G&P Professionals Sdn Bhd G&P Professionals Sdn Bhd (www.gnpgroup.com.my)(www.gnpgroup.com.my)
CASE HISTORIES ON THE CASE HISTORIES ON THE GEOTECHNICAL DESIGN & GEOTECHNICAL DESIGN &
CONSTRUCTION OF THE IPOH CONSTRUCTION OF THE IPOH HOSPITAL EXTENSION HOSPITAL EXTENSION
Cadangan Membina Dan Menyiapkan Cadangan Membina Dan Menyiapkan Blok Wanita, KanakBlok Wanita, Kanak--Kanak dan Pusat Kanak dan Pusat Kardiologi, Hospital Raja Permaisuri Kardiologi, Hospital Raja Permaisuri
Bainun, Ipoh, PerakBainun, Ipoh, PerakBy : Dato’ Ir. Dr. GUE See Sew
Date: 22/09/2014
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
ContentsContents
• Desk Study & Site Visit• Subsurface Investigation (S.I.)• Preliminary Design• Detailed Design• Construction• Approval Process
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
DESK STUDY & SITE VISIT
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Project Location
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Project Location
Jalan Hospital
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Building LayoutBuilding Layout
Jalan Hospital
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Building InformationBuilding Information
• The superstructure consists of a 10-storey tower with :
- 2 floors of elevated car parks- 8 floors of clinical podiums and wards
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Site LayoutSite Layout
SITE IS A FLAT AREA
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
General Geology
Extracted from Geological Map of Perak, Sheet 2-N-5 Ipoh, 1957 published by Geological Survey Department
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Site Visit
Direction of Photo Taken
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Site Visit
Direction of Photo Taken
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Site Visit
Direction of Photo Taken
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Site Visit
Direction of Photo Taken
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
SUBSURFACE INVESTIGATION (S.I.)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Preliminary S.I.
First Stage-Preliminary S.I. (By JKR)•Carried out by Ikram Utara from 9th
January 2010 to 23rd February 2010
•S.I. consists of 6 nos. of Boreholes
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Preliminary S.I. Layout
6 nos. Existing BH (First)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
BorelogBorelog
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Detailed S.I.
Second Stage-Detail S.I.•S.I. has been carried out by Ikram Utara from 26th September 2010 to 9th December 2010
•The S.I. consists of :-– 12 nos. Borehole– 10 nos. Rock Probe– 96 nos. JKR Probe
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
S.I. Layout12 nos. BH
10 nos. RP
6 nos. Existing BH
Boreholes that show cavities
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
S.I. During Construction
Third Stage-S.I. During Construction•S.I. has been carried out by Kamalbina Sdn. Bhd. from 1st October 2013•The S.I. consists of :-
– 45 nos. Cavity Probing (Main Building)– 5 nos. Cavity Probing (PPU) (Not carried out yet)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Justification
• Additional S.I. (cavity probing) shall be carried out during construction stage:-– Identify the extent of cavity– More concentrated at cavity area
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
S.I. Layout
Prelim Boreholes (6 nos)Additional Rock Probes (10 nos)Additional Boreholes (12 nos)Cavity Probe (45 nos)Cavity Detected
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Section 2-2
Prelim Boreholes (6 nos)Additional Rock Probes (10 nos)Additional Boreholes (12 nos)Cavity Probe (45 nos)Cavity Detected
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Cross–Section 2-2
Cavities
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Section 12-12
Prelim Boreholes (6 nos)Additional Rock Probes (10 nos)Additional Boreholes (12 nos)Cavity Probe (45 nos)Cavity Detected
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Cross–Section 12-12
Cavities
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Section D-D
Prelim Boreholes (6 nos)Additional Rock Probes (10 nos)Additional Boreholes (12 nos)Cavity Probe (45 nos)Cavity Detected
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Cross–Section D-D
Cavities
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Section J-J
Prelim Boreholes (6 nos)Additional Rock Probes (10 nos)Additional Boreholes (12 nos)Cavity Probe (45 nos)Cavity Detected
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Cross–Section J-JCavities
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
PRELIMINARY DESIGN
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Selection of FoundationSelection of Foundation• General topography
• Magnitude of column loads
• Subsoil profile
• Bearing capacity of ground
• Settlement due to settling platform, disturbance to surrounding neighbors, etc.
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Options of FoundationOptions of Foundation
Shallow Foundation
Suitable for Low Rise or
Light Structure
Deep Foundation
Suitable for Medium to High Rise
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Selection of PilesSelection of Piles• Types of Piles Available in Market• Installation Method• Ground Conditions (eg Limestone, etc)• Site Conditions & Constraints (eg
Accessibility)• Type and Magnitude of Loading• Development Programme & Cost• etc
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Options of Deep FoundationOptions of Deep Foundation• Spun Pile
- Driven- Jack- in
• Bored Pile
• Micro Pile
Not allowed as near to hospital (Noise)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Options of Deep FoundationOptions of Deep Foundation• Jack- in Spun Pile- Overburden too shallow (less than 10D)
• Bored Pile
• Micro Pile
OPTION 1
OPTION 2
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Piling Problem in LimestonePiling Problem in Limestone
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
RecommendationRecommendation
• Detail S.I. for design
• Cavity Probing during construction
• Cavity treatment is required (compaction grout)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
DETAILED DESIGN
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Detail Design
• Majority of Architectural Layout is Frozen
• Column Loads provided by C&S Engineer
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Column Loads DistributionColumn Loads Distribution
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Column Load (x 103 kN)
0123456789
101112131415161718192021222324252627282930
No.
of C
olum
n
2
6
8
1514
24
2122
1415 15
7
3
1 1 1 1 1 1 1 1
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Option 1: Bored Pile Design
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Bored Pile DesignBored Pile Design
• Pile Capacity
• Pile Length/Socket Length
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Bored Pile CapacityBored Pile Capacity
• Shallow bedrock
• To achieve Structural capacity
Rock Socket Pile
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Allowable Structural CapacityAllowable Structural Capacity
QQallall = 0.25 x f= 0.25 x fcucu x Ax Acc
Qall = Allowable pile capacity
fcu = characteristic strength of concrete
Ac = cross sectional area of concrete
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Allowable Structural CapacityAllowable Structural Capacity
Size (mm) Working Load
600Type A 500Type B 1100Type C 1600
900 55001050 7500
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Allowable Geotechnical CapacityAllowable Geotechnical Capacity
• Fp, Geo (allow) = (fsAs / 1.5) + (fbAb / 3) (Using Partial Safety Factor)
• Fg, Geo (allow) = (fs As + fb Ab) / 2 (Using Global Safety Factor)
Where,fs = Shaft resistance
fb = Base resistanceAs = Surface area of pile shaftAb = Surface area of pile base
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Geotechnical CapacityGeotechnical Capacity
• Very Difficult to Ensure Proper Base Cleaning
• Contribution from Base IGNORED
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Allowable Geotechnical CapacityAllowable Geotechnical Capacity
• Fp, Geo (allow) = (fsAs / 1.5)
• Fg, Geo (allow) = (fs As / 2
Where,fs = Shaft resistance
fb = Base resistanceAs = Surface area of pile shaftAb = Surface area of pile base
+ (fbAb / 3)
+ fb Ab)fs As / 2
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Design AssumptionsDesign Assumptions
• fs(ult) = 2.5 N (for soil)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
SPTSPT--NN
30
25
20
15
10
5
0
0 10 20 30
30
25
20
15
10
5
0
Dep
th (m
)
0 10 20 30
SPT-N Value
LegendABH1ABH2ABH3ABH4ABH5ABH6ABH7ABH8ABH9ABH10ABH11ABH12BH1BH2BH3BH4BH5BH6
SPT N = 3
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rock Socket FrictionRock Socket Friction
Working Rock Socket FrictionWorking Rock Socket Friction RQDRQD
300 kPa300 kPa <25%<25%600 kPa600 kPa 2525--70%70%
1000 kPa1000 kPa >70%>70%
The above design values subject to 0.05 x min (UCS, fThe above design values subject to 0.05 x min (UCS, fcu cu ) ) whichever is smallerwhichever is smaller
Reference: Neoh (1998)Reference: Neoh (1998)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
RQD ValuesRQD Values
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100
Rock Quality Designation, RQD (%)
30
25
20
15
10
5
0D
epth
bel
ow G
roun
d Le
vel (
mbg
l)
Legend
ABH1ABH2ABH3ABH4ABH5ABH6ABH7ABH8ABH9ABH10ABH11ABH12RP1RP2RP(2A)RP3RP4RP5RP6RP7RP8RP9RP10BH1BH2BH3BH4BH5BH6
0 10 20 30 40 50 60 70 80 90 100
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
UCS ValuesUCS Values
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100
Unconfined Compressive Strength, UCS (MPa)
30
25
20
15
10
5
0
Dep
th b
elow
Gro
und
Leve
l (m
bgl)
Legend
ABH1ABH2ABH3ABH4ABH5ABH6ABH7ABH8ABH9ABH10ABH11ABH12RP1RP2RP(2A)RP3RP4RP5RP6RP7RP8RP9RP10BH1BH2BH3BH4BH5BH6
0 10 20 30 40 50 60 70 80 90 100
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rock Socket FrictionRock Socket Friction
Working Rock Socket FrictionWorking Rock Socket Friction RQDRQD
300 kPa300 kPa <25%<25%600 kPa600 kPa 2525--70%70%
1000 kPa1000 kPa >70%>70%
The Rock Socket Friction to be confirmed by The Rock Socket Friction to be confirmed by Instrumented Pile TestInstrumented Pile Test
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rock Socket LengthRock Socket Length
• L = Structural Capacity / 600kPa x π x D
Where,L = Rock Socket LengthD = Diameter of Bored Pile
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rock Socket LengthRock Socket Length
Bore Pile Size Rock Socket Length
600 mm
Type A 0.5mType B 1.0mType C 1.5m
900 mm 3.5m1050 mm 4.0m
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
φφ600mm Bored Pile600mm Bored Pile
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
φφ900mm Bored Pile900mm Bored Pile
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
φφ1050mm Bored Pile1050mm Bored Pile
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Option 2 :Micro Pile Design
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Micro Pile DesignMicro Pile Design• Design based on 300mm pile size
• Reinforcement : API Pipe Grade N80 (177.8mm outer diameter and 10.36mm thickness)
• Rock Socket Pile
• Only Shaft Friction Considered
• End Bearing IGNORED
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Structural CapacityStructural CapacityP Structural (ultimate) = fy * As
OR
P Structural (ultimate) = 0.4*(fcu*Ac) + 0.75*(fy * As) (as short column based on cl.3.8.4.3: BS 8110: 1985)
OR
P Structural (ultimate) = 0.5 * fy * (As + Ec/Es * Ac) (as composite section by strain compatibility based on cl.7.4.6.3.1: BS 8004: 1986)
Where fy = Yield stress of API pipe, 552 N/mm2 for Grade N80As = Area of API pipefcu = Grade of grout
Ac = Cross-sectional area of groutEc = Elastic Modulus of ConcreteEs = Elastic Modulus of Steel
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Micro Pile CapacityMicro Pile Capacity
• FOS for Structural Capacity = 2.0 (based on Table 2: BS 8081: 1989)
• Allowable Structural Capacity 1500 kN
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Micro Pile LengthMicro Pile Length• Grout/Rock bond interface, FOS = 3.0
(Table 2: BS 8081:1989)
• Ultimate Grout/Rock bond stress=1.8N/mm2
• Reinforcement/Grout interface, FOS = 3.0(Table 2: BS 8081:1989)
• Ultimate Reinforcement/Grout bond stress=1.9N/mm2
(Table 3.28 :BS8110: 1985)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Micro Pile LengthMicro Pile Length
• Rock Socket Length = 3m
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Cost Comparison
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
CHEAPER!
Cost ComparisonCost Comparison
Bored Pile Micro Pile
Total Nos. Of Pile
Total Cost
351 1483
RM5.5 Million RM8 Million
ADOPTED
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Cavity Treatment
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Importance of Cavity TreatmentApplication of Building Load
Roof of Cavity starts to Crack …
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Cavity Treatment
• Compaction Grouting is proposed for the cavity treatment.
• 1: 3 Cement & Sand
• Pressure not less than 7 MPa
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Compaction Grouting
The tremie pipe to transferthe mortar into cavity
The mortar from the mixture will pump into the cavity using hydraulic pump
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
CONSTRUCTION
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Bored PilesBORED BORED PILING PILING
MACHINEMACHINE
BG22
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
DrillingDrilling
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Lower Lower ReinforcementReinforcement
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Place Place Tremie Tremie
ConcreteConcrete
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Completed BoredpileCompleted Boredpile
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Definition of Rock Socket
• Definition of Rock Socket• Point Load Test
3 SETS POINT LOAD TEST AT EVERY 1m
CHANGE TOOLS
IS(50) 3 MPA
RECOVERED ROCK MORE THAN 70%
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
UCS vs IUCS vs IS(50)S(50)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Criteria of Rock Socket Length at Criteria of Rock Socket Length at Cavity AreaCavity Area
IF V1<2.5H1
IF V2<2.5H2
Rock SocketH1 H2
√√ √√ √√ √√
XX √√ XX √√√√ XX XX XX
XX XX XX XX
V1 and V2 (Treated Cavity) Not Considered As Rock Socket
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Construction issuesConstruction issues
• No chiseling
• Adjustment of rock sockets
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
ADJUSTMENT OF ROCK SOCKET LENGTH BASED ON INPUT DURING CONSTRUCTION
Designed socket length Limestone Bedrock
Rock socketed
piles
Stable rock zone
Sacrificial socket length
Designed socket length
Potentially unstable
rock zone
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Inclined limestone bedrock
Temporary casing
Collapse of Loose Soil (Slime)
Rock Socket
Rock
Soil
Soft Toe
COLLAPSE OF LOOSE SOIL (SLIME) SURROUNDING THE BORED HOLE
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Inclined limestone bedrock
Temporary casing
No collapse of loose soil (slime) surrounding the
bored bole
Rock Socket
Rock
Soil
PERFORMANCE OF MODIFIED CORING TOOL
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Verification TestVerification Test
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Verification Test
• Preliminary Instrumented Pile Test• Maintained Load Test• Sonic Logging• Pile Integrity
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Pile TestsPile Tests
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Instrumented Pile Load TestInstrumented Pile Load Test
Extensometer
Vibrating Wire Strain
Gauges
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Instrumented Pile Load TestInstrumented Pile Load Test
• 1 No. of Test • Purpose - To test pile capacity contributed from friction
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Instrumented Pile Load TestInstrumented Pile Load Test
• Carried out on 12th December 2013• Pile diameter : 1050mm• Pile Working Load : 7500 kN• Test failed at 2.5 times WL• Rock socket length is confirmed
maintained
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Static Load TestStatic Load Test
• No. of Test - 4 nos.• Purpose - To test pile capacity
(cannot differentiate between the base and friction contribution)
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Static Load TestStatic Load Test• Failure load:
Continuous settlement at constant load• JKR Specification:
The tested pile deemed to have failed if:– The residual settlement after removal of the Test
Load exceeds 6.5mm; or– The total settlement under the Design Load
exceeds 12.5mm; or– The total settlement under twice the Design
Load exceeds 38.0mm, or 10% of pile diameter/width, whichever is the lower value
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Static Load TestStatic Load Test“The residual settlement after removal of
the Test Load exceeds 6.5mm”
• Not specific on which load (1WL or 2WL)• Test Load shall only refer to 1WL
•Inappropriate to limit residual settlement at twice design load
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Static Load TestStatic Load Test
Load
Settlement, ρ
Failure Load
1WL
Continuous settlement at constant load
12.5mm6.5mm
At failure load (2WL) should not limit ρ andmention on residual ρ
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Static Load TestStatic Load Test• Most standard not consider residual ρ,
except Australian Standard AS 2159 (Piling - Design and Installation)
• AS 2159-1995– After remove serviceability load: 7mm– After remove 1.5 design action effect: 30mm
• AS 2159-2009– After remove serviceability load: Max 0.01d, 5 (mm)– After remove ultimate load: 10 + 0.05d (mm)
Note: d is pile diameter
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Pile Integrity TestPile Integrity Test
• No. of Test - 28 nos.• Purpose - To verify concrete quality
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Sonic Logging TestSonic Logging Test
• No. of Test – 28 nos.• Purpose - To verify concrete quality
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
SinkholeSinkhole
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Sinkhole Encountered During Sinkhole Encountered During ConstructionConstruction
Sinkhole 1
Sinkhole 2
Sinkhole 3
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Sinkhole 1 (Near CP20)
Sinkhole 5-6m Dia. With 4-5m Depth
Date :22 November 2013
Sinkhole
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Sinkhole 2 (Near CP40)
Sinkhole 4.2m Dia. With 1.5m Depth
Date :17th December 2013
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Sinkhole 3 (Near CP44)
Sinkhole 2m
Sinkhole 2m Dia. With 2m Depth
Date :23rd December 2013
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rectification works Rectification works
2. Backfilled with sand materials
1. Carry out cavity treatment
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rectification works
Additional Cavity Probing
3. Carry out Cavity Probing to ensure no cavity/cavity treated
CP 20A
CP 20B
CP 20D
CP 20C
3a. 4 nos. Cavity Probing at Sinkhole 1
Sinkhole1
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rectification works3b. Additional 3 nos. Cavity Probing at Sinkhole 2
(Yet to be carried out)
CP 40A
CP 40BCP 40C
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rectification works3c. Additional 10 nos. Cavity Probing at Sinkhole 3
Sinkhole 3
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
APPROVAL PROCESSAPPROVAL PROCESS
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Approval ProcessApproval Process
ContractorConsulting Engineer
PTB (Penyelia Tapak Bina)
JKR HQ
Submission
Recommendation for Approval
Seek for Approval / Advise
Approval / Advise
ApprovalImplication:•Time (2 to ≥4 weeks)
Issue:•Delay•Claim for delay?
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Approval ProcessApproval Process
• SO to approve if:– Work is within the contract– Work is approved by JKR
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Rock Socket Lengthening Rock Socket Lengthening
• Lengthening in cavity
• Decision: How long? 1 or 3 working days
• Issue: Delay causes collapse of drilled hole
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Role of Client and ConsultantRole of Client and Consultant
• Client (JKR HODT/HOPT) and Consultant shall:– Ensure quality of works
• Inspection– Facilitate the construction for completion on
time– Control construction cost within budget
Quality Services Quality Services -- Our CommitmentOur Commitment©© G&P Professionals Sdn BhdG&P Professionals Sdn Bhd
Thank YouThank You