Case Study: I-95 Section GIR -Rain Garden Maintenance

Megan Farnsworth, EIT

October 16, 2019

06/19/2018

Page 2: Case Study: I-95 Section GIR - Rain Garden Maintenance

Case Study: I-95 Section GIR - Rain Garden Maintenance

1. I-95 Section GIR Background

2. GR2 Maintenance Inventory

3. Forebay Maintenance

4. Lessons Learned

Case Study: I-95 Section GIR - Rain Garden Maintenance Page 2

Page 3: Case Study: I-95 Section GIR - Rain Garden Maintenance

1. I-95 Section GIR Background

2. GR2 Maintenance Inventory

3. Forebay Maintenance

4. Lessons Learned

Page 3Case Study: I-95 Section GIR - Rain Garden Maintenance

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 4: Case Study: I-95 Section GIR - Rain Garden Maintenance

I-95 Girard Avenue Interchange Reconstruction (GIR)

3 miles of I-95 Highway (Race Street to Allegheney Avenue)

Multi-phase project (2000-present)

70+ SMP devices throughout project at completion

University Monitoring Program for SMPs since 2016• Temple University• Villanova University

Page 4

I-95 Section GIR Background

Case Study: I-95 Section GIR - Rain Garden Maintenance

Allegheney

Race

Girard

Page 5: Case Study: I-95 Section GIR - Rain Garden Maintenance

• Applied lessonslearned from GR2

• Will continuemonitoring

GIR SMP Maintenance

Page 5

I-95 Section GIR Background

Case Study: I-95 Section GIR - Rain Garden Maintenance

GR2 GR3

GR4

GR5

GR6

GR2&3: Complete GR4: Construction GR5&6: In Design• Temple University

contractedlandscapers

• Monitor manpower• Recommend design

changes

• Applied lessonslearned from GR2&3

• Apply lessons fromGR4 as constructed

• Long-termmaintenance planfor PennDOT

Page 6: Case Study: I-95 Section GIR - Rain Garden Maintenance

Active GIR SMPs

Page 6

SMP A SMPs C,D,&G SMPs E&F

SMP H SMPs I&J SMP P01

I-95 Section GIR Background

08/07/2019 05/14/2019 05/31/2019

08/07/2019 05/14/2018

Case Study: I-95 Section GIR - Rain Garden Maintenance

05/31/2019

Page 7: Case Study: I-95 Section GIR - Rain Garden Maintenance

I-95 – Phase GR2 Aerial View

Page 7

I-95 Section GIR Background

08/18/2018

08/18/2018

SMPs I&JSMP H SMPs E&F

SMP A

SMPs C,D,&G

SMP P01

Case Study: I-95 Section GIR - Rain Garden Maintenance

Delaware Ave

Delaware Ave

Shackamaxon St

Shackamaxon St

Page 8: Case Study: I-95 Section GIR - Rain Garden Maintenance

Case Study: I-95 Section GIR - Rain Garden Maintenance

1. I-95 GIR Background

2. GR2 Maintenance Inventory

3. Forebay Maintenance

4. Lessons Learned

Page 8Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 9: Case Study: I-95 Section GIR - Rain Garden Maintenance

Vegetation - 225 cubic yards• Mow lawns• Remove weeds• Trim overgrown vegetation• SMP A – “Minimal Maintenance

Routine”

Trash - 146 x 42-gallon bags• Collect trash• Needles

Manpower - 1416 man hours• Inspect after storm events• Spring/summerà 2 trips per month• Fall/winter à 1 trip per month

Maintenance Needs (July 2017 – June 2019)

Page 9

GR2 Maintenance Inventory

07/25/2017

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 10: Case Study: I-95 Section GIR - Rain Garden Maintenance

Manpower Observations

Overall Observations• 1-2 days/month• Year 2 – scheduling issues

Low Maintenance Requirements• SMP A – “Minimal Maintenance Routine”• SMP H – less attention on interior• SMP I&J – poor performance

High Maintenance Requirements• SMPs E&F – complaints

• Tedious maintenance• More visits

• SMPs C,D,&G – public presentation• Tours• Publications

Page 10

GR2 Maintenance Inventory

Site Total(2yrs)

Avg permonth

A 238 hrs 9.9 hrsCDG 446 hrs 18.6 hrsEF 420 hrs 17.5 hrsH 207 hrs 8.6 hrsIJ 105 hrs 4.4 hrs

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 11: Case Study: I-95 Section GIR - Rain Garden Maintenance

Manpower per Month

Page 11

GR2 Maintenance Inventory

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 12: Case Study: I-95 Section GIR - Rain Garden Maintenance

Vegetation Debris Observations

Overall Observations• SMPs I&J lowà poor performance• SMPs C,D,&G and SMPs E&F highest in

vegetation and manpower

NB-side vs SB-side of Highway• Year 1 à SB-side higher totals• Sunlight impacts growth• Continue studying

Fenced vs Open to Public• Similar totals• Year 1 – SMPs E&F (fenced)• Year 2 – SMPs C,D,&G (open to public)

Page 12

GR2 Maintenance Inventory

Site Total (2yrs)A 48.0 yds

CDG 53.0 ydsEF 58.0 ydsH 46.5 ydsIJ 19.0 yds

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 13: Case Study: I-95 Section GIR - Rain Garden Maintenance

Vegetation Debris Collected per Month

Page 13

AnnualTotal

- 21.5 yds- 30.0 yds- 32.0 yds- 49.5 yds- 16.0 yds

GR2 Maintenance Inventory

AnnualTotal

- 26.5 yds- 23.0 yds- 14.5 yds- 8.5 yds- 3.0 yds

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 14: Case Study: I-95 Section GIR - Rain Garden Maintenance

Trash Collection Observations

Overall Observations• SMPs C,D,&G highest total• SMPs H,I,&J next to construction of

private developments

NB-side vs SB-side of Highway• Study in GR3&4

• SB-sideà Residential• NB-sideà Along Delaware Ave

Fenced vs Open to Public• Fencedà less trash• SMP C,D,&G had additional collection by

neighbors

Page 14

GR2 Maintenance Inventory

Site Total (2yrs)A 28.1 bags

CD&G 64.8 bagsE&F 24.6 bags

H 15.1 bagsI&J 13.6 bags

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 15: Case Study: I-95 Section GIR - Rain Garden Maintenance

Trash Collected per Month

Page 15

GR2 Maintenance Inventory

AnnualTotal

- 8.1 bags- 20.8 bags- 5.6 bags- 14.1 bags- 12.6 bags

AnnualTotal

- 20.0 bags- 44.0 bags- 9.5 bags- 10.5 bags- 1.0 bag

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 16: Case Study: I-95 Section GIR - Rain Garden Maintenance

Case Study: I-95 Section GIR - Rain Garden Maintenance

1. I-95 GIR Background

2. GR2 Maintenance Inventory

3. Forebay Maintenance

4. Lessons Learned

Page 16Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 17: Case Study: I-95 Section GIR - Rain Garden Maintenance

Forebay Background

Page 17

Forebay Maintenance

GR2 – SMPs w/o forebaysDesign à Riprap

• Reduce velocityObservations

• Erosion present• Sediment buildup• Cigarettes

GR3&4 – SMPs w/ forebaysDesign à Paver forebay

• Pre-treatment• Reduce velocity

• Observations• Easier maintenance• Reduce erosion

07/25/2017

06/25/2018

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 18: Case Study: I-95 Section GIR - Rain Garden Maintenance

SMP P01 (Phase GR3)

Page 18

08/13/2018

Forebay Maintenance

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 19: Case Study: I-95 Section GIR - Rain Garden Maintenance

ImproperConstruction• Clogging during

construction• Reduced

infiltration capacity

MulchErosion• Unanticipated

sediment transport• Covers infiltrating

area

InvasiveWeeds• Tedious

maintenance• Could impact

paver placement

Maintenance Notes

Page 19

Forebay Maintenance

08/07/201908/07/201908/21/2018

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 20: Case Study: I-95 Section GIR - Rain Garden Maintenance

Case Study: I-95 Section GIR - Rain Garden Maintenance

1. I-95 GIR Background

2. GR2 Maintenance Inventory

3. Forebay Maintenance

4. Lessons Learned

Page 20Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 21: Case Study: I-95 Section GIR - Rain Garden Maintenance

Public Reaction to SMPs

Page 21

CommunityInteraction Wildlife Public Interest

Complaints aboutOvergrowth

Homeless“Camp” Storage Vandalization

Lessons Learned

10/05/2016

07/25/2017 08/07/2019

05/31/2019

10/18/2018

10/19/2017

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 22: Case Study: I-95 Section GIR - Rain Garden Maintenance

Fenced SMPs

– Reduces trash• Blocks debris blown by wind• No pedestrian traffic

– Reduces vandalization &trespassing• Steep embankment (SMPs

E,F,&H)• Neighboring properties

Page 22

Lessons Learned

Positives Negatives– No public access

• More complaints withbordering properties

• Public cannot be involved

– More difficult maintenance• Vegetation growth through

fence• Cannot mow perimeter

03/01/2019 08/05/201908/05/201903/01/2019

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 23: Case Study: I-95 Section GIR - Rain Garden Maintenance

SMPs E&F Vegetation

Page 23

Lessons Learned

SMP EReceives Highway Runoff

SMP FTemporary Bypass

08/07/2019 08/07/2019

Comparable vegetation growth

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 24: Case Study: I-95 Section GIR - Rain Garden Maintenance

Summary

Page 24

Lessons Learned

• Monthly visits, more frequent in summer• Little variation between functioning SMPs• Can’t avoid trash cleanup

SMPMaintenance

• Reduces erosion• Pre-treatment avoids clogging SMP (cigarettes)• Room for improvement to reduce maintenance

ForebayDesign

• Maintenance trends• Long term performance of forebays• Community outreach

FutureStudies

Case Study: I-95 Section GIR - Rain Garden Maintenance

Page 25: Case Study: I-95 Section GIR - Rain Garden Maintenance

Megan Farnsworth, [email protected]

http://www.95revive.com/

October 16, 2019

Questions?