case study airport design gets an upgrade · case study airport design gets an upgrade. project...

7
Client United Airlines Terminal, Los Angeles International Airport Design Architect Krueck + Sexton Architects Architect on Record HNTB Glazing Installer Woodbridge Glass, Inc. Construction Manager Hensel Phelps Custom Glazing Skyline Design Glass Technique Eco-etch & Metallic Vitracolor Back-paint Glass Square Footage 10,000+ sq ft Photo by Nick Merrick © Hall + Merrick Case Study Airport Design Gets an Upgrade

Upload: others

Post on 25-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study Airport Design Gets an Upgrade · Case Study Airport Design Gets an Upgrade. Project Challenge Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently

Client United Airlines Terminal, Los Angeles International AirportDesign Architect Krueck + Sexton ArchitectsArchitect on Record HNTBGlazing Installer Woodbridge Glass, Inc.Construction Manager Hensel PhelpsCustom Glazing Skyline DesignGlass Technique Eco-etch & Metallic Vitracolor Back-paintGlass Square Footage 10,000+ sq ft

Photo by Nick Merrick © Hall + Merrick

Case Study Airport Design Gets an Upgrade

Page 2: Case Study Airport Design Gets an Upgrade · Case Study Airport Design Gets an Upgrade. Project Challenge Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently

Project Challenge

Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently moving millions of people through a high performance space that requires more security than ever in their recent redesign of United Airlines Terminals 7 and 8 at the Los Angeles International Airport (LAX). The existing infrastructure at LAX — the nation’s second busiest airport — was a patchwork of buildings not equipped to

handle the rising number of passengers and bags that modern aviation requires. “Our project is quite vast,” says Juan M. Villafañe, AIA, LEED AP BD+C, a lead architect on the project. “The original airport was an agglomeration of elliptical buildings built in the 1950s and 1960s. A series of renovations and additions created a fragmented and congested experience.”

Project Scope, Krueck + Sexton Architects

Page 3: Case Study Airport Design Gets an Upgrade · Case Study Airport Design Gets an Upgrade. Project Challenge Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently

Skyline Design’s Solution

Krueck + Sexton turned to Skyline Design to help improve passenger circulation, make the navigation process more straightforward, and to eliminate the feeling of being in a funnel while enhancing the overall visitor experience. Glass was incorporated into the new 300,000 square foot design to establish a clear and intuitive direct line of sight from the airport entrance through the security checkpoint and into the terminal’s gates.

Concept Renderings, Krueck + Sexton Architects

Page 4: Case Study Airport Design Gets an Upgrade · Case Study Airport Design Gets an Upgrade. Project Challenge Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently

Krueck + Sexton utilized Skyline Design’s capabilities to produce custom patterns and a color palette on the glass throughout the facility’s interconnecting hub.

A subtle yet dynamic pattern inspired by concepts of wind and airflow was etched onto glass panels with Skyline Design’s proprietary processes to suggest and encourage movement.

The Vitracolor back-painted glass creates a more cohesive, spacious design unified by light. Glass and the Eco-etch and Vitracolor techniques employed in the project are particularly suited to the airport application as pattern and color produce appropriate and desired levels of transparency for intuitive wayfinding, balanced with the privacy necessary for security.

Photo by Nick Merrick © Hall + Merrick

Page 5: Case Study Airport Design Gets an Upgrade · Case Study Airport Design Gets an Upgrade. Project Challenge Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently

“Originally in the building circulation was circuitous. After you went through security you were disconnected from where you came. The real project benefit was that we made the route go straight in. Now people can wave to family members or see where they are headed. It’s really about this moment of movement that the glass captures and enables,” says Villafañe.

Circulation Before Circulation After

Concept Rendering, Krueck + Sexton Architects

Page 6: Case Study Airport Design Gets an Upgrade · Case Study Airport Design Gets an Upgrade. Project Challenge Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently

The project also demanded that the LAX terminals remain open and operational at the same time construction was underway. In order to satisfy these needs and to also faithfully realize the client’s vision, Skyline Design closely coordinated with Krueck + Sexton to complete the job in sections over the course of ten phases. “Through control samples and color matching capabilities, everything came out consistent and the client was satisfied,” says Mark Toth, Sales Director at Skyline Design who led the collaboration with the architects.

Clockwise From Top Right: Mark Sexton of Krueck + Sexton Architects reviewing installed panels, Color-match review at the installation site, Shop Drawing elevations from Skyline Design, Section of terminal during construction.

62 1/2"

IG 1.1 PL27

IG 1.1 PL26

IG 1.1 PL25

IG 1.1 PL24

IG 1.1 PL23

IG 1.1 PL22

IG 1.1 PL21

IG 1.1 PL20

IG 1.1 PL19

IG 1.1 PL18

IG 1.1 PL40

IG 1.1 PL10

IG 1.1 PL09

IG 1.1 PL08

IG 1.1 PL07

IG 1.1 PL06

IG 1 PL17

IG 1 PL16

IG 1 PL38R1 IG 1 PL05

IG 1 PL04

IG 1 PL03

IG 1 PL02

IG 1 PL01

62 1/2 IG 1 PL38R11 41 1/2 96 13/16 IG 1.1 PL40

- All artwork is placed as it will be applied to �nal product. Please check all artwork placement, alignment and cropping. -

THES

E D

ESIG

NS

ARE

TH

E C

ON

FID

ENTI

AL,

PR

OPR

IETA

RY A

ND

EXC

LUSI

VE

PRO

PERT

YO

F SK

YLIN

E D

ESIG

N, C

HIC

AG

O, I

LLIN

OIS

.

REPR

OD

UC

TIO

N O

R U

SE IN

AN

Y FO

RM

WIT

HO

UT

SKYL

INE

DES

IGN

’S P

RIO

R PE

RMIS

SIO

N IS

PRO

HIB

ITED

.

Clie

nt: M

etz

Ente

rpris

es, I

nc.

Proj

ect:

LAX

Uni

ted

Term

inal

Job:

506

536-

049

1240

Nor

th H

oman

Ave

nue

Chic

ago,

IL 6

0651

Ph: 7

73.2

78.4

660

Fax:

773

.278

.354

8W

eb: s

kyde

sign

.com

DATE: 10.07.16

SCALE: 1:40

DRAWN BY: CS

REVISION #:

APPROVED: -

PAGE: 1 OF 1

Pattern Surface One:Vertical custom etched pattern

Pattern Surface Two:Vitracolor Metallic Silver 2016-28

VIEWING SIDE ONEBlack = etch

ALL GAPS 1/8” TYP.

41 1/2" 40 3/4" 40 3/4" 40 3/4" 40 11/16"40 11/16"

96 1

3/16

"

27 11/16"31 3/16" 31 3/16" 31 3/16" 31 3/16" 31 3/16" 31 3/16" 31 3/16" 31 3/16"

23 11/16"

96 1

3/16

"

11 1/2"

25"

10 3/4"

12 3/8"

96 1

3/16

"

13 1

/4"

4 1/2"

4 1/

2"

14 3/16"

69 1

/2"

85 11/16"11 "

21" 41 1/2"

4 7/16"4 7/16"

2 3/8" TYP.

IG-3.1VS-1.1

IG-3.1VS-1.2

IG-3.1VS-1.3

IG-3.1VS-1.4

IG-3.1VS-1.5

IG-3.1VS-1.6

IG-3.1VS-1.7

IG-3.1VS-1.8

IG-3.1VS-1.9

IG-3.1VS-1.10

IG-3.1VS-1.11

IG-3.1VS-1.12

IG-3.1VS-1.13

IG-3.1VS-1.17

IG-3.1VS-1.18

IG-3.1VS-1.19

IG-3.1VS-1.20

IG-3.1VS-1.14

IG-3.1VS-1.16

IG-3.1VS-1.15

1 27 11/16 136 IG-3.1 VS-1.15

- All artwork is placed as it will be applied to �nal product. Please check all artwork placement, alignment and cropping. -

THES

E D

ESIG

NS

ARE

TH

E CO

NFI

DEN

TIA

L,

PRO

PRIE

TARY

AN

D E

XCLU

SIVE

PRO

PERT

YO

F SK

YLIN

E D

ESIG

N, C

HIC

AGO

, ILL

INO

IS.

REPR

OD

UC

TIO

N O

R U

SE IN

AN

Y FO

RM

WIT

HO

UT

SKYL

INE

DES

IGN

’S P

RIO

R PE

RMIS

SIO

N IS

PRO

HIB

ITED

.

Clie

nt: M

etz E

nter

prise

s, In

c.

Proj

ect:

LAX

Unite

d Te

rmin

al

Job:

506

676-

021

1240

Nor

th H

oman

Ave

nue

Chic

ago,

IL 6

0651

Ph: 7

73.2

78.4

660

Fax:

773

.278

.354

8W

eb: s

kyde

sign.

com

DATE: 10.05.16SCALE: 1:40DRAWN BY: CSREVISION #: 1APPROVED: -PAGE: 1 OF 2

Pattern Surface One:Vertical custom etched pattern

Pattern Surface Two:No Pattern

VIEWING SIDE ONEBlack = etch

ALL GAPS 1” TYP.

43 1/2" 43 1/2" 43 1/2" 43 1/2" 50 1/2" 50 1/2" 50 1/2" 50 1/2" 50 1/2" 50 1/2" 50 1/2" 50 1/2" 38 1/2" 31" 34 1/2" 34 1/2" 34 1/2" 41"

136"

136"

19 3/8"

39 1

9/32

"39

19/

32"

10"

506676-021

506059-031 / 506797-036

5A IG-1 4A IG-1 3A IG-1 2A IG-1 1A IG-19A IG-1 8A IG-1 7A IG-1 6A IG-114A IG-1 13A IG-1 12A IG-1 11A IG-1 10A IG-1

5 IG-1 4 IG-1 3 IG-1 2 IG-1 1 IG-19 IG-1 8 IG-1 7 IG-1 6 IG-1

14 IG-1 13 IG-1 12 IG-1 11 IG-1 10 IG-1

- All artwork is placed as it will be applied to final product. Please check all artwork placement, alignment and cropping. -

THE

SE

DE

SIG

NS

AR

E T

HE

CO

NFI

DE

NTI

AL,

P

RO

PR

IETA

RY

AN

D E

XC

LUS

IVE

PR

OP

ER

TYO

F S

KY

LIN

E D

ES

IGN

, CH

ICA

GO

, ILL

INO

IS.

RE

PR

OD

UC

TIO

N O

R U

SE

IN A

NY

FOR

M

WIT

HO

UT

SK

YLI

NE

DE

SIG

N’S

PR

IOR

P

ER

MIS

SIO

N IS

PR

OH

IBIT

ED

.

Clie

nt: M

etz

Ente

rpris

es, I

nc.

Proj

ect:

LAX

Uni

ted

Term

inal

Job:

506

059-

031

1240

Nor

th H

oman

Ave

nue

Chi

cago

, IL

6065

1Ph

: 773

.278

.466

0 Fa

x: 7

73.2

78.3

548

Web

: sky

desi

gn.c

om

DATE: 09.15.16SCALE: 1:20DRAWN BY: NRREVISION #: 3APPROVED: -PAGE: 1 OF 1

Pattern Surface One:Vertical custom etched pattern

Pattern Surface Two:Vitracolor Metallic Silver 2016-28

VIEWING SIDE ONEBlack = etch

ALL GAPS 1/8” TYP.

96"

39 3/8"51 3/8"51 3/8"51 3/8"51 3/8"51 3/8"44 3/8"44 3/8" 51 3/8"51 3/8"51 3/8"44 3/8"44 3/8"20 1/4"

5 1/

16"

5 3/

4"

7 13

/16"

9 15

/16"

18 1

5/16

"

18 1

5/16

"

18 1

5/16

"

11 1

5/16

"

14 1

/16"

16 1

/2"

18 1

5/16

"

20 5

/16"

22 1

5/16

"

25 3

/4"

DETAIL A

1/2" typ. 1/2" typ.

10 3

/4"

typ.

DETAIL A

1/8" typ.

27 1

3/16

"

Page 7: Case Study Airport Design Gets an Upgrade · Case Study Airport Design Gets an Upgrade. Project Challenge Chicago-based Krueck + Sexton Architects embraced the challenge of efficiently

Skyline Design’s Result

The new United Airlines terminals at LAX are designed to surpass the current standards of excellence for modern aviation. Created with traveler connectivity in mind, Krueck + Sexton worked with Skyline Design to achieve circulation improvements, cohesion in the design, and to revitalize visitor experience. The expansion helped ease overcrowding and simplified traffic flow.

“Glass was exceptional for a few reasons. In terms of the airport environment, it has immense durability. In terms of people beating it up with luggage walking by you really can’t damage glass when it’s properly installed. Glass is a benefit in that type of application,” notes Villafañe, adding that “Beyond durability, which is so important, the backpainted glass really transforms throughout the day. Your experience of the material changes depending on your angle of approach, your reading of the depth of material, this play of light, shadow, and

surface that is quite magical. Glass does that in a way that other materials cannot.”Employing a holistic, functional design aided by the use of glass — a durable, flexible, and effective material — Krueck + Sexton were able to transform the existing real estate into a reinvigorated space. The resulting design is a thoroughly modernized airport reimagined around a smart experience that helps guide travelers. Providing such experience-focused, responsible design makes moving through the airport both simpler and swifter.

Made in Chicago / © Skyline Design skydesign.com / 888-278-4660 / [email protected]