Entrance Upgrade Corpus Christi Catholic High SchoolOak Flats, NSW
RESIDENTIAL AND COMMERCIALBUILDING SERVICES
CASE STUDY
PROJECT DETAILS
The entrance upgrade project involved the demolition of the existing concrete entrance pathway at the entry of the Corpus Christi Catholic High School in Oak Flats.The existing front entry to the administration building consisted of a combination of concrete and ceramic tiles where the existing slab level had dropped and tiles cracked. The works, as per tender plans, involved cutting and removing a section to install new reinforced concrete slab to engineers’ details and carry out resurfacing to new and existing, creating a uniform fi nish.
Being a main entrance, demolition works were scheduled during the December 2018/January 2019 school holidays to minimise impact to the staff and students.
REP
AIR
S
MA
INTE
NA
NCE
R
ENO
VATI
ON
S
MO
DIF
ICA
TIO
NS
Project ManagerNathan Teixeria
LocationIndustrial RoadOak Flats NSW
SupervisorGlenn Amies
ClientCatholic Education
Diocese of Wollongong
SectorEducation
01w
ww
.ajg
rant
grou
p.co
m.a
u
Entrance Upgrade Corpus Christi Catholic High Sch0olOak Flats NSW
CASE STUDY
THE RESULTS
After the existing concrete had been demolished and removed, the ground and base material was prepared and new mesh reinforcement installed to prepare for the installation of the new concrete.
The new concrete was laid and fi nished allowing suffi cient curing timeframes for the preparation and installation of the concrete resurfacing to the entire new and existing front entry.
- If you have a creative challenge or renovation / repair project, we’d love to hear from you -
COMMERCIAL WORKSwww.ajgrantgroup.com.au1300 254 726
RESIDENTIAL WORKSwww.homecarerepairaustralia.com.au
1800 155 166
RESIDENTIAL AND COMMERCIALBUILDING SERVICES
02R
EPA
IRS
M
AIN
TEN
AN
CE
REN
OVA
TIO
NS
M
OD
IFIC
ATI
ON
S