Benefits No NPT downtime during deployment Provided for a collaborative working relationship to create a successful project management team and process Monitored pressures and identified timing of adjustments to maintain desired oil production levels Background and challenges Deepwater Gulf of Mexico high-pressure well Address scale buildup that could threaten production levels and equipment Baker Hughes solution and results Intelligent Production System that included remote flow control, well monitoring and chemical injection systems HCM-Plus valve, Premier production packer, SureSENS175 well monitoring equipment, and chemical injections Applied chemical injection system to reduce scale buildup and extend the life of the well, further aiding production and holding down operational costs An operator working a deepwater, high- pressure well in the Gulf of Mexico was in search of a solution for a relatively new environment of high-pressure, high-rate production and injection completion systems for the deepwater environment. Having a capacity to process 300,000 B/D (47696 m 3 /d), flawless operation with no downtime was a driver at every level of the operation. Some of the chief requirements included talented and skilled personnel with reliable hardware; project management staff in the client’s office to ensure consistently fast communications; and validation programs for the various systems to confirm the ability to withstand the high-flow rates, erosion potential, and long-term operation. Baker Hughes provided the Intelligent Production System, including the remote flow control, well monitoring, and chemical injection systems. The hydraulically controlled HCM-Plus valve with high flow port design and the Premier production packer were specifically designed and validated for this project. This project required equipment ratings of 12,000-psi (827-bar) differential working pressure at flow rates to 40,000 B/D (6359 m 3 /d). SureSENS 175 well monitoring equipment was implemented to withstand the extreme hydrostatic pressures of 25,000 psi (1724 bar) and vibration from the extreme production and injection rates. Chemical injection was provided by Baker Hughes to ensure long-term operation of the chemical delivery system. Case History Intelligent Production Systems Provided Well Monitoring and Selective Production Flow Installed chemical injection system to improve well

Upload: dinhkhue

Post on 17-Feb-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case History Intelligent Production Systems Provided Well ... · PDF filethat included remote flow control, well monitoring and chemical ... Intelligent Production Systems Provided

Benefits � No NPT downtime during deployment

� Provided for a collaborative working relationship to create a successful project management team and process

� Monitored pressures and identified timing of adjustments to maintain desired oil production levels

Background and challenges � Deepwater Gulf of Mexico high-pressure well

� Address scale buildup that could threaten production levels and equipment

Baker Hughes solution and results � Intelligent Production System that included remote flow control, well monitoring and chemical injection systems

� HCM-Plus valve, Premier production packer, SureSENS175 well monitoring equipment, and chemical injections

� Applied chemical injection system to reduce scale buildup and extend the life of the well, further aiding production and holding down operational costs

An operator working a deepwater, high-pressure well in the Gulf of Mexico was in search of a solution for a relatively new environment of high-pressure, high-rate production and injection completion systems for the deepwater environment. Having a capacity to process 300,000 B/D (47696 m3/d), flawless operation with no downtime was a driver at every level of the operation.

Some of the chief requirements included talented and skilled personnel with reliable hardware; project management staff in the client’s office to ensure consistently fast communications; and validation programs for the various systems to confirm the ability to withstand the high-flow rates, erosion potential, and long-term operation.

Baker Hughes provided the Intelligent Production System, including the remote flow control, well monitoring, and chemical injection systems. The hydraulically controlled HCM-Plus™ valve with high flow port design and the Premier™ production packer were specifically designed and validated for this project.

This project required equipment ratings of 12,000-psi (827-bar) differential working pressure at flow rates to 40,000 B/D (6359 m3/d). SureSENS™ 175 well monitoring equipment was implemented to withstand the extreme hydrostatic pressures of 25,000 psi (1724 bar) and vibration from the extreme production and injection rates. Chemical injection was provided by Baker Hughes to ensure long-term operation of the chemical delivery system.

C a s e H i s t o r y

Intelligent Production Systems Provided Well Monitoring and Selective Production FlowInstalled chemical injection system to improve well

Page 2: Case History Intelligent Production Systems Provided Well ... · PDF filethat included remote flow control, well monitoring and chemical ... Intelligent Production Systems Provided

To deploy these various systems, multi-line spooling services were used to ensure a seamless operation during the installation.

This system was considered to be the most complex installed to date within the field. Due to the preparation work by the dedicated project management team and the operation of reliable equipment, the system was installed without any nonproductive time (NPT)

associated with Baker Hughes. As well, Baker Hughes was able to beat the planned schedule intended for the upper completion.

With the results for the completion system—both lower and upper—falling within the planned schedule, Baker Hughes demonstrated that a single-sourced, fully integrated system deployment could deliver on time and on plan.

© 2011 Baker Hughes Incorporated. All rights reserved. 28744

www.bakerhughes.comDisclaimer of Liability: This information is provided for general information purposes only and is believed to be accurate as of the date hereof; however, Baker Hughes Incorporated and its affiliates do not make any warranties or representations of any kind regarding the information and disclaim all express and implied warranties or representations to the fullest extent permissible by law, including those of merchantability, fitness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the information provided herein. All information is furnished “as is” and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BE LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.