carparking (school hours)
TRANSCRIPT
DN
SPORTS PAVILION & CANTEEN
BUS PARKING
RL 37.0
RL 38.0
RL 39.0
RL 40.0
RL 41.0
RL 42.0
RL 43.0
RL 44.0
RL 45.0
PERFORMANCE AUDITORIUM
EXISTING VEGETATION
PROJECT SCOPE
N 5738545738E 349303461
JUNIOR SCHOOL BUILDING MIDDLE SCHOOL
BUILDING
SPORTS PAVILION & CANTEEN
TRADE SKILLS
CENTRE
ADMININISTRATION + LIBRARY
YEAR 9 BUILDING
SPORTS OVAL
MAINTENANCE SHED
JUNIOR SCHOOL SPORTS OVAL
SPECIALIST BUILDING
1800m2
EXPANSION
GRASS SOCCER PITCH
FUTURE STAFF / VISITOR PARKING
BOARDING600m2
ELC 400m2
EXISTING PLAYGROUND
AQUATIC CENTRE1400m2
GYMNASIUM2764m2
ELC
RECONFIGURE SERVICE ROAD WITHIN SITE
GREENHOUSE
VEGETABLE PATCH
EXISTING SPORT
EXISTING SPORT
SENIOR SCHOOL CENTRE1800m2
PERFORMING ARTS AND MUSIC
2500m2
NEW PICK UP & DROP OFF PARKING
HARDCOURTS
WATER TANKS
EXISTING LONG JUMP
BOOMGATE
ADMIN
SPORTS PAVILION CARPARK
FOOD TECH
ART COURT
BOARDING STAFF CARPARK
SYNTHETIC HOCKEY PITCH / TENNIS COURTS
FENCE
BOOSTER
BOOSTER
AMPHITHEATRE
SHARED PATHWAY
SECONDARYACCESS
PRIMARY ACCESS
EXISTING HARDCOURT
EXISTING HARDCOURT
BUILDING SETBACK LINE PER
PREVIOUS
TOW
NPLANNING
PERMIT
OUTDOOR PLAY
BIKE PATH
YEAR 9
GRASS SOCCER PITCH
EXPANSION
1
16
3a
4
6
2
5
6
6
6
2
5
4
1
2
2
2
2
2
6
2
2
EXISTING BICYCLE
STORAGE:16 SPACES
EXISTING BICYCLE
STORAGE:16 SPACES
EXISTING BICYCLE
STORAGE:16 SPACES
PROPOSED BICYCLE
STORAGE:16 SPACES
INDICATIVE LOCATION OF NEW DETENTION BASIN
EXISTING SUBSTATION + MAIN
SWITCH BOARD
SEWER PUMP
EXISTING SERVICES ROAD TO BE
RELOCATED AS PER MASTERPLAN
SHARED PATHWAY
EXISTING VEGETATION
COURTYARD
EXISTING TREES
EXISTING TREES
EXISTING VEGETATION
P H I L L I P I S L A N D R O A D
COURTYARD
EXISTING BICYCLE
STORAGE:16 SPACES
EXISTING BICYCLE
STORAGE:16 SPACES
EXISTING BICYCLE
STORAGE:16 SPACES
PROPOSED BICYCLE
STORAGE:16 SPACES
PROPOSED LANDSCAPED PATH
PROPOSED ROAD
INDICATIVE LOCATION OF NEW DETENTION BASIN
HUB
35.00
40.00
45.00
47.0046.00
45.00
35.00
36.00
37.00
36.00 40.00
42.00
41.00
42.00
43.00
44.00
35.00
35.00
37.00
36.00
35.00 34.00
34.00
35.00
34.00
34.00
FFL 41.50FFL 43.00
FFL 41.50
FFL 38.00
FFL 37.40
FFL 46.50
SHELTER
KOALA SANCTUARY
NEW BUS DROP OFF / PICK UP
SECONDARYACCESS
WASTE COLLECTION AND STORAGE TO COUNCIL REQUIREMENTS
EXISTING TREES
EXISTING TREES
EXISTING TREES
EXISTING TREES
EXISTING TREES
EXISTING TREES
EXISTING TREES
EXISTING TREES
EXISTING TREES TO BE REMOVED AND REINSTATED WITH NEW LANDSCAPED MAIN ENTRY CONCEPT
GYMNASIUM OVERFLOW CARPARK SHOWN
DASHED
PEDESTRIAN PATH
EXISTING ENTRY AND GRAVEL ROAD
3no. CAR PARKING BAYS
9no. CAR PARKING BAYS
16no. CAR PARKING BAYS
8no. CAR PARKING BAYS
11no. CAR PARKING BAYS
2
2
6no. CAR PARKING BAYS
124no. CAR PARKING BAYS
70no. CAR PARKING BAYS
EXISTING TREES
38° 39' 20"
590.81 mS
E
51° 19' 25"
403.89 mS
W
67° 44' 50"506.75 m
N
W
51° 20' 40"
688.32 mS
W
23° 09' 20"
54.68 mN
W
102720 -
SETBACK305365
175740 -
SETBACK164960
SETBACK110080
7599
0
SETB
ACK
1071
20 -
3b
4a
EXISTING BUILDINGS
PROPOSED BUILDINGS
KEY OPEN SPACE
EXISTING VEGETATION(REFER TO LANDSCAPE PLAN FOR PROPOSED LANDSCAPING)
KEY
SPORTS (FIELDS)
SPORTS (SURFACE)
PEDESTRIAN PATHWAY
WASTE COLLECTION
TITLE BOUNDARY
CARPARKING (SCHOOL HOURS)
SENIOR SCHOOL CENTRESTAGE ONE
BOARDING HOUSE
STAFF / STUDENT NUMBERS (ALL STAGES COMBINED)
1
2
SPECIALIST BUILDING
PERFORMING ARTS: MUSIC, DANCE AND DRAMA
ALL ROAD INFRASTRUCTURE / PARKING
AQUATIC CENTREEARLY LEARNING CENTRE
STATUTORY REQUIREMENT: 107
STAFF : 118
ADMINISTRATION BUILDING EXPANSIONJUNIOR SCHOOL SPORT'S OVAL
STAGE TWO
EARLY LEARNING CENTRE CARPARK
STUDENTS : 969
ACTUAL PROVISION BREAK DOWN:
STAFF / VISITOR: 70
PICK UP / DROP OFF: 124
CARPARKING(AFTER HOURS / OVERFLOW)
GYMNASIUM & PERFORMING ARTS CENTRE OVERFLOW: 250AFTER HOURS (AS SCHOOL HOURS): 247
TOTAL CAMPUS PARKING: 497
DRAINAGE SWALE
BUILDING SPECIFIC PARKING: 53
TOTAL: 247
PARKING SURPLUS: 140
GYMNASIUM / ASSOCIATED CARPARK
NEW ENTRANCE LANDSCAPEREMOVAL OF EXISTING DAM / PROPOSED RETARDING DAM / WSUD
3aSTAGE THREE
SOCCER FIELDS4STAGE FOUR
PERFORMING ARTS AUDITORIUM5STAGE FIVE
HARDCOURTS
6STAGE SIX
SHED EXPANSION
SYNTHETIC HOCKEY PITCH / TENNIS COURTS
3b
4a STORAGE SHED
TOWN PLANNING
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and job dimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright 2008 All rights reserved
Drawn By Checked By Date Printed Scale
Project No Drawing No Revision
Drawing Title
Project Title
Status
Project Address
Ground Floor11-17 Buckingham StreetSurry Hills NSW 2010T +61 2 9660 9329
Level 12,324 Queen Street, Brisbane Qld 4000 T +61 7 3211 9821
ABN: 84006394261 NSW Nominated Architects:Tom Jordan 7521,Richard Leonard 7522, David Tordoff 8028
4/135 Sturt Street Southbank,VIC 3006 T +61 3 9699 3644
Melbourne Sydney Brisbane
1 :1000@A027/03/2020
9:50:01 AM
6
JF OW/EC
MP.01.02
1770 PHILLIP ISLAND RD RHYLL
1995.06
NEWHAVEN COLLEGEPERFORMING ARTS CENTRE -MUSIC, DANCE & DRAMA
SITE MASTERPLAN
Rev Description Date1 TOWN PLANNING APPROVAL 23.12.20152 WASTE COLLECTION AREA REVISION 02.02.20163 BUILDING SETBACK REVISION 19.04.20164 CLIENT REVIEW 13.04.20175 TOWN PLANNING APPROVAL 24.05.20176 TOWN PLANNING SUBMISSION 27.03.2020