Project Description:
Overcoming Significant changes in
levels within the RPA
Technical Requirements:
• 2.4m change in levels
• Curve Design
• Vegetated embankment face
Consultant:
JPP Consulting Civil and Structural
Engineers
Merchant:
Construction Lines
Contractor:
South Midlands Homes
Fleming Road Harrowbrook Industrial Estate
Hinckley LE10 3DU
Tel. 01455 617 139 [email protected]
www.geosyn.co.uk
Case Study
Cellweb® TRP
Overcoming significant changes in levels within the Root Protection Area
New Development off Keats Way, Rushden, Northampton
Introduction
Following their recommendation in Arboricultural Practice Note 12 and BS 5837 2005 and 2012, three dimensional cellular confinement systems have been widely used as a no dig solution in the construction of new hard surfaces within root protection areas (RPA’s). The use of an open structured granular infill material offers vertical and lateral water permeation and enables continued gaseous diffusion between the rooting environment and the atmosphere. More often than not, the system is installed on relatively level sites, and there is a perception that the system is unsuitable for anything other than level terrain. In this case study we will look at how Cellweb®TRP has been used to overcome significant changes in levels within the RPA, while maintaining a healthy environment for tree roots.
Geosynthetics Limited were approached by JPP Consulting Civil and Structural Engineers regarding a new residential development on land off Keats Way, Rushden Northamptonshire. The area of land to be developed could only be accessed from Keats Way and a new access road would need to be constructed. The only feasible route for the new road would pass through the RPA of a large Beech tree. The Beech was considered to be of high amenity value and was to be retained within the new development, which meant that a ‘no dig’ tree root protection system would need to be used for the construction of the access road. Figure 1 shows the proposed route of the new access road passing through the RPA of the Beech, as out lined by the red circle. The blue hatched panels across the width of the access road denote panels of Cellweb®TRP.
Keats Way, Northamptonshire
Figure 1: Sourced JPP Consulting
FFL58.450
FFL58.450m
FFL58.325m
FFL58.025m
FFL58.025m
FFL58.900m
FFL59.350m
FFL60.425m
FFL60.725m
FFL61.025m
47.571
59.900
Title
Project
Client
Status
Scale at A1 Drawn by Checked by Date
Project ref Drawing no. Revision
S. Midlands New Homes
Proposed Development
Off Keats Way
Rushden, Northamptonshire.
Plan Showing Extents of
Geosyn Cellweb System
1:100 JRY May 2014
PRELIMINARY P5710/PP E105
NOTES
GENERAL
Do not scale from this drawing.
All dimensions are in metres unless noted otherwise.
This drawing is to be used in conjunction with all relevant drawings,specifications, details and the Ground Investigation Report.
All highway works shall be constructed in accordance with NorthamptonshireCounty Councils 'Estate Road Construction' dated June 1999 and their'Design for Residential Roads' dated January 2000 together with the currentManual for Streets and Highway Works.
Geosynthetics Limited | Fleming Road | Harrowbrook Industrial Estate | Hinckley | LE10 3DU Tel. 01455 617 139 | [email protected] | www.geosyn.co.uk
Case Study
Cellweb® TRPKeats Way, Northamptonshire
CHAINAGE
EXISTING GROUND LEVEL
ALIGNMENT LEVEL
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
61.0
00
60.7
07
0.00
0
60.4
17
60.3
10
11.3
17
59.1
62
58.0
48
39.2
80
R= 78.400
57.8
79
55.5
19
R= 11.600
58.0
67
58.7
31
60.7
36
77.1
08
R= 45.000
51.4
14
1.98
0
CHAINAGE
EXISTING GROUND LEVEL
ALIGNMENT LEVEL
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
58.0
410.
000
58.0
25
2.06
6
58.1
09
11.3
76
R= 22.375
15.5
87
61.0
44
G= -1.914%1: -52.2
5.00
060
.986
10.0
0060
.890
15.0
0060
.795
20.0
0060
.699
25.0
0060
.603
29.2
1360
.523
L= 10.000KF= -6.05939
30.0
0060
.507
35.0
0060
.384
39.2
1360
.249
58.8
98
G= -3.565%1: -28.1
40.0
0060
.221
45.0
0060
.042
50.0
0059
.864
55.0
0059
.686
60.0
0059
.508
65.0
0059
.330
70.0
0059
.151
75.0
0058
.973
60.9
2660
.926
60.8
3060
.830
60.7
3560
.735
60.6
3960
.639
60.5
4360
.543
60.4
4760
.447
60.3
2460
.324
60.1
6160
.161
59.9
8259
.982
59.8
0459
.804
59.6
2659
.626
59.4
4859
.448
59.2
7059
.270
59.0
9159
.091
58.9
1358
.913
58.8
3858
.838
LEFT HAND CHANNEL
RIGHT HAND CHANNEL
2.40
059
.754
60.2
94
G= 4.095%1: 24.4
5.00
059
.860
10.0
0060
.065
15.0
0060
.270
59.8
205.
485
60.2
34
59.9
58
60.2
34
59.9
588.
854
60.0
0560
.005
60.2
1060
.210
60.2
3460
.234
LEFT HAND CHANNEL
RIGHT HAND CHANNEL
DATUM 55.000
60.000
Proposed Long Section Through Road 1(Scale 1:200 Horizontal, 1:50 Vertical)
Road
Lev
el (K
eats
Way
)
Cent
re L
ine
of R
oad
2
Proposed centreline level
Proposed channel level
Existing ground level
Cent
re L
ine
of R
oad
1
DATUM 55.000
60.000
Existing ground level
Proposed centreline level
Proposed channel level
Proposed Long Section Through Road 2(Scale 1:200 Horizontal, 1:50 Vertical)
Hatching indicate approximate extent of retaining wall.
Half batter kerb type HB2
1:40 camber
4.8m wide carriageway1.0m Service Strip
1:33
1.8m footway
1:33
Half batter kerb type HB2
1:40 camber
Precast concrete footwayedging type EF Precast concrete
footway edging type EF
Typical Cross Section Through Road 1(Scale 1:50)
Half batter kerb type HB2
1:40 camber
4.8m wide carriageway1.0m Service Strip
1:33
Half batter kerb type HB2
1:40 camber
Precast concrete footwayedging type EF
Typical Cross Section Through Road 2(Scale 1:50)
1.0m Service Strip
1:33
Precast concrete footwayedging type EF
Title
Project
Client
Status
Scale at A1 Drawn by Checked by Date
Project ref Drawing no. Revision
S. Midlands Developments
Proposed DevelopmentOff Keats WayRushden, Northamptonshire
Proposed Long Sections
As Stated DL PAB October 2011
PRELIMINARY P5710/PP E112
NOTES
GENERAL
Do not scale from this drawing.
All dimensions are in metres unless noted otherwise.
This drawing is to be used in conjunction with all relevant drawings, specifications, details and theGround Investigation Report.
All highway works shall be constructed in accordance with Northamptonshire County Councils'Estate Road Construction' dated June 1999 and their 'Design for Residential Roads' dated January2000 together with the current Manual for Streets and Highway Works.
The site posed a second challenge in the form of its terrain. Over the length of the access road there was a fall in levels of 2.4m from the southern end of the road at Keats Way to the Northern end of the road in the new development. Figure 2 below shows a longitudinal section showing how the existing ground level changes along the route of the proposed new access road. The hatched area represents the area where the ground level needed to be built up inside the RPA.
Any increase in levels within the RPA should be carried out and constructed to ensure continued water permeation and gaseous exchange to and from the rooting environment and the atmosphere. If this is not maintained and anaerobic conditions are created, it can result in root death and ultimately bring about the demise of the tree. To overcome this change in levels it required a build-up of 2.4m above the existing ground level at the most southern end of the RPA, reducing to 1.2m above the existing ground at the most northern point.
The Engineering department at Geosynthetics Limited calculated a site specific technical recommendation and proposed the solution that can be seen in figure 3. The solution shows how layers of 200mm depth Cellweb®TRP can be stacked on top of each other to increase levels. The system can then be terraced to create a gradual reduction in levels as the route progresses north towards the new development. This solution was adopted and a full design was carried out by JPP Consulting Civil and Structural Engineers.
Figure 2: Changes in existing ground level
Figure 3: Stacked 200mm depth Cellweb® TRP
Geosynthetics Limited | Fleming Road | Harrowbrook Industrial Estate | Hinckley | LE10 3DU Tel. 01455 617 139 | [email protected] | www.geosyn.co.uk
Case Study
Cellweb® TRPKeats Way, Northamptonshire
Photo 1, shows the first layer of Cellweb®TRP being installed, with the retained Beech tree on the left. Minimal excavation was carried out on the far southern extremity of the RPA, at the entrance from Keats Way. This was carried out to create a flat surface to which 2.4m of Cellweb®TRP would need to abut. The Cellweb®TRP system is pegged out over the top of one layer of Treetex™ Geotextile. This acts as a separation layer, preventing the infill aggregate from migrating into the subgrade below. This also acts as a pollution control measure in accordance with BS 5837 2012.
Photo 2, shows the progression of the installation and the layering of the Cellweb®TRP. To the right in the photo and next to the tree we can see the beginnings of the formation of a Cellweb®TRP embankment. This batter is designed to have a gradient of one in three and is infilled with the same 4-20mm clean angular stone used to infill the rest of the system. The end cells of each layer of Cellweb®TRP are left empty and are later filled with topsoil and are planted to create a vegetated embankment.
Photo 1: First Layer of Cellweb®TRP being installed
Photo 2: Layering of the Cellweb®TRP
Geosynthetics Limited | Fleming Road | Harrowbrook Industrial Estate | Hinckley | LE10 3DU Tel. 01455 617 139 | [email protected] | www.geosyn.co.uk
Case Study
Cellweb® TRPKeats Way, Northamptonshire
ConclusionIt can be seen from this case study that with thoughtful design Cellweb®TRP can be utilised on far more challenging sites than previously thought. This is particularly poignant at a time where we see increasing demand for development land, which places ever increasing pressure on our national tree stock. The benefits of trees are becoming increasingly recognised and it is important that we utilise engineered solutions to enable us to retain healthy trees as part of future developments.
The Beech tree in this case study now forms part of an ongoing programme to assess the health and vitality of trees which are subject to the construction of Cellweb®TRP systems. More information on this programme is available by contacting Geosynthetics Tree Root Protection team on 01455 617139.
Photos three and four below, show the completed access road and development eighteen months later. In photo three it can be seen that the Cellweb®TRP section of the new access road is surfaced using permeable blocks, allowing continued water permeation and gaseous exchange. The remaining road outside of the RPA is constructed using a conventional subbase with an asphalt surface. In photo four we can see the completed batter which passes around the main stem of the retained Beech, allowing enough space for the future incremental growth of the buttress roots. The end cells of each layer of Cellweb®TRP have been infilled with topsoil and are now planted to create an attractive vegetated bank.