WELCOME
Carter Carburetor
Public Availability Meeting
April 10, 2014
4/10/2014 U.S. Environmental Protection Agency 1
EPA Staff
LaTonya Sanders, Public Affairs/Congressional Liaison
Tamara Freeman, Environmental Justice Liaison and
interim Community Involvement Coordinator
Jeff Weatherford, Site Project Manager
Shawn Grindstaff, Facilitator
4/10/2014 U.S. Environmental Protection Agency 2
Retired EPA Staff
Belinda Young, 37 years
Community Involvement Coordinator
4/10/2014 U.S. Environmental Protection Agency 3
Pam Johnson, 40 years
Environmental Justice Liaison
Carter Carburetor Site
Removal Action
Community Update
April 10, 2014
4/10/2014 4U.S. Environmental Protection Agency
TOPICS
• Brief Background Refresher
• Recent and Current Activities
• Next Steps
4/10/2014 U.S. Environmental Protection Agency 5
Removal Action Objectives
• Make the site ready for reuse
• Stop further migration of contaminants into
the surrounding soil, air, surface water, or
groundwater
4/10/2014 U.S. Environmental Protection Agency 10
March 2011 Action Memo Proposed Actions
• Carter Building Inc. (CBI) Building
– Total Building Demolition and Off-Site Disposal
• Willco Plastics Building
– Partial Removal and Replacement
• Die Cast Building Area
– Excavation and Off-Site Disposal
• TCE Aboveground Storage Tank Area
– In-situ Thermal Desorption (ISTD)
4/10/2014 U.S. Environmental Protection Agency 11
July 2013 Settlement Agreementbetween EPA and ACF Industries
• ACF Industries Responsibilities• Cleanup and Demolition of the CBI Building
• Cleanup of the Die Cast Area
• Cleanup of the TCE/AST Area
• U.S. EPA Responsibilities• Conduct Debris Cleanup in the CBI Building
• Provide Government Oversight of the Cleanup
• Provide Perimeter Air Monitoring
4/10/2014 U.S. Environmental Protection Agency 12
July 2013 Settlement Agreementbetween EPA and Carter Building Inc.
• Carter Building Inc. (CBI) Responsibilities• Cleanup of the Willco Building
• U.S. EPA Responsibilities• Provide government oversight of the cleanup
• Provide perimeter air monitoring
4/10/2014 U.S. Environmental Protection Agency 13
CBI Building Debris Removal
• Debris cleanup includes materials left in the
building by previous owner and/or tenants of
the CBI Building
• On-site activities began August 2013 and
concluded at the end of October 2013
4/10/2014 U.S. Environmental Protection Agency 14
January 2014 Removal Action Work Plan
• General Work Plan with Detailed
Amendments
– CBI Building Demolition Amendment
• Asbestos Abatement
• PCB Cleanup
• Demolition
4/10/2014 U.S. Environmental Protection Agency 19
Asbestos Abatement
• Asbestos Abatement Work Plan Approved
• Tentatively scheduled to begin April 21
• Completion expected within six months
4/10/2014 U.S. Environmental Protection Agency 20
Next Steps(Durations are Estimates Only)
• CBI Building Demolition – Spring 2014 to Fall 2015
• Die Cast Area – Fall 2015 to Fall 2016
• TCE Area – Fall 2016 to Fall 2017
• Willco Building – Undetermined
4/10/2014 U.S. Environmental Protection Agency 22
EPA Contacts
• Jeff Weatherford – EPA On-Scene Coordinator:
636-326-4720, [email protected]
• Tamara Freeman – Community Involvement
Coordinator: 913-551-7463,
• EPA Call Center - Toll Free - 800-223-0425
4/10/2014 U.S. Environmental Protection Agency 23