carl arboit - becker mining
TRANSCRIPT
Performance. Know-how. Reliability.
CASE STUDY | Longwall Electrics: lessons
learned from the commissioning of a
$20million longwall electrical system
Carl Arboit
Chief Technology Officer
Becker Mining Australia
2
Agenda
Mine Electrical Project outlook
Innovative features and technology applications
Increasing coal output and reducing maintenance time
Challenges
The Change Management process required for Becker Equipment
3
Longwall Overview
2200 Tonne/hr, 120Hrs/wk
>10M Tonne/yr
>98.9% Performance Guarantee
Installed kW’s- 9300kW
AFC Motors- 3x 1200kW
300m – 400m Face
4
Becker Supply
7.5MVA Water Cooled Substations [x2]
10 Outlet Distribution and Control Boxes (DCB) [x2]
Control and Monitoring Enclosures (CME) at BSL, MG and TG [x2]
Signalline, Voicecom and Automation System
PRS Power Supply units- Exe Enclosures [x187]
LED Lighting [x350]
Associated cabling – Power and Control
Compatibility, Minibuild and Commissioning Activities
5
Becker Design Phase
Review of conventional control and switchgear against Becker
traditional products
Innovative Features
Compact and modular design
Longwall layout
Plug and Play
6
Innovative Features- decreasing maintenance
time and increasing coal output
Boltless door technology
Integrated Circuit Breaker and Protection
into a removal module- plug and play
HV Earthing (3.3kV)- integrated earth
facility without unplugging equipment-
Time, Safety, Cost savings
Statutory Tests- Group Earth Leakage
Test. No individual testing. Functional
safety backed
7
Compact and modular design
Substation and DCB common
design- commonality of parts
Equipment inherently narrow-
monorail mounted capability
Longwall Substation water cooled
(AFWF)- Similar footprint to a
4.5MVA ANAN
8
Compact and modular design (cont)
Services cut-through ambient operating temperature lower
Equipment life extended and reliability improved
9
Longwall layout
Conventional Layout- substation 800m from face
Voltage drop
Large expensive cables
Australian accepted design
Inbye Substation- Monorail / BSL mounted
Less cable complexity
Voltage improvement- increase Torque
Split power system- 2 substations
Proven design layout- installed at 100 mines
10
Plug and Play
Control and Switchgear interconnected by standard plug and
socket technology
Seamless integration of control, switchgear and safety systems
Minimisation of overall products
Reduction of Longwall move time
Simple connectorised system reduces complexity and removes
the need for a highly skilled workforce.
Interlinks with Maintenance and Fault finding capabilities
11
Challenges
Workforce Familiarity
Becker Personnel upskilling
Remote Location
Quality Control
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Tonnes
Actual Forecast variance Average
12
Workforce Familiarity
Becker equipment not the norm
Initial intrigue, followed by negativity for the
difference in look and feel
Training and extra service support key to
changing the mindset
Provide intuitive operating screens
Equipment robustness and reliability
provides confidence
Followed by coal output
13
Becker Personnel Upskilling
First of its kind for Australia
Intercompany upskilling- Knowledge share with oversea sister
companies
Direct links with OEM for key issues during tendering, design and
commissioning activities
14
Remote Location
Difficult to man with all skill sets for extended durations
Software Engineers- Remote access
Transport Damage
Service and Support- Onsite and Offsite
SCADA and OEM Software Interfaces
15
Quality Control
Substation Hot Joint during Minibuild activities
Loose bolt on cable attachment- Bolt tension marks intact
Actions as a result of the failure- Minibuild / Commissioning
additional actions
Bolt tension checks
Cable security checks
Workshop Quality control review
Customer Confidence- Arc fault contained
16
Quality Control
Substation Hot Joint- Additional Photos
Substation now in production
know-how | performance | reliability