O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 1 http://pmsymposium.umd.edu/pm2017/ http://pmsymposium.umd.edu/pm2017/ Kenneth J. O’Connell, Ph.D., P.E. Joshua D. Rice, CCM, PMP, PSP Jennifer V. Tereyla, P.E., PSP 2017 Project Management Symposium CASE STUDY: ROCKY PEN RUN RESERVOIR STAFFORD COUNTY, VIRGINIA

Upload: others

Post on 27-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 1

http://p

msym

posiu

m.u

md.e

du/p

m2017/

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Kenneth J. O’Connell, Ph.D., P.E.

Joshua D. Rice, CCM, PMP, PSP

Jennifer V. Tereyla, P.E., PSP

2017 Project Management Symposium

CASE STUDY: ROCKY PEN

RUN RESERVOIR

STAFFORD COUNTY, VIRGINIA

Page 2: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 2

http://p

msym

posiu

m.u

md.e

du/p

m2017/ Kenneth J. O'Connell, Ph.D., P.E., PSP, CFCC

1

Joshua D. Rice, CCM, PMP, PSP

Jennifer V. Tereyla, P.E., PSP, R.P.L.S.

O'Connell & Lawrence, Inc.,17904 Georgia Avenue, Suite 302, Olney, MD 20832

1Adjunct Professor, Department of Civil Engineering, University of Maryland

Presented by:

Page 3: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 3

http://p

msym

posiu

m.u

md.e

du/p

m2017/ The Rocky Pen Run Reservoir dam excavation and foundation preparation project was one

phase of a multi-phase construction project that created additional drinking water reserves for

Stafford County, Virginia. The Rocky Pen Run Reservoir is located approximately one mile

upstream of the convergence of Rocky Pen Run with the Rappahannock River.

The scope of work for this phase included clearing 28 acres of land, the construction of a

reinforced concrete pipe (RCP) diversion to temporarily reroute Rocky Pen Run around the future

dam location, providing a suitable foundation for the new earthen dam, excavation to rock, and

foundation cleaning.

Upon completion of the work, a dispute arose between the General Contractor and its specialty

subsurface drilling and grouting sub-contractor relating to delay and disruption costs incurred by

the subcontractor. The consultant performed various cost, schedule, and lost productivity

analyses (measured mile and earned value) to determine what went wrong, why, and who was

responsible for the time and cost overruns – the rest of the story!

Case Study

Page 4: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 4

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• THE PROJECT

• IMPACTS TO LAYNE’S WORK

• OUTCOME

Page 5: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 5

http://p

msym

posiu

m.u

md.e

du/p

m2017/

THE PROJECT

Page 6: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 6

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Page 7: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 7

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Page 8: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 8

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• Rocky Pen Run Reservoir Project

– Need: to provide additional drinking water storage

for residents of Stafford County, Virginia

– Solution: Construct new earthen dam to create

reservoir to hold drinking water.

Project Overview

Page 9: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 9

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Owner Board of Supervisors of Stafford County (Owner)

Designer URS Corporation (URS)

Construction Manager Schnabel Engineering (SE)

Contractor General Excavation, Inc. (GEI)

Subcontractor Layne GeoConstruction Corporation (Layne)

Subcontractor Industrial Concrete, Inc. (ICI)

Subcontractor WG Construction Co., Inc. (WG)

Major Players

Page 10: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 10

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• 3 Project Phases

– Phase 1 - river intake, pumping station and

transmission pipeline (complete April, 2008)

– Phase 2 - stream diversion and dam foundation

– Phase 3 - construct dam and fill reservoir

This Case Study Focuses on Phase 2

Project Phases

Page 11: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 11

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• 28 acres of clearing and grubbing;

• 704 linear feet (LF) of 84 inch reinforced concrete pipe (RCP) stream diversion;

• 44,500 LF of subsurface drilling and grouting to provide a suitable foundation for the new earthen dam;

• Excavation to rock, foundation cleaning, removal of rock outcroppings, and various dental concrete procedures;

• 1,135 LF of concrete grout cap along the centerline of the future dam.

Phase 2 Scope of Work

Page 12: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 12

http://p

msym

posiu

m.u

md.e

du/p

m2017/

U

P

S

T

R

E

A

M

D

O

W

N

S

T

R

E

A

M

19+00

4+00

N

Page 13: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 13

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Grout Cap

U

P

S

T

R

E

A

M

D

O

W

N

S

T

R

E

A

M

19+00

4+00

N

Page 14: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 14

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Spillway

U

P

S

T

R

E

A

M

D

O

W

N

S

T

R

E

A

M

19+00

4+00

N

Page 15: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 15

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Shear Zones

U

P

S

T

R

E

A

M

D

O

W

N

S

T

R

E

A

M

19+00

4+00

N

Page 16: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 16

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Diversion Pipe

U

P

S

T

R

E

A

M

D

O

W

N

S

T

R

E

A

M

19+00

4+00

N

Page 17: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 17

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• Subsurface drilling and grouting to provide a suitable

foundation for the new earthen dam, including drilling

of approximately 44,500 LF grouting of the existing

strata.

• The majority of this work was performed from the new

concrete grout cap.

Layne’s Work in Phase 2

Page 18: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 18

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Page 19: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 19

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Page 20: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 20

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Page 21: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 21

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Page 22: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 22

http://p

msym

posiu

m.u

md.e

du/p

m2017/

IMPACTS TO LAYNE’S

WORK

Page 23: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 23

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• Bidding took place September - October, 2009

• Layne was one of 5 subcontractors that bid• Bid was 1% below second bidder• Bid was based on, and its subcontract

required:– At least 75% of the production work area was

to be available prior to the start of work.

Drilling & Grouting Subcontract

Page 24: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 24

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• Layne’s productivity was impacted by:

– Restricted access to production work;

– Stacking of trades (General Contractor and concrete

subcontractor);

– Unfavorable winter conditions;

– Scope changes.

Impacts to Layne’s Work

Page 25: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 25

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• Layne's work was planned and its bid based on its

ability to work efficiently. In-part, this required that

Layne be provided 75% of the production work area

at the beginning of its operation.

Impacts to Subcontractor’s Work

Page 26: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 26

http://p

msym

posiu

m.u

md.e

du/p

m2017/

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

110.00%

Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11

Month

Amount of Available Work

ROCK DRILLING

GROUTING

Page 27: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 27

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Anticipated Progression of Work

Areas by Week

Page 28: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 28

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Production Drilling Anticipated to Start on 9/22/10

Work Zone Wk 1 to Wk 6

75% of work to be available per Subcontract Agreement

Page 29: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 29

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Week 1: 9/22/10 to 9/28/10

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Page 30: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 30

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Week 2: 9/29/10 to 10/5/10

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Page 31: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 31

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Week 3: 10/6/10 to 10/12/10

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Page 32: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 32

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Week 4: 10/14/10 to 10/19/10

Page 33: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 33

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Week 5: 10/20/10 to 10/26/10

Page 34: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 34

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

NO PRODUCTION DRILLING THIS WEEK

RIGHT SIDE COMPLETE. BEGIN MIDDLE.Work Zone Wk 1 to Wk 6Work Zone Wk 7 to Wk 10

Week 6: 10/27/10 to 11/2/10

Page 35: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 35

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

PRODUCTION DRILLING STARTS ON 11/8/10

COMPLETED WK 6Work Zone Wk 7 to Wk 10

Work Zone Wk 7 to Wk 6

Week 7: 11/3/10 to 11/9/10

Page 36: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 36

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 7 to Wk 10

Work Zone Wk 7 to Wk 24

Week 8: 11/10/10 to 11/16/10

Page 37: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 37

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 7 to Wk 10

Work Zone Wk 7 to Wk 24

Week 9: 11/17/10 to 11/23/10

Page 38: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 38

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 10

Work Zone Wk 7 to Wk 24

MIDDLE COMPLETE. BEGIN LEFT SIDE.

Week 10: 11/24/10 to 11/30/10

Page 39: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 39

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 11: 12/1/10 to 12/7/10

Page 40: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 40

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 12: 12/8/10 to 12/14/10

Page 41: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 41

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 13: 12/15/10 to 12/21/10

Page 42: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 42

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Privileged and Confidential | For Mediation 42

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 14: 12/22/10 to 12/28/10

Page 43: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 43

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 15: 12/29/10 to 1/4/11

Page 44: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 44

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

PRODUCTION DRILLING 100% COMPLETE ON 1/11/11

PRODUCTION DRILLING 18.52% COMPLETE ON

1/11/11

COMPLETED WK 6COMPLETED WK 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 16: 1/5/11 to 1/11/11

Page 45: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 45

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Anticipated vs. Actual Progression

of Work Areas by Week

Page 46: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 46

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Production Drilling Anticipated to Start on 9/22/10

Work Zone Wk 1 to Wk 6

75% of work to be available per Subcontract Agreement

Page 47: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 47

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Week 1: 9/22/10 to 9/28/10

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Page 48: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 48

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Week 2: 9/29/10 to 10/5/10

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Page 49: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 49

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Week 3: 10/6/10 to 10/12/10

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Page 50: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 50

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Week 4: 10/14/10 to 10/19/10

Page 51: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 51

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

NO PRODUCTION DRILLING THIS WEEK

Work Zone Wk 1 to Wk 6

Week 5: 10/20/10 to 10/26/10

Page 52: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 52

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

NO PRODUCTION DRILLING THIS WEEK

RIGHT SIDE COMPLETE. BEGIN MIDDLE.Work Zone Wk 1 to Wk 6Work Zone Wk 7 to Wk 10

Week 6: 10/27/10 to 11/2/10

Page 53: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 53

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

PRODUCTION DRILLING STARTS ON 11/8/10

COMPLETED WK 6Work Zone Wk 7 to Wk 10

Work Zone Wk 7 to Wk 24

Week 7: 11/3/10 to 11/9/10

Page 54: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 54

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 7 to Wk 10

Work Zone Wk 7 to Wk 24

Week 8: 11/10/10 to 11/16/10

Page 55: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 55

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 7 to Wk 10

Work Zone Wk 7 to Wk 24

Week 9: 11/17/10 to 11/23/10

Page 56: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 56

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 10

Work Zone Wk 7 to Wk 24

MIDDLE COMPLETE. BEGIN LEFT SIDE.

Week 10: 11/24/10 to 11/30/10

Page 57: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 57

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 11: 12/1/10 to 12/7/10

Page 58: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 58

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 12: 12/8/10 to 12/14/10

Page 59: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 59

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 13: 12/15/10 to 12/21/10

Page 60: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 60

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 14: 12/22/10 to 12/28/10

Page 61: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 61

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6Work Zone Wk 11 to Wk 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 15: 12/29/10 to 1/4/11

Page 62: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 62

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

PRODUCTION DRILLING 100% COMPLETE ON 1/11/11

PRODUCTION DRILLING 18.52% COMPLETE ON 1/11/11

COMPLETED WK 6COMPLETED WK 16

Work Zone Wk 7 to Wk 24

COMPLETED WK 10

Week 16: 1/5/11 to 1/11/11

Page 63: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 63

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Work Zone Wk 7 to Wk 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 17: 1/12/11 to 1/18/11

Page 64: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 64

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Work Zone Wk 7 to Wk 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 18: 1/19/11 to 1/25/11

Page 65: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 65

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Work Zone Wk 7 to Wk 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 19: 1/26/11 to 2/1/11

Page 66: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 66

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Work Zone Wk 7 to Wk 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 20: 2/2/11 to 2/8/11

Page 67: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 67

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Work Zone Wk 7 to Wk 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 21: 2/9/11 to 2/15/11

Page 68: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 68

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Work Zone Wk 7 to Wk 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 22: 2/16/11 to 2/22/11

Page 69: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 69

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

Work Zone Wk 7 to Wk 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 23: 2/23/11 to 3/1/11

Page 70: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 70

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

RIGHT SIDE COMPLETED 18 WKS LATER THAN

ANTICIPATED. BEGIN LEFT SIDE

COMPLETED WK 24

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

Week 24: 3/2/11 to 3/8/11

Page 71: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 71

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 25: 3/9/11 to 3/15/11

Page 72: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 72

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 26: 3/16/11 to 3/22/11

Page 73: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 73

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 27: 3/23/11 to 3/29/11

Page 74: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 74

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 28: 3/30/11 to 4/5/11

Page 75: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 75

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 29: 4/6/11 to 4/12/11

Page 76: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 76

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 30: 4/13/11 to 4/19/11

Page 77: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 77

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 31: 4/20/11 to 4/26/11

Page 78: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 78

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 32: 4/27/11 to 5/3/11

Page 79: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 79

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 33: 5/4/11 to 5/10/11

Page 80: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 80

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 34: 5/11/11 to 5/17/11

Page 81: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 81

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 35: 5/18/11 to 5/24/11

Page 82: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 82

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 36: 5/25/11 to 5/31/11

Page 83: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 83

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 37: 6/1/11 to 6/7/11

Page 84: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 84

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 38: 6/8/11 to 6/14/11

Page 85: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 85

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 39: 6/15/11 to 6/21/11

Page 86: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 86

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 40: 6/22/11 to 6/28/11

Page 87: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 87

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 41: 6/29/11 to 7/5/11

Page 88: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 88

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 42: 7/6/11 to 7/12/11

Page 89: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 89

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24Work Zone Wk 25 to Wk 44 (Determined by GEI's release of Work Areas)

Week 43: 7/13/11 to 7/19/11

Page 90: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 90

http://p

msym

posiu

m.u

md.e

du/p

m2017/

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

100

150

200

250

19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+00 8+00 7+00 6+00 5+00 4+00

PROFILE VIEW

100

150

200

250

ANTICIPATED Grout Hole Drilling Sequence

AS-BUILT Grout Hole Drilling Sequence

PROFILE VIEW

PRODUCTION DRILLING COMPLETED ON 7/26/11:

28 WKS LATER THAN ANTICIPATED.

COMPLETED WK 6COMPLETED WK 16 COMPLETED WK 10

PRODUCTION DRILLING 100% COMPLETE IN WK 16

COMPLETED WK 24COMPLETED WK 24

Week 44: 7/20/11 to 7/26/11

Page 91: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 91

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Lost Productivity Analysis

• O’C&L performed a lost productivity analysis using the “Measured Mile” Approach

– Definition: compares the contractor's activities

during the impacted period of performance with

the contractor's identical or substantially similar

activities during a period of unimpacted

performance (Measured Mile Period).

Page 92: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 92

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Period 1 Period 2 Period 3 Period 4

Project Start-Up Impacted Period Measured Mile Demobilization

9/13/10 to 10/31/10 11/1/10 to 3/31/11 4/1/11 to 7/17/11 7/18/11 to 7/27/11

Total Available Calendar Days: 49 151 108 10 318

Total Available Work Days: 35 106 74 8 223

Total Production Days: 31 69 68 8 176

Total Man-Hours Worked: 2147.5 5215 5693.5 130 13186

Average Hours / Shift: 9.42 10.27 10.19 9.32 N/A

Total Linear Feet Drilled: 1521 16804.5 24428.59 972.8 43726.89

Period Production - MH/LF: 1.41 0.31 0.23 0.13 N/A

Period Production - LF/MH: 0.71 3.22 4.29 7.48 N/A

Average Period Production - LF/DY: 49.06 243.54 359.24 121.60 N/A

Period StatisticsProject

Totals

Lost Productivity Analysis

Page 93: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 93

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Modification to Measured Mile Approach

• Even the Measured Mile period was impacted by delay,

disruption and lack of adequate access.

– Layne could have achieved a higher level of production during this period but

for GEI’s failure to provide 75% of the work areas to Layne in accordance

with its subcontract agreement. Instead, Layne was forced to “leapfrog” and

perform work out of sequence.

• O’C&L conservatively modified the Measured Mile production

rate by 10% to account for the impact of leapfrogging and the

performance of work out-of-sequence during this period. This

adjustment resulted in a revised Measured Mile production rate

of 395.17 LF/DY (359.24 * 1.10).

Page 94: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 94

http://p

msym

posiu

m.u

md.e

du/p

m2017/

P2 + P3 Production Duration 137.00 DY

P2 + P3 - Total Linear Feet of Drilling Produced 41233.09 LF

Period 3 Production Duration 68.00 DY

Period 3 - Total LF of Foundation Drilling Produced 24428.59 LF

Measured Mile Production Rate (LF/DY) 359.24 LF

Measured Mile Modification Rate for Out-of-Sequence Work 10.00%

Adjusted Measured Mile Production Rate 395.17 LF

Actual P2 + P3 Production Duration 137.00 DY

Calculated Measured Mile Production Duration 104.34 DY

Projected Duration Increase Due to Restricted Access 32.66 DY

Average Crew Hours/Shift 10.27 HR

Lost Hours 32.66 x 10.27 335.39 HR

Hourly Crew & Equipment Rate per Subcontract

Loss:

Additional Indirect Field Costs

Additional Equipment Costs due to 13 Delay Days:

Subtotal:

10% Home Office Overhead

Subtotal:

10% Profit

Subtotal:

1% Bond/Insurance

Total:

Measured Mile Analysis

Period 2 + Period 3 Production - November 1, 2010 through July 17, 2011

Period 3 - Measured Mile Period - April 1, 2011 through July 17, 2011

Actual P2 & P3 Duration Vs. Adjusted Measured Mile Duration

813,557.81$

Lost Productivity Calculation

1,500.00$

503,079.64$

97,625.14$

65,000.00$

665,704.78$

66,570.48$

732,275.26$

73,227.53$

805,502.79$

8,055.03$

Page 95: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 95

http://p

msym

posiu

m.u

md.e

du/p

m2017/

OUTCOME

Page 96: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 96

http://p

msym

posiu

m.u

md.e

du/p

m2017/

• Layne was provided limited access to its work contrary to the provisions of its subcontract agreement.

• Inadequate access to its work, delay to predecessor work and other disruptions to its work negatively and measurably impacted Layne's productivity.

• O’C&L concluded that Layne is entitled to at least $813,557.81 for delays and inefficiencies.

• O’C&L presented its analysis at Mediation and the case successfully settled.

Outcome

Page 97: CASE STUDY: ROCKY PEN RUN RESERVOIRpmsymposium.umd.edu/pm2017/wp-content/uploads/... · O’Connell, Tereyla, Rice UMD Project Management Symposium May 4-5, 2017 Slide 3 7/ The Rocky

O’Connell, Tereyla, Rice

UMD Project Management Symposium

May 4-5, 2017

Slide 97

http://p

msym

posiu

m.u

md.e

du/p

m2017/

Thank you!

Questions / Comments?