    CELL I - Set Up Time Reduction - ( Loss Number 2 )

    Product : Wheel Cylinder Machining

    Approach:

    Cross functional team formed

    VTR Study conducted

    Activities Classified as Removal, Fixing

    & adjustments

    Counter Measures & Kaizens Identified

    Target set - 2 Months

    Operation : Fine Reaming & Rolling

    Machines : REAMING 2

    Brakes India LimitedBrakes India Limited, Padi, Padi

    Theme : Set Up Time Reduction

    Back Ground : -

    12 Product Varieties are Handled in Reaming Machine -2.

    Customers require weekly delivery schedule than monthly delivery.

    Capacity constraint is there to accommodate all the varieties by weeklyFrom pareto, we found setting time increased due to high frequency

    PARETO CHART ON LOSS HOURS IN REAMIING 2

    8.2

    1.8

    0.24 0.2

    78.54

    95.7910098.08

    0

    2

    4

    6

    8

    10

    SETTING TOOL CHANGE ADJUSTMENT

    LOSS

    BREAK DOWN

    TIMEINHRS

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    PERCENTAG

    5

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    3/12

    Identify Machine

    Set Theme

    Brakes India LimitedBrakes India Limited, Padi, Padi

    Conduct Time Study, Video Study

    Categorize Activities Removal,Fixing & Adjustments.

    Implement Kaizens for Tool Presetting

    Fixture Presetting etc.,

    Implement Kaizens for Conversion from

    Internal to External activities

    Implement Kaizens for

    Internal & Adj. Activities

    Sustain

    Standardise

    Horizontal Deployment Savings Evaluation

    Identify

    KAIZENS

    Identify

    KAIZENS

    Observe Performance

    SET UP TIME REDUCTION

    METHODOLOGY

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    4/12

    Brakes India LimitedBrakes India Limited, Padi, Padi

    Exist ing Target

    1 Removal of Acrylic Guard Spindle To Aviod Oil Spillage Required - 5 5

    23 Nos Alen screw loosening from Top

    locatorFixture For holding Top locator Required - 30 30

    33 Nos Alen screw removal from Top

    locatorFixture To change the Part No Eliminate

    Elongated radial Slot to be Provideded in

    Top locator65 0

    4 Grub screw loosining from spindle Spindle For holding the spindle Required - 15 15

    5 Reamer & Locator removal Fixture & Spindle To change the Part No Reduce PLC to be modified 35 15

    6 Bottom locator removal Fixture To change the Part No Required - 10 10

    7 Washing exsisting Locators Kerosine Tank To remove the burr Required - 10 10

    8 Removing Rolling tool Rolling m/c To change the Part No Required 60 60

    Fixing Activity

    9 Washing new Locators Kerosine Tank To remove Forign materieal Required - 10 10

    10 Fixing Bottom Locator Fixture For holding the Part Required - 25 25

    11 Fixing Top Locator Fixture For holding the Part Reduce PLC to be modified 30 10

    12 Fixing Reamer Spindle For cutting the bore Reduce PLC to be modified 35 10

    13 Tightning Grub screw to spindle Spindle For holding the spindle Required - 12 12

    14 3 Nos Alen screw fixing to Top locator Fixture For holding Top locator EliminateElongated radial Slot to be Provideded in

    Top locator65 0

    15 Tightning 3 nos alen screw to top locator Fixture For holding Top locator Required - 25 25

    16 Fixing Acrylic Guard Spindle To Aviod Oil Spillage Required - 5 5

    17 Fixing Rolling tool Rolling m/cTo meet the Specification of

    the ProductRequired - 25 25

    Adjustment Activity

    18 Bottom Dog Loosining Limit Switch To change the Part No Required - 5 5

    19 Bottom Dog Adjustment Limit Switch To change the Part No setting Reduce Setting Block to be introduced 15 5

    20 Bottom Dog Tightning Limit Switch For holding the Dog Required - 5 5

    21 Slide Postioning slide ways For travel of reamer Eliminate Setting Block to be introduced 60 0

    22 Approch Dog Loosining Limit Switch To change the Part No Required - 5 5

    23 Approch Dog Adjustment Limit Switch To change the Part No setting Reduce Setting Block to be introduced 15 524 Approch Dog Tightning Limit Switch For holding the Dog Required - 5 5

    25 Slide Postioning slide ways For travel of reamer Reduce Setting Block to be introduced 25 10

    26 Adjustment Rolling tool Rolling m/cTo meet the Specification of

    the ProductEliminate Pre setting to be Introduced 240 0

    Internal Activity

    27Control Plan,Drawing,Locators,&

    Reamer taken from StoreTool Store To change the Part No Eliminate

    Before Setting all tools lying in near the

    Machine300 0

    28 Mercer Plug taken from store Tool Store To change the Part No EliminateBefore Setting all tools lying in near the

    Machine150 0

    29 Adjustment of Mercer Plug Setting Gauge Stand To meet Master Value Reduce Pre Setting to be Introduced 80 20

    30Bore Concentricity checking at S urface

    TableInspection Table To Meet Product Specification Reduce K ept in Near the Machine 90 30

    31Bore Surface Finish checking at

    Stds.RoomInspection Table To Meet Product Specification Reduce Kept in Near the Machine 120 60

    32 First off Report Preparation Inspection Table o preparation of Product History Reduce Kept in Near the Machine 180 120

    Total in Seconds 1757.00 537

    Total in Minutes 29.28 8.95

    Time Taken (Secs)

    Removing Activities

    Machine : Reaming 2

    Activities Split Up

    Action Plan ( How )Counter

    MeasureWhyWhereSl.No Activities

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    5/12

    Gantt Chart

    AFTER - 8.95 MintsBEFORE 29.28

    1 2 3 4 5 6 7 8

    10 11 12 13 14 15 16 17 18 1

    20 21 22 23 24 25 26 27 28 2

    30

    REMOVING

    21

    1

    1

    1

    2

    1

    1

    0.3

    11

    ADJUSTMENT

    2

    1

    2

    3

    Internal

    5

    2

    1

    0.2

    2

    0.3

    2

    1 3

    2

    3 Remove Rolling Tool

    1 Remove Locators

    2 Remove Reamer

    Fixing Rolling tool

    5 Fixing Locators

    6 Fixing Reamer

    14

    Control

    Plan,Drawing,Locators,&

    Reamer taken from Store

    15 Mercer Plug taken fromstore

    16Adjustment of Mercer

    Plug Setting

    17

    Bore Concentricity

    checking at Surface

    Table

    18Bore Surface Finish

    checking at Stds.Room

    1 First off Report

    Preparation

    Activities

    13

    Time In MINS

    FIXING

    Adjustment Rolling tool

    11 Approch Dog Adjustment

    Bottom Dog Adjustment

    7

    Elongated Slot

    Introduced

    PLC panel

    Setting

    Block

    Introduced

    Pre Setting

    Introduced

    Before Setting all tools

    lying in near the Machine

    Kept in Near the Machine

    Brakes India LimitedBrakes India Limited, Padi, Padi

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    6/12

    Major ImprovementsAfterBefore

    PLC Control has been changed in Electrical Panel

    Elongated Slot has been changed in Top locator

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    7/12

    Setting Block has been Introduced

    Major ImprovementsBefore After

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    8/12

    GROUP A GROUP B GROUP C GROUP - D

    Brakes India LimitedBrakes India Limited, Padi, Padi

    Machine : Reaming - 2

    Part No Over all Length Reamer No Reamer length

    2966 3388 / 89 58.2 / 57.8 22RS2099 170

    2966 6449 58.2 / 57.8 22RS2098 170

    2966 6136 / 37 58.2 / 57.8 22RS2101 170

    2966 5877 59.0 / 58.5 22RS2052 160

    2966 5073 59.0 / 58.5 22RS2065 170

    2966 5084 59.8 / 60.3 22RS2052 160

    2966 5089 59.8 / 60.3 22RS2065 170

    2966 4765 63.7 / 63.2 22RS2033 170

    2966 2540 52.0 / 51.6 22RS2100 150

    2966 5632 55.3 / 54.8 22RS2081 150

    2966 5744 55.3 / 54.8 22RS2099 170

    Group C 2966 2800 90.9 / 90.4 22RS2058 190

    6467 5317 79.1 / 79.7 22RS2033 170

    2966 5518 79.1 / 79.7 22RS2057 190Group D

    Group A

    Group B

    Grouping Details For Setting Block

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    9/12

    Results

    Brakes India LimitedBrakes India Limited, Padi, Padi

    A C T IV I T IE S S P IL T U P IN S E T T IN G - R E A M IN G 2

    7 . 5

    2 . 42

    0 . 7

    3 . 8 63 . 8 3

    0

    1 0

    R E M O V I N G F I X I N G A D J U S T M E N T

    NUM

    BER

    O

    F

    AC

    G O O D

    ACTIVITIES IN SETTING - REAMING 2

    18

    36

    0

    10

    20

    30

    40

    Bef ore A f ter

    NU

    MBER

    II

    IE

    BEFORE AFTER

    GOOD

    EX T E R N AL AC T I IT IES

    6

    00

    2

    4

    6

    8

    INTERA NA L EXTERNA L

    N

    UM

    BERO

    FA

    CTI

    I

    BEFO RE A FT ER

    G O O D

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    10/12

    Brakes India LimitedBrakes India Limited, Padi, Padi

    Results

    INVENTORY REDUCED

    2300

    7000

    0

    2000

    4000

    6000

    8000

    BEFORE AFTER

    QTY.

    BEFORE AFTER

    GOOD

    FREQUENCY INCREASED

    BEFORE AFTER

    Nos

    BEFORE AFTER

    GOOD

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    11/12

    Results

    Benefits : Set Up Time Per Set Up Reduced from 30 to 9 Mins.

    Brakes India LimitedBrakes India Limited, Padi, Padi

    I I

    9

    30

    0

    5

    10

    15

    20

    25

    30

    35

    May '05 June '05 July '05 Aug '05 Sep '05 Oct '05

    I

    I

    I

    Before

    After

  • 8/7/2019 CASE STUDY SETTING TIME REDUCTION

    12/12

    PERFORMANCE TREND CHART

    0

    20

    40

    60

    80

    100

    PERFORMANCE

    PE

    FO

    MANCE 81.2 96.6 92.9 92.8 90.3 87.3 89.8 88.9 91

    200 200 200 Apr- Ma Jun-Jul- Au Se

    QUALITY RATE TREND

    99.7

    99.75

    99.8

    99.85

    99.9

    99.95

    100

    QUALITY

    RATE

    QUALITY 99.8 99.95 99.91 99.96 99.92 99.91 99.92 99.98 99.98

    2002 2003 2004 Apr- M ay- Jun- Jul- Aug- Sep-

    AVAILABIL I

    74

    76

    78

    80

    82

    84

    86

    88

    AVAILABILI

    %

    AVAIL. 80.63 84.81 78.25 82.02 82.3 82.85 83.1 85 85.9

    2002 2003 2004 Apr- May- Jun- Jul- Aug- Sep-

    Brakes India LimitedBrakes India Limited, Padi, Padi

    55

    60

    65

    70

    75

    80

    OEE

    OEE 65. 49 70. 3 72. 61 74. 3 74. 6 72. 21 7 4. 56 76 78

    2002 2003 2004 A

    May

    J

    J

    l

    05 A

    Se