Aquatic recreational plan. Final phase of construction. Overall facitliy plan. CHALLENGE Design and build a multipurpose aquatic center as a part of a new, ground-up YMCA facility that would be easily and cost effectively operated and maintained, as well as address the following needs: Accommodate the varied aquatic needs of it’s multi-generational clientele. Provide space for fitness and learn to swim programs. Incorporate area for entertainment and and play with family appeal. SOLUTION ADG designed and built a cohesive aquatics center that addressed all the varied needs of the YMCA’s diverse clientele. The lap swimming pool and large spa area with hydrotherapy pool allows for multi-functional programming options, while a zero-depth activity pool with water basketball, spray features, a toddler slide and lazy river current channel provides entertainment value and revenue generating opportunities through event bookings. RESULT The facility is currently in the final phase of construction and is expected to open Spring 2015. CASE STUDY NorthWest YMCA Syracuse, NY BUILD AN EXPERIENCE Innovative. Experienced. Committed. Inspired. ADG offers smart solutions for real success. Flexible programing products and design options to drive revenue.

Upload: others

Post on 21-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: case study · 2020. 2. 28. · open Spring 2015. case study NorthWest YMCA Syracuse, NY Build an experience Innovative. Experienced. Committed. Inspired. adG offers smart solutions

Aquatic recreational plan. Final phase of construction.

Overall facitliy plan.

challengeDesign and build a multipurpose aquatic center as a part of a new, ground-up YMCA facility that would be easily and cost effectively operated and maintained, as well as address the following needs:

• Accommodate the varied aquatic needs of it’s multi-generational clientele.

• Provide space for fitness and learn to swim programs.

• Incorporate area for entertainment and and play with family appeal.

solutionADG designed and built a cohesive aquatics center that addressed all the varied needs of the YMCA’s diverse clientele. The lap swimming pool and large spa area with hydrotherapy pool allows for multi-functional programming options, while a zero-depth activity pool with water basketball, spray features, a toddler slide and lazy river current channel provides entertainment value and revenue generating opportunities through event bookings.

resultThe facility is currently in the final phase of construction and is expected to open Spring 2015.

case study NorthWest YMCASyracuse, NY

Build an experience

Innovative. Experienced. Committed. Inspired. adG offers smart solutions for real success.

Flexible programing products anddesign options to drive revenue.

Page 2: case study · 2020. 2. 28. · open Spring 2015. case study NorthWest YMCA Syracuse, NY Build an experience Innovative. Experienced. Committed. Inspired. adG offers smart solutions

P.O. Box 64813 Green Mountain DriveCohoes, NY 12047 1.800.458.9283 #Waterrevenue

For more projects by ADG, visit aquaticgroup .com