review

8. Construction of Rupakot Thumki

Road (22 km)

SNRTP-365-NCB-O-SNRTP-

KAS-W-NCB-12.08-UG-070-

71

DTO Kaski Expected

Post Review

9. Construction of Baidam Pame

Chhadichhita Road (14 Km.)

SNRTP-366-NCB-O-SNRTP-

KAS-W-NCB-12.09-UG-070-

71

DTO Kaski Expected

Post Review

6. Construction of Gaidahawa Khola

Bridge across Thu-Piprahawa

Karauta Semara Road (30 meter

Span)

SNRTP-367-NCB-O-SNRTP-

RUP-W-NCB-22.06-BRI-070-

71

DTO Rupandehi Expected

Post Review

8. Construction of Bakuwakhola

Bridge across Akolwa-Dumariya

Road (25 Meter Span)

SNRTP-368-NCB-O-SNRTP-

RAU-W-NCB-21.08-BRI-070-

71

DTO Rautahat Expected

Post Review

9. Construction of Aruwa Khola

Bridge Malahi Ghat across Santapur

Road (25 Meter Span)

SNRTP-369-NCB-O-SNRTP-

RAU-W-NCB-21.09-BRI-070-

71

DTO Rautahat Expected

Post Review

5. Construction of Lakhandehi

Bridge across Kaudena-

Janakinagar(300 Meter Span)

SNRTP-370-NCB-O-SNRTP-

SAR-W-NCB-25.04-BRI-071-

72

DTO Sarlahi Expected

Post Review

 10/02/15  12/03/15  N/A  11/04/15  60  10/04/17

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  09/10/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  11/01/15

 N/A  11/01/15  10/02/15

 28/03/15  27/04/15  N/A  27/05/15  60  26/05/17

 18/03/14  N/A  10/05/14  68  07/12/14

 N/A  26/02/15

 N/A  01/02/14  03/03/14

 17/03/15  16/04/15  N/A  16/05/15  60  15/05/17

 12/03/15  N/A  11/04/15  60  10/01/16

 N/A  15/02/15

 N/A  11/01/15  10/02/15

 10/02/15  12/03/15  N/A  11/04/15  60  10/01/16 N/A  11/01/15

7. Construction of Siraha-Shukhipur

Road (10 Km.)

SNRTP-371-NCB-O-SNRTP-SIR-

W-NCB-26.07-UG-070-71

DTO Siraha Expected

Post Review

4. Construction of Dulegauda-

Sankhe Raipur (Dhorbarahi Marg)

10 Km:

SNRTP-372-NCB-O-SNRTP-

TAN-W-NCB-29.04-UG-070-

71

DTO Tanahun Expected

Post Review

6. Lapang phedi-Lapang Khola Truss

Bridge across Dharding Besi

Sangkosh Tipling Road (35 Meter

Span)

SNRTP-376-NCB-O-SNRTP-

DHA-W-NCB-6.06-BRI-071-72

DTO Dharding Expected

Post Review

4. Construction of Seugha-Simaghat-

Purkot Daha -Aglung Phedi Road

(57 Km)

SNRTP-383-NCB-O-SNRTP-

GUL--W-NCB-8.04-UG-071-72

DTO Gulmi Expected

Post Review

5. Construction of Chorkate

Santipur Gwaghat -Phosing -

Purtighat Road (45 Km)

SNRTP-384-NCB-O-SNRTP-

GUL--W-NCB-8.05-UG-071-72

DTO Gulmi Expected Add Comme

nt

Post Review

7. Gachchhe - Dhanachaur -Lamtal -

Bhaluwang Rd. (65 Km)

SNRTP-390-NCB-O-SNRTP-

ARG-W-NCB-1.07-UG-071-72

Re-

estimation

of dates

12/04/2015

17:59  

DTO Arghakhanchi Expected Add Comme

nt

Post Review

8. Ghumti- Palpa Rd. (29 Km) SNRTP-391-NCB-O-SNRTP-

ARG-W-NCB-1.08-UG-071-72

Re-

estimation

of dates

12/04/2015

19:24  

DTO Arghakhanchi Expected Add Comme

nt

Post Review

 20/06/15  N/A  20/07/15  45  18/10/16 N/A  06/05/15  05/06/15

 05/06/15  20/06/15  N/A  20/07/15  45  17/01/17

 25/05/15  N/A  24/06/15  60  22/09/16

 N/A  06/05/15

 N/A  26/03/15  25/04/15

 25/04/15  25/05/15  N/A  24/06/15  60  22/09/16

 12/03/15  N/A  11/04/15  60  09/10/16

 N/A  26/03/15

 N/A  11/01/15  10/02/15

 10/01/15  10/01/15  N/A  10/01/15  0  09/01/17

 12/03/15  N/A  11/04/15  60  10/04/17

 N/A  10/01/15

 N/A  11/01/15  10/02/15

9. Rajupanikhada-Masurpata Rd.

(10 Km)

SNRTP-392-NCB-O-SNRTP-

ARG-W-NCB-1.09-UG-071-72

Update

Internal ID

(SNRTP-ARG-

W-NCB-1.09-

UG-071-72)

12/04/2015

18:11  

DTO Arghakhanchi Expected Add Comme

nt

Post Review

10. Sandhikharka - Pakale -

dharapani -Chujathi Rd. (10 Km)

SNRTP-393-NCB-O-SNRTP-

ARG-W-NCB-1.10-UG-071-72

Update

Internal ID

(SNRTP-ARG-

W-NCB-1.10-

UG-071-72)

12/04/2015

18:14  

DTO Arghakhanchi Expected Add Comme

nt

Post Review

11. Samne khola bridge (40 m.

span) across Sandhikharka - Pakale -

Dharapani -Chujathi Rd

SNRTP-394-NCB-O-SNRTP-

ARG-W-NCB-1.11-BRI-071-72

Update

Internal ID

(SNRTP-ARG-

W-NCB-1.11-

BRI-071-72)

14/04/2015

06:45  

DTO Arghakhanchi Expected Add Comme

nt

Post Review

12. Khakabesi khola bridge (40 m.

span) across Sandhikharka - Pakale -

Dharapani -Chujathi Rd

SNRTP-395-NCB-O-SNRTP-

ARG-W-NCB-1.12-BRI-071-72

Update

Internal ID

(SNRTP-ARG-

W-NCB-1.12-

BRI-071-72)

14/04/2015

06:47  

 20/06/15  N/A  20/07/15  45  17/01/17 N/A  06/05/15  05/06/15

 05/06/15  20/06/15  N/A  20/07/15  45  17/01/17

 20/06/15  N/A  20/07/15  45  18/10/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  20/06/15  N/A  20/07/15  45  19/07/16 N/A  06/05/15

DTO Arghakhanchi Expected Add Comme

nt

Post Review

5. Budhi kulo Bridge (40 m span)

across Rajapur Ring Rd.

SNRTP-396-NCB-O-SNRTP-

BRD-W-NCB-4.05-BRI-071-72

Re-

estimation

of dates

12/04/2015

18:23  

DTO Bardia Expected Add Comme

nt

Post Review

3. Bijauri -Manpur -Buruwa Rd (15

Km)

SNRTP-397-NCB-O-SNRTP-

DAN-W-NCB-5.03-UG-071-72

Change the

planned

dates, as

these have

already

passed (the

year may

have been

mistakenly

entered as

2014

instead of

2015).

15/04/2015

06:00  

DTO Dang Expected Add Comme

nt

Post Review

 03/03/14  N/A  02/05/14  75  02/08/15 N/A  17/01/14  16/02/14

 05/06/15  20/06/15  N/A  20/07/15  45  17/01/17

 20/06/15  N/A  20/07/15  45  17/01/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

4. Chyati Khola Bridge (40 m span)

across pawan nagar purandhara

road

SNRTP-398-NCB-O-SNRTP-

DAN-W-NCB-5.04-BRI-071-72

Change the

planned

dates, as

these have

already

passed (the

year may

have been

mistakenly

entered as

2014

instead of

2015).

15/04/2015

06:01  

DTO Dang Expected Add Comme

nt

Post Review

5. Kalipuruwa Bridge (40 m span)

across Kalakate - Gadhawa Rd.

SNRTP-399-NCB-O-SNRTP-

DAN-W-NCB-5.05-BRI-071-72

Change the

planned

dates, as

these have

already

passed (the

year may

have been

mistakenly

entered as

2014

instead of

2015).

15/04/2015

06:01  

DTO Dang Expected Add Comme

nt

Post Review

 03/03/14  N/A  02/05/14  75  31/10/15 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  31/10/15 N/A  17/01/14

6. Khagriya Kholoa Bridge (40 m

span) across Kalakate - Gadhawa

Rd.

SNRTP-400-NCB-O-SNRTP-

DAN-W-NCB-5.06-BRI-071-72

Change the

planned

dates, as

these have

already

passed (the

year may

have been

mistakenly

entered as

2014

instead of

2015).

15/04/2015

06:02  

DTO Dang Expected Add Comme

nt

Post Review

7. Gurung Khola Bridge (40 m span)

across Kalakate - Gadhawa Rd.

SNRTP-401-NCB-O-SNRTP-

DAN-W-NCB-5.07-BRI-071-72

Change the

planned

dates, as

these have

already

passed (the

year may

have been

mistakenly

entered as

2014

instead of

2015).

15/04/2015

06:03  

DTO Dang Expected Add Comme

nt

Post Review

 03/03/14  N/A  02/05/14  75  31/10/15 N/A  17/01/14  16/02/14

 16/02/14  03/03/14  N/A  02/05/14  75  31/10/15 N/A  17/01/14

8. Dhanusadham-Raghunathpur-

Kirathpur Rd (10 Km)

SNRTP-402-NCB-O-SNRTP-

DHAN-W-NCB-7.08-PM-071-

72

Re-

estimation

of dates

12/04/2015

18:37  

DTO Dhanusha Expected Add Comme

nt

Post Review

9. Janaki Medical college -Ramdaiya-

sabaila Pakerwa Rd (10 Km)

SNRTP-403-NCB-O-SNRTP-

DHAN-W-NCB-7.09-PM-071-

72

Update

Internal ID

(SNRTP-

DHAN-W-

NCB-7.09-

PM-071-72)

14/04/2015

06:51  

DTO Dhanusha Expected Add Comme

nt

Post Review

10. Kurtha- Santipur -Jamunibas Rd

(10 Km)

SNRTP-404-NCB-O-SNRTP-

DHAN-W-NCB-7.10-PM-071-

72

Update

Internal ID

(SNRTP-

DHAN-W-

NCB-7.10-

PM-071-72)

12/04/2015

18:41  

DTO Dhanusha Expected Add Comme

nt

Post Review

11. Mahuwa-Dhabauli-Yaddukwaha-

Balabakha Rd(15 Km)

SNRTP-405-NCB-O-SNRTP-

DHAN-W-NCB-7.11-UG-071-

72

Update

Internal ID

(SNRTP-

DHAN-W-

NCB-7.11-

UG-071-72)

12/04/2015

18:44  

DTO Dhanusha Expected Add Comme

nt

Post Review

 20/06/15  N/A  20/07/15  45  17/01/17 N/A  06/05/15  05/06/15

 05/06/15  20/06/15  N/A  20/07/15  45  19/07/16

 20/06/15  N/A  20/07/15  45  19/07/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  20/06/15  N/A  20/07/15  45  19/07/16 N/A  06/05/15

12. Charnath Bridge (100 m Span)

across .Mahuwa-Dhabauli-

Yaddukwaha-Balabakhar Rd

SNRTP-406-NCB-O-SNRTP-

DHAN-W-NCB-7.12-BRI-071-

72

Update

Internal ID

(SNRTP-

DHAN-W-

NCB-7.12-

BRI-071-72)

12/04/2015

18:46  

DTO Dhanusha Expected Add Comme

nt

Post Review

13. Kajipaini Bridge (40 m span)

across Mahuwa-Dhabauli-

Yaddukwaha-Balabakhar Rd

SNRTP-407-NCB-O-SNRTP-

DHAN-W-NCB-7.13-BRI-071-

72

Update

Internal ID

(SNRTP-

DHAN-W-

NCB-7.13-

BRI-071-72)

12/04/2015

18:48  

DTO Dhanusha Expected Add Comme

nt

Post Review

14. Aurahi Khola Bridge (120 m

span) across Kurtha- Santipur -

Jamunibas Rd

SNRTP-408-NCB-O-SNRTP-

DHAN-W-NCB-7.14-BRI-071-

72

Update

Internal ID

(SNRTP-

DHAN-W-

NCB-7.14-

BRI-071-72)

14/04/2015

06:52  

DTO Dhanusha Expected Add Comme

nt

Post Review

 05/06/15  20/06/15  N/A  20/07/15  45  17/01/17

 20/06/15  N/A  20/07/15  45  19/10/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  20/06/15  N/A  20/07/15  45  17/01/17 N/A  06/05/15

15. Baluwa khola Bridge (40 m

span) across Dhanusadham

Raghunathpur Rd

SNRTP-409-NCB-O-SNRTP-

DHAN-W-NCB-7.15-BRI-071-

72

Update

Internal ID

(SNRTP-

DHAN-W-

NCB-7.15-

BRI-071-72)

12/04/2015

18:52  

DTO Dhanusha Expected Add Comme

nt

Post Review

4. Chorkote-Santipur- Gwagha -

Foksing- Purti ghat Rd (45 Km)

SNRTP-410-NCB-O-SNRTP-

GUL--W-NCB-8.04-UG-071-72

Re-

estimation

of dates

12/04/2015

18:57  

DTO Gulmi Expected Add Comme

nt

Post Review

5. Seugah - Simaghat - Purkotdaha -

Aglung Phedi Rd (57 Km.)

SNRTP-411-NCB-O-SNRTP-

GUL--W-NCB-8.05-UG-071-72

Update

Internal ID

(SNRTP-GUL-

-W-NCB-

8.05-UG-071-

72)

12/04/2015

18:59  

DTO Gulmi Expected Add Comme

nt

Post Review

4. Sukhad- Khaila- Bhajhani Rd (24

km)

SNRTP-412-NCB-O-SNRTP-

KAI-W-NCB-9.04 -UG-071-72

Update

Internal ID

(SNRTP-KAI-

W-NCB-9.04

-UG-071-72)

12/04/2015

19:03  

DTO Kailali Expected Add Comme

nt

Post Review

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 20/06/15  N/A  20/07/15  45  17/01/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  20/06/15  N/A  20/07/15  45  17/01/17

 20/06/15  N/A  20/07/15  45  17/01/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

5. Malaria Khola Bridge.( 25 m

span) across Dadthan- Baliban Rd

SNRTP-413-NCB-O-SNRTP-

KAN--W-NCB-10.05-BRI-071-

72

Update

Internal ID

(SNRTP-KAN-

-W-NCB-

10.05-BRI-

071-72)

12/04/2015

19:08  

DTO Kanchanpur Expected Add Comme

nt

Post Review

10. Rakhi- Mijauri Road (20 Km.) SNRTP-414-NCB-O-SNRTP-

KAS-W-NCB-12.10-UG-071-

72

Update

Internal ID

(SNRTP-KAS-

W-NCB-

12.10-UG-

071-72)

12/04/2015

19:13  

DTO Kaski Expected Add Comme

nt

Post Review

11. Kaseri- Majsadhi-Thumako

Danda Road (20 Km.)

SNRTP-415-NCB-O-SNRTP-

KAS-W-NCB-12.11-UG-071-

72

Update

Internal ID

(SNRTP-KAS-

W-NCB-

12.11-UG-

071-72)

12/04/2015

19:15  

DTO Kaski Expected Add Comme

nt

Post Review

12. Wardi Khola Bridge (40 m.

Span) across Rakhi- Mijauri Road

(20 Km.)

SNRTP-416-NCB-O-SNRTP-

KAS-W-NCB-12.12-BRI-071-

72

Update

Internal ID

(SNRTP-KAS-

W-NCB-

12.12-BRI-

071-72)

12/04/2015

19:17  

 06/06/15  06/07/15  N/A  05/08/15  60  02/02/17

 06/07/15  N/A  05/08/15  60  02/02/17

 N/A  07/05/15

 N/A  07/05/15  06/06/15

 06/06/15  06/07/15  N/A  05/08/15  60  02/02/17

 06/07/15  N/A  05/08/15  60  02/02/17

 N/A  07/05/15

 N/A  07/05/15  06/06/15

DTO Kaski Expected Add Comme

nt

Post Review

13. Aapu Khola Bridge (40 m. Span)

across Talo -Gulegaunda - Polyang

Tar Rd

SNRTP-417-NCB-O-SNRTP-

KAS-W-NCB-12.13-BRI-071-

72

Update

Internal ID

(SNRTP-KAS-

W-NCB-

12.13-BRI-

071-72)

12/04/2015

19:20  

DTO Kaski Expected Add Comme

nt

Post Review

3. Musharpatti -Suga- Simaradhi -

Parkauli Rd (10 Km)

SNRTP-418-NCB-O-SNRTP-

MAH--W-NCB-13.03-PM-071-

72

Re-

estimation

of dates

12/04/2015

19:30  

DTO Mahottari Expected Add Comme

nt

Post Review

4. Tikuliya- Banuata -Leuri -

Madyapura Rd (10 Km)

SNRTP-419-NCB-O-SNRTP-

MAH--W-NCB-13.04-PM-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.04-

PM-071-72)

12/04/2015

19:33  

DTO Mahottari Expected Add Comme

nt

Post Review

 05/07/15  N/A  04/08/15  60  03/08/16 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/08/16

 06/07/15  N/A  05/08/15  60  02/02/17

 N/A  06/05/15

 N/A  07/05/15  06/06/15

 06/06/15  06/07/15  N/A  05/08/15  60  02/02/17 N/A  07/05/15

5. Bakhari - Ankar - Parsa - Chakwa-

Nainahi Rd (10 Km)

SNRTP-420-NCB-O-SNRTP-

MAH--W-NCB-13.05-PM-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.05-

PM-071-72)

12/04/2015

19:35  

DTO Mahottari Expected Add Comme

nt

Post Review

6. Malwahi- Tharkholi-Ekdanda -

Sandha Rd (10 Km)

SNRTP-421-NCB-O-SNRTP-

MAH--W-NCB-13.06-PM-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.06-

PM-071-72)

12/04/2015

19:36  

DTO Mahottari Expected Add Comme

nt

Post Review

7. Bardibas- Krishnanagar-

Pashupatinagar - Hattisarwa -Rauja

Rd (15 Km)

SNRTP-422-NCB-O-SNRTP-

MAH--W-NCB-13.07-UG-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.07-

UG-071-72)

12/04/2015

19:38  

DTO Mahottari Expected Add Comme

nt

Post Review

8. Bakhari -Halkhori - Batnaha -

Sisuwaha - Kataiya -Manra Jawka

Rd (15 Km)

SNRTP-423-NCB-O-SNRTP-

MAH--W-NCB-13.08-UG-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.08-

UG-071-72)

12/04/2015

19:39  

 05/07/15  N/A  04/08/15  60  03/11/16 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16

 05/07/15  N/A  04/08/15  60  03/08/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/08/16 N/A  06/05/15

DTO Mahottari Expected Add Comme

nt

Post Review

9. Chauriya -Ekdada- Koluha -

Mahottari -Rd (10 Km)

SNRTP-424-NCB-O-SNRTP-

MAH--W-NCB-13.09-UG-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.09-

UG-071-72)

12/04/2015

19:41  

DTO Mahottari Expected Add Comme

nt

Post Review

10. Musarpatti-Suga-Sadi-Parkauli-

Mahottari-Bhagwanpur- Loharoatti

Rd(10 Km)

SNRTP-425-NCB-O-SNRTP-

MAH--W-NCB-13.10-UG-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.10-

UG-071-72)

12/04/2015

19:43  

DTO Mahottari Expected Add Comme

nt

Post Review

11. Jaleswar -Sadi -Simradhi -

Dhirapur -Majhaura- Phulgama Rd

(12 Km)

SNRTP-426-NCB-O-SNRTP-

MAH--W-NCB-13.11-UG-071-

72

Update

Internal ID

(SNRTP-

MAH--W-

NCB-13.11-

UG-071-72)

12/04/2015

19:45  

DTO Mahottari Expected Add Comme

nt

Post Review

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16

 05/07/15  N/A  04/08/15  60  03/11/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16

 05/07/15  N/A  04/08/15  60  03/11/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

5. Sahid Alok Chakra Path (40 Km) SNRTP-427-NCB-O-SNRTP-

NAW-W-NCB-15.05-UG-071-

72

Update

Internal ID

(SNRTP-

NAW-W-

NCB-15.05-

UG-071-72)

13/04/2015

00:07  

DTO Nawal Parasi Expected Add Comme

nt

Post Review

6. Jharaha Khola Bridge (40 m Span)

across Maheshpur -Tribeni Rd

SNRTP-428-NCB-O-SNRTP-

NAW-W-NCB-15.06-BRI-071-

72

Update

Internal ID

(SNRTP-

NAW-W-

NCB-15.06-

BRI-071-72)

13/04/2015

00:10  

DTO Nawal Parasi Expected Add Comme

nt

Post Review

3.Harthok- Chahara Rd (25 Km) SNRTP-430-NCB-O-SNRTP-

PAL-W-NCB-17.03-UG-071-

72

Update

Internal ID

(SNRTP-PAL-

W-NCB-

17.03-UG-

071-72)

13/04/2015

01:30  

DTO Palpa Expected Add Comme

nt

Post Review

4. Chilangdi -Chappani Ramdi Rd

(16 Km)

SNRTP-431-NCB-O-SNRTP-

PAL-W-NCB-17.04-UG-071-

72

Update

Internal ID

(SNRTP-PAL-

W-NCB-

17.04-UG-

071-72)

13/04/2015

01:32  

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

DTO Palpa Expected Add Comme

nt

Post Review

5. Amliyan Bridge (40 m span)

across Bastari-Jhadewa Rd

SNRTP-432-NCB-O-SNRTP-

PAL-W-NCB-17.05-BRI-071-7

Update

Internal ID

(SNRTP-PAL-

W-NCB-

17.05-BRI-

071-7)

13/04/2015

01:34  

DTO Palpa Expected Add Comme

nt

Post Review

4. Bagdula-Machhi -Thulabesi Rd

(37 Km)

SNRTP-433-NCB-O-SNRTP-

PYU-W-NCB-19.04-UG-071-

72

Update

Internal ID

(SNRTP-PYU-

W-NCB-

19.04-UG-

071-72)

13/04/2015

01:37  

DTO Pyuthan Expected Add Comme

nt

Post Review

5. Mulghat Bridge (40 m. span)

across Bagdula-Bahane-Syaulibang

SNRTP-434-NCB-O-SNRTP-

PYU-W-NCB-19.05-BRI-071-

72

Update

Internal ID

(SNRTP-PYU-

W-NCB-

19.05-BRI-

071-72)

14/04/2015

07:00  

DTO Pyuthan Expected Add Comme

nt

Post Review

 05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16 N/A  06/05/15

7. Tunihawa- Mukundghadha Rd

(19 Km)

SNRTP-435-NCB-O-SNRTP-

RUP-W-NCB-22.07-UG-071-

72

Update

Internal ID

(SNRTP-RUP-

W-NCB-

22.07-UG-

071-72)

14/04/2015

07:02  

DTO Rupandehi Expected Add Comme

nt

Post Review

8. Tamnagar- Bethari Rd (23 Km) SNRTP-436-NCB-O-SNRTP-

RUP-W-NCB-22.08-UG-071-

72

Update

Internal ID

(SNRTP-RUP-

W-NCB-

22.08-UG-

071-72)

13/04/2015

01:42  

DTO Rupandehi Expected Add Comme

nt

Post Review

4. Luhan Kavra - Rampur Rd (25 Km) SNRTP-437-NCB-O-SNRTP-

SAL--W-NCB-23.04-UG-071-

72

Update

Internal ID

(SNRTP-SAL--

W-NCB-

23.04-UG-

071-72)

13/04/2015

01:44  

DTO Salyan Expected Add Comme

nt

Post Review

5. Dhorchaur -Gurdase -Kain Danda

Rd (20 Km)

SNRTP-438-NCB-O-SNRTP-

SAL--W-NCB-23.05-UG-071-

72

Update

Internal ID

(SNRTP-SAL--

W-NCB-

23.05-UG-

071-72)

13/04/2015

01:46  

DTO Salyan Expected Add Comme

nt

 05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  03/11/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16 N/A  06/05/15

Post Review

6. Tharmare-Baghchaur - Kotmaula -

Patihalna -Bafo Khola Khaula Rd(15

Km)

SNRTP-439-NCB-O-SNRTP-

SAL--W-NCB-23.06-UG-071-

72

Update

Internal ID

(SNRTP-SAL--

W-NCB-

23.06-UG-

071-72)

13/04/2015

01:48  

DTO Salyan Expected Add Comme

nt

Post Review

7. Majhkanda Khola Bridge (40 m

span) across Simkhark-

Kupendedaha-Baluwasangharhi Rd

SNRTP-440-NCB-O-SNRTP-

SAL--W-NCB-23.04-BRI-071-

72

Update

Internal ID

(SNRTP-SAL--

W-NCB-

23.04-BRI-

071-72)

13/04/2015

01:49  

DTO Salyan Expected Add Comme

nt

Post Review

8. Jimari Khola Bridge (40 m span)

across.Tharmare-Badagaun-

Sanipiply-Chorjhari Rd

SNRTP-441-NCB-O-SNRTP-

SAL--W-NCB-23.08-BRI-071-

72

Update

Internal ID

(SNRTP-SAL--

W-NCB-

23.08-BRI-

071-72)

13/04/2015

01:50  

DTO Salyan Expected Add Comme

nt

Post Review

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15

9. Luhan Khola Bridhe (40 m span)

across Luhan Kavra - Rampur Rd

SNRTP-442-NCB-O-SNRTP-

SAL--W-NCB-23.09-BRI-071-

72

Update

Internal ID

(SNRTP-SAL--

W-NCB-

23.09-BRI-

071-72)

13/04/2015

01:51  

DTO Salyan Expected Add Comme

nt

Post Review

3 .Mahuli -Lohajra -Hanuman Nagar

Rd (15 Km)

SNRTP-443-NCB-O-SNRTP-

SAP-W-NCB-24.03-UG-071-

72

Update

Internal ID

(SNRTP-SAP-

W-NCB-

24.03-UG-

071-72)

13/04/2015

01:54  

DTO Saptari Expected Add Comme

nt

Post Review

4 .Kadarbona- Rautahat - Ramnagar

Rd (15 Km)

SNRTP-444-NCB-O-SNRTP-

SAP-W-NCB-24.04-UG-071-

72

Update

Internal ID

(SNRTP-SAP-

W-NCB-

24.04-UG-

071-72)

13/04/2015

02:08  

DTO Saptari Expected Add Comme

nt

Post Review

5 .Kharchuhiya- Tachan Rd (15 Km) SNRTP-445-NCB-O-SNRTP-

SAP-W-NCB-24.05-UG-071-

72

Update

Internal ID

(SNRTP-SAP-

W-NCB-

24.05-UG-

071-72)

13/04/2015

02:09  

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16

 05/07/15  N/A  04/08/15  60  03/11/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

DTO Saptari Expected Add Comme

nt

Post Review

8. Jamta -Lagri diyani Road (20 Km.) SNRTP-446-NCB-O-SNRTP-SIR-

W-NCB-26.08-PM-071-72

Update

Internal ID

(SNRTP-SIR-

W-NCB-

26.08-PM-

071-72)

13/04/2015

02:12  

DTO Siraha Expected Add Comme

nt

Post Review

9. Mainawati river Bridge (40 m

span) across Siraha-Shukhipur Road

SNRTP-447-NCB-O-SNRTP-SIR-

W-NCB-26.09-BRI-071-72

Update

Internal ID

(SNRTP-SIR-

W-NCB-

26.09-BRI-

071-72)

13/04/2015

02:15  

DTO Siraha Expected Add Comme

nt

Post Review

10. Gagan Khola Bridge (40 m span)

across Siraha-Shukhipur Road

SNRTP-448-NCB-O-SNRTP-SIR-

W-NCB-26.10-BRI-071-72

Update

Internal ID

(SNRTP-SIR-

W-NCB-

26.10-BRI-

071-72)

13/04/2015

02:17  

DTO Siraha Expected Add Comme

nt

Post Review

 05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  03/08/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16 N/A  06/05/15

11.Kamala Canal Bridge (20 m span)

across Siraha-Kalyanpur-Mirchaiya

Rd

SNRTP-449-NCB-O-SNRTP-SIR-

W-NCB-26.11-BRI-071-72

Update

Internal ID

(SNRTP-SIR-

W-NCB-

26.11-BRI-

071-72)

14/04/2015

07:05  

DTO Siraha Expected Add Comme

nt

Post Review

6. Sanke Khola Bridge (40 m.span)

across .Dulegauda-Sankhe Raipur

(Dhorbarahi Marg)

SNRTP-450-NCB-O-SNRTP-

TAN-W-NCB-29.06-BRI-071-

72

Update

Internal ID

(SNRTP-TAN-

W-NCB-

29.06-BRI-

071-72)

13/04/2015

02:25  

DTO Tanahun Expected Add Comme

nt

Post Review

6.Baddichaur-Guttu Rd (28 Km) SNRTP-451-NCB-O-SNRTP-

SUR-W-NCB-27.06-UG-071-

72

Update

Internal ID

(SNRTP-SUR-

W-NCB-

27.06-UG-

071-72)

13/04/2015

04:19  

DTO Surkhet Expected Add Comme

nt

Post Review

7. Jamunyauli -Duni Daha Rd (14

Km)

SNRTP-452-NCB-O-SNRTP-

SUR-W-NCB-27.07-UG-071-

72

Update

Internal ID

(SNRTP-SUR-

W-NCB-

27.07-UG-

071-72)

13/04/2015

04:23  

 05/07/15  N/A  04/08/15  60  03/11/16 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/08/16 N/A  06/05/15

DTO Surkhet Expected Add Comme

nt

Post Review

8 . Chhinchu- Ghariban-Badakholi -

Betani -Phalate -Kalche Rd (40 Km)

SNRTP-453-NCB-O-SNRTP-

SUR-W-NCB-27.08-UG-071-

72

Update

Internal ID

(SNRTP-SUR-

W-NCB-

27.08-UG-

071-72)

13/04/2015

04:26  

DTO Surkhet Expected Add Comme

nt

Post Review

9. Jyamire Khola Bridge (40 m span)

across Ramghat-Samuji ghat Rd.

SNRTP-454-NCB-O-SNRTP-

SUR-W-NCB-27.09-BRI-071-

72

Update

Internal ID

(SNRTP-SUR-

W-NCB-

27.09-BRI-

071-72)

13/04/2015

04:29  

DTO Surkhet Expected Add Comme

nt

Post Review

10. .Karre Khola Bridge (40 m span)

across Dhuliya -bit -Bhedabari Rd

SNRTP-455-NCB-O-SNRTP-

SUR-W-NCB-27.10-BRI-071-

72

Update

Internal ID

(SNRTP-SUR-

W-NCB-

27.10-BRI-

071-72)

13/04/2015

04:32  

DTO Surkhet Expected Add Comme

nt

Post Review

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  03/11/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

9. Rangkhola Juge bagal Bridge (40

m. span) across Nagdanda-

Karkineta Rd

SNRTP-456-NCB-O-SNRTP-

SYA-W-NCB-28.09-BRI-071-

72

Update

Internal ID

(SNRTP-SYA-

W-NCB-

28.09-BRI-

071-72)

14/04/2015

07:09  

DTO Syanja Expected Add Comme

nt

Post Review

10. Bastra Khola Bridge (40 m span)

across Rangkhola-Biruwa Rd.

SNRTP-457-NCB-O-SNRTP-

SYA-W-NCB-28.10-BRI-071-

72

Update

Internal ID

(SNRTP-SYA-

W-NCB-

28.10-BRI-

071-72)

13/04/2015

04:37  

DTO Syanja Expected Add Comme

nt

Post Review

11. Suragi Khola pyuri dovan Bridge

(40 m span) across Badhkhola-

Taksar-Dadegaunda Rd

SNRTP-458-NCB-O-SNRTP-

SYA-W-NCB-28.11-BRI-071-

72

Update

Internal ID

(SNRTP-SYA-

W-NCB-

28.11-BRI-

071-72)

13/04/2015

04:39  

DTO Syanja Expected Add Comme

nt

Post Review

 05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

12. Galaiche ghat Bridge (40 m.

span) across Badhkhola-Taksar-

Dadegaunda Rd

SNRTP-459-NCB-O-SNRTP-

SYA-W-NCB-28.09-BRI-071-

72

Update

Internal ID

(SNRTP-SYA-

W-NCB-

28.09-BRI-

071-72)

13/04/2015

04:40  

DTO Syanja Expected Add Comme

nt

Post Review

13. Pauwaigaude Khola Bridge (40

m. span) across Badhkhola-Taksar-

Dadegaunda Rd

SNRTP-460-NCB-O-SNRTP-

SYA-W-NCB-28.13-BRI-071-

72

Update

Internal ID

(SNRTP-SYA-

W-NCB-

28.13-BRI-

071-72)

13/04/2015

04:43  

DTO Syanja Expected Add Comme

nt

Post Review

14. Andhi ghat Khola Bridge (40 m.

span) Across Mirdi-Jagat Bhanjyang-

Kinare-Chapakot Rd

SNRTP-461-NCB-O-SNRTP-

SYA-W-NCB-28.09-BRI-071-

72

Update

Internal ID

(SNRTP-SYA-

W-NCB-

28.09-BRI-

071-72)

13/04/2015

04:46  

DTO Syanja Expected Add Comme

nt

Post Review

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15

1. Bhojpur Mane Bhanjyang -Rani

bas- Ghodetar Rd (15 Km)

SNRTP-462-NCB-O-SNRTP-

BHOJ-W-NCB-31.01-UG-071-

72

Update

Internal ID

(SNRTP-

BHOJ-W-

NCB-31.01-

UG-071-72)

13/04/2015

04:49  

DTO Bhojpur Expected Add Comme

nt

Post Review

2. Bhojpur -Dingla - Mulpani -

Keureni pani Rd (15 Km

SNRTP-463-NCB-O-SNRTP-

BHOJ-W-NCB-31.02-UG-071-

72

Update

Internal ID

(SNRTP-

BHOJ-W-

NCB-31.02-

UG-071-72)

13/04/2015

04:51  

DTO Bhojpur Expected Add Comme

nt

Post Review

3. Bhojpur -Dingla - Mulpani -

Keureni pani Rd (15 Km)

SNRTP-464-NCB-O-SNRTP-

BHOJ-W-NCB-31.03-PM-071-

72

Update

Internal ID

(SNRTP-

BHOJ-W-

NCB-31.03-

PM-071-72)

13/04/2015

04:53  

DTO Bhojpur Expected Add Comme

nt

Post Review

4. Taksar- Gumba -Dalgaun- Okhare

- Dodhalekhani Rd 158 Km)

SNRTP-465-NCB-O-SNRTP-

BHOJ-W-NCB-31.04-PM-071-

72

Update

Internal ID

(SNRTP-

BHOJ-W-

NCB-31.04-

PM-071-72)

13/04/2015

04:57  

 05/06/15  05/07/15  N/A  04/08/15  60  03/08/16

 05/07/15  N/A  04/08/15  60  03/08/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/11/16

 05/07/15  N/A  04/08/15  60  03/11/16

 N/A  06/05/15

 N/A  06/05/15  05/06/15

DTO Bhojpur Expected Add Comme

nt

Post Review

11. Gam Khola Bridge (40 m span)

across Dhuliya -bit -Bhedabari Rd

SNRTP-466-NCB-O-SNRTP-

SUR-W-NCB-27.11-BRI-071-

72

Update

Internal ID

(SNRTP-SUR-

W-NCB-

27.11-BRI-

071-72)

13/04/2015

09:27  

DTO Surkhet Expected Add Comme

nt

Post Review

12. Chaur Khola Bridge (40 m span)

across Badichaur-Guttu Rd.

SNRTP-467-NCB-O-SNRTP-

SUR-W-NCB-27.12-BRI-071-

72

Update

Internal ID

(SNRTP-SUR-

W-NCB-

27.12-BRI-

071-72)

13/04/2015

09:28  

DTO Surkhet Expected Add Comme

nt

Post Review

5.Thadi Khola Causeway (40 m

span) across Gaighat (Moti gadha)

Phattepur Rd

SNRTP-468-NCB-O-SNRTP-

UDA-W-NCB-30.5-BRI-070-71

Update

Internal ID

(SNRTP-UDA-

W-NCB-30.5-

BRI-070-71)

14/04/2015

07:13  

DTO Udaypur Expected Add Comme

nt

Post Review

 05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  03/08/16 N/A  06/05/15

6.Luhale Khola Bridge (50 m span)

across Gaighat (Moti gadha)

Phattepur Rd

SNRTP-469-NCB-O-SNRTP-

UDA-W-NCB-30.06-BRI-070-

71

Update

Internal ID

(SNRTP-UDA-

W-NCB-

30.06-BRI-

070-71)

13/04/2015

09:33  

DTO Udaypur Expected Add Comme

nt

Post Review

7.Babiya Khola Bridge (40 m span)

across Gaighat (Moti gadha)

Phattepur Rd

SNRTP-470-NCB-O-SNRTP-

UDA-W-NCB-30.07-BRI-070-

71

Update

Internal ID

(SNRTP-UDA-

W-NCB-

30.07-BRI-

070-71)

13/04/2015

09:34  

DTO Udaypur Expected Add Comme

nt

Post Review

8.Konga Khola Bridge (50 m span)

across Gaighat (Moti gadha)

Phattepur Rd

SNRTP-471-NCB-O-SNRTP-

UDA-W-NCB-30.08-BRI-070-

71

Update

Internal ID

(SNRTP-UDA-

W-NCB-

30.08-BRI-

070-71)

13/04/2015

09:36  

DTO Udaypur Expected Add Comme

nt

Post Review

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17

 05/07/15  N/A  04/08/15  60  01/02/17

 N/A  06/05/15

 N/A  06/05/15  05/06/15

 05/06/15  05/07/15  N/A  04/08/15  60  01/02/17 N/A  06/05/15

10. Construction of Saruhatha-

Badarwa-Bankul-Aruwa Khola Road

(17.51 Meter Span)

SNRTP-472-NCB-O-SNRTP-

RAU-W-NCB-21.10-PM-070-

71

Update

Internal ID

(SNRTP-RAU-

W-NCB-

21.10-PM-

070-71)

11/05/2015

06:37  

DTO Rautahat Expected Add Comme

nt

Post Review

Category Goods:  Activities ShowHide

Total days of

(between Bid

Opening and

P.P. - Executing Agency: 2015-2-

Method: NCB (National

Jeep Vehicle (4 W Drive) 2 Nos. ( 1

for CPCU & 1 for IDD):

SNRTP-2-NCB-B-SNRTP-CPCU-

G-NCB-02--070-

Cancelled Activity Cancelled Add Comme

nt

Post Review

SNRTP-15-NCB-B-SNRTP-

CPCU-G-NCB-04-070-71

Activity Cancelled Add Comme

nt

Post Review

SNRTP-16-NCB-B-SNRTP-

CPCU-G-NCB-05-070-71

Activity Cancelled Add Comme

nt

Post Review

SNRTP-17-NCB-B-SNRTP-

CPCU-G-NCB-06-070-71

Activity Cancelled Add Comme

nt

Post Review

SNRTP-18-NCB-B-SNRTP-

CPCU-G-NCB-07-070-71

Comment

 25/04/14 25/12/13  24/01/14  31/01/14  N/A  24/02/14  31

 31/01/14  N/A  24/02/14  31  25/04/14

Procurement of GPS 40 Nos. and 33

Nos.Total Station survey

equipments for DTOs

 N/A

 24/02/14  31  25/04/14

Procurement of Lap tops -80

Nos.(66 Nos for 33 DTOs , 10 Nos.

for two PIUs & 4 Nos. for CPCU)

 N/A  25/12/13  24/01/14

 25/04/14

Procurement of Photocopiers Plus

Scanner 38 Nos. ( 33 Nos for DTOs ,

4 Nos. for Two PMUs and 1 No. for

CPCU)

 N/A  25/12/13  24/01/14  31/01/14  N/A

 25/12/13  24/01/14  31/01/14  N/A  24/02/14  31

 28/12/13  N/A  04/01/14  14  19/05/15

Procurement of Desk top

Computers 76 Nos.( 2 Nos for 33

DTOs, 2Nos.for CPCU and 6 Nos. for

two PMUs)

 N/A

End of

Contract

(Completed

 N/A  21/11/13  21/12/13

No

Objection

Documents

Publication

/ Invitation

Bid

Opening

Evaluation

of Bids

No

Objection

to

Contract

Signature

Date

 15/07/15  N/A  14/08/15  60  11/02/17

Description Reference #

 N/A  16/05/15  15/06/15

Activity Cancelled Add Comme

nt

Post Review

Motorbikes (125-150 cc, 4 strokes) -

76 Nos.(2 for each 33 DTOs and 10

for two PMUs

SNRTP-162-NCB-B-SNRTP-

CPCU-G-NCB-03-070-71

Cancelled Activity Cancelled Add Comme

nt

Prior Review

SNRTP-291-NCB-B-SNRTP-

CPCU-G-NCB-04-070-71

Expected Add Comme

nt

Post Review

SNRTP-292-NCB-B-SNRTP-

CPCU-G-NCB-05-070-71

Expected Add Comme

nt

Post Review

SNRTP-293-NCB-B-SNRTP-

CPCU-G-NCB-06-070-71

Expected Add Comme

nt

Post Review

SNRTP-294-NCB-B-SNRTP-

CPCU-G-NCB-07-070-71

Expected Add Comme

nt

Post Review

SNRTP-345-NCB-B-SNRTP-

CPCU-G-NCB-13-071-72

Expected Add Comme

nt

Post Review

SNRTP-346-NCB-B-SNRTP-

CPCU-G-NCB-14-071-72

Expected Add Comme

nt

Post Review

Method: SH (Shopping)

 10/02/15  12/03/15  N/A  11/04/15  60  11/06/1514. Procurement of 36 Nos

Generator (10 KVA) for backup for

33 districts, PMU and CPCU

 N/A  11/01/15

 10/02/15  12/03/15  N/A  11/04/15  60  11/06/1513. Procurement of Lab equipments

for 33 districts

 N/A  11/01/15

 23/03/15  22/04/15  N/A  22/05/15  60  21/06/157. Procurement of GPS 40 Nos. and

18 Nos. Total Station survey

equipments for DTOs

 N/A  21/02/15

 23/03/15  22/04/15  N/A  22/05/15  60  21/07/156. Procurement of Lap tops and

external hard drives-87 Nos. each

(70 Nos for 33 DTOs , 10 Nos. for

two PIUs & 4 Nos. for CPCU 3 nos

for IDD)

 N/A  21/02/15

 13/03/15  12/04/15  N/A  12/05/15  60  26/06/15

 N/A  12/05/15  60  11/07/15

5. Photocopiers, Scanners, Fax

Machines and Printers 42 Nos. each

( 33 Nos for DTOs , 4 Nos. for Two

PMUs and 3 No. for CPCU 2 nos for

IDD)

 N/A  11/02/15

 37  25/02/15

4. Procurement of Desk top

Computers 95 Nos. including UPSs(

2 Nos for 33 DTOs, 6 Nos.for CPCU

and 6 Nos. for two PMUs 4 Nos for

IDD and remaining for others)

 N/A  11/02/15  13/03/15  12/04/15

 25/04/14

 28/11/13  05/12/13  19/01/14  03/02/14  10/02/14  25/02/14

 25/12/13  24/01/14  31/01/14  N/A  24/02/14  31Procurement of GPS 40 Nos. and 33

Nos.Total Station survey

equipments for DTOs

 N/A

SNRTP-11-CP-B-SNRTP-PMU1-

G-SHOPPING-08-070-71

Activity Cancelled Add Comme

nt

Post Review

SNRTP-19-CP-B-SNRTP-PMU2-

G-SHOPPING-09-070-71

Activity Cancelled Add Comme

nt

Post Review

SNRTP-295-CP-B-SNRTP-

PMU1-G-SHOP-08-070-71

Expected Add Comme

nt

Post Review

SNRTP-296-CP-B-SNRTP-

PMU2-G-SHOP-09-070-71

Expected Add Comme

nt

Post Review

Method: DC (Direct contracting)

10. Purchase of Purchase of

Different goods with reference to

15 contracts not exceeding Nrs.

300,000 for single contract

SNRTP-342-CD-B-SNRTP-

CPCU-G-DP-10-071-72

This will be procured as per

Government of Nepal Direct

Purchase System as these are very

small contracts. Single contract will

not exceed USD 3,000.00.

Expected Add Comme

nt

Post Review

11. Purchase of Different goods

with reference to 6 contracts not

exceeding Nrs. 300,000 for single

contract

SNRTP-343-CD-B-SNRTP-

PMU1-G-DP-11-071-072

 26/03/15  02/04/15  N/A  07/04/15  12  10/04/15

 N/A  N/A  17/03/15  20/03/15

 N/A  11/03/15

 28/03/15  12  30/03/15

 N/A  N/A  N/A

 25/03/15

9. Purchase of Furnitures: Sofaset-6

sets, Executive Table-16

No.,Executive Chair -16 Nos,

Meeting Table-1 No,Tea-Table -1

No, Meeting Chair-10 Nos.White

Board-3 Nos, Soft Board-4 Nos. for

 N/A  01/03/15  16/03/15  23/03/15  N/A

 17/02/15  04/03/15  11/03/15  N/A  16/03/15  12

 08/02/14  N/A  15/02/14  14  25/04/14

8. Purchase of Furnitures: Sofaset-6

sets,Executive Table-16

No.,Executive Chair -16 Nos,

Meeting Table-1 No,Tea-

Table1No,Meeting Chair-10

Nos.White Board-3 Nos, Soft Board-

4 Nos. for PMU1 :

 N/A

 02/02/14  9  14/02/14

Purchase of Furnitures: Sofaset-6

sets, Executive Table-16

No.,Executive Chair -16 Nos,

Meeting Table-1 No,Tea-Table -1

No, Meeting Chair-10 Nos.White

Board-3 Nos, Soft Board-4 Nos. for

 N/A  17/01/14  01/02/14

Purchase of Furnitures: Sofaset-6

sets,Executive Table-16

No.,Executive Chair -16 Nos,

Meeting Table-1 No,Tea-

Table1No,Meeting Chair-10

Nos.White Board-3 Nos, Soft Board-

4 Nos. for PMU1 :

 N/A  17/01/14  24/01/14  31/01/14  N/A

This will be procured as per

Government of Nepal Direct

Purchase System as these are very

small contracts. Single contract will

not exceed USD 3,000.00.

Expected Add Comme

nt

Post Review

12. Purchase of Different goods

with reference to 6 contracts not

exceeding Nrs. 300,000 for single

contract

SNRTP-344-CD-B-SNRTP-

PMU2-G-DP-12-071-72

This will be procured as per

Government of Nepal Direct

Purchase System as these are very

small contracts. Single contract will

not exceed USD 3,000.00.

Expected Add Comme

nt

Post Review

Method: ICB (International

Pick Up Vehicles (4W Drive) - 41

Nos. (2 Nos. for CPCU, 5 Nos for

two PMUs,1 No. for IDD & 33 Nos.

for 33 DTOs)

SNRTP-1-LPI-B-SNRTP-CPCU-

G-ICB-01-070-7

Cancelled Activity Cancelled Add Comme

nt

Prior Review

Category Training:  Activities ShowHide

Description Reference #

No

Objection

to ATP

Total days

of Process

End of

Activity Comment

P.P. - Executing Agency: 2015-2-

Method: DC (Direct contracting)

1. SNRTP Project Orientation

Training to DDC, DTO & PMU

SNRTP-353-CD-SC-SNRTP-

CPCU-NCS-DC-01-071-72

Lovely Banquet Hall, Jawlakhel Contract Completed Add Comm

ent

Post Review  N/A  18/11/14

2. SNRTP Project Launching Work

Shop & MOU signing: SNRTP-CPCU-

NCS-DP-02-071-72

SNRTP-354-CD-SC-SNRTP-

CPCU-NCS-DC-02-071-72

 N/A  18/11/14

 N/A  14/11/14

 03/02/14  10/02/14  25/02/14  37  25/02/15 28/11/13  05/12/13  19/01/14

 02/04/15  N/A  07/04/15  12  14/04/15 N/A  11/03/15  26/03/15

 26/03/15  02/04/15  N/A  07/04/15  12  10/04/15 N/A  11/03/15

Hotel Himalaya , Kupondole Contract Completed Add Comm

ent

Post Review  N/A  21/11/14

SNRTP-355-CD-SC-SNRTP-

CPCU-NCS-DC-03-071-72

Expected Add Comm

ent

Post Review

SNRTP-356-CD-SC-SNRTP-

CPCU-NCS-DC-04-071-72

Expected Add Comm

ent

Post Review

5. Procurement and Contract

Management Training to DTO &

PMU officials

SNRTP-357-CD-SC-SNRTP-

CPCU-NCS-DC-05-071-72

Nepal Administrative Staff College,

Jawlakhel

Contract Completed Add Comm

ent

Post Review  N/A  22/01/15

6. Financial Management Trainings

to DDC & DTO Account Officials

SNRTP-358-CD-SC-SNRTP-

CPCU-NCS-DC-06-071-72

Rajashwa Prashashan Talim

Kendra, Harihar Bhawan

Contract Completed Add Comm

ent

Post Review  N/A  07/01/15

SNRTP-359-CD-SC-SNRTP-

CPCU-NCS-DC-07-071-72

Expected Add Comm

ent

Post Review

SNRTP-360-CD-SC-SNRTP-

CPCU-NCS-DC-08-071-72

Expected Add Comm

ent

Post Review

SNRTP-361-CD-SC-SNRTP-

CPCU-NCS-DC-09-071-72

Expected Add Comm

ent

Post Review

SNRTP-362-CD-SC-SNRTP-

CPCU-NCS-DC-10-071-72

 25/04/15

10. Mobile Monitoring Training to

DTO and CBOs

 N/A  20/04/15

9. Safeguard and Governance

Training to DDC, DTO and PMU

officials

 N/A

 25/03/15

8. Road Maintenance Training to

DTO & PMU officials

 N/A  25/03/15

7. RuTIMS Application Training to

DTO and PMU officials

 N/A

 N/A  25/02/15

 N/A  25/02/15

 22/02/15

4. Road Bridge Design to DTO and

PMU officials

 N/A  25/02/15

3. Road Pavement Design Training

to DTO officials

 N/A

 N/A  18/11/14

Expected Add Comm

ent

Post Review

SNRTP-363-CD-SC-SNRTP-

CPCU-NCS-DC-11-071-72

Expected Add Comm

ent

Post Review

Category Consultants - Firms:  Activities ShowHide

P.P. - Executing Agency: 2015-2-

Method: QCBS (Quality and Cost

SNRTP-381-SBCC-CF-SNRTP-

CPCU-CS-QCBS-35-071/072

Expected

Post Review

SNRTP-382-SBCC-CF-SNRTP-

CPCU-CS-QCBS-36-071/072

Expected

Post Review

Method: CQS (Selection based on

SNRTP-380-SCC-CF-SNRTP-

CPCU-S-CQS-34-071/072

Expected

Post Review

Method: SSS (Selection based on a

SNRTP-167-SSF-CF-SNRTP-

CPCU-S-SSS-25-070-71

Contract under execution

Prior Review  14/02/14  N/A  25/03/14  28/03/14

SNRTP-323-SSF-CF-SNRTP-

CPCU-CS-SSS-27-070-71

Contract Completed

Post Review  N/A  N/A  02/07/14  04/07/14  N/A  N/A  25/07/14  N/A  28/07/14  28/01/15

31. Hiring Consultant for the

Maintenance , Upgrading and

hosting of RuTIMS Software : M/s

SNRTP-379-SSF-CF-SNRTP-

CPCU-S-SSS-31-071/072

M/s Softwel Pvt.Ltd , New

Baneshwar has developed

Contract under execution

Post Review  N/A  N/A  30/11/14  04/12/14  N/A  N/A  20/12/14  N/A  29/12/14

 31/07/15

Contract

Signature

 21/07/14

 12/03/14

 08/06/15

 04/09/14  N/A  04/09/14  29/08/19

 20/10/14

 N/A  N/A  15/08/14  04/09/14  N/A  N/A

 N/A  N/A  20/07/14  N/A

 11/03/19

27. Institute of Engineering (IoE) ,

Central Campus, Pulchowk, T.U for

procurement and training of Single

Source Consultant

 N/A  N/A  14/05/14  21/05/14

 N/A  N/A  N/A  N/A  02/03/14

 04/02/19

International Consultant of UN

Agency(ILO Nepal) for Rural Road

maintenance 5 years

 25/12/13  N/A  N/A

 19/04/15  09/05/15  N/A  29/05/15  N/A

 04/02/19

34. Procurement of NGO for

Beneficiary Monitoring

 17/03/15  N/A  20/03/15

 22/05/15  21/06/15  N/A  11/07/15  N/A

 03/07/15  04/02/19

36. Procurement of Consulting

Firms for Market Infracture study of

75 districts

 19/04/15  N/A  22/04/15

 25/03/15  24/04/15  24/05/15  N/A  13/06/15  N/A

End of

Contract

35. Procurement of Consulting Firm

for baseline study of project

districts

 22/03/15  N/A

Bid

Opening

Technical

Evaluation

No

Objection

Final Evaluation

and Negotiation

No

Objection

 12/03/15

Description Reference #

Request for

Proposal

No

Objection

Invitation

for RFP

11. Quality Training to DTO officials  N/A

10. Mobile Monitoring Training to

DTO and CBOs

 N/A  20/04/15

39. Procurement of Consulting Firm

for baseline study of project

districts

SNRTP-385-SSF-CF-SNRTP-

CPCU-CS-SSS-39-071/072

Base line survey was supposed to ExpectedPost Review

Category Consultants - Individuals:  Activities ShowHide

Description Reference #

No

Objection

to the TOR

Contract

Signature

Date

Total days

of Process

End Date of

Activity Comment

P.P. - Executing Agency: 2015-2-

Method: IND (Individual

SNRTP-135-IND-CI-SNRTP-

CPCU-CS-IND-01-070-71

Activity Cancelled

Post Review

SNRTP-136-IND-CI-SNRTP-

CPCU-CS-IND-02-070-71

Activity Cancelled

Post Review

SNRTP-137-IND-CI-SNRTP-

CPCU-CS-IND-03-070-71

Activity Cancelled

Post Review

SNRTP-138-IND-CI-SNRTP-

CPCU-CS-IND-04-070-71

Activity Cancelled

Post Review

SNRTP-139-IND-CI-SNRTP-

PMU1-CS-IND-05-070-71

Activity Cancelled

Post Review

SNRTP-140-IND-CI-SNRTP-

PMU2-CS-IND-06-070-71

Activity Cancelled

Post Review

SNRTP-141-IND-CI-SNRTP-

PMU1-CS-IND-07-070-71

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

 04/02/19

Quality Monitoring Consultant for 5

(Five) Years at PMU1

 N/A  05/02/14  04/02/19

Procurement and Contract

Management Consultant for 5

(Five) years at cluster PMU 2

 N/A  05/02/14

 04/06/19

Procurement and Contract

Management Consultant for 5

(Five) years at cluster PMU 1

 N/A  05/02/14  04/02/19

Financial Management Assistant for

5 years

 N/A  05/02/14

 04/02/19

Social Safeguard Specialist for 2.5

years intermittent input of total 5

years

 N/A  05/02/14  04/02/19

 05/02/14  04/02/19

Environmental Safeguard Specialist

for 2.5 years intermittent input of

total 5 years

 N/A  05/02/14

 12/05/15  12/11/15

Central Monitoring & Evaluation

Consultant for 5 (Five) Years

 N/A

 20/04/15  20/04/15  24/04/15  N/A  30/04/15  N/A N/A  N/A

Activity Cancelled

Post Review

SNRTP-142-IND-CI-SNRTP-

PMU2-CS-IND-08-070-71

Activity Cancelled

Post Review

SNRTP-143-IND-CI-SNRTP-

PMU1-CS-IND-09-070-71

Activity Cancelled

Post Review

SNRTP-144-IND-CI-SNRTP-

PMU2-CS-IND-10-070-71

Activity Cancelled

Post Review

SNRTP-145-IND-CI-SNRTP-

PMU1-CS-IND-11-070-71

Activity Cancelled

Post Review

SNRTP-146-IND-CI-SNRTP-

PMU2-CS-IND-12-070-71

Activity Cancelled

Post Review

SNRTP-147-IND-CI-SNRTP-

PMU1-CS-IND-13-070-71

Activity Cancelled

Post Review

SNRTP-149-IND-CI-SNRTP-

PMU2-CS-IND-14-070-71

Activity Cancelled

Post Review

SNRTP-150-IND-CI-SNRTP-

PMU1-CS-IND-15-070-71

Activity Cancelled

Post Review

SNRTP-151-IND-CI-SNRTP-

PMU2-S-IC-16-070-71

Activity Cancelled

Post Review

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

 04/02/19Environmental Safeguard

Consultant for 5 years at PMU2

 N/A  05/02/14

 04/02/19

Environmental Safeguard

Consultant for 5 years at PMU1

 N/A  05/02/14  04/02/19

Social Development Expert for 5

(Five)years at PMU2

 N/A  05/02/14

 04/02/17

Social Development Expert for 5

(Five)years at PIU 1:

 N/A  05/02/14  04/02/19

Bridge Design Specialist for 5 Years

at PMU2

 N/A  05/02/14

 04/02/17

Bridge Design Specialist for 5 Years

at PMU1

 N/A  05/02/14  04/02/17

Road Design Specialist for 5 Years

at PMU2

 N/A  05/02/14

 04/02/19

Road Design Specialist for 5 Years

at PMU1

 N/A  05/02/14  04/02/17

Quality Monitoring Consultant for 5

(Five) Years at PMU2

 N/A  05/02/14

Quality Monitoring Consultant for 5

(Five) Years at PMU1

 N/A  05/02/14  04/02/19

SNRTP-152-IND-CI-SNRTP-

PMU1-CS-IND-17-070-71

Activity Cancelled

Post Review

SNRTP-153-IND-CI-SNRTP-

PMU2-CS-IND-18-070-71

Activity Cancelled

Post Review

SNRTP-154-IND-CI-SNRTP-

PMU1-CS-IND-19-070-71

Activity Cancelled

Post Review

SNRTP-155-IND-CI-SNRTP-

PMU2-CS-IND-20-070-71

Activity Cancelled

Post Review

Project Support Engineers for 16

Project Districts corresponding to

PMU1 for 5 years(32 Nos)

SNRTP-156-IND-CI-SNRTP-

PMU1-CS-IND-21-070-71

. There will be about 32 individual

contracts. The value of single

Activity Cancelled

Post Review

Project Support Engineers for 17

Project Districts corresponding to

PMU2 for 5 years(34 Nos):

SNRTP-157-IND-CI-SNRTP-

PMU2-CS-IND-22--070-71

There will be about 34 individual

contracts. The value of single

Activity Cancelled

Post Review

Safeguard Consultant for Project

districts under PMU1 for 5

(Five)years at 16 DTOs (16 Nos)

SNRTP-158-IND-CI-SNRTP-

PMU1-CS-IND-23-070-71

There will be about 16 individual

contracts. The value of single

Activity Cancelled

Post Review

Safeguard Consultant for Project

districts under PMU2 for 5

(Five)years at PMU1 (17 Nos)

SNRTP-159-IND-CI-SNRTP-

PMU2-CS-IND-24-070-71

There will be about 17 individual Activity CancelledPost Review

SNRTP-164-IND-CI-SNRTP-

CPCU-CS-SSS-26-070-71

Activity Cancelled

Post Review

SNRTP-297-IND-CI-SNRTP-

CPCU-CS-IND-01-070-71

Expected

Post Review

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

 04/02/191. Hiring Central Monitoring &

Evaluation Consultant for 5 (Five)

Years

 N/A  25/02/15

 04/02/19

Short Term Consultants 4 Nos for

12 months as and when required in

diferrent discipline :

 N/A  12/03/14  11/03/19

 N/A  05/02/14

Add Comment

 04/02/19

 N/A  05/02/14  04/02/19

 N/A  05/02/14

 04/02/19

 N/A  05/02/14  04/02/19

Senior Lab. Technician 2 Nos for 5

(five) years at PMU2

 N/A  05/02/14

 04/06/19

Senior Lab. Technician 2 Nos for 5

(five) years at PMU1

 N/A  05/02/14  04/02/19

Financial Management Assistant for

5 years at PMU2

 N/A  05/02/14

Financial Management Assistant for

5 years at PMU1

 N/A  05/02/14  04/06/19

SNRTP-298-IND-CI-SNRTP-

CPCU-CS-IND-02-070-71

Expected

Post Review

SNRTP-299-IND-CI-SNRTP-

CPCU-CS-IND-03-070-71

Expected

Post Review

SNRTP-300-IND-CI-SNRTP-

CPCU-CS-IND-04-070-71

Contract under execution

Post Review  N/A  12/09/14

SNRTP-301-IND-CI-SNRTP-

PMU1-CS-IND-05-070-71

Expected

Post Review

SNRTP-302-IND-CI-SNRTP-

PMU2-CS-IND-06-070-71

Expected

Post Review

SNRTP-303-IND-CI-SNRTP-

PMU1-CS-IND-07-070-71

Expected

Post Review

SNRTP-304-IND-CI-NRTP-

PMU2-CS-IND-08-070-71

Expected

Post Review

SNRTP-305-IND-CI-SNRTP-

PMU1-CS-IND-09-070-71

Expected

Post Review

SNRTP-306-IND-CI-SNRTP-

PMU2-CS-IND-10-070-71

Expected

Post Review

SNRTP-307-IND-CI-SNRTP-

PMU1-CS-IND-11-070-71

Expected

Post Review

SNRTP-308-IND-CI-SNRTP-

PMU2-CS-IND-12-070-71

Expected Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

 04/02/17

12. Hiring of Bridge Design

Specialist for 5 Years at PMU2

 N/A  05/03/15  04/02/17

11. Hiring of Bridge Design

Specialist for 5 Years at PMU1

 N/A  05/03/15

 04/02/17

10. Hiring of Road Design Specialist

for 5 Years at PMU2

 N/A  25/02/15  04/02/17

9. Hiring of Road Design Specialist

for 5 Years at PMU1

 N/A  25/02/15

 04/02/19

8. Hiring of Quality Monitoring

Consultant for 5 (Five) Years at

PMU2

 N/A  25/02/15  04/02/19

7. Hiring of Quality Monitoring

Consultant for 5 (Five) Years at

PMU1

 N/A  25/02/15

 04/02/19

6. Procurement and Contract

Management Consultant for 5

(Five) years at cluster PMU 2

 N/A  05/03/15  04/02/19

5. Procurement and Contract

Management Consultant for 5

(Five) years at cluster PMU 1

 N/A  05/03/15

 04/02/19

4. Hiring of Financial Management

Assistant for 5 years

 N/A  05/02/14  04/06/19

3. Hiring of Social Safeguard

Specialist for 2.5 years intermittent

input of total 5 years

 N/A  25/02/15

2. Hiring of Environmental

Safeguard Specialist for 2.5 years

intermittent input of total 5 years

 N/A  25/02/15  04/02/19

Post Review

SNRTP-309-IND-CI-SNRTP-

PMU1-CS-IND-13-070-71

Expected

Post Review

SNRTP-310-IND-CI-SNRTP-

PMU2-CS-IND-14-070-71

Expected

Post Review

SNRTP-311-IND-CI-SNRTP-

PMU1-CS-IND-15-070-71

Expected

Post Review

SNRTP-312-IND-CI-SNRTP-

PMU2-CS-IND-16-070-71

Expected

Post Review

SNRTP-313-IND-CI-SNRTP-

PMU1-CS-IND-17-070-71

Expected

Post Review

SNRTP-314-IND-CI-SNRTP-

PMU2-CS-IND-18-070-71

Expected

Post Review

SNRTP-315-IND-CI-SNRTP-

PMU1-CS-IND-19-070-71

Expected

Post Review

SNRTP-316-IND-CI-SNRTP-

PMU2-CS-IND-20-070-71

Expected

Post Review

21. Hiring of Project Support

Engineers for 16 Project Districts

corresponding to PMU1 for 5

SNRTP-317-IND-CI-SNRTP-

PMU1-CS-IND-21-070-71

. There will be about 32 individual

contracts. The value of single

Expected

Post Review

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

 04/02/19 N/A  05/03/15

 04/02/19

20. Hiring of Senior Lab. Technician

2 Nos for 5 (five) years at PMU2

 N/A  05/03/15  04/02/19

19. Hiring of Senior Lab. Technician

2 Nos for 5 (five) years at PMU1

 N/A  05/03/15

 04/06/19

18 Hiring of Financial Management

Assistant for 5 years at PMU2

 N/A  05/03/15  04/06/19

17. Hiring of Financial Management

Assistant for 5 years at PMU1

 N/A  05/03/15

 04/02/19

16. Hiring of Environmental

Safeguard Consultant for 5 years at

PMU2

 N/A  05/03/15  04/02/19

15. Hiring of Environmental

Safeguard Consultant for 5 years at

PMU1

 N/A  05/03/15

 04/02/19

14. Hiring of Social Development

Expert for 5 (Five)years at PMU2

 N/A  05/03/15  04/02/19

13. Hiring of Social Development

Expert for 5 (Five)years at PIU 1:

 N/A  05/03/15

12. Hiring of Bridge Design

Specialist for 5 Years at PMU2

22. Hiring of Project Support

Engineers for 17 Project Districts

corresponding to PMU2 for 5

SNRTP-318-IND-CI-SNRTP-

PMU2-CS-IND-22--070-71

There will be about 34 individual

contracts. The value of single

Expected

Post Review

23. Hiring of Safeguard Consultant

for Project districts under PMU1 for

5 (Five)years at 16 DTOs (16 Nos)

SNRTP-319-IND-CI-SNRTP-

PMU1-CS-IND-23-070-71

There will be about 16 individual

contracts. The value of single

Expected

Post Review

24. Hiring of Safeguard Consultant

for Project districts under PMU2 for

5 (Five)years at PMU1 (17 Nos)

SNRTP-320-IND-CI-SNRTP-

PMU2-CS-IND-24-070-71

There will be about 17 individual

contracts. The value of single

Expected

Post Review

SNRTP-321-IND-CI-SNRTP-

CPCU-CS-IND-26-070-71

Contract CompletedPost Review  N/A  21/10/14  31/01/15

SNRTP-348-IND-CI-SNRTP-

CPCU-S-IND-30-071-72

Expected

Post Review

SNRTP-351-IND-CI-SNRTP-

CPCU-S-IND-33-071/072

Expected

Post Review

38. Short Term Consultants (Social

safeguard Rajendra Pandit and

(Environmental Safeguard) Mr. Sita

SNRTP-377-IND-CI-SNRTP-

CPCU-CS-SSS-38-071-72

Above two Consultants have

worked till 31 January 2015. Now

Expected

Post Review

SNRTP-387-IND-CI-SNRTP-

CPCU-CS-IND-40-071/072

Expected

Post Review

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Add Comment

Update of the % of

Bank Loan Amount

(100) 12/04/2015

10:11  

Add Comment

Add Comment

 02/10/1540. Procurement of Individual

Social Development Expert for

global (umbrella) ESMS

 N/A  05/05/15

 14/10/17

 N/A  10/02/15  11/04/15

33. Procurement of gender specilist

intermittent ( 6 months over the

period of 3 years)

 N/A  15/02/15

 11/03/15

30. Hiring of Financial Management

Expert Individual Consultant

intermittent ( 5 months in a year)

for Five years

 N/A  15/02/15  14/10/17

26. Short Term Consultants 4 Nos

for 12 months as and when

required in diferrent discipline :

 N/A  12/03/14

 04/02/19

 N/A  05/03/15  04/02/19

 N/A  05/03/15

 N/A  05/03/15  04/02/19

SNRTP-388-IND-CI-SNRTP-

CPCU-CS-IND-41-071/072

Expected

Post Review

SNRTP-389-IND-CI-SNRTP-

CPCU-CS-IND-42-071/072

Expected

Post Review

Method: SSS (Selection based on a

SNRTP-168-SSF-CI-SNRTP-

CPCU-S-SSS-27-070-71

Activity Cancelled

Post Review

28. Hiring of Procurement

Management Expert- 6 months

Intermetint over the period of two

SNRTP-324-SSF-CI-SNRTP-

CPCU-CS-SSS-28-071-72

Mr. Shakti Prasad Shrestha has Expected

Prior Review

29. Hiring of Quality Management

Expert for 6 month intermittent

over the period of two year

SNRTP-347-SSF-CI-SNRTP-

CPCU-S-SSS-29-071/072

Mr. Sudarshan Lal Shrestha has

developed Quality Assurance

Contract under execution

Post Review  N/A  21/10/14

32. Hiring of Transformation of

RAIDP web Site to SNRTP web site

and Maintenance , Upgrading and

SNRTP-350-SSF-CI-SNRTP-

CPCU-S-SSS-32-071/072

M/s itechies P.Ltd has developed

RAIDP Web site. That's why this

Contract under execution

Post Review  N/A  28/12/14

SNRTP-375-SSF-CI-SNRTP-

CPCU-CS-SSS-37-071/072

Expected

Post Review

Add Comment

Add Comment

Add Comment

Add Comment

Update Internal ID

(SNRTP-CPCU-CS-IND-

41-071/072)

12/04/2015 10:17  

Add Comment

Update Internal ID

(SNRTP-CPCU-CS-IND-

42-071/072)

12/04/2015 10:33  Add Comment

Add Comment

 25/05/1537 Procurement of Inetrnational

Consultant Mr. Shahidur Khandkar

for Baseline and impact study

 N/A  05/04/15

 15/04/15

 N/A  25/02/15  14/10/19

 N/A  12/11/14

 11/03/19

 15/09/14  15/02/15  14/02/17

 19/05/19

Institute of Engineering (IoE) ,

Central Campus, Pulchowk, T.U for

procurement and training of

:iSingle Source Consultant

 N/A  12/03/14

42. Procurement of Individual

Quality Mgmt. Expert

 N/A  20/05/15

41. Procurement of Individual

Environmental Specialist for global

(umbrella) ESMS

 N/A  10/05/15  09/05/16