carbon steel stainless steel

4
INGENIEURTECHNIK www. jpm-gmbh.de Carbon Steel Stainless Steel We are your partner for planning, construction and repair of tanks and plants. | Engineering | Manufacturing | Construction | Reconstruction | Maintenance | Repair TANKS

Upload: vuliem

Post on 11-Feb-2017

255 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Carbon Steel Stainless Steel

INGENIEURTECHNIK

www. jpm-gmbh.de

Carbon SteelStainless SteelWe are your partner for planning, construction

and repair of tanks and plants.

| Engineering| Manufacturing| Construction| Reconstruction| Maintenance| Repair

TANKS

Page 2: Carbon Steel Stainless Steel

www. jpm-gmbh.de

Experience Continuity

Work Areas

was established in 1970 by Mr. Jan-Peter Meyer in Henstedt-

Ulzburg. The first contracts were received for planning and construction of

tanks from major customers within the fields of oil, gas and petro chemical

industry. These assignments were the foundation for the continued expan-

sion of the company’s customer base and range of services.

is a family owned powerful enterprise. Through our professional

organization and very flexible approach, we are able to meet your specific

requirements within the fields of engineering and construction of storage

tanks and plants. Our motivated team of engineers, technicians and desig-

ners will customize your projects according to your demands for storage of

liquids, gases and solids. The construction work on your site will be carried

out by our experienced construction managers, certified welders and as-

semblers.

Fixed-Roof Tanks ▪ Cup Tanks

▪ Double Bottom

▪ Steel-Internal Floating Roofs

The welding techniques applied at our construction sites correspond to sta-

te-of-the-art technique, and are pioneering when it comes to the construc-

tion of large storage tanks. To us, it is a given that we use certified WPQR’s

for the different materials, plate thicknesses and welding positions.

It is one of our daily tasks to ensure that we adhere to the strictest safety re-

quirements. We are environmentally and quality conscious, and apply these

characteristics at the construction sites in order to ensure that we adhere to

the given schedules.

Many years of experience, extensive knowledge, in-house developments

and patents, as well as numerous company approvals (e.g. DIN 18800, ISO

9001, WHG, SCC, DIBt, etc.) make up the foundation of our work.

Floating Roof Tanks ▪ Pontoon Floating Roofs

▪ Double Deck Floating Roofs

▪ Floating Roof Sealings SWING

Gas Holders ▪ Diving Bell Gas Holders

▪ Membrane Gas Holders

▪ Dry Gas Holders

ALU-Dome

Reconstruction and Tanklif-ting ▪ Bottom, Shell, Roof

▪ Tank Lifting

▪ Upgrading

▪ Retrofitting

Floating Roof Sealing ▪ Primary Sealing SWING I & II

▪ Secondary Sealing DOUBLE SWING

▪ Tertiary Sealing TERTIAER SWING

▪ Wax Scraper SUPER SWING

Devices and Pressure Vessels ▪ Earth-covered Pressure Gas

Holders

▪ Columns

▪ Reactors

Silos ▪ Sugar Silos

▪ Steel Pellet Silos

▪ Sulphur Pellet Silos

Page 3: Carbon Steel Stainless Steel

www. jpm-gmbh.de

Turnkey Projects

Start of Operation

Tests and Acceptance

HSE-Management

Quality ControlConsultingDesignPlanning

Static Calculations

FEM Analysis

Construction Drawings

Procurement

ManufacturingDelivery

Construction

Patents

General Construction Approvals

Welding Technique

Quality Adherence to Schedules

New construction of a tank farm with 21 tanks, storage capacity from 24.500m³ to 43.000m³, equipped with steel cup and internal floating roof.

Page 4: Carbon Steel Stainless Steel

Cryogenic Tanks • Pressure Vessels • Planning • Design • Calculation • CAD • 3DFixed Roof Tanks • Devices • Floating Roof Tanks • Consulting • Floating Roof SealingService • Environmental Protection • Cup Tanks • Double Bottom • Internal Floating RoofDouble Wall Tanks • Leakage Detection • Steel Construction • Dividing Bell Gas Holders • SCCPiping • ALU-Dome • Silos • Columns • Turnkey Projects • Tank Lifting • Tank MovingReconstruction • Expertise • Welding Technology • Quality Control • EngineeringManufacturing • Secondary SealingPrimary Sealing

INGENIEURTECHNIK GMBH

Heideweg 2

24558 Henstedt-Ulzburg, Germany

Tel.: +49 (0) 4193/905-0

Fax: +49 (0) 4193/905-50

E-Mail: [email protected]

Web: www. jpm-gmbh.de

Our Performance

Stress analysis are calculated and documented in a reliable manner

using FEM-Software.

The Team

has the necessary approvals at its disposal:

ISO 9001, DIN 4119, DIN 18800, SCC, WHG, FDBR, TÜV,

WPQRs, Welding Certificates, etc.

We work with the latest IT-Systems in order to live up to the requirements

of our customers.