School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants 1

Upload: reese

Post on 04-Jan-2016

24 views

Category:

Documents


0 download

DESCRIPTION

School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013. Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants. An Overview of Facilities. Overview of Instructional Buildings. Overview of Bus Garages. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

School District Merger Study

Crown Point Central Schooland

Ticonderoga Central School

Facilities

April 17, 2013Castallo and Silky Education Consultants

Alan Pole and Jessica Cohen, Consultants1

Page 2: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

An Overview of Facilities

2

Page 3: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Overview of Instructional Buildings

3

Page 4: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Overview of Bus Garages

4

Page 5: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Outside Groups Using School Buildings

5

Page 6: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Enrollment Projections-Crown Point

6

Page 7: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Enrollment Projections-Ticonderoga

7

Page 8: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Crown Point Classrooms

8

Page 9: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Ticonderoga Classrooms

9

Page 10: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Combined Enrollment by Level

10

Page 11: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Middle School Room Utilization

11

Page 12: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

High School Room Requirements

12

Page 13: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

High School Classroom Utilization

13

Page 14: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

School Sites

14

Crown Point-playground, softball field, baseball field, 2 soccer fields, tennis court

Ticonderoga High School- Multi-purpose play/practice field, softball field, tennis/basketball court

Ticonderoga Elementary/Middle School-playground, 5 lane track, football stadium, softball field, 2 baseball fields, 2 soccer fields, 2 basketball courts, multi-purpose play/practice field, undeveloped field

Page 15: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Capital Construction Activities

Crown Point: No recent capital projects since the new bus garage in 2001 with old bus garage converted to 3 elementary classrooms. $2M project in 2009 for gym infrastructure renovation and partial roof replacement. No capital projects planned.

Ticonderoga: Recently completed major capital project that made significant improvements to the high school and the elementary/middle school.

15

Page 16: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Capital Project at Ticonderoga• High School-Parking lot upgrades; replaced all windows;

relocated and updated several offices; renovated gym with new floor and new bleachers plus new lobby; added new wing for technology, art, and music; lighting upgrades; infrastructure upgrades including technology, security, clocks, PA, telephone, sewer, and electrical

• Elementary/Middle School-Parking lot upgrades; added vestibules; replaced carpeting, ceilings, and room dividers throughout; renovated libraries, music room, locker rooms, auditorium/gym area; relocated and updated offices; built new cafeteria, kitchen, special ed room and science room; infrastructure upgrades including air quality, security, telephone, PA, clock, water, and electricity 16

Page 17: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Incentive Building Aid for Merged Districts

Additional 30% on top of the higher district’s selected building aid ratio up to 95% (98% for high needs districts) for 10 years for any new construction

17

District Combined Wealth Ratio Building Aid Ratio

Crown Point .615 .946

Ticonderoga 1.261 .623

Page 18: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

18

Existing debt is aided at the higher of the previous districts’ selected

building aid ratios

Additional Building Aid for Merged Districts

District Combined Wealth Ratio Building Aid Ratio

Crown Point .615 .946

Ticonderoga 1.261 .623

Page 19: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Take-AwaysTentative Facility/Grade Recommendation

• Pre-K-5 elementary schools in both districts with the existing attendance zones.

• Send all students in grades 6-8 to a combined middle school in the current Ticonderoga Middle School

• Send all students in grades 9-12 to a combined high school in the current Ticonderoga High School

• Maintain current two bus facilities, at least for the short term.

19

Page 20: Castallo and Silky Education Consultants Alan Pole and Jessica Cohen, Consultants

Questions

20