carrier02 revd (26 assembled and in hand)

2
carrier02 revD (26 assembled and in hand) carrier13 revD (26 being assembled now) *should arrive in HI by Feb 20th need modified Al/SS spacers machined (4 per boardstack; design complete) need PEEK pogo pin carriers machined (2 per board; design being tweaked) need a jig to precisely align the pogo pins while soldering (design in progress) Intermediate Board Stack Intermediate Board Stack Intermediate Board Stack Carrier Rev. D (carrier02, carrier13)

Upload: bowen

Post on 21-Jan-2016

23 views

Category:

Documents


0 download

DESCRIPTION

Intermediate Board Stack. Intermediate Board Stack. Intermediate Board Stack. Carrier Rev. D (carrier02, carrier13). carrier02 revD (26 assembled and in hand). carrier13 revD (26 being assembled now) *should arrive in HI by Feb 20th. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: carrier02 revD (26 assembled and in hand)

carrier02 revD (26 assembled and in hand) carrier13 revD (26 being assembled now)*should arrive in HI by Feb 20th

need modified Al/SS spacers machined (4 per boardstack; design complete) need PEEK pogo pin carriers machined (2 per board; design being tweaked) need a jig to precisely align the pogo pins while soldering (design in progress)

Intermediate Board StackIntermediate Board StackIntermediate Board Stack Carrier Rev. D (carrier02, carrier13)

Page 2: carrier02 revD (26 assembled and in hand)

Pre-production Board Stack SCROD revB / carrier revE:

– will have preliminary designs by CD-2/3 (March)– design review & fabrication in April– ready for testing ASIC right when it comes back

form factor identical to mock-up (can re-use existing board spacers)