caps risk assessments, monitoring & documentation · 2 agenda case manager’s role in risk...

61
1 CAPS Risk Assessments, Monitoring & Documentation Presented by: Suzy Quinlan

Upload: lykhanh

Post on 11-Nov-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

1

CAPS Risk Assessments,Monitoring & Documentation

Presented by: Suzy Quinlan

Page 2: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

2

AGENDACase Manager’s Role in Risk Management

Continuous Risk Intervention Services

Risk Process

Monitoring Requirements

CAPS Upgrade of Risks

Risk Assessment Worksheet and Guidelines

Contact Information

Page 3: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

3

Case Manager’s Role in Risk MgmtIdentify individuals at riskIdentify what risk factors the individual hasWork with individual to eliminate or minimize the risksMonitor & continue to offer options over time, to assist the individual in evaluating risks and developing a plan

Page 4: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

4

Continuous Risk Intervention Services

Assessing and identifying risksWork with individual to eliminate or reduce risksDevelop and Implement PlansMonitoring risks over timeMake adjustments to Service Plan as neededDocumenting risks in the RISK section of CAPS

Page 5: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

5

Risks that cannot be mitigated

Continue periodic monitoring

Continue to offer interventions and

solutions to minimize the risk

Discuss the risks with the individual

Page 6: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

6

CAPS Risks Plan/Comments

Document the overall risk level and the monitoring plan for the clientEg, the overall risk is high and the monitoring plan is monthly in-person or phone contact (assessed as high risk in 3 areas)

Identify risks needing clarification

If no Risk Reducing Factor or additional info is needed, identify how each risk is or is not going to be resolved

Explain solutions offered to minimize the risk

Document the individual’s ability to understand and accept or decline any plan or intervention

Enter the name, address & phone number of person that is assisting with the risk and how this person will assist the individual

Plan/Comments is used for CAPS2 Emergency Concerns Report – next slide

Page 7: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

7

CAPS2Emergency Concerns Report

High Risk Level for Power Outage or Natural Disaster/Extreme Weather

Develop contingency plans for in-home plans

CBC or nursing Facilities are responsible to

develop contingency plans for emergencies

Document in the CAPS Risks Plan/Comments

Page 8: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

8

Page 9: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

9

Monitoring RequirementsMonitoring contacts must be documented in the OACCESS narrative.

Use “Monitoring” as the 1st word in the narrative and then explain the contact information

1. All client must have at least 2 contact per year:This is clients with NO HIGH risk levels

2. Clients with 3 or more High risk categories:Must have contact at least monthly

3. Clients with 1 or 2 High risk categories:Must have contact at least quarterly

Page 10: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

10

CAPS Upgrade of Risks

Page 11: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

11

CAPS Upgrade of RisksNew risk assessment process required for new CAPS and re-assessments completed 7-16-12 or later

All Client Details are required for all service types

Cannot create in-home service benefit/plans unless the Risk Assessment is completed for:

APD In-homeICP

Spousal Pay

Page 12: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

12

Order for completing sections of CAPS

1st Complete the SPL Client Assessment2nd Complete the Risk Assessment3rd Complete the Service Plan4th Modify completed Risk Assessment if

necessary

Page 13: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

13

Page 14: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

14

Page 15: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

15

Risk Levels

Every Risk must have a Risk Level selected

andAt least one Risk Reducing Factor selected

Note: Risk Level of NONE will auto-select the Risk Reducing Factor of None/Not at Risk

Page 16: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

16

Page 17: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

17

Page 18: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

18

Page 19: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

19

Page 20: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

20

Page 21: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

21

Risk Assessment Worksheet and Guidelines

Page 22: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

22

Page 23: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

23

Level of RisksH - High RiskM - Moderate RiskL - Low RiskN - No Risk

Page 24: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

24

22 Risk Reducing Factors

Page 25: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

25

Page 26: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

26

Risk Level Descriptions

Page 27: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

27

Risk Level Descriptions

Page 28: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

28

Risk Level Descriptions

Page 29: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

29

Power OutageHigh Risk

No alternative heat source and impacts the life and safety of the personDependent on consistent power and no back-up planSelect “High” risk to pull to the Emergency Concerns report

Page 30: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

30

Power Outage – continued….

Moderate Risk No alternative heat source and impacts the life and safety of the person

Can manage without power for up to 3 daysAfter 3 days will need intervention

Page 31: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

31

Power Outage – continued….

Low Risk No alternative heat source and impacts the life and safety of the person

Has an emergency preparedness plan orSupports in place

Page 32: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

32

Power Outage – continued….

No Risk No alternative heat source and impacts the life and safety of the person

Has an emergency preparedness plan andSupports in place

Page 33: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

33

Natural Disaster – Extreme Weather

High Risk No plan in place andDependent on others to evacuate or vacate andNo support availableSelect “High” risk to pull to the Emergency Concerns report

Page 34: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

34

Natural Disaster – Extreme Weather

Moderate Risk Has plan in place andDependent on others to evacuate or vacate andSupports not immediately available

Page 35: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

35

Natural Disaster – Extreme Weather

Low Risk Has plan in place andDependent on others to evacuate or vacate andSupports are immediately available

Page 36: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

36

Natural Disaster – Extreme Weather

No Risk Has plan in place andAre able to evacuate or vacate without supports

Page 37: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

37

Physical FunctioningHigh Risk

Has a progressive debilitating condition orHas a permanent impairment and Is incapable of most or all ADLs andHas no supports or inadequate supports available

Page 38: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

38

Physical Functioning – continued….

Moderate Risk Similar to high risk, but with less physical changes

Has a progressive debilitating condition orHas a permanent impairment and Is incapable of most ADLs andHas no supports or inadequate supports available

Page 39: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

39

Physical Functioning – continued….

Low RiskMinimal physical challenges

No RiskNo physical challenges

Page 40: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

40

Mental & Emotional FunctioningHigh Risk

Mental/Emotional functioning severely impacts health and safety issues of the client or others

Moderate Risk Similar to high risk, but doesn’t impact the health and safety of the client or others as “severely” as high risk

Page 41: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

41

Mental & Emotional FunctioningLow Risk

Mental/emotional functioning may result in “limited” health & safety issues that are reduced through intervention

No Risk No apparent mental or emotional challenges

Page 42: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

42

Cognitive FunctioningHigh Risk

ConfusionDisoriented to person, place or timeUnable to make decisionsForgets to do things that meet their basic need, such as food, shelter and clothing

Page 43: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

43

Cognitive FunctioningModerate Risk

Periodic confusionImpaired reasoning abilityMakes decisions with assistancePeriodic forgetfulness that over time negatively impacts basic needs

Page 44: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

44

Cognitive FunctioningLow Risk

Mild forgetfulnessCan meet their basic needs

No RiskNo apparent Cognitive impairmentNo confusion

Page 45: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

45

Behavioral Issues

High Risk Severe problem behaviors that place individual at risk

Moderate RiskModerate problem behaviors

Page 46: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

46

Behavioral Issues

Low Risk Minor problem behaviors

No Risk No problem behaviors

Page 47: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

47

Income/Financial IssuesHigh Risk

Unable or unwilling to provide for life’s necessities

Moderate Risk Barely able to provide for life’s necessitiesSometimes must choose between necessities

Page 48: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

48

Income/Financial IssuesLow Risk

Adequate income for necessities only

No Risk Adequate income for necessitiesFinancially independent

Page 49: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

49

Safety/Cleanliness of Residence/Fac…

High Risk Residence poses problems that place the individual at immediate high risk, such as no heat or water, caved-in ceilingEviction in progress

Moderate Risk Safety or cleanliness poses a degree of risk

Page 50: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

50

Safety/Cleanliness of Residence/Fac..

Low RiskOngoing minor maintenance &/or cleanliness issuesMay have threat of eviction

No RiskNo apparent safety or cleanliness risks

Page 51: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

51

Service plan meets Physical/Medical needs

High Risk Client has unmet critical physical and medical needs

Moderate RiskService plan fails to meet some medical or physical needs

Page 52: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

52

Service plan meets Physical/Medical needs

Low Risk Some minor or occasional issues with service provisions, but client’s basic medical/physical needs are met

No Risk Service plan meets all of client’s medical and physical needs

Page 53: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

53

Service Plan meets Mental/Emotional/Behavior Needs

High RiskAt serious or imminent risk due to inadequacy of in-home or facility care/services meeting critical emotional/behavioral needs or problems

Moderate RiskService plan fails to meet some of client’s mental, emotional or behavioral needs, but risk to client’s health is not serious or imminent

Page 54: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

54

Service Plan meets Mental/Emotional/Behavior Needs

Low Risk Some minor or occasional issues with service provisions, but client’s basic mental/ emotional/behavioral needs are met

No Risk Service plan meets all mental/emotional/ behavioral needs

Page 55: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

55

Adequacy and Availability of Natural Support

High Risk Family, friends or other supports interfere with client’s needs being met or are not involved at all

Moderate RiskFamily, friends or other supports are unreliable

Page 56: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

56

Adequacy and Availability of Natural Support

Low Risk Family, friends or other supports are concerned but provide only limited assistance

No Risk Family, friends or other supports are actively involved to assist, and client accepts assistance

Page 57: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

57

Access to Care and ServicesHigh Risk

Has significant medical and/or mental health needs but access to care and/or services is unavailable

Moderate Risk Has medical and/or mental health needs but has limited access to care and/or services

Page 58: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

58

Access to Care and Services

Low RiskAbility to access care and/or services system is occasionally problematic

No RiskHas unimpeded access to services

Page 59: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

59

Other – Identify in Plan

High Risk Does not understand the risk and refuses interventionOther high risk factors

Moderate Risk Understands the risk & refuses interventionOther moderate risk factors

Page 60: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

60

Other – Identify in Plan

Low Risk Accepts needed services and interventionOther low risk factors

No Risk Needs no intervention

Page 61: CAPS Risk Assessments, Monitoring & Documentation · 2 AGENDA Case Manager’s Role in Risk Management Continuous Risk Intervention Services Risk Process Monitoring Requirements CAPS

61

Contact Information

Suzy Quinlan (503) 947-5189

Jenny Cokeley (503) 945-6985

Darwin Frankenhoff (503) 947-5162

Kelsey Weigel (503) 945-6413