Performance Profile Sheet (Page 1 of 1) NCCER Training Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice. CARPENTRY MODULE 27201 V5 PERFORMANCE PROFILE Craft: Module: Module Title: TRAINEE NAME: TRAINING PROGRAM SPONSOR: INSTRUCTOR: Rating Levels: Recognition: OBJECTIVE RATING DATE START TIME END TIME 1 1 1 1 Using an instructor-provided schedule, identify various criteria necessary for interpretation. Using an instructor-provided shop drawing, interpret key aspects of that drawing. Also, list the date for testing for each task was completed. When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor. TASK Locate 10 items contained in a set of commercial drawings. (The instructor will select the 10 items.) Examine a drawing to cross- reference the accuracy of dimensions from architectural to structural drawings. (1) Passed: performed task (2) Failed: did not perform task Carpentry 27201 Commercial Drawings

Upload: others

Post on 24-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY MODULE 27201 V5 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

1

1

1

1

Using an instructor-provided schedule, identify various criteria necessary for interpretation.

Using an instructor-provided shop drawing, interpret key aspects of that drawing.

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Locate 10 items contained in a set of commercial drawings. (The instructor will select the 10 items.)

Examine a drawing to cross-reference the accuracy of dimensions from architectural to structural drawings.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry 27201Commercial Drawings

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27205 V5 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

1

2

2Demonstrate the ability to build headers (back-to-back, box, and L-header).

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Estimate the amount of materials to complete an instructor-specified steel framing project.

Lay out a steel stud wall with openings to include bracing and blocking.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry27205Cold-Formed Steel Framing

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27204 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

3

4

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Install three of the most common siding types in your area.

Estimate the amount of lap or panel siding required for a structure.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 2 27204 Exterior Finishing

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27203 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

3

3

4 Install selected building wraps.

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Install blanket insulation in a wall.

Install a vapor barrier on a wall.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 227203Thermal and Moisture Protection

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27202 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

4

4

4

4

Lay out, cut, and install a cricket or saddle.

Demonstrate the techniques for installing other selected types of roofing materials.

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Demonstrate how to install composition shingles on a specified roof and valley.

Demonstrate the method to properly cut and install the ridge cap using composition shingles.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 2 27202Roofing Applications

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27208 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

5

5

5

5

Lay out and cut hinges in an instructor-selected project.

Install a door closer using the proper safety precautions.

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Demonstrate the proper installation of a hollow metal frame and door using the proper safety precautions.

Install a prehung door unit or door hanging system using the proper safety precautions.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 2 27208Doors and Door Hardware

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27206 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

1

2

4

• Nails

• Screws

• Adhesives

Estimate material quantities for an installation.

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Select the type and thickness of drywall required for an installation.

Install gypsum drywall panels on a stud wall and a ceiling using any or all of the following fastening systems:

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 2 27206Drywall Installation

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27207 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

1

4

4 Patch damaged drywall.

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

State the differences between the six levels of finish established by industry standards and distinguish a finish level by observation.

Properly apply a corner bead, tape, and finish to a drywall panel.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 2 27207 Drywall Finishing

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27209 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

2

3

3Lay out and install a lay-in suspended ceiling system according to an instructor-supplied drawing.

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Estimate the quantities of materials needed to install a lay-in suspended ceiling system in a typical room from an instructor-supplied drawing.

Establish a level line at ceiling level such as is required when installing the wall angle for a suspended ceiling.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 2 27209 Suspended Ceilings

Performance Profile Sheet (Page 1 of 2) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27210 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

3

3

3

3

Make a coped joint using a coping saw.

Install interior trim using a finish nailer and hand nailing methods.

• Door trim

• Window trim

• Base trim

• Ceiling trim

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Make square and miter cuts to selected moldings using a hand miter box.

Make square and miter cuts to selected moldings using a power miter/compound miter saw.

(1) Passed: performed task (2) Failed: did not perform task

Carpentry Level 227210Window, Door, Floor, and Ceiling Trim

Peformance Profile Sheet (Page 2 of 2) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27210 PERFORMANCE PROFILE

Craft:Module:Module Title:

Carpentry Level 227210Window, Door, Floor, and Ceiling Trim

OBJECTIVE RATING DATESTART  TIME

END  TIME

4 Make a coped joint using a coping saw.

TASK

Performance Profile Sheet (Page 1 of 1) NCCER Training

Copyright © 2013 NCCER. Permission is granted to reproduce this page provided that copies are for local use only and that each copy contains this notice.CARPENTRY LEVEL TWO--MODULE 27211 PERFORMANCE PROFILE

Craft:Module:Module Title:

TRAINEE  NAME:

TRAINING  PROGRAM  SPONSOR:

INSTRUCTOR:

Rating  Levels:

Recognition:

 

OBJECTIVE RATING DATESTART  TIME

END  TIME

4

Also, list the date for testing for each task was completed.

When testing for the NCCER Training Program, be sure to record Performance testing results on Training Report Form 200, and submit the results to the Training Program Sponsor.

TASK

Lay out and identify various types of base and wall units following a specified layout scheme.

(1) Passed: performed task (2) Failed: did not perform task