category overview2

Upload: shru6sanvi

Post on 14-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Category Overview2

    1/14

    Category Overview1:24:19AM March 10, 2010

    Reduction in lead time of rotor blades of Orpheus engine using VSM

    Time Units:Replications: 1 Days

    Key Performance Indicators

    AverageSystem

    Number Out 105

    Model Filename: Page of 1 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    2/14

    Category Overview1:24:19AM March 10, 2010

    Reduction in lead time of rotor blades of Orpheus engine using VSM

    Time Units:Replications: 1 Days

    ntity

    Time

    VA TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    2.8930part 0.00 49.8300(Insufficient)

    NVA TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    0.8685part 0.1300 10.8340(Insufficient)

    Wait TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    19.3165part 0.00 200.00(Insufficient)

    Transfer TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    0.00part 0.00 0.00(Insufficient)

    Other TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    0.00part 0.00 0.00(Insufficient)

    Total TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    23.0779part 0.1300 219.38(Insufficient)

    Other

    Number InValue

    part 301.00

    Number OutValue

    part 105.00

    WIP Half WidthAverage MinimumValueMaximum

    Value

    97.0206part 0.00 196.00(Correlated)

    Model Filename: Page of 2 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    3/14

    Category Overview1:24:19AM March 10, 2010

    Reduction in lead time of rotor blades of Orpheus engine using VSM

    Time Units:Replications: 1 Days

    Queue

    Time

    Waiting TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    50.6919Bench marking and flashemoval.Queue

    0.00 100.76(Insufficient)

    82.0100bench work 2.Queue 81.6200 82.4000(Insufficient)

    44.1017bench work.Queue 0.00 107.76(Insufficient)

    3.4980blohm surface grinding andeburring.Queue

    1.5780 6.6780(Insufficient)

    1.9983Bristol root grinding.Queue 0.00 7.7300(Insufficient)

    19.8223orrect twist and droop.Queue 0.00 51.5900(Insufficient)

    0.03416667engraving.Queue 0.00 1.2300(Insufficient)

    0.00lass beed peening.Queue 0.00 0.00(Insufficient)

    20.4524Horizontal milling 1.Queue 0.00 39.7500(Insufficient)

    0.00osmond cut off.Queue 0.00 0.00(Insufficient)

    42.9503parawash.Queue 10.4820 82.9620(Insufficient)

    21.2469plano milling andeburring.Queue

    0.8400 40.3480(Insufficient)

    32.6900Polishing.Queue 0.00 82.2500(Insufficient)

    50.9785preperation of cd test.Queue 29.9600 107.49(Insufficient)

    47.7395Remove corners.Queue 0.1000 98.8300(Insufficient)

    45.3670tripping.Queue 0.00 94.8900(Insufficient)

    0.00ibroetch cd test.Queue 0.00 0.00(Insufficient)

    Other

    Model Filename: Page of 3 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    4/14

    Category Overview1:24:19AM March 10, 2010

    Reduction in lead time of rotor blades of Orpheus engine using VSM

    Time Units:Replications: 1 Days

    Queue

    Other

    Number WaitingHalf WidthAverage

    MinimumValue

    MaximumValue

    35.7395Bench marking and flashemoval.Queue

    0.00 71.0000(Correlated)

    0.6255bench work 2.Queue 0.00 2.0000(Insufficient)

    10.6010bench work.Queue 0.00 29.0000(Insufficient)

    0.0933blohm surface grinding andeburring.Queue

    0.00 1.0000(Insufficient)

    0.5196Bristol root grinding.Queue 0.00 2.0000(Insufficient)

    5.0470orrect twist and droop.Queue 0.00 22.0000(Insufficient)

    0.00410000engraving.Queue 0.00 1.0000(Insufficient)

    0.00lass beed peening.Queue 0.00 0.00(Insufficient)

    9.6143Horizontal milling 1.Queue 0.00 23.0000(Insufficient)

    0.00osmond cut off.Queue 0.00 0.00(Insufficient)

    0.00packing.Queue 0.00 0.00(Insufficient)

    0.00painting.Queue 0.00 0.00(Insufficient)

    1.0437parawash.Queue 0.00 3.0000(Insufficient)

    3.1721plano milling andeburring.Queue

    0.00 10.0000(Insufficient)

    0.1727plating.Queue 0.00 1.0000(Insufficient)

    1.8233Polishing.Queue 0.00 8.0000(Insufficient)

    1.1350preperation of cd test.Queue 0.00 4.0000(Insufficient)

    19.0701Remove corners.Queue 0.00 42.0000(Insufficient)

    3.1694tripping.Queue 0.00 11.0000(Insufficient)

    0.00ibroetch cd test.Queue 0.00 0.00(Insufficient)

    Model Filename: Page of 4 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    5/14

    Category Overview1:24:19AM March 10, 2010

    Reduction in lead time of rotor blades of Orpheus engine using VSM

    Time Units:Replications: 1 Days

    Resource

    Usage

    Instantaneous UtilizationHalf WidthAverage

    MinimumValue

    MaximumValue

    0.01946667utting machine 0.00 1.0000(Insufficient)

    0.3780engraving machine 0.00 1.0000(Insufficient)

    0.03200000equipments 0.00 1.0000(Insufficient)

    0.9988auging machine 0.00 1.0000(Insufficient)

    0.9143rinding machine 0.00 1.0000(Insufficient)

    0.9275man 0.00 1.0000(Insufficient)

    0.9912milling machine 0.00 1.0000(Insufficient)

    0.6829OMT projector 0.00 1.0000(Insufficient)0.03000000peening machine 0.00 1.0000(Insufficient)

    0.00prays 0.00 0.00(Insufficient)

    Number BusyHalf WidthAverage

    MinimumValue

    MaximumValue

    0.01946667utting machine 0.00 1.0000(Insufficient)

    0.3780engraving machine 0.00 1.0000(Insufficient)

    0.03200000equipments 0.00 1.0000(Insufficient)

    0.9988auging machine 0.00 1.0000(Insufficient)

    0.9143rinding machine 0.00 1.0000(Insufficient)

    0.9275man 0.00 1.0000(Insufficient)0.9912milling machine 0.00 1.0000(Insufficient)

    0.6829OMT projector 0.00 1.0000(Insufficient)

    0.03000000peening machine 0.00 1.0000(Insufficient)

    0.00prays 0.00 0.00(Insufficient)

    Number ScheduledHalf WidthAverage

    MinimumValue

    MaximumValue

    1.0000utting machine 1.0000 1.0000(Insufficient)

    1.0000engraving machine 1.0000 1.0000(Insufficient)

    1.0000equipments 1.0000 1.0000(Insufficient)

    1.0000auging machine 1.0000 1.0000(Insufficient)1.0000rinding machine 1.0000 1.0000(Insufficient)

    1.0000man 1.0000 1.0000(Insufficient)

    1.0000milling machine 1.0000 1.0000(Insufficient)

    1.0000OMT projector 1.0000 1.0000(Insufficient)

    1.0000peening machine 1.0000 1.0000(Insufficient)

    1.0000prays 1.0000 1.0000(Insufficient)

    Model Filename: Page of 5 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    6/14

    Category Overview1:24:19AM March 10, 2010

    Reduction in lead time of rotor blades of Orpheus engine using VSM

    Time Units:Replications: 1 Days

    Resource

    Usage

    Scheduled UtilizationValue

    utting machine 0.01946667

    engraving machine 0.3780

    equipments 0.03200000

    auging machine 0.9988

    rinding machine 0.9143

    man 0.9275

    milling machine 0.9912

    OMT projector 0.6829peening machine 0.03000000

    prays 0.00

    0.000

    0.200

    0.400

    0.600

    0.800

    1.000

    cutting machine

    engraving machineequipments

    gauging machine

    grinding machineman

    milling machineOMT projector

    peening machine

    sprays

    Model Filename: Page of 6 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    7/14

    Category Overview1:24:19AM March 10, 2010

    Reduction in lead time of rotor blades of Orpheus engine using VSM

    Time Units:Replications: 1 Days

    Resource

    Usage

    Total Number SeizedValue

    utting machine 8.0000

    engraving machine 36.0000

    equipments 3.0000

    auging machine 221.00

    rinding machine 86.0000

    man 104.00

    milling machine 157.00

    OMT projector 47.0000peening machine 3.0000

    prays 0.00

    0.000

    40.000

    80.000

    120.000

    160.000

    200.000

    240.000

    cutting machine

    engraving machineequipments

    gauging machine

    grinding machineman

    milling machineOMT projector

    peening machine

    sprays

    nnamed Project

    Time Units:Replications: 1 Days

    Model Filename: Page of 7 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    8/14

    Category Overview1:24:19AM March 10, 2010

    nnamed Project

    Time Units:Replications: 1 Days

    Key Performance Indicators

    AverageSystem

    Number Out 105

    Model Filename: Page of 8 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    9/14

    Category Overview1:24:19AM March 10, 2010

    nnamed Project

    Time Units:Replications: 1 Days

    ntity

    Time

    VA TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    2.8930part 0.00 49.8300(Insufficient)

    NVA TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    0.8685part 0.1300 10.8340(Insufficient)

    Wait TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    19.3165part 0.00 200.00(Insufficient)

    Transfer TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    0.00part 0.00 0.00(Insufficient)

    Other TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    0.00part 0.00 0.00(Insufficient)

    Total TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    23.0779part 0.1300 219.38(Insufficient)

    Other

    Number InValue

    part 301.00

    Number OutValue

    part 105.00

    WIP Half WidthAverage MinimumValueMaximum

    Value

    97.0206part 0.00 196.00(Correlated)

    Model Filename: Page of 9 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    10/14

    Category Overview1:24:19AM March 10, 2010

    nnamed Project

    Time Units:Replications: 1 Days

    Queue

    Time

    Waiting TimeHalf WidthAverage

    MinimumValue

    MaximumValue

    50.6919Bench marking and flashemoval.Queue

    0.00 100.76(Insufficient)

    82.0100bench work 2.Queue 81.6200 82.4000(Insufficient)

    44.1017bench work.Queue 0.00 107.76(Insufficient)

    3.4980blohm surface grinding andeburring.Queue

    1.5780 6.6780(Insufficient)

    1.9983Bristol root grinding.Queue 0.00 7.7300(Insufficient)

    19.8223orrect twist and droop.Queue 0.00 51.5900(Insufficient)

    0.03416667engraving.Queue 0.00 1.2300(Insufficient)

    0.00lass beed peening.Queue 0.00 0.00(Insufficient)

    20.4524Horizontal milling 1.Queue 0.00 39.7500(Insufficient)

    0.00osmond cut off.Queue 0.00 0.00(Insufficient)

    42.9503parawash.Queue 10.4820 82.9620(Insufficient)

    21.2469plano milling andeburring.Queue

    0.8400 40.3480(Insufficient)

    32.6900Polishing.Queue 0.00 82.2500(Insufficient)

    50.9785preperation of cd test.Queue 29.9600 107.49(Insufficient)

    47.7395Remove corners.Queue 0.1000 98.8300(Insufficient)

    45.3670tripping.Queue 0.00 94.8900(Insufficient)

    0.00ibroetch cd test.Queue 0.00 0.00(Insufficient)

    Other

    Model Filename: Page of 10 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    11/14

    Category Overview1:24:19AM March 10, 2010

    nnamed Project

    Time Units:Replications: 1 Days

    Queue

    Other

    Number WaitingHalf WidthAverage

    MinimumValue

    MaximumValue

    35.7395Bench marking and flashemoval.Queue

    0.00 71.0000(Correlated)

    0.6255bench work 2.Queue 0.00 2.0000(Insufficient)

    10.6010bench work.Queue 0.00 29.0000(Insufficient)

    0.0933blohm surface grinding andeburring.Queue

    0.00 1.0000(Insufficient)

    0.5196Bristol root grinding.Queue 0.00 2.0000(Insufficient)

    5.0470orrect twist and droop.Queue 0.00 22.0000(Insufficient)

    0.00410000engraving.Queue 0.00 1.0000(Insufficient)

    0.00lass beed peening.Queue 0.00 0.00(Insufficient)

    9.6143Horizontal milling 1.Queue 0.00 23.0000(Insufficient)

    0.00osmond cut off.Queue 0.00 0.00(Insufficient)

    0.00packing.Queue 0.00 0.00(Insufficient)

    0.00painting.Queue 0.00 0.00(Insufficient)

    1.0437parawash.Queue 0.00 3.0000(Insufficient)

    3.1721plano milling andeburring.Queue

    0.00 10.0000(Insufficient)

    0.1727plating.Queue 0.00 1.0000(Insufficient)

    1.8233Polishing.Queue 0.00 8.0000(Insufficient)

    1.1350preperation of cd test.Queue 0.00 4.0000(Insufficient)

    19.0701Remove corners.Queue 0.00 42.0000(Insufficient)

    3.1694tripping.Queue 0.00 11.0000(Insufficient)

    0.00ibroetch cd test.Queue 0.00 0.00(Insufficient)

    Model Filename: Page of 11 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    12/14

    Category Overview1:24:19AM March 10, 2010

    nnamed Project

    Time Units:Replications: 1 Days

    Resource

    Usage

    Instantaneous UtilizationHalf WidthAverage

    MinimumValue

    MaximumValue

    0.01946667utting machine 0.00 1.0000(Insufficient)

    0.3780engraving machine 0.00 1.0000(Insufficient)

    0.03200000equipments 0.00 1.0000(Insufficient)

    0.9988auging machine 0.00 1.0000(Insufficient)

    0.9143rinding machine 0.00 1.0000(Insufficient)

    0.9275man 0.00 1.0000(Insufficient)

    0.9912milling machine 0.00 1.0000(Insufficient)

    0.6829OMT projector 0.00 1.0000(Insufficient)0.03000000peening machine 0.00 1.0000(Insufficient)

    0.00prays 0.00 0.00(Insufficient)

    Number BusyHalf WidthAverage

    MinimumValue

    MaximumValue

    0.01946667utting machine 0.00 1.0000(Insufficient)

    0.3780engraving machine 0.00 1.0000(Insufficient)

    0.03200000equipments 0.00 1.0000(Insufficient)

    0.9988auging machine 0.00 1.0000(Insufficient)

    0.9143rinding machine 0.00 1.0000(Insufficient)

    0.9275man 0.00 1.0000(Insufficient)0.9912milling machine 0.00 1.0000(Insufficient)

    0.6829OMT projector 0.00 1.0000(Insufficient)

    0.03000000peening machine 0.00 1.0000(Insufficient)

    0.00prays 0.00 0.00(Insufficient)

    Number ScheduledHalf WidthAverage

    MinimumValue

    MaximumValue

    1.0000utting machine 1.0000 1.0000(Insufficient)

    1.0000engraving machine 1.0000 1.0000(Insufficient)

    1.0000equipments 1.0000 1.0000(Insufficient)

    1.0000auging machine 1.0000 1.0000(Insufficient)1.0000rinding machine 1.0000 1.0000(Insufficient)

    1.0000man 1.0000 1.0000(Insufficient)

    1.0000milling machine 1.0000 1.0000(Insufficient)

    1.0000OMT projector 1.0000 1.0000(Insufficient)

    1.0000peening machine 1.0000 1.0000(Insufficient)

    1.0000prays 1.0000 1.0000(Insufficient)

    Model Filename: Page of 12 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    13/14

    Category Overview1:24:19AM March 10, 2010

    nnamed Project

    Time Units:Replications: 1 Days

    Resource

    Usage

    Scheduled UtilizationValue

    utting machine 0.01946667

    engraving machine 0.3780

    equipments 0.03200000

    auging machine 0.9988

    rinding machine 0.9143

    man 0.9275

    milling machine 0.9912

    OMT projector 0.6829peening machine 0.03000000

    prays 0.00

    0.000

    0.200

    0.400

    0.600

    0.800

    1.000

    cutting machine

    engraving machineequipments

    gauging machine

    grinding machineman

    milling machineOMT projector

    peening machine

    sprays

    Model Filename: Page of 13 14F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

  • 7/30/2019 Category Overview2

    14/14

    Category Overview1:24:19AM March 10, 2010

    nnamed Project

    Time Units:Replications: 1 Days

    Resource

    Usage

    Total Number SeizedValue

    utting machine 8.0000

    engraving machine 36.0000

    equipments 3.0000

    auging machine 221.00

    rinding machine 86.0000

    man 104.00

    milling machine 157.00

    OMT projector 47.0000peening machine 3.0000

    prays 0.00

    0.000

    40.000

    80.000

    120.000

    160.000

    200.000

    240.000

    cutting machine

    engraving machineequipments

    gauging machine

    grinding machineman

    milling machineOMT projector

    peening machine

    sprays