1. I-95 Section GIR Background
2. GR2 Maintenance Inventory
3. Forebay Maintenance
4. Lessons Learned
Case Study: I-95 Section GIR - Rain Garden Maintenance Page 2
1. I-95 Section GIR Background
2. GR2 Maintenance Inventory
3. Forebay Maintenance
4. Lessons Learned
Page 3Case Study: I-95 Section GIR - Rain Garden Maintenance
Case Study: I-95 Section GIR - Rain Garden Maintenance
I-95 Girard Avenue Interchange Reconstruction (GIR)
3 miles of I-95 Highway (Race Street to Allegheney Avenue)
Multi-phase project (2000-present)
70+ SMP devices throughout project at completion
University Monitoring Program for SMPs since 2016• Temple University• Villanova University
Page 4
I-95 Section GIR Background
Case Study: I-95 Section GIR - Rain Garden Maintenance
Allegheney
Race
Girard
• Applied lessonslearned from GR2
• Will continuemonitoring
GIR SMP Maintenance
Page 5
I-95 Section GIR Background
Case Study: I-95 Section GIR - Rain Garden Maintenance
GR2 GR3
GR4
GR5
GR6
GR2&3: Complete GR4: Construction GR5&6: In Design• Temple University
contractedlandscapers
• Monitor manpower• Recommend design
changes
• Applied lessonslearned from GR2&3
• Apply lessons fromGR4 as constructed
• Long-termmaintenance planfor PennDOT
Active GIR SMPs
Page 6
SMP A SMPs C,D,&G SMPs E&F
SMP H SMPs I&J SMP P01
I-95 Section GIR Background
08/07/2019 05/14/2019 05/31/2019
08/07/2019 05/14/2018
Case Study: I-95 Section GIR - Rain Garden Maintenance
05/31/2019
I-95 – Phase GR2 Aerial View
Page 7
I-95 Section GIR Background
08/18/2018
08/18/2018
SMPs I&JSMP H SMPs E&F
SMP A
SMPs C,D,&G
SMP P01
Case Study: I-95 Section GIR - Rain Garden Maintenance
Delaware Ave
Delaware Ave
Shackamaxon St
Shackamaxon St
Case Study: I-95 Section GIR - Rain Garden Maintenance
1. I-95 GIR Background
2. GR2 Maintenance Inventory
3. Forebay Maintenance
4. Lessons Learned
Page 8Case Study: I-95 Section GIR - Rain Garden Maintenance
Vegetation - 225 cubic yards• Mow lawns• Remove weeds• Trim overgrown vegetation• SMP A – “Minimal Maintenance
Routine”
Trash - 146 x 42-gallon bags• Collect trash• Needles
Manpower - 1416 man hours• Inspect after storm events• Spring/summerà 2 trips per month• Fall/winter à 1 trip per month
Maintenance Needs (July 2017 – June 2019)
Page 9
GR2 Maintenance Inventory
07/25/2017
Case Study: I-95 Section GIR - Rain Garden Maintenance
Manpower Observations
Overall Observations• 1-2 days/month• Year 2 – scheduling issues
Low Maintenance Requirements• SMP A – “Minimal Maintenance Routine”• SMP H – less attention on interior• SMP I&J – poor performance
High Maintenance Requirements• SMPs E&F – complaints
• Tedious maintenance• More visits
• SMPs C,D,&G – public presentation• Tours• Publications
Page 10
GR2 Maintenance Inventory
Site Total(2yrs)
Avg permonth
A 238 hrs 9.9 hrsCDG 446 hrs 18.6 hrsEF 420 hrs 17.5 hrsH 207 hrs 8.6 hrsIJ 105 hrs 4.4 hrs
Case Study: I-95 Section GIR - Rain Garden Maintenance
Manpower per Month
Page 11
GR2 Maintenance Inventory
Case Study: I-95 Section GIR - Rain Garden Maintenance
Vegetation Debris Observations
Overall Observations• SMPs I&J lowà poor performance• SMPs C,D,&G and SMPs E&F highest in
vegetation and manpower
NB-side vs SB-side of Highway• Year 1 à SB-side higher totals• Sunlight impacts growth• Continue studying
Fenced vs Open to Public• Similar totals• Year 1 – SMPs E&F (fenced)• Year 2 – SMPs C,D,&G (open to public)
Page 12
GR2 Maintenance Inventory
Site Total (2yrs)A 48.0 yds
CDG 53.0 ydsEF 58.0 ydsH 46.5 ydsIJ 19.0 yds
Case Study: I-95 Section GIR - Rain Garden Maintenance
Vegetation Debris Collected per Month
Page 13
AnnualTotal
- 21.5 yds- 30.0 yds- 32.0 yds- 49.5 yds- 16.0 yds
GR2 Maintenance Inventory
AnnualTotal
- 26.5 yds- 23.0 yds- 14.5 yds- 8.5 yds- 3.0 yds
Case Study: I-95 Section GIR - Rain Garden Maintenance
Trash Collection Observations
Overall Observations• SMPs C,D,&G highest total• SMPs H,I,&J next to construction of
private developments
NB-side vs SB-side of Highway• Study in GR3&4
• SB-sideà Residential• NB-sideà Along Delaware Ave
Fenced vs Open to Public• Fencedà less trash• SMP C,D,&G had additional collection by
neighbors
Page 14
GR2 Maintenance Inventory
Site Total (2yrs)A 28.1 bags
CD&G 64.8 bagsE&F 24.6 bags
H 15.1 bagsI&J 13.6 bags
Case Study: I-95 Section GIR - Rain Garden Maintenance
Trash Collected per Month
Page 15
GR2 Maintenance Inventory
AnnualTotal
- 8.1 bags- 20.8 bags- 5.6 bags- 14.1 bags- 12.6 bags
AnnualTotal
- 20.0 bags- 44.0 bags- 9.5 bags- 10.5 bags- 1.0 bag
Case Study: I-95 Section GIR - Rain Garden Maintenance
Case Study: I-95 Section GIR - Rain Garden Maintenance
1. I-95 GIR Background
2. GR2 Maintenance Inventory
3. Forebay Maintenance
4. Lessons Learned
Page 16Case Study: I-95 Section GIR - Rain Garden Maintenance
Forebay Background
Page 17
Forebay Maintenance
GR2 – SMPs w/o forebaysDesign à Riprap
• Reduce velocityObservations
• Erosion present• Sediment buildup• Cigarettes
GR3&4 – SMPs w/ forebaysDesign à Paver forebay
• Pre-treatment• Reduce velocity
• Observations• Easier maintenance• Reduce erosion
07/25/2017
06/25/2018
Case Study: I-95 Section GIR - Rain Garden Maintenance
SMP P01 (Phase GR3)
Page 18
08/13/2018
Forebay Maintenance
Case Study: I-95 Section GIR - Rain Garden Maintenance
ImproperConstruction• Clogging during
construction• Reduced
infiltration capacity
MulchErosion• Unanticipated
sediment transport• Covers infiltrating
area
InvasiveWeeds• Tedious
maintenance• Could impact
paver placement
Maintenance Notes
Page 19
Forebay Maintenance
08/07/201908/07/201908/21/2018
Case Study: I-95 Section GIR - Rain Garden Maintenance
Case Study: I-95 Section GIR - Rain Garden Maintenance
1. I-95 GIR Background
2. GR2 Maintenance Inventory
3. Forebay Maintenance
4. Lessons Learned
Page 20Case Study: I-95 Section GIR - Rain Garden Maintenance
Public Reaction to SMPs
Page 21
CommunityInteraction Wildlife Public Interest
Complaints aboutOvergrowth
Homeless“Camp” Storage Vandalization
Lessons Learned
10/05/2016
07/25/2017 08/07/2019
05/31/2019
10/18/2018
10/19/2017
Case Study: I-95 Section GIR - Rain Garden Maintenance
Fenced SMPs
– Reduces trash• Blocks debris blown by wind• No pedestrian traffic
– Reduces vandalization &trespassing• Steep embankment (SMPs
E,F,&H)• Neighboring properties
Page 22
Lessons Learned
Positives Negatives– No public access
• More complaints withbordering properties
• Public cannot be involved
– More difficult maintenance• Vegetation growth through
fence• Cannot mow perimeter
03/01/2019 08/05/201908/05/201903/01/2019
Case Study: I-95 Section GIR - Rain Garden Maintenance
SMPs E&F Vegetation
Page 23
Lessons Learned
SMP EReceives Highway Runoff
SMP FTemporary Bypass
08/07/2019 08/07/2019
Comparable vegetation growth
Case Study: I-95 Section GIR - Rain Garden Maintenance
Summary
Page 24
Lessons Learned
• Monthly visits, more frequent in summer• Little variation between functioning SMPs• Can’t avoid trash cleanup
SMPMaintenance
• Reduces erosion• Pre-treatment avoids clogging SMP (cigarettes)• Room for improvement to reduce maintenance
ForebayDesign
• Maintenance trends• Long term performance of forebays• Community outreach
FutureStudies