Case Study Mechanical and Electrical Commercial & Industrial Division Project Aston University Library, Birmingham The Brief This is the main library at Aston University, constructed in the 1970’s it is a 4 story building covering 6400 sq meters. The refurbishment of the Library was planned over 2 phases. Phase 1 of the project commenced in summer 2010 and covered the refurbishment of the ground and first floors as well as toilets to all the floors. Phase 2 carried out in 2011 applied major works to 2nd and 3rd floors along with comprehensive mechanical and electrical central plant. The new build element of the refurbishment consisted of a fully glazed entrance and atrium, new stairs and a new lift to provide access to all floors. www.npower.com npm8816/03.11 Scope of Works • LV and sub mains distribution • Lighting and emergency lighting • Fire Alarm system • Security • Access Control • CCTV • PA Audio • Data Systems • Toilet Block relocation • Above ground drainage • Heating controls • Underfloor Heating • Trench Heating • Controls • Plant Room • Ventilation • Power and communications wiring • AHUs • Air Conditioning Client Aston University Main Contractor BAM Construction Architect ADP Consultant Stewart Associates Project Managers Mace Contract Value >£1m

Upload: others

Post on 23-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Case Study Mechanical and ElectricalCommercial & Industrial Division

Project Aston University Library, Birmingham

The BriefThis is the main library at Aston University, constructed in the 1970’s it is a 4 story building covering 6400 sq meters. The refurbishment of the Library was planned over 2 phases. Phase 1 of the project commenced in summer 2010 and covered the refurbishment of the ground and first floors as well as toilets to all the floors. Phase 2 carried out in 2011 applied major works to 2nd and 3rd floors along with comprehensive mechanical and electrical central plant. The new build element of the refurbishment consisted of a fully glazed entrance and atrium, new stairs and a new lift to provide access to all floors.

www.npower.com

npm8816/03.11

Scope of Works• LVandsubmainsdistribution• Lightingandemergencylighting• FireAlarmsystem• Security• AccessControl• CCTV• PAAudio• DataSystems• ToiletBlockrelocation• Abovegrounddrainage

• Heatingcontrols• UnderfloorHeating• TrenchHeating• Controls• PlantRoom• Ventilation• Powerandcommunicationswiring• AHUs• AirConditioning

ClientAston University MainContractorBAMConstruction ArchitectADP ConsultantStewartAssociates Project ManagersMace

ContractValue>£1m