Capital Improvement ProgramProject Overview
April 29, 2021
Agenda
• Housekeeping Items
• Opening Remarks
• Presentation
• Closing Remarks
Projects To Be Discussed
• EN00636 - 107th Ave DCR (Ben Wilson)
• EN00646 - Old Town DCR (Craig Bolze)
• UT00274 - CAP Pump Station Rehab (Kurt Mahoney)
• CS00146 - Stadium Trail Phase 1 (Craig Bolze)
• CS00232 - Stadium Trail Phase 2 (Craig Bolze)
EN00636107th Ave; Williams Rd to Hatfield Rd
Design Concept Report(Ben Wilson)
` PROJECT CORRIDOR
Project Corridor: 107th Ave; Williams Rd to Hatfield Rd
• Project Management– Schedule Preparation and Updates– Conduct and Attend Meetings– Project Progress Reports– Agency Coordination
• Field Data Collection and Survey/Base Map Preparation
• Utility Data Acquisition and Coordination• Environmental Assessment; Cultural
Resources, Biological Assessment, Clean Water Act
• Geotechnical/Pavement Study• Drainage Analysis and Preliminary Drainage
Design
Scope of Work Elements• Roadway/Intersection Geometrics
Alternatives Analysis– Access Management– Interim Improvements/Alternative
Cross-Sections– Truck Traffic/Parking
• Traffic Study• Noise Study• Coordination with Other Concurrent Work • Cost Estimates, Phasing, Delivery Method• Public Outreach Involvement• Design Concept Report Including 15%
Plans
• Private Development– Cemex Expansion– SEC Pinnacle Peak Rd & 107th Ave
• Pinnacle Peak Rd Extension• Reclaimed Waterline• Patterson Well Pump to Waste Line
• SW Gas - High Pressure Gas Main Re-Alignment in Hatfield Rd/107th Ave
• CS00165 NRT and Hatfield Trail Segments. Hatfield segment crosses 107th Ave, extends from New River to the Agua Fria
107th Ave; Williams Rd to Hatfield Rd
Photograph taken from Hatfield Rd looking south. Shows dip section in 107th Ave and transmission towers and lines crossing and running adjacent to 107th Ave.
107th Ave; Williams Rd to Hatfield Rd
Inset photo taken from the north side of Pinnacle Peak Rd showing the inlet side of the channel and culvert crossing east of 107th Ave.
107th Ave; Williams Rd to Hatfield Rd
Photograph taken from 107th Ave looking north at Pinnacle Peak Rd intersection. Note transmission tower at northwest corner.
Project Schedule
Milestones
• Consultant Meeting - April 29, 2021
• Advertise June/July 2021
• Begin Work Late 2021
• 9 Months for Study
Questions
EN00646Old Town Streetscape
83rd Ave; Monroe St to Grand Ave(Craig Bolze)
Study Focus Areas• 83rd Ave Streetscape: Monroe
St to Grand Ave• Osuna Park / Gateway
Streetscape• 83rd Ave: Grand Ave to
Washington St• 83rd Ave Realignment: Cotton
Crossing to Monroe St
Study Area: 83rd Ave; Cotton Crossing to Grand Ave
• Develop Place Making Themes and Streetscape Concepts
• Accessibility/Pedestrian Circulation• Parking/Signage/Wayfinding• Sustainability/Low Impact Design/Livability• Traffic Study/Circulation/Transit Connections• Roadway and Intersection Geometrics• Existing Utility Inventory and Mapping• Field Data Collection and Survey/Base Map• Land Ownership• Existing and Proposed Right of
Way/Easements• Proposed Development Within the Study Area
Scope of Work Elements• Capacity of Existing Water, Sewer, Storm
Drain, Comm, Elec, Infrastructure• Proposed Utility Modifications/Relocations• Drainage Characterization• Review and evaluate all existing
information relevant to the project – plans, reports, etc.
• Reclaimed Water Extension to Old Town• Public Outreach• Coordination with Other Concurrent Work • Design Concept Report Including 15%
Plans
Study AreaPrevious Studies
• Old Town Conceptual Design (DPS 2019)• Old Town Traffic Study (B&N 2014)• Old Town Specific Area Plan (2011)• Old Town Revitalization Plan (2009)• Downtown Area Drainage Master Plan Update
DCR (KH 2007)• DCR Washington St & 83rd Ave (AKG 1995)• EN00286 Washington St Alley Improvements• P-0314 84th Ave Improvements From
Washington to Monroe
The concepts developed in the Old Town Conceptual Design study will inform this study.
Madison St.
83rd
Ave
84th
Ave
Jefferson St.
Washington St.
Peoria Ave.
Monroe St.
Peoria Ave.
Women’s Club & Community Center
Cen
tral
Sc
hool
Driftwood Axiom
Edwards Hotel
Peoria Performing Arts Center
Municipal Complex
Jail
Peoria Place PAD
Willhelm Automotive
Retail
Exis
ting
Dev
elop
men
t
Study AreaC
ity-O
wne
d Pa
rcel
s
Concurrent Studies• Vintage Partners Memorandum of
Understanding & Development Master Plan• Peoria Place PAD• Lighting Study• Grand Ave Corridor Revitalization Area
(DPS)• Grand Ave Pedestrian Bridge• Small Cell Site - Cotton Crossing & 83rd Ave
Madison St.
83rd
Ave
84th
Ave
Jefferson St.
Washington St.
Peoria Ave.
Monroe St.
Peoria Ave.
Municipal ComplexPeoria Place PAD
Concepts
Osuna Park: Entry Concepts
Concepts
Osuna Park: Entry Concepts
Concepts
Osuna Park: Entry Concepts
Concepts
83rd Avenue: Streetscape Concepts
Concepts
Website:https://www.peoriaed.com/programs-and-incentives/old-town-commercial-revitalization-program
Concepts: 83rd Ave Re-Alignment; Cotton Crossing to Monroe St
Utilities: Utility Schematic for 83rd Ave
Not Shown:• UG Elec• Comm
Project Schedule
Schedule is In-Development and Will Likely Change - These Are My Thoughts On A Conceptual Working Schedule:
• Scoping/Consultant Outreach: April - May 2021• Solicitation Advertisement/Consultant Selection June - July 2021• Final Scope/Contract Negotiation: August - September 2021• Preparation of DCR: September 2021 - June 2022• Design & Preconstruction Coordination: June 2022 - July 2023• Construction: August 2023 - January 2025• Closeout: February 2025
UT00274CAP Pump Station Rehabilitation
(Kurt Mahoney)
163rdAVE
Project Location: 163rd Ave North of Jomax at CAP Canal
Scope of Work Elements• Project Management
– Schedule Preparation and Updates– Conduct and Attend Meetings– Project Progress Reports
• Pre-Design Services– Field Data Collection and Survey/Base
Map Preparation– Land Ownership/Advanced Coordination
w/ CAP– Utility Data Acquisition and Coordination
• Design and Construction Document Preparation
– 30%, 60%, 90%, Final PS&E– Proposed Utility
Modifications/Relocations– Permitting– Surge Analysis– Condition Assessment Tech Memo 16”
Main– MOPO Development/Coordination
• Site must remain in Operation during Construction
• Post-Design Services– Construction Observation– As-Built Preparation
Project Schedule
Milestones• Advertise June/July 2021
– Site Visit June/July• Begin Design Mid/Late-2021• 9 Months for Design• Begin Construction Mid-2022
2021 2022May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Stadium TrailCS00146 Phase 1: 83rd Ave to 73rd Ave
CS00232 Phase 2: 75th Ave to Skunk Creek(Craig Bolze)
Stadium Trail
• Phase 1 - Design Consultant Selection
• Phase 2 - Initiating Project
• Stadium Point at P83
Scope of Work Elements - Stadium Trail Ph 2• Survey and Base Map Preparation• Pedestrian Bridge Crossing Skunk Creek
• Undercrossing of Existing 75th Ave Bridge
• Coordination with New Development• Connections with Existing Trail System• Bridge Selection and Aesthetics• Structural Analysis and Design• Hydrologic and Hydraulic Analysis in Support of Bridge and Bank Stabilization Design
Project Schedule - Stadium Trail Ph 1CS00146
Project Schedule - Stadium Trail Ph 2CS00232
Questions?Website: