CASE STUDYUSA - Connecticut

Moses Wheeler Bridge

Page 2: CASE STUDY - USA - Connecticut - Moses Wheeler Bridge

#CHALLENGES

1) Keep the bridge fully operational during the replacing and widening process

2) Safely run on variable curved runway rails, at different levels and slopes.

Page 3: CASE STUDY - USA - Connecticut - Moses Wheeler Bridge

#SOLUTION

Supply of 3 "Special Gantries" equipped with a 70 US ton capacity winches and custom engineered, able to run on two rails installed in two snakeline bands and to perform all the necessary material handling.

Page 4: CASE STUDY - USA - Connecticut - Moses Wheeler Bridge

#OUTCOME

A smart technology, high productivity, safe working conditions and 135,000 cars and trucks passing every day, as usual, also during replacement and widening operations.