Accessing Carbon FinanceCase Study: CDM and Energy
Efficiency
Hakim Zahar, P.Eng.Vice-President
ECONOLER INTERNATIONAL
February-March, 2007
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 3/32
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 4/32
1 st Case study: Taishan Cement WorksWHR and Utilisation for Power
Generation ProjectProject DescriptionStatus of t he project for its registrationCDM deal structure: tenders or sole sourceFinancing of t he CDM costs
MethodologyAdditionality
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 5/32
1 st Case study: Taishan Cement Works
Project Description ± Project Activity : waste heat recovery and utilization for power
generation project ± Location: Taishan Cement Works in Ninyang County of S handong
Province of t he People¶s Republic of C hina. ± Host Party: C hina ± Other Parties Involved: United Kingdom of Great Britain and
Nort hern Ireland ± Authorized Participants: Natsource Europe Limited ± Description: The Taishan Cement Works produces highquality
cement using t he new dry process tec hnique and has been beingimplemented in two p hases ± t he 2500 tons per day clinker production line commenced operation in June 2003 and t he 5000tons per day clinker production began production November 2004.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 6/32
1 st Case study: Taishan Cement WorksProject Description ± Problematic: Energy demand has increased in tandem wit h cement
production and t he captive power plant has insufficient capacity to provide for t his increase.
± Baseline: Taishan would have to take electricity eit her from t he grid,
or construct a new waste coal fueled captive power plant, t he mosteconomically attractive option. ± Project Activity: recovery and use of waste heat from t he rotating
kilns of t he two cement clinker production lines. The waste heat iscurrently mainly vented to atmosp here, wit h a portion re-circulatedwithin the clinker process. However t he Project Activity will nowcapture t he waste heat for use in a power generation plant, t heexhaust heat of w hich can also still be recirculated to t he clinker process. Th is power generation plant will be rated at 13.2MW andwill produce annually 89.5 million kW h of electricity wit h nosignificant associated emissions of CO2.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 7/32
1 st Case study: Taishan Cement Works
Project Description ± Large Scale Project
± Categories: 1 and 4The project activity falls under sectoral scope 4 ± ManufacturingIndustries, specifically t he cement sector.The project activity is also relevant to sectoral scope 1 ± Energy± Mining/mineral production.
± Amount of Reductions: 105,894 metric tonnes CO2equivalent per annum
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 8/32
1 st Case study: Taishan Cement Works
Status of t he project for its registration ± The start date of t he Project Activity was 1st
July 2004, w hen equipment ordered. ± Validation report: Marc h 2006 ± Registration Date: June 24, 2006 ± Crediting Period: 01 Jan 06 - 31 Dec 12
(Renewable)
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 9/32
1 st Case study: Taishan Cement Works
CDM deal structure: tenders or sole source ± Xinwen Mining Group Company is permitted by t he
National Development and Reform Commission of t hePeople¶s Republic of C hina to transfer to t he NatsourceEurope Limited no more t han 800,000 tCO 2e in totalCERs for a period of 7 years from t he starting date of t he
project.
Financing of t he CDM costs ± Fee level: USD 19923.2
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 10/32
1 st Case study: Taishan Cement Works
Methodology ± Th is Project Activity uses t he approved met hodology
AM0024 titled ³Met hodology for green house gasreductions t
hroug
hwaste
heat recovery and utilization
for power generation at cement plants´ w hich wasdeveloped for t his Project Activity and w hich wasrecommended for approval by t he met hodologies panelat their 17t h meeting and accepted by t he ExecutiveBoard at t heir 21st meeting.
± The met hodology is applicable to t he Project as t heProject clearly utilises waste heat recovery for utilisationin a power generation unit at a cement plant.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 11/32
1 st Case study: Taishan Cement Works
Methodology : The met hodology lists five applicabilitycriteria and all of t hese applicability criteria clearly applyto this Project Activity because:A. The electricity produced by t he Project Activity is used wit hin
the cement works w here the Project Activity is located andthere is no electricity export to t he grid in t he baseline scenario.
B. The Project Activity displaces electricity from an identifiedspecific generation source w hich is a 15MW extension to t he37MW captive coal fired plant at t he site (baseline). Th is
15MW extension, i.e. t he baseline scenario, is a moreeconomically attractive course of action t han the proposedCDM Project Activity.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 12/32
1 st Case study: Taishan Cement WorksMethodology : The met hodology lists five applicabilitycriteria and all of t hese applicability criteria clearlyapply to t his Project Activity because:C. There is sufficient publicly available information to identify
the specific generation source (baseline) w hich is a 15MWextension to t he existing 37MW captive coal fired plant at t hesite.
D. The PDD demonstrates t hat in t he baseline, waste heat use isonly possible wit hin the boundary of t he clinker making
process.
E. Waste heat is only planned to be used in t he Project Activityand for recycling waste heat wit hin the boundary of t he clinker making process.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 13/32
1 st Case study: Taishan Cement Works
CDM project additionality demonstration:1. Prior to t he project starting date t he Project Sponsor had entered
into a CDM development agreement wit h a CDM consultingcompany and started t he preparation of a submission of a new
methodology applicable to t he project activity (NM0079).2. The Project Activity is not t he only option w hich is available to t he
Project Owners.3. There is clear evidence t hat the Project Activity is less financially
attractive t han the baseline scenario for a wide range of scenarios(the Project IRR of t he baseline scenario is 67% higher than theProject Activity)
4. There are tec hnological barriers and barriers to prevailing practice
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 14/32
1 st Case study: Taishan Cement Works
CDM project additionality demonstration:5. No similar projects were found in S handong Province and only four
similar projects have been identified as implemented in C hina atsimilar sized cement plants to date ± two using imported e quipmentand two using domestic e quipment. None of t hose projects locatedat a mine mout h cement plant w here the incentives for carrying outthe Project Activity are considerably different to cement workswhere there are no captive power plant options.
6. Clearly t he CDM revenue represents a significant stream of revenue for t he Project, counting for 19.2% of t he annual revenueof the project during t he crediting period assuming a conservative
CER value of USD6 per ton and comparing it against avoidedelectricity purc hases. Th is potential benefit directly increases t heinvestment return of t he Project Activity and compensates for itsincreased cost and increased risks.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 15/32
2nd Case Study: Project bundling:Landfill Gas Recovery and Flaring for
9 bundled landfills in Tunisia
Definition of bundlingProject DescriptionStatus of t he project for its registrationCDM deal structure: tenders or sole sourceFinancing of t he CDM costs
MethodologyAdditionality
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 16/32
Definition of bundling
A bundle of CDM projects is defined as a collection or aggregation of several CDM projects.In a bundle, eac h activity could be undertaken individuallyas a CDM project activity (e.g. t hree wind farms) and t hevarious project activities are only bundled toget her in order to reduce CDM-related transaction costs.A proposed CDM project s hall be deemed to be a bundle of CDM projects : ± The bundled tec hnologies/measures s hould be independently owned
and operated; ± The bundle s hould be implemented at different locations; ± New CDM projects can be added to a bundle wit hin the crediting
period;
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 17/32
2nd Case Study: 9 bundled landfills in
TunisiaProject Description ± Project Activity : Landfill Gas Recovery and Flaring for 9 bundled
landfills in Tunisia ± Location: The nine landfills are disseminated over t he Tunisian
Territory and close to t he following cities: Bizerte, Sfax, Kairouan,Djerba, Gabes, Monastir, Sousse, Nabeul and Medenine.
± Host Party: Tunisia ± Other Parties Involved: Italy ± Authorized Participants: International Bank for Reconstruction and
Development (IBRD) as t he Trustee of Italian Carbon Fund (ICF) ± Large Scale Project ± Categories: Waste handling and disposal
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 18/32
2nd Case Study: 9 bundled landfills in
TunisiaProject Description ± Description: The project activity will install a gas recovery and
flaring system in eac h of the nine landfills, in order to reduce CH4emissions, and t hus generate CERs, w hile ensuring safety at t heLandfill sites, serving sustainable development purposes, and
providing additional resources to environment protection in Tunisia.The nine landfills have an aggregated nominal capacity of 3,300tons of waste per day; i.e. 1.2 million tons of waste/year.
± Baseline: Originally, none of t he nine landfills was designed to beequipped wit h LFG management system.
± Amount of Reductions: 317,909 metric tonnes CO2 e quivalent per annum
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 19/32
2nd Case Study: 9 bundled landfills in
TunisiaStatus of t he project for its registration ± The starting date of t he project activity is
expected to be 1st January 2007. ± Validation report: February 2006 ± Registration Date: November 23, 2006 ± Crediting Period: 01 Jan 07 - 31 Dec 12 (Fixed)
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 20/32
2nd Case Study: 9 bundled landfills in
TunisiaCDM deal structure: tenders or sole source ± The LFG recovery and flaring systems will be financed by t he
National Waste Management Agency (ANGED), and operated by private contractors.
± Total investment of t he LFG collection and flaring system in t henine landfills is estimated at 6.7 MUS$, w hich will be mobilizedthrough a World Bank Loan.
± The World Bank will provide to t he government of Tunisia wit h aloan to partially finance a Solid Waste Management Project tosupport t he implementation of t his programme
Financing of t he CDM costsFee level: USD 62081.8
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 21/32
2nd Case Study: 9 bundled landfills in
TunisiaMethodology ± Consolidated baseline met hodology for landfill gas
project activities ± ACM0001/Version3, dated 19 May
2006 ± Project activity meets applicability criteria of t he chosen
methodology. Th is met hodology is adopted in relationwith the selected approac h for Baseline taken from
paragrap h 48 of t he CDM modalities and procedures:³(b) Emissions from a tec hnology t hat represents aneconomically attractive course of action, taking intoaccount barriers to investment´.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 22/32
2nd Case Study: 9 bundled landfills in
TunisiaAdditionality1. The project will start by July 2006, so t he registration will occur
before t he start of t he first crediting period.2. There is no mandatory law or regulation, or any contractual
arrangement t hat force Landfill operators to collect and flare met haneor to use it for electricity generation.
3. Considering t he LFG project wit hout CDM, t he project would nothave been adopted by Tunisia as it wouldn't generate any revenue, andits NPV would be negative (MUS$ -9.1), wit h an IRR also negative.
4. Common Practice for Controlled landfills in Tunisia will not consider CH4 extraction and flaring, and it is unlikely t hat LFG systems would
be prevalent in t he future wit hout the CDM contribution.5. The project activity will generate significant economic benefitsthrough the sale of ERs t hat will justify contracting a loan to cover t heinvestment expenses and to make project implementation possible.
h7
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 23/32
Slide 22
h7 j'élimine ce diapo.Hakim Za h ar, 1/30/200 7
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 24/32
3 rd Case Study: Programmatic approach:Moldova Energy conservation and
greenhouse gases emissions reduction
Definition of programmatic approac hProject DescriptionStatus of t he project for its registrationCDM deal structure: tenders or sole sourceFinancing of t he CDM costs
MethodologyAdditionality
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 25/32
Definition of programmatic approach
The program is t he project, t he program enactingagent is project participant
The Program can be a private sector initiative or aGovernment measure: voluntary or mandatoryEmission reductions are ac hieved by multipleactions executed over time
Type, size and timing of t he induced actions maynot be known at t he time of registration
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 26/32
3 rd Case Study: Moldova Energy
conservation and GHG reductionProject Description ± Project Activity: The project refers to energy conservation measures
in public buildings and conse quently to GHG emission reduction. ± Location: 32 public buildings in 9 municipalities of t he Republic of
Moldova: Cantemir, Edinet, Falesti, Floresti, Hincesti, Ialoveni, Nisporeni, Straseni, Ung heni ± Host Party: Republic of Moldova ± Bilateral and Multilateral Funds : Community Development Carbon
Fund (CDCF)Managing company: International Bank for Reconstruction andDevelopment (IBRD)
Netherlands ± Authorized Participants: Carbon Finance Unit Moldova ± Small Scale Project
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 27/32
3 rd Case Study: Moldova Energy
conservation and GHG reductionProject Description ± Description: Th is Moldovan project aims at GHG emission
reduction as result of efficiency improvements and fuel switc hingmeasures for a series of public buildings (kindergartens, sc hools,
vocational sc hools, hospitals, policlinics etc.) implemented via t heWB Moldova Energy II Project. ± Baseline: t he most conservative scenario selection, has been c hosen
the scenario corresponding to five (5) percent annual heatconsumption growt h rate.
± Categories: Sectoral scope 1: Energy industries (renewable - / non-renewable sources); Sectoral scope 3: Energy demand
± Amount of Reductions: 11,567 metric tonnes CO2 e quivalent per annum
± Fee level: USD 5000
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 28/32
3 rd Case Study: Moldova Energy
conservation and GHG reductionStatus of t he project for its registration ± The start date of t he Project Activity was
January 15, 2006 ± Validation report: November 7, 2005 ± Registration Date: January 29, 2006 ± Crediting Period: 20 Jan 06 - 19 Jan 16 (Fixed)
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 29/32
3 rd Case Study: Moldova Energy
conservation and GHG reductionCDM deal structure: tenders or sole source ± The total Energy II project financing will be US$ 39.93 million, of
which US$35 million would be financed from an IDA credit,US$4.33 million from internal cas h generation and municipalcontributions and US$0.6 million from t he Swedis h InternationalDevelopment Agency (SIDA).
± The WB Energy II Project investment decisions refer to least costtechnical solutions, w hich have to satisfy t he required heatingstandards at minimum costs.
± The Community Development Carbon Fund (CDCF) will have theCER rig hts.
Financing of t he CDM costs :
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 30/32
3 rd Case Study: Moldova Energy
conservation and GHG reductionMethodologies ± II.E Energy efficiency and fuel switc hing
measures for buildings ± III.B Switc hing fossil fuels
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 31/32
3 rd Case Study: Moldova Energy
conservation and GHG reductionAdditionalitya) Investment barrier: a financially more viable alternative to t he project
activity would have led to higher emissions; b) Technological barrier: a less tec hnologically advanced alternative to
the project activity involves lower risks due to t he performanceuncertainty or low market s hare of t he new tec hnology adopted for t he
project activity and so would have led to higher emissions;c) Barrier due to prevailing practice: prevailing practice or existing
regulatory or policy re quirements would have led to implementation of a tec hnology wit h higher emissions;
d) Other barriers: wit hout the project activity, for anot her specific reasonidentified by t he project participant, suc h as institutional barriers or limited information, managerial resources, organizational capacity,financial resources, or capacity to absorb new tec hnologies, emissionswould have been higher¶.
8/6/2019 Case Studies Energy Efficiency Landfill Gas
http://slidepdf.com/reader/full/case-studies-energy-efficiency-landfill-gas 32/32
Thank you for your attention!
Hakim Za har, [email protected]