case study · case study project details the entrance upgrade project involved the demolition of...

2
Entrance Upgrade Corpus Christi Catholic High School Oak Flats, NSW RESIDENTIAL AND COMMERCIAL BUILDING SERVICES CASE STUDY PROJECT DETAILS The entrance upgrade project involved the demolition of the existing concrete entrance pathway at the entry of the Corpus Christi Catholic High School in Oak Flats. The existing front entry to the administration building consisted of a combination of concrete and ceramic tiles where the existing slab level had dropped and tiles cracked. The works, as per tender plans, involved cutting and removing a section to install new reinforced concrete slab to engineers’ details and carry out resurfacing to new and existing, creating a uniform finish. Being a main entrance, demolition works were scheduled during the December 2018/ January 2019 school holidays to minimise impact to the staff and students. REPAIRS MAINTENANCE RENOVATIONS MODIFICATIONS Project Manager Nathan Teixeria Location Industrial Road Oak Flats NSW Supervisor Glenn Amies Client Catholic Education Diocese of Wollongong Sector Education 01 www.ajgrantgroup.com.au

Upload: others

Post on 28-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY · CASE STUDY PROJECT DETAILS The entrance upgrade project involved the demolition of ... the existing concrete entrance pathway at the entry of the Corpus Christi Catholic

Entrance Upgrade Corpus Christi Catholic High SchoolOak Flats, NSW

RESIDENTIAL AND COMMERCIALBUILDING SERVICES

CASE STUDY

PROJECT DETAILS

The entrance upgrade project involved the demolition of the existing concrete entrance pathway at the entry of the Corpus Christi Catholic High School in Oak Flats.The existing front entry to the administration building consisted of a combination of concrete and ceramic tiles where the existing slab level had dropped and tiles cracked. The works, as per tender plans, involved cutting and removing a section to install new reinforced concrete slab to engineers’ details and carry out resurfacing to new and existing, creating a uniform fi nish.

Being a main entrance, demolition works were scheduled during the December 2018/January 2019 school holidays to minimise impact to the staff and students.

REP

AIR

S

MA

INTE

NA

NCE

R

ENO

VATI

ON

S

MO

DIF

ICA

TIO

NS

Project ManagerNathan Teixeria

LocationIndustrial RoadOak Flats NSW

SupervisorGlenn Amies

ClientCatholic Education

Diocese of Wollongong

SectorEducation

01w

ww

.ajg

rant

grou

p.co

m.a

u

Page 2: CASE STUDY · CASE STUDY PROJECT DETAILS The entrance upgrade project involved the demolition of ... the existing concrete entrance pathway at the entry of the Corpus Christi Catholic

Entrance Upgrade Corpus Christi Catholic High Sch0olOak Flats NSW

CASE STUDY

THE RESULTS

After the existing concrete had been demolished and removed, the ground and base material was prepared and new mesh reinforcement installed to prepare for the installation of the new concrete.

The new concrete was laid and fi nished allowing suffi cient curing timeframes for the preparation and installation of the concrete resurfacing to the entire new and existing front entry.

- If you have a creative challenge or renovation / repair project, we’d love to hear from you -

COMMERCIAL WORKSwww.ajgrantgroup.com.au1300 254 726

RESIDENTIAL WORKSwww.homecarerepairaustralia.com.au

1800 155 166

RESIDENTIAL AND COMMERCIALBUILDING SERVICES

02R

EPA

IRS

M

AIN

TEN

AN

CE

REN

OVA

TIO

NS

M

OD

IFIC

ATI

ON

S