Carlsbad SeawaterCarlsbad SeawaterDesalination ProjectDesalination Project
Who is Poseidon Resources?Who is Poseidon Resources?
Privately held company that develops and invests in waterPrivately held company that develops and invests in waterinfrastructure projectsinfrastructure projects
Headquartered in Stamford, CT with local California officesHeadquartered in Stamford, CT with local California officesin Long Beach, Carlsbad and San Diegoin Long Beach, Carlsbad and San Diego
Representative projects:Representative projects:
Largest privately funded municipal wastewater plant in the U.S.Largest privately funded municipal wastewater plant in the U.S. ––Cranston, RICranston, RI
Largest portfolio of water infrastructure assets in MexicoLargest portfolio of water infrastructure assets in Mexico –– PemexPemex
Original developer of the first large scale desalination projectOriginal developer of the first large scale desalination project in thein theUnited States located in Tampa, Florida.United States located in Tampa, Florida.
Currently developing desalination projects in Carlsbad, HuntingtCurrently developing desalination projects in Carlsbad, HuntingtononBeach and Monterey County.Beach and Monterey County.
Why Desalination?Why Desalination?
Mature TechnologyMature Technology 21,000 Projects Operating Worldwide21,000 Projects Operating Worldwide 3 Billion Gallons Per Day of Production3 Billion Gallons Per Day of Production Serving All Conceivable UsesServing All Conceivable Uses
Environmentally Responsible SolutionEnvironmentally Responsible Solution
Recent Reductions in CostRecent Reductions in Cost
Affordable Water Supply OptionAffordable Water Supply Option
Why Now?Why Now?
Significant reductions in the cost:Significant reductions in the cost:
Technology improvementsTechnology improvements
Use of existing infrastructureUse of existing infrastructure
Increased productionIncreased productionefficiencyefficiency
Economies of scaleEconomies of scale
Improved energy efficiencyImproved energy efficiency
% Increase in Productivity
Reverse osmosismembrane andpressure vessel
manufactured inSan Diego County
Market DriversMarket Drivers
IncreasedIncreasedDemandDemand
EconomicEconomicDevelopmentDevelopment
WaterWaterQualityQuality
ReliabilityReliability
Carlsbad SeawaterCarlsbad SeawaterDesalination ProjectDesalination Project
High ( 250High ( 250 –– 350 mg/L350 mg/LTDS )TDS )
Quality:Quality:
DroughtDrought--Proof SupplyProof SupplyRedundant CapacityRedundant Capacity
Reliability:Reliability:
Not to Exceed ImportedNot to Exceed ImportedWater Cost Plus MWDWater Cost Plus MWDIncentiveIncentive
Price:Price:
50 MGD ( 56,000 AFY )50 MGD ( 56,000 AFY )constructed in one orconstructed in one ormore phasesmore phases
Quantity:Quantity:
OnOn--Line 2008Line 2008Schedule:Schedule:
$270 Million$270 MillionEstimatedEstimatedCost:Cost:
6060--Year Lease WithYear Lease WithCabrillo PowerCabrillo Power
Site:Site:
San Diego CountySan Diego County –– CityCityof Carlsbadof Carlsbad
Location:Location:
Encina Power Plantin Carlsbad, California
EXISTING SITE CONDITIONS
PROPOSED DESALINATION FACILITY AT ENCINA POWER STATION
Carlsbad Desalination ProjectCarlsbad Desalination ProjectBefore & After SimulationBefore & After Simulation
Outfall
Intake
Mouth of Lagoon
Carlsbad Desalination 50 MGDCarlsbad Desalination 50 MGDProject SimulationProject Simulation
Desal Plant ConfigurationDesal Plant Configuration
What Happens to the Salt?What Happens to the Salt?
Demonstration PlantDemonstration Plant
La Costa Reservoir
Santa Fe II Reservoir
TAP Reservoir
San Francisco Peak Reservoir
Maerkle Reservoir
Guajome Reservoir
CarlsbadPlant
Morro Hills Reservoir
LEGENDAgency Boundary
Existing Pipeline
Poseidon Pipeline
SDCWA Pipeline
Desalination Facility
Existing Reservoirs
Available SupplyAvailable Supply
Plant Capacity 56,000 AFYPlant Capacity 56,000 AFY
Existing CommitmentsExisting Commitments Carlsbad MWD 21,000 AFY Water Purchase AgreementCarlsbad MWD 21,000 AFY Water Purchase Agreement Valley Center MWD 7,500 AFY Water PurchaseValley Center MWD 7,500 AFY Water Purchase
AgreementAgreement Rincon Del Diablo MWD 7,700 AFY Letter of IntentRincon Del Diablo MWD 7,700 AFY Letter of Intent Olivenhain MWD 5,000Olivenhain MWD 5,000--17,000 AFY Letter of Intent17,000 AFY Letter of Intent
Available SupplyAvailable Supply –– Up to 14,800 AFYUp to 14,800 AFY
Water Purchase AgreementWater Purchase Agreement
Poseidon provides Purchasers with a specified quantity, qualityPoseidon provides Purchasers with a specified quantity, quality andandreliability of supply.reliability of supply.
The water would be treated as independentlyThe water would be treated as independently--owned, local water.owned, local water.
Purchaser eligible to receive a backPurchaser eligible to receive a back--up supply on terms generallyup supply on terms generallyavailable to SDCWA member agencies.available to SDCWA member agencies.
Poseidon would assume the risk of development, permitting,Poseidon would assume the risk of development, permitting,financing, construction and operation of the project.financing, construction and operation of the project.
Purchasers would only pay for water that is delivered in accordaPurchasers would only pay for water that is delivered in accordancencewith predetermined specificationswith predetermined specifications –– Quantity, Quality, Reliability etc.Quantity, Quality, Reliability etc.
Ratepayers protected by longRatepayers protected by long--term, fixed price water purchaseterm, fixed price water purchaseagreement.agreement.
Addresses Key Coastal IssuesAddresses Key Coastal Issues
Economically Feasible and Environmentally ResponsibleEconomically Feasible and Environmentally ResponsibleSolutionSolution Cost of Water Never More Than That of ImportedCost of Water Never More Than That of Imported
WaterWater Complements Conservation and Recycling ProgramsComplements Conservation and Recycling Programs Minimizes Intake EntrainmentMinimizes Intake Entrainment Sustains Biological Productivity in the Discharge AreaSustains Biological Productivity in the Discharge Area Maintains, Enhances & Restores Water QualityMaintains, Enhances & Restores Water Quality
Public Trust Aspects of Ocean Resources PreservedPublic Trust Aspects of Ocean Resources Preserved Advanced Through Local / Regional CoordinationAdvanced Through Local / Regional Coordination Does Not Result in Increased GrowthDoes Not Result in Increased Growth Enhances Public Access to Coastal ResourcesEnhances Public Access to Coastal Resources Preserves Existing GovernmentalPreserves Existing Governmental Regulatory OversightRegulatory Oversight
Project BenefitsProject Benefits
Entirely New DroughtEntirely New Drought--Proof Water SupplyProof Water Supply
Reduced Pressure on SacramentoReduced Pressure on Sacramento--San Joaquin DeltaSan Joaquin Delta
Improved Water QualityImproved Water Quality
Affordable and Predictable PriceAffordable and Predictable Price Increased Revenue to the City and RedevelopmentIncreased Revenue to the City and Redevelopment
AgencyAgency
Dedication of Lagoon and Ocean Front Property forDedication of Lagoon and Ocean Front Property forPublic Access, Recreation and Marine ResearchPublic Access, Recreation and Marine Research
Environmentally Sensitive SolutionEnvironmentally Sensitive Solution
Strong Public SupportStrong Public Support