capital investment plancip adoption resolution sylhet city corporation 2015- 2019 ... is a major...
TRANSCRIPT
CAPITAL INVESTMENT PLAN
2015-2019 S Y L H E T C I T Y C O R P O R A T I O N , S Y L H E T
CIP ADOPTION RESOLUTION Sylhet City Corporation
2015- 2019
RESOLUTION
Five year Capital Investment Plan for Administrative Agreement 2015-2019 was adopted in the general meeting of Sylhet City Corporation held on 5th January 2016.
Motion Carried
I certify that the above resolution of the council was adopted in regular session held on 5th January 2016.
(SEAL) _______________________
MAYOR
Sylhet City Corporation
Executive Summary City Vision Statement: Planned Green City, City Of Tourism, Traffic Congestion-free, Neat And Clean City, A Healthy Clean And Green city, Clean And Specious City. CIP Financing Summary
CIP Financing Plan
Year 1 (2014-15)
Year 2 (2015-16)
Year 3 (2016-17)
Year 4 (2017-18)
Year 5 (2018-19)
CIP investment cost 874.00 10020.34 19590.82 9441.82 3377.95 Available Revenue 1848.00 2030.00 3666.00 3848.00 2394.00 Unfunded Difference -974.00 7990.34 15924.82 5593.82 983.95 Total 874.00 10020.34 19590.82 9441.82 3377.95
CIP Projects by Sector and Source of Finance
Sector ADP Own Source Revenue
Project Funds (Donor)
PPP Donations Others Total percentage
Road Network 7082.09 16.33665% Drainage Network 15100.00 34.83206% Retaining Wall 1640.50 3.784233% Walkway/Footpath 638.32 1.472448% Beautification 100.00 0.230676% Fly over 2550.00 5.882227% Dumping Ground 3485.00 8.039043% Recreation 7000.00 16.14729% Graveyard/Shoshan 409.00 0.943463% Pipeline 2400.00 5.536213% Tube well 2000.00 4.613511% Chara Cleaning 580.00 1.337918% Culvert 320.00 0.738162% Total 43304.93 100.00%
Table of Content Index No. Page No.
1 Introduction To ULB 1
1.1 ULB Profile 2
1.2 ULB MAP 3
2 Development Context 4
2.1 Geography 4
2.2 History 4
2.3 Economy (activities/drivers) 5
3 Vision 5
4 Problems Identified 6
5 Proposed Capital Investment Plan 6-16
6 Implementation of the CIP 17-24
6.1 Multi-year Implementation Plan 17-24
6.2 CIP Projects by Sector and Source of Finance 25
6.3 CIP Financing Capacity 25
ANNEX 1: City Visioning Exercise 26-28
Problem-mapping 28-29
Proposed MGSP Priority List 30
ANNEX 2: City Financial Profile 31
ANNEX 3: Sub-Project Request Form: [Name of the Sub-Project] 32-34
ANNEX 4: CIP Adoption Resolution and meeting minutes 35-
1
Capital Investment Plan S Y L H E T C I T Y C O R P O R A T I O N , S Y L H E T
1..Introduction To ULB
The local institution is running from the period of British government. Sylhet municipal board established in 1867. At 9th April 2001 the municipal corporation improved as City Corporation. Sylhet , is a major city in north-eastern Bangladesh. It is the capital of Sylhet Division and Sylhet District, and was granted metropolitan city status in March 2009. Sylhet is located on the banks of the Surma river and is surrounded by the Jaintia, Khasia and Tripura hills.
The city has a high population density, with nearly 900,000 people. It is one of the largest cities in Bangladesh. The Sylhet region is well known for its tea gardens and tropical forests, the city however is currently known for its business boom being one of the richest cities in Bangladesh, with new investments of hotels, shopping malls and luxury housing estates, brought mainly by emigrated living in the United Kingdom.
Sylhet consists of 27 wards and 210 mahallas, and has a total area of 26.50 km². During the colonial period, Sylhet experienced rapid growth and expansion of the city. In 1878, Sylhet Municipality was established, it had an area of 10.49 sq km with 5 wards (until 1995) and then 15 wards (in 1996). Sylhet was changed to a city corporation from a municipal board in 2001, and currently the city is administrated by the Sylhet City Corporation. At present, Sylhet is the district-headquarters as well as the divisional headquarters of the districts of Sunamganj, Habibganj, Maulvi Bazar and Sylhet District. The Sylhet City Corporation is responsible for the services that are provided within the city which includes traffic, roads, garbage collection, water supply, registrations and many others. The corporation consists of the Mayor and 36 other Councilors, and focuses on the development of the city.
Capital Investment Plan
2
1.1. ULB Profile
Administrative land area (sq.m.) 26.50sqm
Total population (year) 9.70 lakh
Population density 36603.77 ppa
Average population growth rate 1.73%
Literacy rate 73%
% of households with access to piped water 25%
Number of Wards 27
Major economic activities (percentage)
a) Primary (agriculture, fishery, forestry) 8.33%
b) Secondary (manufacturing, processing) 25.19%
c) Tertiary (services, banking, wholesale and retail)
66.48%
Average annual budget of the ULB 325,00,00,000.00
Average revenue income of the ULB 34,77,70,255.00
3
1.2. ULB MAP
Map of Sylhet City Corporation
Capital Investment Plan
4
1. Development Context
1.1. Geography
Sylhet city is located at 24.8917°N and 91.8833°E in the north eastern region of Bangladesh within the Sylhet Division, within the Sylhet District and Sylhet Sadar Upazila. The climate of Sylhet is tropical monsoon with a predominantly hot and humid summer and a relatively cool winter. The city is within the monsoon climatic zone, with annual average highest temperatures of 23°C (Aug-Oct) and average lowest temperature of 7°C (Jan). Nearly 80% of the annual average rainfall of 3,334 mm occurs between May and September. The city is located within the region where there are hills and basins which constitute one of the most distinctive regions in Bangladesh. The physiography of Sylhet comprises mainly of hill soils, encompassing a few large depressions known locally as "beels" which can be mainly classified as oxbow lakes, caused by tectonic subsidence primarily during the earthquake of 1762. It is flanked by the Indian states of the Meghalaya in the north, Assam in the east, Tripura in the south and the Bangladesh districts of Netrokona, Kishoregonj and Brahmanbaria in the west. The area covered by Sylhet Division is 12,569 km², which is about 8% of the total land area of Bangladesh.
Geologically, the region is complex having diverse sacrificial geomorphology; high topography of Plio-Miocene age such as Khasi and Jaintia hills and small hillocks along the border. At the centre there is a vast low laying flood plain of recent origin with saucer shaped depressions, locally called Haors. Haors, also known as the Sylhet basin, are a wetland ecosystem, which is a natural bowl-shaped depression and mainly can be found in the Sylhet region, in particular also in Sylhet Sadar. Available limestone deposits in different parts of the region suggest that the whole area was under the ocean in the Oligo-Miocene. In the last 150 years three major earthquakes hit the city, at a magnitude of at least 7.5 on the Richter Scale, the last one took place in 1918, although many people are unaware that Sylhet lies on the earthquake prone zone of Bangladesh.
1.2. History
Sylhet Pourashva was established in the year 1878. Sylhet City Corporation has been upgraded from Sylhet Pourashva in 2002. Its area is 26.50 sqkm and population is almost 1.00 million. Sylhet City is called the spiritual capital of Bangladesh. It is also known as Holy City as the shrines of two great saints Hazrat Shahjalal (Rh:) and Hazar Shah Poran (Rh:) are located in this city. There is also more than 3 hundred mazars of different islami saints in this city. So this city is called as land of 360 Awlia (Saints).
There are two public universities and many other government and non government academic institutions in this city including one govt. medical college and one cadet college. The river Surma flows through the city and different canals falls to the river Surma which flow through the whole city.
As Sylhet City Corporation is the heart of the Sylhet Division, so its importance in national economy is beyond description.
5
1.3. Economy (activities/drivers)
Percentage excluding housewife and student category
Occupation category Percentage
Percentage Govt.Officer 6.3 15.99391
Teaching/Doc/Eng/Advocate 1.39 3.528814
Farming/Agriculture 0.3 0.761615
Housewife 28.38 0
Large Business 2.8 7.108403
Small Business 16.6 42.14268
Private Service/NGO 2.9 7.362275
Handicrafts 0.6 1.523229
Skilled Labor 0.9 2.284844
Unskilled Labor/Daily Labor 2.5 6.346789
Rickshaw/Van Puller 0.16 0.406194
Barber 0.05 0.126936
Poultry/Shrimp/Fish Farming 1.2 3.046458
Honey Collector 0 0
Student 32.32 0
Unemployed 2.1 5.331302
Retired 0.8 2.030972
Other 0.7 1.777101
2. Vision
Planned Green City, City Of Tourism, Traffic Congestion-free, Neat And Clean City, A Healthy Clean And Green city, Clean And Specious City.
Capital Investment Plan
6
4. Problems Identified
Problem Impact Level
Highest Impact Moderate Impact Relatively Less Impact Water-logging Clean Water Supply Drainage
Traffic Congestion Developing Pedestrian Walkways Planned Urbanization
Public Places and Children’s Playground
Measure to Mediate natural Disasters eg,earthquakes Stopping The Leveling of Natural Slope and Hills
Planned Housing Road and Drainage Network Retrieving the Ponds Water bodies From Encroachment Surma Riverfront Development
Electricity Supply Tourism-enhancement
Street Lighting Solid –waste Management
Sewerage System Enhancement Ward-based IT Zones and Library Removing Illegal Establishments
Health Facilities Graveyard Areas Restoring Religious Structures Relocating Temporary Street Vendors Slum-upgrading
5. Proposed Capital Investment Plan FIRM PIPELINE
Name of Sub-project Anticipated Benefit of the sub-project
Quantity Indicative Cost
Funding Source
1 Construction of RCC Box drain from Shibgonj Akbori Mashjid to Baluchor Road via Khoradipara both side. (Ch. 0.00 m - 1190.00 m)
Improvement of road network.
Relief from water logging.
L: 2380.00 m
W: 1.25 m
498.39 MGSP
2 Improvement of existing dumping ground at Lalmatia.
Improvement of waste management
L: 4300.00 m
W: 200.00 m
860.00 MGSP
3 Surma River side development with Slope protection, Walkway, Plantation, Park & Recreation place. Starting Gutatikor city park to
Increase recreational facility for city
dwellers.
L: 8.00 km 6800.00 MGSP
7
Kanishail area both side.
4 Construction of RCC Box drain, Development of road & walkway at Keen bridge to Humayun Rashid Chattar via Mukhtijuddha Chattar with street light. (Ch. 0.00 m - 2500.00 m)
Improvement of road network.
Reduce water logging.
L: 2500.00 m
W: 23.00 m
3200.00
MGSP
5 Construction of RCC U type drain at Babu Chara (Humayun Rashid Chattar to Bandorghat via Shibbari) (Ch. 0.00 m - 1836.00 m)
Reduce water logging.
L: 1836.00 m
W: 2.54 m
944.04 MGSP
6 Improvement of BC road, R.C.C drain, beautification and Electrification at Keen bridge to Muktijuddah chattar via Jhalopara.
Improvement of road network.
Reduce water logging.
L: 1000.00 m
W: 11.00m
692.00 MGSP
7 Construction of RCC Box drain from Shahi Eidghah to Bhubi Chara at Jhornarpar. (Ch. 0.00 m - 1400.00 m)
Relief from water logging.
L: 1400.00 m
W: 2.10 m
499.73 MGSP
8 Construction of RCC Box drain, Sluice gate, Retaining wall, walkway with street light beside Sagardigirpar road & Development of the same road with Asphalt including construction of Road Divider. (Ch. 0.00 m - 1200.00 m)
Relief from water logging.
L: 1200.00 m
W: 10.67 m
1500.00 MGSP
9 Construction of drain at Kolapara to Surma river
Relief from water logging.
L: 600.00 m
W: 1.50 m
96.00 MGSP
10 Construction of RCC Drain at Sheikhghat main road
Improvement of drainage system.
L: 1100.00 m
W: 1.50 m
176.00 MGSP
Capital Investment Plan
8
11 Widening of Uposhahar canal near Teroratan.(Drain at Teroraton)
Relief from water logging.
L: 600.00 m
W: 3.00 m
180.00 MGSP
13 Carpeting Road at Picher Mukh to Surma River culvert(Kanishail)
Improvement of road network.
L: 1200.00 m
W: 4.50 m
124.20 MGSP
14 Construction of RCC Drain from Undal hotel at Zindabazar to Jalalabad pump. (Ch. 0.00 m – 1200 m)
Improvement of drainage system.
L: 1200.00 m
W: 2.1 m
602.00
15 Construction of RCC Drain at Londoni road point to Dhupa Chara. (Ch. 0.00 m - 1388.75 m)
Improvement of drainage system.
L: 1388.75 m
W: 1.80 m
484.70 MGSP
16 Construction of RCC Box drain from Amborkhana to Malni Chara (beside Airport road) (Ch. 0.00 m - 2866.00 m)
Relief from water logging.
L: 2866.00 m
W: 1.50 m
600.53 MGSP
17 Road widening at Bongobir Foreign Post Office to Dhaka Sylhet By pass via Barokhola.
Improvement of road network.
(Ch 0.00-2200.00) 101.00 MGSP
18 Improvement of Jollarpar low land area with retaining wall, footpath, lighting & excavation.
Improvement of road network,
beautification.
L = 1000.00 m W = 3.96 m
825.00 MGSP
19 (a) Construction of RCC Drain at Vataliea Main Road Starting From Boshu Khal To Osmani Madecal Road.(Ch. 45.00m-232.00m/Ch. 85.00m-130.00m/Ch. 161.00m-754.00m) Length = 1108 m (Bothside) (b) Construction of RCC Drain at Nobab Road (Starting From Osmani
Improvement of road network.
Relief from water logging.
Road - 2743.00 m
Drain L = 3225.00 m
W = 1.40 m
1024.00 MGSP
9
Medical Road To Kazirbazar Road Both Side) (Ch. 00.00m-965.00m/ 0.00m-1145.00m) Length = 1145 m (Bothside) (c) Improvement of Nobab Road Starting From Osmani Medical Road To Kazirbazar Road With Asphalt.(Ch. 0.00m-1145.00m) Length = 1145 m (d) Improvement of Vataliea Main Road Starting From Osmani Medical Road To Lamabazar Point With Asphalt.(Ch. 0.00m-1115.00m) Length = 1115 m (e) Improvement of Kazirbazar main Road (starting from Kazir Bazar Bridge to Sheikhghat Jame Mosque) (Ch: 0.00m - 280.00m) Length = 280 m (f) Improvement of RCC Road at Kazir Bazar Main Road (starting from Sheikhghat Jame Mashjid to New Fish Market) (Ch: 280.00m - 490.00m) Length = 210 m
SOFT PIPELINE
Name of Sub-project Anticipated Benefit of the sub-project
Quantity Indication Cost
MGSP
1 Construction of RCC Box drain from Goali Chara towards Shahi Eidghah. (Ch. 0.00 m - 1006.00 m)
Relief from water logging.
L: 1006.00 m
W: 3.00 m
532.19 MGSP
2 a)Hazrat Manikpir (Rh.) tilla b)M.C. college area c)Christian Graveyard & Church d)Chali Bondor Shosahan e)Gutatikor shosan f)Norsingtila Robidas graveyard.
Conservation of heritage
infrastructure. Improvement of inhume facility.
7.00 acre L: 800.00 m W: 4.50 m 4.00 acre
85.00 108.00 75.00
MGSP
Capital Investment Plan
10
g)Norshingtila Muslim Graveyard.
3.00 acre 2.00 decimal 2.00 acre 4.00 acre
65.00 50.00 50.00 100.00
3 Construction of RCC Box drain, Footpath & Development of road at Sunamgonj road to Ragib Rabeya Medical college with street light. (Ch. 0.00 m - 2255.00 m)
Improvement of connectivity
And drainage system.
L: 2255.00 m
W: 1.50 m
730.32 MGSP
4 Construction of Box Drain at VIP Road to Dorgah area (rest portion) (Ch. 0.00 m - 92.00 m)
Improvement of drainage system.
L: 92.00 m W: 6.00 m
144.78 MGSP
5 Construction of RCC Drain both side of Hazrat Shahjalal (Rh.) Mazar main road.
Improvement of drainage system.
L: 800.00 m
W: 1.50 m
128.00 MGSP
6 Construction of RCC Box drain & Development of road at Sunamgonj road to Bon Kolapara area via Nurani R/A. (Ch. 0.00 m - 2800.00 m)
Improvement of road network.
Relief from water logging.
L: 2800.00 m
W: 1.25 m
485.66 MGSP
7 Development of Uposhahar road no. 14, block B & D. (Ch. 0.00 m - 950.00 m)
Improvement of road network.
L: 950.00 m
W: 5.00 m
400.00 MGSP
8 Construction of RCC U type drain at Kani Chara at Darshon Dewry, Chowkideki, Amberkhana.
Improvement of drainage system.
L: 2200.00 m
W: 2.00 m
440.00 MGSP
9 Construction of RCC U type drain at Nosain Chara at Jalalabad.
Improvement of drainage system.
L: 1000.00 m
W: 3.50 m
280.00 MGSP
10 Construction of RCC U type drain at South Khujarkhola
Improvement of drainage system.
L: 1800.00 m
W: 2.00 m
360.00 MGSP
11 Construction of RCC U type drain at Ratnar Khal
Improvement of drainage system.
L: 1500.00 m
W: 3.00 m
375.00 MGSP
12 Construction of RCC Box Drain from Tamabil Road (Near Dada pir Mazar) to Shahi Eidgah
Improvement of drainage system.
L: 2000.00 m
W: 1.80 m
360.00 MGSP
11
13 Construction of RCC U type drain at Lamapara 15Shibgonj
Improvement of drainage system.
L: 1000.00 m
W: 2.50 m
250.00 MGSP
14 Construction of drain at electric supply road (M. C. College road)
Improvement of drainage system.
L: 1000.00 m
W: 1.80 m
180.00 MGSP
15 Construction of RCC Drain front side of Boro Bazar to Amberkhana Bazar..
Improvement of drainage system.
L: 500.00 m
W: 1.50 m
80.00 MGSP
16 Construction of drain at Gashitula to Gaviarkhal
Relief from water logging.
L: 500.00 m
W: 2.00 m
100.00 MGSP
17 Construction of RCC Drain at Kazirbazar main road.
Improvement of drainage system.
L: 1000.00 m
W: 1.50 m
160.00 MGSP
18 Construction of Retaining wall at Bolram Khal
Relief from water logging.
L: 250.00 m
W: 3.00 m
67.50 MGSP
19 Construction of RCC Retaining wall at Tilagor Petrol Pump to Holdi Chara.
Relief from water logging.
L: 1800.00 m
W: 2.50 m
414.00 MGSP
20 Construction of Fly over at at South Surma Bus Terminal via Kadamtali Gutatikor to Habinandi.
Improvement of internal connectivity
L: 2500.00 m
W: 10.00 m
2500.00 MGSP
21 Development of road at Khasdobir Darus Salam Madrasha road to National Tea Garden.
Improvement of road network.
L: 600.00 m
W: 5.00 m
75.00 MGSP
22 Construction of RCC Road at Patantula, Ponitula, Nowapara Area.
Improvement of road network.
L: 850.00 m
W: 2.00 m
170.00 MGSP
23 Development of road at Lamabazar Monipuripara
Improvement of road network.
L: 400.00 m
W: 3.50 m
35.00 MGSP
24 Repairing and beautification of Sunatula pond
Improvement of recreational facility
L: 1000.00 m
W: 1.20 m
100.00 MGSP
Capital Investment Plan
12
25 Construction of RCC Road at Mendibag area
Improvement of road network.
L: 850.00 m
W: 3.50 m
74.37 MGSP
26 Construction of Road at Kaistorail High School to Shahi Eidgah area
Improvement of road network.
L: 2000.00 m
W: 4.50 m
225.00 MGSP
27 Construction of RCC Road at Kadamtali Polly Biduyt to Surma River
Improvement of road network.
L: 850.00 m
W: 3.00 m
63.75 MGSP
28 Development of Habinandi Road by RCC
Improvement of road network.
L: 1000.00 m
W: 3.00 m
75.00 MGSP
29 Sanitary landfill near Dumping Ground
Improvement of solid waste management
L: 350.00 m
W: 25.00 m
175.00 MGSP
30 South Surma natural park Improvement of recreational facility
L: 145.00 m
W: 90.00 m
150.00 MGSP
31 Installation of pipe line in city area.
Improvement of clean water supply
60 km 2400.00 MGSP
32 Construction of 30 nos Pump house and production tube well.
Improvement of clean water supply
30 nos 2000.00 MGSP
33 Connecting Holdi Chara at Uposhahar block H.
Relief from water logging.
L: 1000.00 m
W: 4.50 m
400.00 MGSP
34 Construction of RCC U type drain Howladarpara Chara
Relief from water logging.
L: 750.00 m
W: 1.50 m
120.00 MGSP
35 Construction of RCC Box drain at Gonganagar
Relief from water logging.
L: 900.00 m
W: 1.80 m
207.00 MGSP
13
36 Construction of RCC U type drain at Jaintar khal
Relief from water logging.
L: 1500.00 m
W: 4.50 m
600.00 MGSP
37 Construction of RCC Drain from Dorga Moholla to Alia Madrasha field.
Relief from water logging.
L: 650.00 m
W: 1.50 m
104.00 MGSP
38 Construction of RCC Box drain from Lamabazar point via Zindabazar point to Zindapir (Rh.) Mazar.
Relief from water logging.
L: 2000.00 m
W: 1.50 m
320.00 MGSP
39 34. Construction of RCC Drain at Munshipara R/A.
Relief from water logging.
L: 1050.00 m
W: 1.25 m
105.00 MGSP
40 Construction of RCC Box drain at Al Madina housing from Madina Market to STS Plant.
Relief from water logging.
L: 1000.00 m
W: 1.25 m
100.00 MGSP
41 Construction of RCC Drain at Zindabazar point to Naiorpol point.
Relief from water logging.
L: 2000.00 m
W: 1.50 m
320.00 MGSP
42 Construction of RCC Drain at Hotel Rose Veiw to Shibgonj Tamabil Road both side.
Relief from water logging.
L: 3000.00 m
W: 1.50 m
480.00 MGSP
43 Construction of RCC Drain at Mendibag area
Relief from water logging.
L: 700.00 m
W: 1.25 m
70.00 MGSP
44 Construction of RCC Retaining wall at Goalichara (Chararpar)
Relief from water logging.
L: 500.00 m
H: 5.00 m
150.00 MGSP
45 Construction of U type drain at Gaviar Khal.
Relief from water logging.
L: 2500.00 m
W: 4.00 m
875.00 MGSP
46 Widening of road from Kazir Bazar bridge to Abdus Samad chattar via Lawai.
Improvement of road network.
L: 2000.00 m
W: 11.50
704.00 MGSP
Capital Investment Plan
14
m
47 Development of Housing Estate road & Airport link road by Asphalt
Improvement of road network.
L: 2000.00 m
W: 7.00 m
448.00 MGSP
48 Development of road by Asphalt from Medical to Madina Market.
Improvement of road network.
L: 2000.00 m
W: 10.00 m
640.00 MGSP
49 Carpeting Road at PDB Mashjid to Shamimabad Culvert Malnichara
Improvement of road network.
L: 850.00 m
W: 7.00 m
136.85 MGSP
50 Development of road by Carpeting at Sheikhghat
Improvement of road network.
L: 1100.00 m
W: 10.00 m
253.00 MGSP
51 Development of road by RCC at Jollarpar
Improvement of road network.
L: 450.00 m
W: 3.66 m
41.17 MGSP
52 Development of RCC Road at Roynagar Sebok area.
Improvement of road network.
L: 1200.00 m
W: 7.50 m
225.00 MGSP
53 Development of Road at Gupaltila by RCC
Improvement of road network.
L: 500.00 m
W: 3.50 m
43.75 MGSP
54 Development of Patanpara Road by RCC
Improvement of road network.
L: 700.00 m
W: 3.66 m
64.05 MGSP
55 Acquisition of land for new dumping ground.
Improvement of waste management
25.00 acre 2500.00 MGSP
56 Development of Road by RCC From Kastoghor to Chalibondor.
Improvement of road network.
L: 500.00 m
W: 6.00 m
165.00 MGSP
57 Construction of RCC U type drain Relief from water L: 1500.00 420.00 MGSP
15
at Alampur, Gutatikor Chara. logging. m
W: 2.50 m
58 Construction of RCC Box Drain at Habinandi area.
Relief from water logging.
L: 750.00 m
W: 1.25 m
75.00 MGSP
59 Construction of RCC Box culvert from Mother Care Clinic to Aisha Medicare.
Relief from water logging.
L: 800.00 m
W: 4.50 m
320.00 MGSP
60 Construction of RCC Drain at Mojumdhari.
Relief from water logging.
L: 350.00 m
W: 1.50 m
35.00 MGSP
61 Construction of drain at backward of Telihaor Parkview Hospital.
Relief from water logging.
L: 750.00 m
W: 1.50 m
120.00 MGSP
62 Construction of RCC Drain at Noyasorok point to Chowhatta Point.
Relief from water logging.
L: 800.00 m
W: 1.50 m
128.00 MGSP
63 Construction of RCC Drain at Charadigirpar and Moslish Amin area.
Relief from water logging.
L: 750.00 m
W: 1.25 m
75.00 MGSP
64 Construction of RCC Drain at Loharpara Boro Drain to Noorjahan Hospital.
Relief from water logging.
L: 500.00 m
W: 3.00 m
150.00 MGSP
65 Construction of drain at Khandikorpara to Uposhor Block-A Main Chara.
Relief from water logging.
L: 500.00 m
W: 1.25 m
50.00 MGSP
66 Construction RCC Drain at Sadarpara
Relief from water logging.
L: 1000.00 m
W: 1.25 m
100.00 MGSP
67 Construction of RCC Retaining wall at Uposhahor Tilabari beside of Chara.
Relief from water logging.
L: 350.00 m
W: 1.50 m
56.00 MGSP
Capital Investment Plan
16
68 Construction of C C Road at Laladigirpar, South Kajolsha, North Kuarpar , Vataliea, Billpar, Lamabazar , Modushoied Area.
Improvement of road network.
L: 750.00 m
W: 2.50 m
11.25 MGSP
69 Construction of RCC Retaining wall at Gutatikor to Fenchugonj road both side
Improvement of road network.
L: 800.00 m
W: 4.00 m
280.00 MGSP
70 Development of Alompur Road by Carpeting
Improvement of road network.
L: 2000.00 m
W: 4.00 m
184.00 MGSP
71 Development of Khujarkhola road by RCC
Improvement of road network.
L: 1500.00 m
W: 3.66 m
137.25 MGSP
72 Construction of RCC Retaining wall at Malni Chara
Relief from water logging.
L: 2000.00 m
W: 4.00 m
700.00 MGSP
73 Development of Carpeting road at Kalibari to Noyabazar
Improvement of road network.
L: 2000.00 m
W: 5.00 m
230.00 MGSP
74 Development of Carpeting road at Boroikandi to Kajir Bazar
Improvement of road network.
L: 2500.00 m
W: 3.66 m
210.45 MGSP
17
6. Implementation of the CIP
1. Multi-year Implementation Plan
CIP Implementation Plan
Project No Project Name
YR 1 (2014-
15)
YR 2 (2015-
16)
YR 3 (2016-
17)
YR 4 (22017-
18)
YR 5 (2018-
19) Total Cost
01 (a) Construction of RCC Drain at Vataliea Main Road Starting From Boshu Khal To Osmani Madecal Road.(Ch. 45.00m-232.00m/Ch. 85.00m-130.00m/Ch. 161.00m-754.00m) Length = 1108 m (Bothside) (b) Construction of RCC Drain at Nobab Road (Starting From Osmani Medical Road To Kazirbazar Road Both Side) (Ch. 00.00m-965.00m/ 0.00m-1145.00m) Length = 1145 m (Bothside) (c) Improvement of Nobab Road Starting From Osmani Medical Road To Kazirbazar Road With Asphalt.(Ch. 0.00m-1145.00m) Length = 1145 m (d) Improvement of Vataliea Main Road Starting From Osmani Medical Road To Lamabazar Point With Asphalt.(Ch. 0.00m-1115.00m) Length = 1115 m (e) Improvement of Kazirbazar main Road (starting from Kazir Bazar Bridge to Sheikhghat Jame Mosque) (Ch: 0.00m - 280.00m) Length = 280 m (f) Improvement of RCC Road at Kazir Bazar Main Road (starting from Sheikhghat Jame Mashjid to New Fish Market) (Ch: 280.00m - 490.00m) Length = 210 m
874.00
- - 874.00
02 Construction of RCC U type drain at Babu Chara (Humayun Rashid Chattar to Bandorghat via Shibbari) (Ch. 0.00 m -
944.04 - - 944.04
Capital Investment Plan
18
1836.00 m)
03 Construction of RCC Box drain from Shibgonj Akbori Mashjid to Baluchor Road via Khoradipara both side. (Ch. 0.00 m - 1190.00 m)
498.39 - - 498.39
04 Construction of RCC Box drain from Amborkhana to Malni Chara (beside Airport road) (Ch. 0.00 m - 2866.00 m)
600.53 - - 600.53
05 Construction of RCC Box drain, Sluice gate, Retaining wall, walkway with street light beside Sagardigirpar road & Development of the same road with Asphalt including construction of Road Divider. (Ch. 0.00 m - 1200.00 m)
1500.00
- - 1500.00
06 Construction of RCC Box drain Development of road & walkway at Keen bridge to Humayun Rashid Chattar via Mukhtijuddha Chattar with street light. (Ch. 0.00 m - 2500.00 m)
3200.00
- - 3200.00
07 Construction of RCC Box drain, Footpath & Development of road at Sunamgonj road to Ragib Rabeya Medical college with street light. (Ch. 0.00 m - 2255.00 m)
730.32 - - 730.32
08 Construction of Box Drain at VIP Road to Dorgah area (rest portion) (Ch. 0.00 m - 92.00 m)
144.78 - - 144.78
09 Construction of RCC Box drain from Goali Chara towards Shahi Eidghah. (Ch. 0.00 m - 1006.00 m)
532.19 - - 532.19
10 Construction of RCC Box drain from Shahi Eidghah to Bhubi
499.73 - - 499.73
19
Chara at Jhornarpar. (Ch. 0.00 m - 1400.00 m)
11 Construction of RCC Drain at Londoni road point to Dhupa Chara. (Ch. 0.00 m - 1388.75 m)
484.70 - - 484.70
12 Construction of RCC Box drain & Development of road at Sunamgonj road to Bon Kolapara area via Nurani R/A. (Ch. 0.00 m - 2800.00 m)
485.66 - - 485.66
13 Development of Uposhahar road no. 14, block B & D. (Ch. 0.00 m - 950.00 m)
400.00 - - 400.00
14 Construction of RCC U type drain at Kani Chara at Darshon Dewry, Chowkideki, Amberkhana.
440.00 - 440.00
15 Construction of RCC U type drain at Nosain Chara at Jalalabad.
280.00 - 280.00
16 Construction of RCC U type drain at South Khujarkhola
360.00 360.00
17 Construction of RCC U type drain at Ratnar Khal
375.00 375.00
18 Construction of RCC Box Drain from Tamabil Road (Near Dada pir Mazar) to Shahi Eidgah
360.00 360.00
19 Construction of RCC U type drain at Lamapara Shibgonj
250.00 250.00
20 Construction of RCC Drain both side of Hazrat Shahjalal (Rh.) Mazar main road.
128.00 128.00
21 Construction of drain at electric supply road (M. C. College road)
180.00 180.00
22 Construction of RCC Drain front side of Boro Bazar to
80.00 80.00
Capital Investment Plan
20
Amberkhana Bazar..
23 Construction of drain at Gashitula to Gaviarkhal
100.00 100.00
24 Construction of RCC Drain at Kazirbazar main road.
160.00 160.00
25 Construction of RCC Drain at Sheikhghat main road
176.00 176.00
26 Construction of Retaining wall at Bolram Khal
67.50 67.50
27 Construction of RCC Retaining wall at Tilagor Petrol Pump to Holdi Chara.
414.00 414.00
28 Construction of Fly over at at South Surma Bus Terminal via Kadamtali Gutatikor to Habinandi.
2500.00 2500.00
29 Development of road at Khasdobir Darus Salam Madrasha road to National Tea Garden.
75.00 75.00
30 Construction of RCC Road at Patantula, Ponitula, Nowapara Area.
170.00 170.00
31 Carpeting Road at Picher Mukh to Surma River culvert
124.20 124.20
32 Development of road at Lamabazar Monipuripara
35.00 35.00
33 Repairing and beautification of Sunatula pond
100.00 100.00
34 Construction of RCC Road at Mendibag area
74.37 74.37
35 Construction of Road at Kaistorail High School to Shahi Eidgah area
225.00 225.00
36 Construction of RCC Road at Kadamtali Polly Biduyt to
63.75 63.75
21
Surma River
37 Development of Habinandi Road by RCC
75.00 75.00
38 Improvement of existing dumping ground at Lalmatia.
860.00 860.00
39 Sanitary landfill near Dumping Ground
175.00 175.00
40 Surma River side development with Slope protection, Walkway, Plantation, Park & Recreation place. Starting Gutatikor city park to Kanishail area both side.
6800.00 6800.00
41 Walkway at outside of M.C. College field area.
- - 108.00 - - 108.00
42 South Surma natural park - - 150.00 - - 150.00
43 Hazrat Manikpir (Rh.) tilla - - 85.00 - - 85.00
44 Gutatikor shosan
- - 50.00 - - 50.00
45 Norsingtila Robidas graveyard. - - 50.00 - - 50.00
46 Norshingtila Muslim Graveyard.
- - 100.00 - - 100.00
47 Installation of pipe line in city area.
- - 2400.00 - - 2400.00
48 Construction of 30 nos Pump house and production tube well.
- - 2000.00 - - 2000.00
49 Connecting Holdi Chara at Uposhahar block H.
- - - 400.00 - 400.00
50 Widening of Uposhahar canal near Teroratan.
- - - 180.00 - 180.00
51 Construction of RCC U type drain Howladarpara Chara
- - - 120.00 - 120.00
52 Construction of RCC Box drain at Gonganagar
- - - 207.00 - 207.00
Capital Investment Plan
22
53 Construction of RCC U type drain at Jaintar khal
- - - 600.00 - 600.00
54 Construction of RCC Drain from Dorga Moholla to Alia Madrasha field.
- - - 104.00 - 104.00
55 Construction of RCC Box drain from Lamabazar point via Zindabazar point to Zindapir (Rh.) Mazar.
- - - 320.00 - 320.00
56 34. Construction of RCC Drain at Munshipara R/A.
- - - 105.00 - 105.00
57 Construction of RCC Box drain at Al Madina housing from Madina Market to STS Plant.
- - - 100.00 - 100.00
58 Construction of Drain at Jollarpar area.
- - - 50.00 - 50.00
59 Construction of RCC Drain at Zindabazar point to Naiorpol point.
- - - 320.00 - 320.00
60 Construction of RCC Drain at Hotel Rose Veiw to Shibgonj Tamabil Road both side.
- - - 480.00 - 480.00
61 Construction of RCC Drain at Mendibag area
- - - 70.00 - 70.00
62 Construction of RCC Retaining wall at Goalichara (Chararpar)
- - - 150.00 - 150.00
63 Construction of U type drain at Gaviar Khal.
- - - 875.00 - 875.00
64 Widening of road from Kazir Bazar bridge to Abdus Samad chattar via Lawai.
- - - 704.00 - 704.00
65 Development of Housing Estate road & Airport link road by Asphalt
- - - 448.00 - 448.00
66 Development of road by Asphalt from Medical to Madina Market.
- - - 640.00 - 640.00
23
67 Carpeting Road at PDB Mashjid to Shamimabad Culvert Malnichara
- - - 136.85 - 136.85
68 Development of road by Carpeting at Sheikhghat
- - - 253.00 - 253.00
69 Development of road by RCC at Jollarpar
- - - 41.17 - 41.17
70 Development of RCC Road at Roynagar Sebok area.
- - - 225.00 - 225.00
71 Development of Road at Gupaltila by RCC
- - - 43.75 - 43.75
72 Development of Patanpara Road by RCC
- - - 64.05 - 64.05
73 Acquisition of land for new dumping ground.
- - - 2500.00 - 2500.00
74 Christian Graveyard & Church - - - 75.00 - 75.00
75 Chali Bondor Shosahan - - - 65.00 - 65.00
76 Development of Road by RCC From Kastoghor to Chalibondor.
- - - 165.00 - 165.00
77 Construction of RCC U type drain at Alampur, Gutatikor Chara.
- - - - 420.00
420.00
78 Construction of RCC Box Drain at Habinandi area.
- - - - 75.00 75.00
79 Construction of RCC Box culvert from Mother Care Clinic to Aisha Medicare.
- - - - 320.00
320.00
80 Construction of RCC Drain at Mojumdhari.
- - - - 35.00 35.00
81 Construction of drain at Kolapara to Surma river
- - - - 96.00 96.00
82 Construction of drain at backward of Teliha or Parkview Hospital.
- - - - 120.00
120.00
83 Construction of RCC Drain at Noyasorok point to Chowhatta
- - - - 128.00
128.00
Capital Investment Plan
24
Point.
84 Construction of RCC Drain at Charadigirpar and Moslish Amin area.
- - - - 75.00 75.00
85 Construction of RCC Drain at Loharpara Boro Drain to Noorjahan Hospital.
- - - - 150.00
150.00
86 Construction of drain at Khandikorpara to Uposhor Block-A Main Chara.
- - - - 50.00 50.00
87 Construction RCC Drain at Sadarpara
- - - - 100.00
100.00
88 Construction of RCC Retaining wall at Uposhahor Tilabari beside of Chara.
- - - - 56.00 56.00
89 Construction of C C Road at Laladigirpar, South Kajolsha, North Kuarpar , Vataliea, Billpar, Lamabazar , Modushoied Area.
- - - - 11.25 11.25
90 Construction of RCC Retaining wall at Gutatikor to Fenchugonj road both side
- - - - 280.00
280.00
91 Development of Alompur Road by Carpeting
- - - - 184.00
184.00
92 Development of Khujarkhola road by RCC
- - - - 137.25
137.25
93 Construction of RCC Retaining wall at Malni Chara
- - - - 700.00
700.00
94 Development of Carpeting road at Kalibari to Noyabazar
- - - - 230.00
230.00
95 Development of Carpeting road at Boroikandi to Kajir Bazar
- - - - 210.45
210.45
25
2. CIP Projects by Sector and Source of Finance (BDT IN LAKH)
3. CIP Financing Capacity (BDT IN LAKH)
CIP Financing Plan Year 1
(2014-15) Year 2 (2015-16)
Year 3 (2016-17)
Year 4 (2017-18)
Year 5 (2018-19)
CIP investment cost 874.00 10020.34 19590.82 9441.82 3377.95 Available Revenue 1848.00 2030.00 3666.00 3848.00 2394.00 Unfunded Difference -974.00 7990.34 15924.82 5593.82 983.95 Total 874.00 10020.34 19590.82 9441.82 3377.95 CIP investment cost 874.00 10020.34 19590.82 9441.82 3377.95
CIP Projects by Sector and Source of Finance
Sector ADP Own
Source Revenue
Project Funds
(Donor) PPP Donations Others Total
percentage
Road Network 7082.09 16.33665% Drainage Network 15130 34.90126% Retaining Wall 1640.5 3.784233% Walkway/Footpath 638.32 1.472448% Beautification 100.00 0.230676% Fly over 2550.00 5.882227% Dumping Ground 3485.00 8.039043% Recreation 7000.00 16.14729% Graveyard/Shoshan 425.00 0.980371% Pipeline 2400.00 5.536213% Tube well 2000.00 4.613511% Chara Cleaning 580.00 1.337918% Culvert 320.00 0.738162% Total 43350.93 100.00%
Capital Investment Plan
26
ANNEX 1: City Visioning Exercise
City Visioning and CIP preparation Workshop
Brainstorming Session
Session 1 involved group discussions, with each group having a minimum of 5 members and 1 facilitator. The groups were given colored papers and the color coding in terms of immediate importance was provided.
“Colour”: Most important “Colour”: Moderately important “Colour”: Relatively less Important
Groups 01 Vision Statement: “Planned Green City”
Green Yellow Blue Output Image
Water Logging Clean Water
Supply Drainage
Traffic Congestion
Developing Pedestrian Walkways
Planned Urbanization
Public Places Children’s
Playground
Groups 02 Vision Statement: “City Tourism”
Green Yellow Blue Output Image
Water-Logging Clean Water
Supply Measures to
Mediate Natural Disasters eg,earthquakes
Stopping the Leveling of Natural Slopes and Hills
Planned Housing Traffic
Congestion Road and
Drainage Network
Retrieving the Ponds water bodies from Encroachment
Surma Riverfront Development
Parks and Open Spaces
Children’s playground
Electricity supply
27
Groups 03 Vision Statement:
Green Yellow Blue Output Image
Solid waste management
Clean water supply
Traffic Congestion
Water-logging Development
Pedestrian Walkways
Establishing Parks, Playground and Public Toilets
Sewerage System Enhancement
Ward –Based IT Zones and Library
Surma River Revitalization
Removing illegal Establishment
Healthy Facilities
Graveyard Areas
Restoring Religious Structures
Relocating Temporary Street Vendors
Slum-upgrading
Groups 04 Vision Statement: “Traffic Congestion-free, Neat and Clean City”
Green Yellow Blue Output Image
Traffic Congestion
Water-logging Entertainment
Facilities
Solid-waste Management
Clean Water Supply
Groups 05 Vision Statement: “A Healthy Clean and green City”
Green Yellow Blue Output Image
Water-logging Clean Water
Supply Drainage
Traffic Congestion
Developing Pedestrian Walkways
Planned Urbanization
Public Spaces Children’s
Playground
Capital Investment Plan
28
Groups 06 Vision Statement: “Clean and spacious City”
Green Yellow Blue Output Image
Water-Logging Clean Water
Supply Measures to
Mediate Natural Disasters eg, earthquakes
Stopping the Leveling of Natural Slopes and Hills
Planned Housing Traffic
Congestion Road and
Drainage Network
Retrieving the Ponds water bodies from Encroachment
Surma Riverfront Development
Parks and Open Spaces
Children’s playground
Electricity supply
Problem-mapping
Session 2 involved detailed discussions within groups through problem mapping and prioritization of projects:
GROUP 1 (Environmental Improvement)
GROUP 2 (Solid-waste Management)
GROUP 3 (Development of Public/Open Spaces)
Maintaining the Scares Green
Areas Long-extended Pedestrian
Walkway Along Main River Rain-water Harvesting
Recycling centers in Each Ward Effective Dumping Separation of Inorganic and
Organic Solid Waste Composting Centers
River-side Development 1.Walkways 2.Benches 3.Plantations
Park Extension 1.Children’s Park 2.Park Surrounding College Area 3.Senior Citizens
29
GROUP 4 (Water and Sanitation) GROUP 5 (Tourism and Heritage) GROUP 6 (Connectivity)
Addressing Water-logging 1.Rain-water Harvesting 2.Integrated Drainage Network
Preservation and Cleanup of Surma River and Water Bodies 1.Retention Ponds 2.Restricting Solid-waste dumping into Water Bodies
Boosting the Economy Through 1.Integrated Central Area of Sylhet with Markets,Resorts,Hotels,access to Tea Gardens and Develop open Space Along the Surma River
Reduction of Traffic Congestion Through 1.Integrated Road Network with addition of Bi-pass road to Improve access to and From Airport 2.Wide Foot Bridges Along across the Surma River 3.Elongated Walkways Lining the Surma River 4.Truck Terminal Towards the South
Capital Investment Plan
30
Proposed MGSP Priority List
1. Construction/Improvement of road(39028.00m)link roads and bypass road to ease traffic solid-waste management(have new dumping site needs assistance in sanitary landfill)
2. Construction of drain(62348.75m) 3. Construction of retaining wall(5700.00m) 4. Installation of pipeline & Tube well(30Nos) 5. Chara cleaning(1600.00) 6. Construction of culvert(800.00m) 7. Acquisition of land for new dumping ground(25.00acres) & Improvement of dumping ground(4650.00sqm) 8. Improvement of graveyard & shoshan(20.00acres) 9. Beautification work of walkways/footpath(5255.00m) & increase recreation place(8145.00m) 10. Construction of fly over(2500.00m)
31
ANNEX 2: City Financial Profile
Capital Income Projection
Capital Income Projection Actual Plan PROJECTION REVEN
UE INCOME
Current Year
Current Year
Year 1 (2014-15)
Year 2 (2014-15)
Year 3 (2014-15)
Year 4 (2014-15)
Year 5 (2014-15)
1. Local Revenues
Holding Taxes
7,10,40,211 7,50,40,211 6,10,40,211 6,70,40,211 7,50,40,211 8,90,40,211 9,10,40,211
Business Taxes
1,39,02,355 1,50,02,355 1,10,02,355 1,20,02,355 1,50,02,355 2,10,02,355 2,50,02,355
Fees and Charges
1,51,04,990 1,70,04,990 1,11,04,990 1,40,04,990 1,70,04,990 2,10,04,990 2,51,04,990
Others Miscellaneous Revenues
13,86,75,825 14,26,75,825 11,86,75,825 12,26,75,825 14,26,75,825 14,70,75,825 15,36,75,825
2.Central Government Transfer(ADP)
18,66,66,667.00
19,10,66,667.00
15,66,66,667.00
16,50,66,667.00
19,10,66,667.00
19,80,66,667.00
20,10,66,667.00
3.Others 65,25,27,459.00
65,50,27,459.00
63,20,27,459.00
64,75,27,459.00
65,50,27,459.00
66,50,27,459.00
67,25,27,459.00
TOTAL REVENUES:
107,79,17,507.00
109,58,17,507.00
99,05,17,507.00
102,83,17,507.00
109,58,17,507.00
114,12,17,507.00
116,84,17,507.00
Capital Expenditure Projection
Capital Expenditure Projection Actual Plan PROJECTION REVENUE
EXPENDITURE
Current Year
Current Year
Year 1 Year 2 Year 3 Year 4 Year 5
1.Personnel Services
6,90,61,293.00
7,10,61,293.00
5,90,61,293.00
6,50,61,293.00
7,10,61,293.00
7,90,61,293.00
8,10,61,293.00
2.Maintainance & Operation Expenses
11,15,70,585.00
11,50,70,585.00
10,15,70,585.00
10,50,70,585.00
11,50,70,585.00
11,85,70,585.00
12,50,70,585.00
3.Capital Expenditure
54,99,58,915.00
55,10,58,915.00
53,99,58,915.00
54,50,58,915.00
55,10,58,915.00
55,79,58,915.00
56,10,58,915.00
TOTAL EXPENDITURE
73,05,90,793.00
73,71,90,793.00
70,05,90,793.00
71,51,90,793.00
73,71,90,793.00
75,55,90,793.00
76,71,90,793.00
Capital Investment Plan
32
ANNEX 3: Sub-Project Request Form: [Name of the Sub-Project]
[Name of the ULB]
[Date]
I. Project Profile
Project title: Project type: Project location: Proposed size of the project: Proposed starting date: Project duration: Proposed cost: Expected number of beneficiaries:
II. Background [Why is the project being undertaken? Briefly describe an opportunity or problem that the project is to address. ]
III. Objectives [If the project is successful, briefly discuss how it will contribute towards achieving the city vision and same time contribute to national development objective.]
IV. Scope [What will be the end result of the project? Briefly describe here what phases or various components of works that will be undertaken.]
V. Social Impact [List the anticipated social impacts on the site surrounding that may take place during project implementation.]
VI. Environmental Impact [List the anticipated environmental impact on the site surrounding that may take place during project implementation.]
33
VII. Development Impact
Range of Development Impact
Ward Level District Level Regional Level
No. Or Wards ULBs and other surrounding UP/ULB
If applicable
No of people directly benefiting from the sub-project
VIII. Project Timeline
Project Milestones
Project Milestones Requirement Estimated Timing
(Months) Remarks
1. Survey [Yes/No]
2. Preparation of sub-project
3. Land Acquisition
4. Resettlement Concerns
5. Environmental Concerns
6. Preparation of Standard Bidding Documents
7. Procurement and Award
8. Phase 1 construction
9. Phase 1 construction
10.
11.
Capital Investment Plan
34
Implementation Timeline
Phases Estimated Time Required
Estimated Start Date Estimated End Date
Project Preparation
Construction
Total Project Period
IX. Budget
Estimated Cost and Timeline for Construction
Sub Project related infrastructure/
facilities
Unit Cost
Estimated
Total Cost
Average Construction
Period
Estimated
Construction Period
(Months)
Approval Signatures
Mayor,
Sylhet City Corporation,
Chief Engineer(Acting), Project Implementation Unit, In-
charge
[Name], Project Director, MGSP