CARBONES SURAMERICANOS S.A. (CSA)
“An emerging Coking Coal Exporter from Colombia”
Present Operation and Expansion Projects
www.csa.com.co
Contents
Who we areWho we are
Coking Coal Present OperationCoking Coal Present Operation
Projects: - Cartagena Port ExpansionProjects: - Cartagena Port Expansion
- Greenfield Areas - Greenfield Areas
- Met Coke Project - Met Coke Project
Who We AreWho We Are
Privately held independent Colombian co. established in 2004 by experienced coal industry leaders and run by a management team with a proven track record.
Alvaro AlegriaAlvaro Alegria ex Commercial V. P. Exxon/Cerrejon (+30 years)ex Commercial V. P. Exxon/Cerrejon (+30 years)
Alvaro BoomAlvaro Boom ex Administrative V.P. Exxon/Cerrejon (+15 ex Administrative V.P. Exxon/Cerrejon (+15 years)years)
Alvaro BustamanteAlvaro Bustamante Banking & FinanceBanking & Finance
Alfredo Gonzalez-RubioAlfredo Gonzalez-Rubio ex President Carbones del Caribe/Argos ex President Carbones del Caribe/Argos (largest (largest Colombian coal producer) (30 Colombian coal producer) (30 years)years)
David NassarDavid Nassar Ex Mine Operator ( Contractor) – Carbones del Ex Mine Operator ( Contractor) – Carbones del Caribe Caribe (20 Years).(20 Years).
Jose J. GarciaJose J. Garcia Ex Carbones Del Caribe/Argos Sales Director 4.5 Ex Carbones Del Caribe/Argos Sales Director 4.5 Mmt/year PCI, Sized & thermal coals (18 Mmt/year PCI, Sized & thermal coals (18
years)years)
Norte Santander
Boyacá
Cundinamarca
Bogotá (Office)
Present Coking Coal Mines and Maritime Ports
Cartagena
Buenaventura
Barranquilla (Main Office)
Snapshot (actual coal operation)Snapshot (actual coal operation)
100 employees100 employees 9 administrative9 administrative 64 mine + 4 mine support64 mine + 4 mine support 18 at stockyards18 at stockyards 5 port supervisors5 port supervisors
Offices Offices Barranquilla (Main Office)Barranquilla (Main Office) BogotáBogotá UbateUbate
Underground mine Underground mine (Cundinamarca)(Cundinamarca)
14 Stockyards14 Stockyards 9 Cundinamarca9 Cundinamarca 2 Boyaca2 Boyaca 3 Norte Santander3 Norte Santander
Coal SuppliersCoal Suppliers CundinamarcaCundinamarca BoyacáBoyacá Norte SantanderNorte Santander
2 Quality Control Labs2 Quality Control Labs CundinamarcaCundinamarca BoyacáBoyacá Independent internationally recognized at Independent internationally recognized at
portsports
Loading PortsLoading Ports Cartagena (Atlantic Ocean)Cartagena (Atlantic Ocean) Buenaventura (Pacific Ocean)Buenaventura (Pacific Ocean)
Snapshot II (actual coal operation)Snapshot II (actual coal operation)
Bella Estancia Mine
•Low, Med and High volatile coking coals
•Two inclines (shafts)
•Production 4,000mt/month
Coking Coal Specification
Medium VolatileMedium Volatile
(As per ASTM Standards In Dry Basis except moisture)(As per ASTM Standards In Dry Basis except moisture)
Total Moisture Total Moisture %% 8.0 8.0 Ash Ash %% 9.5 9.5 Volatiles Volatiles %% 27.027.0 Fixed CarbonFixed Carbon %% 63.563.5 SulphurSulphur % % 0.9 0.9
F. S. I.F. S. I. 7.0 7.0 PhosphorusPhosphorus 0.035 0.035 Alkali in Ash(Na2O+K2O)Alkali in Ash(Na2O+K2O) %% 1.8 1.8 Maximum FluidityMaximum Fluidity ddpmddpm + 700+ 700 Arnu max DilatationArnu max Dilatation % + 60% + 60
CARTAGENA PORT(Atlantic Ocean)
•Draft 11.2 meters BW•Draft 2012 12.5 meters BW•Stock area 40 hectares•Load rate 9,000/day SHINC•Load rate 2012 25,000/day
Present Coking Coal & Metcoke OperationPresent Coking Coal & Metcoke Operation
All-encompassing operation from mine production to FOB or C&F customer´s port.
End users are major steel mills in Mexico, Brazil, Turkey, Poland, Croatia, China & Ukraine.
Volumes and Revenues continue to grow.
Unloading of trucks by hydraulic platforms to conveyor belts.Unloading of trucks by hydraulic platforms to conveyor belts.
Discharge of river barges to conveyor belts.Discharge of river barges to conveyor belts.
Stacker and portal reclaimer supplied by FAM of Germany.Stacker and portal reclaimer supplied by FAM of Germany.
Capability for unloading trucks or barges and loading vessels Capability for unloading trucks or barges and loading vessels simultaneously.simultaneously.
Automatic sampler and magnet in conveyor system.Automatic sampler and magnet in conveyor system.
Exclusive berth for coal and coke loading. Exclusive berth for coal and coke loading.
Operations commence June, 2012.Operations commence June, 2012.
Cartagena Port DescriptionCartagena Port Description
Truck unloading capacity of 12,600 mt/day with 3 platforms; Truck unloading capacity of 12,600 mt/day with 3 platforms;
6 trucks/platform/hour (expandable). Additional platform for coke.6 trucks/platform/hour (expandable). Additional platform for coke.
Coal loading rate of min. 25,000 mt/day SHINC for gearless and panamax Coal loading rate of min. 25,000 mt/day SHINC for gearless and panamax vessels.vessels.
Coke loading rate of min. 12,000 mt/day SHINC with Coke loading rate of min. 12,000 mt/day SHINC with Cleveland Cascade soft Cleveland Cascade soft loadingloading..
Permissible sailing draft of 12.5 meters with projected draft of 14 meters.Permissible sailing draft of 12.5 meters with projected draft of 14 meters.
Additional sampling of coal and coke at port arrival.Additional sampling of coal and coke at port arrival.
Cartagena Port DescriptionCartagena Port Description
Greenfield Areas / Potential Coal Reserves
Location Number of Areas
Area (hectares)
BOYACÁ 7 10,180
ANTIOQUIA 2 11,254
TOLIMA 1 696
SANTANDER 4 12,957
TOTAL 14 35,087
Areas Assigned For Exploration
Met Coke Project Profile
•Plant Type: Sole mechanical non recovery.
•Location: 80 km North of Bogotá, Colombia.
•Scope 54 ovens in two batteries
•Production: 175,000mt of coke per year
• Markets: Steel and ferro alloy industries in U.S.A., Mexico, Brazil, Canada, Argentina, Peru, Europe and Asia.
• Raw Material Source: coking coal from own, associated and third party mines within 50 km of plant location (Boyacá and Cundinamarca).
• Logistics: Coke to be transported with same trucks and exported through same ports being used today by the coking coal operation.
Coke Project Key Figures
PLANT SIZE 54 ovens in 2
Batteries
Internal Oven dimensions Height 1.61 m (coal)
Length 11.31 m
Width 3.12 m
Construction time 15 months
CAPEX (USD$) $26 million
Coal requirements per month (mt) 20,854
Coke to coal ratio (conservative) 0.7
Terrain Size 17 hectares
Environmental & Operation Permits Approved
Annual coke production (mt) 175,000