capital commitment plan the city of new yorkfy 2007 authorized commitment plan page: 790 with fy...

490
The City of New York Capital Commitment Plan Fiscal Year 2007 Volume 3 September 2006 Michael R. Bloomberg, Mayor Office of Management and Budget Mark Page, Director

Upload: others

Post on 04-Feb-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

  • The City of New York

    Capital Commitment PlanFiscal Year 2007

    Volume 3September 2006

    Michael R. Bloomberg, Mayor Office of Management and BudgetMark Page, Director

  • FY 2007 September Capital Commitment Plan Agency Index

    Department No. Department Name Volume Page 125 Aging, Department for the (AG) .......................................................................................... 1 1

    801 Business Services, Department of Economic Development, Office of (ED)................................................................ 1 105

    068 Children’s Services, Administration for (CS)....................................................................... 1 76 042 City University of New York (HN)...................................................................................... 2 375 856 Citywide Administrative Services, Department of Courts (CO)............................................................................................................ 1 49 Equipment and Miscellaneous (PU)....................................................................... 3 823 Public Buildings (PW) ........................................................................................... 3 966 Real Property (RE)................................................................................................. 3 1042 072 Correction, Department of (C).............................................................................................. 1 24 126 Cultural Affairs, Department of (PV)................................................................................... 3 840 858 Department of Information Technology & Telecommunications (DP)................................ 1 91 040 Education, Department of (E)............................................................................................... 1 95 826 Environmental Protection, Department of Equipment (EP)...................................................................................................... 1 149 Sewers (SE)............................................................................................................ 3 1074 Water Mains (WM)................................................................................................ 3 1194 Water Pollution Control (WP)................................................................................ 3 1236 Water Supply (W) .................................................................................................. 3 1188 057 Fire Department (F).............................................................................................................. 1 165 816 Health, Department of (HL) ................................................................................................. 2 350 819 Health and Hospitals Corporation (HO) ............................................................................... 2 409

  • FY 2007 September Capital Commitment Plan Agency Index

    Department No. Department Name Volume Page 071 Homeless Services, Department of (HH) ............................................................................. 1 339 806 Housing Preservation and Development Housing Authority (HA) ........................................................................................ 1 199 Housing Preservation and Development (HD)....................................................... 1 300 096 Human Resources Administration (HR)............................................................................... 2 425 130 Juvenile Justice, Department of (JJ) ..................................................................................... 2 548 Libraries 035 New York Research (L) ......................................................................................... 2 551 038 Brooklyn Public (LB)............................................................................................. 2 556 037 New York Public (LN)........................................................................................... 2 565 039 Queens Borough Public (LQ)................................................................................. 2 587 846 Parks and Recreation, Department of (P) ............................................................................. 2 601 056 Police Department (PO) ....................................................................................................... 3 787 827 Sanitation, Department of (S)............................................................................................... 3 1048 998 Transit Authority MTA Bus Company (MT)………………………………………………………... 2 599 Staten Island Rapid Transit (ST) ............................................................................ 3 1133 Transit Authority (T).............................................................................................. 3 1136 841 Transportation, Department of Bridges, Highway (HB) ......................................................................................... 1 217 Bridges, Waterway (BR)........................................................................................ 1 16 Equipment (TD) ..................................................................................................... 3 1141 Ferries and Aviation (FA) ...................................................................................... 1 186 Franchise Transportation (FT) ............................................................................... 1 197 Highways (HW) ..................................................................................................... 2 441 Traffic (TF) ............................................................................................................ 3 1147

  • 2007–2010 Appropriations and Commitments with 2007 Plan andForecast, and Actuals through August, Including Detailed ProjectStatus Information, by Budget Line

    VIII.

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 787WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    BUDGET LINE: PO-C001 FMS #: 056 C01 POLICE DEPARTMENT BUILDINGS, IMPROVEMENTS, CITYWIDEAVAILABLE BALANCE AS OF: 08/31/06 $2,467,723.94 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $526,036.18 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 25 * * * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * * * * * * * * * * 25 * 25FORCST (C) * * * * * * * * * 25 * * * * 25ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 POC20MISD COMPUTER UPGRADE - 20TH PRECINCTEQFN 001 EQUIPMENT AND FURNITURE 18 0 06/07

    CO#: C EQFN 001 EQUIPMENT AND FURNITURE 7 0 06/07

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-D001 FMS #: 056 D01 POLICE DEPARTMENT BUILDINGS, IMPROVEMENTS, CITYWIDEAVAILABLE BALANCE AS OF: 08/31/06 $2,110,772.81 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $465,816.48 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $332,240.96 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 2,381 * * * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * 144 * 80 * * * * * * * * * * 2,157 * 2,381FORCST (C) * 144 * 80 * * * * * * * * * * 2,157 * 2,381ACTUAL (C) * 158 * 93 * * * * * * * * * * * 252

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 POD112ELE 112TH PCT - ELEVATOR RENOVATION DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 110 0 06/07

    056 POD112FTD 112TH PCT NEW FRONT DESKCONS 001 CONSTRUCTION 46 0 06/07

    056 POD112WIN 112TH PCT - WINDOWS RENOVATION DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 177 0 06/07

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 788WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 POD17PCT 17TH PRECINCT RENOVATION DEVSCOPE 06/05 09/05EQFN 001 EQUIPMENT AND FURNITURE 130 0 06/07EQFN 002 EQUIPMENT AND FURNITURE 18 0 07/06EQFN 003 EQUIPMENT AND FURNITURE 19 0 07/06EQFN 004 EQUIPMENT AND FURNITURE 18 0 07/06EQFN 005 EQUIPMENT AND FURNITURE 11 0 07/06EQFN 006 EQUIPMENT AND FURNITURE 7 0 06/07EQFN 007 EQUIPMENT AND FURNITURE 6 0 08/06EQFN 008 EQUIPMENT AND FURNITURE 6 0 08/06EQFN 009 EQUIPMENT AND FURNITURE 23 0 08/06EQFN 010 EQUIPMENT AND FURNITURE 1 0 08/06EQFN 011 EQUIPMENT AND FURNITURE 7 0 06/07EQFN 012 EQUIPMENT AND FURNITURE 1 0 06/07EQFN 013 EQUIPMENT AND FURNITURE 1 0 06/07EQFN 014 EQUIPMENT AND FURNITURE 18 0 06/07EQFN 015 EQUIPMENT AND FURNITURE 1 0 07/06EQFN 016 EQUIPMENT AND FURNITURE 34 0 08/06EQFN 017 EQUIPMENT AND FURNITURE 1 0 07/06EQFN 018 EQUIPMENT AND FURNITURE 3 0 06/07EQFN 019 EQUIPMENT AND FURNITURE 8 0 08/06EQFN 020 EQUIPMENT AND FURNITURE 1 0 06/07EQFN 021 EQUIPMENT AND FURNITURE 6 0 07/06EQFN 022 EQUIPMENT AND FURNITURE 2 0 08/06EQFN 023 EQUIPMENT AND FURNITURE 2 0 06/07EQFN 024 EQUIPMENT AND FURNITURE 2 0 06/07EQFN 025 EQUIPMENT AND FURNITURE 2 0 06/07EQFN 026 EQUIPMENT AND FURNITURE 66 0 07/06EQFN 027 EQUIPMENT AND FURNITURE 2 0 06/07EQFN 028 EQUIPMENT AND FURNITURE 4 0 07/06

    056 POD45BATH 45TH PCT - BATHROOM RENOVATION DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 100 0 06/07

    056 POD46BATH 46TH PCT - BATHROOM RENOVATION DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 200 0 06/07

    056 POD47HVAC 47TH PCT - HVAC DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 254 0 06/07

    056 POD48BATH 48TH PCT BATHROOM RENOVATIONCONS 001 CONSTRUCTION 282 0 06/07

    056 POD48FNDK 48TH PCT NEW FRONT DESKCONS 001 CONSTRUCTION 66 0 06/07

    056 POD48GARD 48TH PCT NEW GARAGE DOORCONS 001 CONSTRUCTION 39 0 06/07

    056 POD50ELGE 50TH PCT REPLACE ELEVATORS AND GENERATORS DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 325 0 06/07

    056 POD61PARK 61ST PCT PARKINGCONS 001 CONSTRUCTION 50 0 06/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 789WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 POD62HVAC 62ND PCT - HVAC RENOVATIONCONS 003 CONSTRUCTION 192 0 06/07

    056 POD63HVAC 63RD PRECINCT - HVACCONS 002 CONSTRUCTION 139 0 06/07

    056 POD70BATH 70TH PCT - BATHROOM RENOVATIONCONS 003 CONSTRUCTION 1 0 06/07

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-D185 FMS #: 056 D85 PURCHASE OF VEHICLES AND EQUIPMENT, CITYWIDEAVAILABLE BALANCE AS OF: 08/31/06 $453,582.03 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $443,417.97 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 352 * * * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * 46 * * * * * * * * * 306 * 352FORCST (C) * * * 46 * * * * * * * * * 306 * 352ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO-D185F PBBXTF MOBILE EMERGENCY RESPONSE VEHICLEEQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 46 0 09/06

    111 PO-D185H 112TH PRECINCT SURVEILANCE VANEQVH EM 002 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 21 0 06/07

    111 PO-D185J 107TH PRECINCT - COMMUNITY COUNCIL (HANDICAP ACCESSIBLE VAN)EQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 35 0 06/07

    111 PO-D185K STATEN ISLAND SURVEILLANCE CAMERASEQFN EM 001 EQUIPMENT AND FURNITURE EMERGENCY VEHICLES 250 0 06/07

    ------------------------------------------------------------------------------------------------------------------------------------

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 790WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    BUDGET LINE: PO-R079 FMS #: 056 R79 IMPROVEMENTS TO POLICE DEPARTMENT PROPERTY, STATEN ISLANDAVAILABLE BALANCE AS OF: 08/31/06 $2,621,720.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $399,050.00 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 1,000 * * * * (C)* 2,622 * * * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * * * * * * * * * * 2,622 * 2,622FORCST (C) * * * * * * * * * * * * 2,622 * 2,622ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 POR120 AC 120TH PCT - HVACCONS 001 CONSTRUCTION 400 0 06/07

    056 POR120FD 120TH PCT NEW FRONT DESKCONS 001 CONSTRUCTION 50 0 06/07

    056 POR120WIN 120TH PCT - WINDOW REPLACEMENTCONS 001 CONSTRUCTION 200 0 06/07

    056 POR122BLR 122ND PCT BOILER REPLACEMENT DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 170 0 06/07

    056 POR122BTH 122ND PCT RECON MALE/FEMALE BATHSCONS 002 CONSTRUCTION 145 0 06/07

    056 POR122FD 122ND PCT NEW FRONT DESKCONS 001 CONSTRUCTION 50 0 06/07

    056 POR122RNG 122ND PCT RANGE ABATEMENT AND CONVERSIONCONS 001 CONSTRUCTION 516 0 06/07

    056 POR122WIN 122ND PCT WINDOW RENOVATION DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 220 0 06/07

    056 POR123 AC 123RD PCT - HVACCONS 001 CONSTRUCTION 400 0 06/07

    056 POR123BLR 123RD PCT BOILER REPLACEMENT DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 170 0 06/07

    056 POR123BTH 123RD PCT- BATHROOM RENOVATION DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 90 0 06/07

    056 POR123ROF 123RD PCT NEW ROOFCONS 001 CONSTRUCTION 151 0 06/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 791WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    CONS 002 CONSTRUCTION 49 0 06/07

    056 POR123WTR 123RD PCT - WATER REMEDIATION SYSTEM DEVSCOPE 06/05 09/05CONS 002 CONSTRUCTION 11 0 06/07

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-R185 FMS #: 056 R85 VEHICLES OF AT LEAST $35,000 AFTER NOVEMBER 1, 1999, STATEN ISLANDAVAILABLE BALANCE AS OF: 08/31/06 $307,009.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $253,991.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $383,371.00 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 5 * * * * (C)* 351 * * * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * 6 * * * * * * * * * 345 * 351FORCST (C) * * * 51 * * * * * * * * * 300 * 351ACTUAL (C) * * 44 * * * * * * * * * * * 44

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO-R185C Investigative Response VehiclesEQVH 001 EQUIPMENT - VEHICLES 300 0 06/07

    111 PO-R185D 120TH PRECINCT SURVEILLANCE VANEQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 45 0 06/07

    CO#: A EQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 6 0 09/06

    ------------------------------------------------------------------------------------------------------------------------------------

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 792WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    BUDGET LINE: PO-X079 FMS #: 056 X01 IMPROVEMENTS TO POLICE DEPARTMENT PROPERTY, THE BRONXAVAILABLE BALANCE AS OF: 08/31/06 $71,362.97 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $3,288.61- (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $63,279.64 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 71 * * * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * * * * * * * * * * 71 * 71FORCST (C) * * * * * * * * * * * * 71 * 71ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 POX46LOT 46TH PCT PARKING LOT UPGRADE DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 71 0 06/07

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-X185 FMS #: 056 X85 VEHICLES OF AT LEAST $35,000AVAILABLE BALANCE AS OF: 08/31/06 $16,971.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $44,029.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 17 * * * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * 17 * * * * * * * * * * 17FORCST (C) * * * 17 * * * * * * * * * * 17ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO-X185A PATROL BOROUGH BRONX SURVEILLANCE VANSCO#: A EQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 17 0 09/06

    ------------------------------------------------------------------------------------------------------------------------------------

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 793WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    BUDGET LINE: PO-46 FMS #: 056 202 ULTRA HIGH FREQUENCY RADIO TELEPHONE EQUIPMENTAVAILABLE BALANCE AS OF: 08/31/06 $65,186,556.51 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $12,604,447.91 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $170,512,533.87 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 5,042 * 17,543 * 18,571 * 22,960 * (C)* 41,820 * 23,666 * 18,571 * 22,960 *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * 148 * * * 15,135 * * * * * 25,842 * * * 695 * 41,820FORCST (C) * 148 * * * 15,135 * * * * * 33,457 * * * 80 * 48,820ACTUAL (C) * 148 * * * * * * * * * * * * 148

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 PO46HQTEL HQ--NEW TELEPHONE SYSTEMEQFN 003 EQUIPMENT AND FURNITURE 80 0 06/07

    111 PO46-CALL SOLAR POWERED CELLULAR CALL BOXESCO#: A EQFN 001 EQUIPMENT AND FURNITURE 615 0 06/07

    111 PO46-COPS COPS INTEROPERABILITYEQFN 001 EQUIPMENT AND FURNITURE 2,000 0 03/07

    111 PO46-PWR POWER UPGRADE OF RADIO SYSTEM TRANSMITTERSEQFN 002 EQUIPMENT AND FURNITURE 2 0 03/07

    111 PO46-1 SIGNAL GENERATOREQFN CQ 002 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 110 0 03/07EQFN CQ 003 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 141 0 06/10

    111 PO46-10 ANTENA FINDEREQFN CQ 003 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 140 0 03/07EQFN CQ 004 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 169 0 06/10

    111 PO46-14 MOBILE RADIOSEQFN CQ 013 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 3,633 0 03/07EQFN CQ 014 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,303 0 06/08EQFN CQ 015 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,368 0 06/09EQFN CQ 016 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,437 0 06/10EQFN CQ 017 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,509 0 06/11EQFN CQ 018 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,584 0 06/12EQFN CQ 019 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,663 0 06/13EQFN CQ 020 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,756 0 06/14EQFN CQ 021 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 1,884 0 06/15

    111 PO46-22C TAPE & RECORDS UNIT EQUIPMENTEQFN 001 EQUIPMENT AND FURNITURE 550 0 03/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 794WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO46-24 REPLACE RADIO SYSTEMEQFN ED 011 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 9,700 0 03/07EQFN ED 012 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 17,563 0 06/08EQFN ED 013 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 9,380 0 06/09EQFN ED 014 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 12,999 0 06/10EQFN ED 017 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 13,649 0 06/11EQFN 030 EQUIPMENT AND FURNITURE 5,000 0 06/12EQFN 031 EQUIPMENT AND FURNITURE 5,000 0 06/13EQFN 032 EQUIPMENT AND FURNITURE 5,000 0 06/14EQFN 033 EQUIPMENT AND FURNITURE 5,000 0 06/15EQFN 038 EQUIPMENT AND FURNITURE 1,569 0 03/07

    CO#: B EQFN 038 EQUIPMENT AND FURNITURE 148 0 07/06EQFN 039 EQUIPMENT AND FURNITURE 4,224 0 03/07

    CO#: A EQFN 039 EQUIPMENT AND FURNITURE 3,008 0 03/07

    111 PO46-38 CONSOLETTE BASES-25EQFN CQ 012 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 658 0 03/07EQFN CQ 013 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 248 0 03/07EQFN CQ 016 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 260 0 06/08EQFN CQ 017 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 273 0 06/09EQFN CQ 018 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 287 0 06/10EQFN CQ 019 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 301 0 06/11EQFN CQ 020 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 317 0 06/12EQFN CQ 021 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 332 0 06/13EQFN CQ 022 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 349 0 06/14EQFN CQ 023 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 366 0 06/15

    111 PO46-6A PORT RAD ALL BOROSEQFN CQ 021 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 4,540 0 06/08EQFN CQ 027 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 7,550 0 06/09EQFN CQ 028 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 7,927 0 06/10EQFN CQ 029 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 8,323 0 06/11EQFN CQ 034 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 5,000 0 06/12EQFN CQ 035 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 5,000 0 06/13EQFN CQ 036 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 5,000 0 06/14EQFN CQ 037 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 5,000 0 06/15EQFN CQ 038 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 15,135 0 10/06

    ------------------------------------------------------------------------------------------------------------------------------------

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 795WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    BUDGET LINE: PO-79 FMS #: 056 207 IMPROVEMENTS TO POLICE DEPARTMENT PROPERTY, CITYWIDEAVAILABLE BALANCE AS OF: 08/31/06 $125,389,529.69 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $47,910,273.19 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $247,281,876.11 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 16,948 * 17,571 * 8,127 * 11,089 * (C)* 78,249 * 53,836 * 8,127 * 11,089 *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * 5 * 3,845 * * 54 * * 6 * * * 8,979 * * * 65,360 * 78,249FORCST (C) * 5 * 6,645 * * 54 * * 6 * * * 9,728 * 906 * * 94,176 * 111,520ACTUAL (C) * 5 * 7,393 * * * * * * * * * * * 7,398

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 POD112ELE 112TH PCT - ELEVATOR RENOVATION DEVSCOPE 06/05 09/05CONS 002 CONSTRUCTION 190 0 06/07

    056 POX46LOT 46TH PCT PARKING LOT UPGRADE DEVSCOPE 06/05 09/05CONS 002 CONSTRUCTION 29 0 06/07

    056 PO79 9 FE 9TH PCT FURNITURE AND EQUIPMENTCO#: C EQFN 001 EQUIPMENT AND FURNITURE 61 0 06/07

    EQFN 002 EQUIPMENT AND FURNITURE 1 0 06/07EQFN 009 EQUIPMENT AND FURNITURE 1 0 06/07EQFN 021 EQUIPMENT AND FURNITURE 43 0 06/07EQFN 029 EQUIPMENT AND FURNITURE 7 0 06/07EQFN 031 EQUIPMENT AND FURNITURE 1 0 06/07EQFN 032 EQUIPMENT AND FURNITURE 8 0 06/07EQFN 033 EQUIPMENT AND FURNITURE 2 0 06/07

    056 PO79-BMS BMS PROJECTSCONS 010 CONSTRUCTION 1,740 0 06/07CONS 011 CONSTRUCTION 6,850 0 06/08CONS 012 CONSTRUCTION 5,077 0 06/09CONS 015 CONSTRUCTION 8,589 0 06/10CONS 016 CONSTRUCTION 8,589 0 06/11CTGY 018 CONTINGENCY 25,000 0 12/06CONS 069 CONSTRUCTION 16,386 0 06/12CONS 070 CONSTRUCTION 15,120 0 06/13CONS 071 CONSTRUCTION 8,500 0 06/14CONS 072 CONSTRUCTION 8,403 0 06/15

    056 PO79-CONS CONSTRUCTION PROJECTS - LUMP SUMCONS 002 CONSTRUCTION 127 0 06/07CONS 003 CONSTRUCTION 5,750 0 06/08

    056 PO79-ELEV HQ ELEVATORSCONS 002 CONSTRUCTION 42 0 06/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 796WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 PO79-ENCR NYPD PCT ENERGY CONSERATION PROJECTSCO#: A CONS 002 CONSTRUCTION 150 0 06/07

    056 PO79-110B NEW 110TH PCTSITE 001 SITE 4,000 0 06/11DSGN 002 DESIGN 6,372 0 06/12CONS 003 CONSTRUCTION 13,908 0 06/14EQFN 004 EQUIPMENT AND FURNITURE 720 0 06/15

    056 PO79BMAAP POLICE LAB AUDITORIUMCONS 001 CONSTRUCTION 400 0 03/07

    056 PO79BMAAQ SERVICE SHOP GARAGE DOOR #6 RENOVATION DSGN 02/05 08/05CONS 001 CONSTRUCTION 50 0 06/07

    056 PO79BMABM 52ND PCT ROOF AND REPOINTING DEVSCOPE 02/04 05/04CONS 001 CONSTRUCTION 745 0 03/07

    056 PO79BMABV 1 POLICE PLAZA - COOLING COIL REPLACEMENTCO#: A CONS 001 CONSTRUCTION 6 0 06/07

    056 PO79BMACB ROOF RENO 28TH, 32TH, 49TH, 83RD, 105TH PCTS DEVSCOPE 06/05 09/05CONS 002 CONSTRUCTION 808 0 06/07

    056 PO79BMACK FLOYD BENNETT FIELD BOILER REPLACEMENT DSGN 02/05 08/05CONS 003 CONSTRUCTION 2 0 06/07

    056 PO79BMACO ROOF RENOVATION FOR 67TH, 68TH, 101ST, 113TH, 115TH DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 1,174 0 03/07

    056 PO79BMACP ROOF RENOVATION FOR 5TH, 60TH, 107TH, MIDTN NRTH, APD DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 749 0 06/07

    056 PO79BMACQ WINDOWS FOR 6TH, 25TH, 50TH, 66TH, 113RD, HW #2 DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 1,174 0 03/07

    056 PO79BMACU 102ND PCT FRONT DESK RENOVATIONCONS 001 CONSTRUCTION 50 0 06/07

    056 PO79BMACV 28TH PCT FRONT DESK RENOVATIONCONS 001 CONSTRUCTION 50 0 06/07

    056 PO79BMACW 47TH PCT FRONT DESK RENOVATIONCONS 001 CONSTRUCTION 55 0 06/07

    056 PO79BMADA RODMAN'S NECK STORAGE FACILITYCONS 001 CONSTRUCTION 100 0 06/07

    056 PO79BMADB HQ GARAGE ELECTRICAL AND PLUMBINGCONS 001 CONSTRUCTION 99 0 06/07

    CO#: A CONS 002 CONSTRUCTION 9 0 06/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 797WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 PO79BMADC 7TH PCT ELEVATOR REPLACEMENTCONS 001 CONSTRUCTION 218 0 06/07

    056 PO79BMADH BOMB SQUAD BUNKERCONS 002 CONSTRUCTION 13 0 06/07

    056 PO79BMADJ HARBOR ADAM DOCK RENOVATIONCONS 001 CONSTRUCTION 3,000 0 06/07

    056 PO79BMADL 111TH PCT NEW FRONT DESKCONS 001 CONSTRUCTION 39 0 06/07

    056 PO79BMADN MIDTOWN SOUTH ELEVATOR REHABILITATION DSGN 06/06 11/06CONS 001 CONSTRUCTION 152 0 06/07

    056 PO79BMADO 78TH PCT ELEVATOR REHABILITATION DSGN 01/06 07/06CONS 001 CONSTRUCTION 358 0 06/07

    056 PO79BMADP MIDTOWN NORTH ELEVATOR REHABILITATION DSGN 06/06 12/06CONS 001 CONSTRUCTION 36 0 06/07

    056 PO79BMADQ 50TH PCT ELEVATOR REHABILITATION DSGN 06/06 12/06CONS 002 CONSTRUCTION 51 0 06/07

    056 PO79BMADR HQ PLUMBING - PHOTO LAB DSGN 06/06 12/06CONS 001 CONSTRUCTION 46 0 06/07

    056 PO79BMADS 72ND PCT AND CENTRAL REPAIR SHOP ROOF RENOVATIONCONS 001 CONSTRUCTION 500 0 06/07

    056 PO79BMADT 68TH PCT, 79TH AND SHOP #1 BOILER REPLACEMENTSCONS 001 CONSTRUCTION 1,350 0 06/07

    056 PO79BMADU 33RD, 41ST, 83RD AND APD HVAC SYSTEM REPLACEMENTSCONS 001 CONSTRUCTION 2,400 0 06/07

    056 PO79BMADV LAB BOILER SEALS REPLACMENTCONS 001 CONSTRUCTION 50 0 06/07

    056 PO79BMADW 19TH PCT ELEVATOR REPLACEMENTCONS 001 CONSTRUCTION 300 0 03/07

    056 PO79BMADX 90TH PCT BOILER REPLACEMENTCONS 001 CONSTRUCTION 250 0 03/07

    056 PO79BMADY 1 POLICE PLAZA EMERGENCY GENERATORCONS 001 CONSTRUCTION 416 0 03/07CONS 002 CONSTRUCTION 284 0 03/07

    056 PO79BMADZ 1 POLICE PLAZA COMMAND AND CONTROL HVACCONS 001 CONSTRUCTION 500 0 03/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 798WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    056 PO79BMAEA 1 POLICE PLAZA EXECUTIVE ELEVATORCONS 001 CONSTRUCTION 300 0 03/07

    056 PO79BMAEB 1 POLICE PLAZA STEAM STATIONCONS 001 CONSTRUCTION 100 0 03/07

    056 PO79BMAEC OUTDOOR RANGE DIESEL SITECONS 001 CONSTRUCTION 175 0 03/07

    056 PO79BMAED 103RD PCT ELEVATOR REHABILITATIONCONS 001 CONSTRUCTION 300 0 03/07

    056 PO79CT5 HEPA air filtration system DEVSCOPE 06/02 09/02CONS 001 CONSTRUCTION 906 0 06/07

    056 PO79PABAT POLICE ACADEMY BATHROOMS RENOVATION DEVSCOPE 12/05 03/06CONS 001 CONSTRUCTION 727 0 03/07

    056 PO79PAFIR POLICE ACADEMY FIRING RANGE RENOVATION DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 2,134 0 03/07

    056 PO79RELOC RELOCATION OF VARIOUS NYPD FACILITIESCONS 001 CONSTRUCTION 2,500 0 06/07CONS 002 CONSTRUCTION 2,500 0 06/08CONS 003 CONSTRUCTION 2,500 0 06/09CONS 004 CONSTRUCTION 2,500 0 06/10

    111 PO-D046A CPP CALL BOXESEQFN 003 EQUIPMENT AND FURNITURE 34 0 06/07

    111 PO79-201K POLICE ACADEMY: REHAB PARTS OF 5TH & 8TH FLRS F&ECO#: E EQFN 016 EQUIPMENT AND FURNITURE 22 0 06/07

    111 PO79CPPFE CPP - F & EEQFN 001 EQUIPMENT AND FURNITURE 550 0 06/09

    801 PO79 HLR Randall's Island Pier Improvements--NYPD DSGN 08/05 02/06CONS 001 CONSTRUCTION 3,000 0 06/07

    801 PO79HARBG NYPD Harbor George Pier Improvements DSGN 01/05 01/05CONS 001 CONSTRUCTION 2,227 0 06/07

    850 POLICEPLZ RECON OF ONE POLICE PLAZA GARAGECONS 006 CONSTRUCTION 49 0 06/07

    CO#: 06 CONS 006 CONSTRUCTION 431 0 06/07CONS 017 CONSTRUCTION 8 0 06/07CONS 020 CONSTRUCTION 103 0 06/07

    850 PO201-120 NEW 120 PRECINCT FD 05/02 07/15CONS 012 CONSTRUCTION 33,200 0 06/08

    850 PO223-001 NEW STATEN ISLAND PRECINCT DSGNCOMP 06/06 10/07IFSP 008 IFA CONSTRUCTION SUPERVIS 10 0 06/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 799WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    850 PO79-CPP CENTRAL PARK PRECINCT REHABILITATION CLOSE 07/05 06/15CO#: CT CTGY 101 CONTINGENCY 2,437 0 06/07

    DSGN 106 DESIGN 862 0 06/07IFSP 110 IFA CONSTRUCTION SUPERVIS 2,000 0 06/07CONS 112 CONSTRUCTION 1,033 0 06/07DSGN 114 DESIGN 500 0 06/07CONS 115 CONSTRUCTION 2,900 0 06/07

    850 PO79-FSUP FIRE SUPPRESSION SYSTEMS AT VARIOUS SITESCONS 001 CONSTRUCTION 3,065 0 06/08

    CO#: 1 DSGN 001 DESIGN 136 0 06/07CTGY 002 CONTINGENCY 320 0 06/07

    850 PO79-PRR1 40TH PRECINCT ROOF RECONSTRUCTIONCONS 002 CONSTRUCTION 25 0 06/07

    CO#: R2 CONS 002 CONSTRUCTION 100 0 06/07CONS 008 CONSTRUCTION 100 0 06/07CONS 009 CONSTRUCTION 444 0 06/07

    850 PO79-PRR2 104TH PRECINCT ROOF RECONSTRUCTIONCO#: BL CONS 002 CONSTRUCTION 7 0 06/07

    CONS 007 CONSTRUCTION 214 0 06/07CO#: BL CONS 007 CONSTRUCTION 22 0 06/07

    CONS 010 CONSTRUCTION 50 0 06/07

    850 PO79-PRR3 111TH PRECINCT ROOF RECONSTRUCTIONCONS 002 CONSTRUCTION 8 0 06/07

    CO#: R3 CONS 002 CONSTRUCTION 1 0 06/07CO#: 02 CONS 002 CONSTRUCTION 6 0 12/06

    850 PO79-QSTF QUEENS SO TASK FORCE (NEW CONSTRUCTION)CONS 020 CONSTRUCTION 16 0 06/07

    CO#: R9 CONS 020 CONSTRUCTION 15 0 06/07

    850 PO79-009A REHAB 9TH PCT CONSCOMP 12/03 10/07CONS 013 CONSTRUCTION 585 0 06/07CONS 016 CONSTRUCTION 250 0 06/07DSGN 017 DESIGN 200 0 06/07

    850 PO79BMABG SHOP 1 ROOF REPLACEMENT CONSCOMP 08/06 02/08CO#: R5 CONS 001 CONSTRUCTION 5 0 07/06

    CTGY 004 CONTINGENCY 510 0 06/07CONS 006 CONSTRUCTION 552 0 06/07

    CO#: RG CONS 006 CONSTRUCTION 3,845 0 08/06CTGY 007 CONTINGENCY 433 0 06/07

    CO#: 01 IFDS 008 IFA DESIGN 70 0 06/07

    850 PO79BMADE FIRE ALARM SYSTEMS AT PA/13TH, 67TH, 48TH, 112TH,122ND PCTSCONS 001 CONSTRUCTION 800 0 06/07DSGN 002 DESIGN 200 0 06/07

    850 PO79HORSE Horse stable relocation and Tow Pound renovation PROJSTRT 07/06 07/06CONS 001 CONSTRUCTION 2,700 0 06/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 800WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________CO#: 2 CONS 001 CONSTRUCTION 54 0 10/06CO#: 1 DSGN 001 DESIGN 246 0 06/07

    CNSP 002 CONSTRUCTION SUPERVISION 905 0 06/07DSGN 003 DESIGN 204 0 06/07CONS 004 CONSTRUCTION 4,161 0 06/07

    CO#: 1 CONS 005 CONSTRUCTION 491 0 06/07IFSP 005 IFA CONSTRUCTION SUPERVIS 275 0 06/07IFDS 006 IFA DESIGN 25 0 06/07

    856 PO326LIV 250 LIVINGSTON ST BROOKLYNCONS LS 001 CONSTRUCTION CONST/RECONST OF LEASED S 232 0 06/07IFSP 003 IFA CONSTRUCTION SUPERVIS 28 0 08/06IFDS 004 IFA DESIGN 26 0 08/06

    856 PO326STBL Mounted Unit Stables DEVSCOPE 06/04 09/04CONS LS 001 CONSTRUCTION CONST/RECONST OF LEASED S 2,333 0 06/08EQFN FF 002 EQUIPMENT AND FURNITURE OFFICE FURNITURE 111 0 06/08EQFN CQ 003 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 27 0 06/08IFSP 006 IFA CONSTRUCTION SUPERVIS 297 0 08/06IFDS 007 IFA DESIGN 30 0 08/06

    856 PO3261595 NYPD/TEU BRONX OFFICESCONS LS 002 CONSTRUCTION CONST/RECONST OF LEASED S 180 0 06/07IFSP 007 IFA CONSTRUCTION SUPERVIS 106 0 06/07

    856 PO32617PT 17th Precinct Police Station DEVSCOPE 06/04 09/04IFDS 006 IFA DESIGN 50 0 08/06

    856 PO79-CELL 120 SCHERMERHORN ST.- HOLDING CELLS & ARRAIGNMENT ROOMSIFDS 006 IFA DESIGN 6 0 08/06

    856 PO79BMAAH 112TH & 109TH PCT BOILER REPLACEMENTCONS 002 CONSTRUCTION 68 0 06/07IFSP 003 IFA CONSTRUCTION SUPERVIS 7 0 08/06IFDS 004 IFA DESIGN 25 0 08/06

    856 PO79BMAAK POLICE ACADEMY LIGHTS & WINDOWS REPLACEMENTCONS 001 CONSTRUCTION 650 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 65 0 08/06IFDS 003 IFA DESIGN 30 0 08/06

    856 PO79BMAAM POLICE ACADEMY ELECTRICAL UPGRADE DSGN 11/03 11/03IFSP 002 IFA CONSTRUCTION SUPERVIS 198 0 08/06IFDS 003 IFA DESIGN 50 0 08/06

    856 PO79BMAAR 114TH PCT HVAC + BOILERCONS 001 CONSTRUCTION 650 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 65 0 08/06IFDS 003 IFA DESIGN 20 0 08/06

    856 PO79BMAAZ 6TH AND 113TH PCT HVAC REPLACEMENTCONS 001 CONSTRUCTION 500 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 65 0 08/06IFDS 003 IFA DESIGN 30 0 08/06

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 801WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    856 PO79BMABA 24TH AND 73RD PCT BOILER REPLACEMENTCONS 001 CONSTRUCTION 742 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 74 0 08/06IFDS 003 IFA DESIGN 20 0 08/06

    856 PO79BMABK PA - GARAGE RENOVATIONIFSP 002 IFA CONSTRUCTION SUPERVIS 195 0 08/06IFDS 003 IFA DESIGN 30 0 08/06

    856 PO79BMABR 23RD AND 25TH PCT BOILER REPLACEMENTS DEVSCOPE 03/05 06/05CONS 001 CONSTRUCTION 1,555 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 83 0 08/06IFDS 003 IFA DESIGN 20 0 08/06

    856 PO79BMABS 200 LIGHT FIXTURES FOR 1 PP DSGN 03/05 09/05CONS 011 CONSTRUCTION 94 0 06/07IFSP 100 IFA CONSTRUCTION SUPERVIS 11 0 08/06IFDS 101 IFA DESIGN 10 0 08/06

    856 PO79BMACC 61ST AND 67TH PCT CHILLERS DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 786 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 75 0 08/06IFDS 003 IFA DESIGN 20 0 08/06

    856 PO79BMACD HVAC 30TH 41ST 52ND PCTS and 30TH & 41ST PCT CHILLERS DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 810 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 80 0 08/06IFDS 003 IFA DESIGN 20 0 08/06

    856 PO79BMACE 40TH AND 111TH PCT BOILER REPLACEMENTS DEVSCOPE 06/05 09/05CONS 001 CONSTRUCTION 1,390 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 97 0 08/06IFDS 003 IFA DESIGN 20 0 08/06

    856 PO79BMACH HQ LIGHTING SYSTEM UPGRADE DEVSCOPE 06/05 09/05IFSP 002 IFA CONSTRUCTION SUPERVIS 15 0 08/06IFDS 003 IFA DESIGN 10 0 08/06CONS 056 CONSTRUCTION 150 0 06/07

    856 PO79BMACX 103RD AND 81ST PCT BOILER REPLACEMENTSCONS 001 CONSTRUCTION 1,161 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 85 0 08/06IFDS 003 IFA DESIGN 20 0 08/06

    856 PO79BMACY 67TH PCT BOILER AND 76TH PCT CHILLER REPLACEMENTSCONS 001 CONSTRUCTION 1,026 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 103 0 08/06IFDS 003 IFA DESIGN 50 0 08/06

    856 PO79BMACZ 52ND PCT CHILLER AND 61ST PCT BOILER REPLACEMENTSCONS 001 CONSTRUCTION 1,090 0 06/07IFSP 002 IFA CONSTRUCTION SUPERVIS 12 0 08/06IFDS 003 IFA DESIGN 10 0 08/06

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 802WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    856 PO79BMADR 1ST AND 43RD PCT BOILER REPLACEMENTSCONS 001 CONSTRUCTION 1,178 0 06/07

    856 PO79BSN Brooklyn South Narcotics DEVSCOPE 06/06 09/06CONS LS 001 CONSTRUCTION CONST/RECONST OF LEASED S 180 0 06/07IFSP 005 IFA CONSTRUCTION SUPERVIS 291 0 06/07

    856 PO79CRDMR Relocate Squads Currently Located at Creedmore DEVSCOPE 06/05 09/05CONS LS 001 CONSTRUCTION CONST/RECONST OF LEASED S 8,549 0 06/07EQFN 002 EQUIPMENT AND FURNITURE 2,161 0 06/07EQFN CQ 003 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 520 0 06/07IFSP 005 IFA CONSTRUCTION SUPERVIS 1,348 0 08/06

    856 PO79IAB Internal Affairs Bureau DEVSCOPE 06/05 09/05CONS LS 001 CONSTRUCTION CONST/RECONST OF LEASED S 2,050 0 06/07

    856 PO79STORG BARRIER STORAGE RELOCATIONEQFN CQ 002 EQUIPMENT AND FURNITURE COMMUNICATIONS EQUIPMENT 38 0 06/07IFSP 006 IFA CONSTRUCTION SUPERVIS 5 0 08/06IFDS 007 IFA DESIGN 3 0 08/06

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-111 FMS #: 056 250 MARINE LAUNCHES FOR HARBOR UNITAVAILABLE BALANCE AS OF: 08/31/06 $6,644,719.60 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $962,859.76 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $11,852,948.04 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * 108 * (C)* 3,216 * 979 * 2,043 * 516 *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * * * * * * * 3,216 * * * * 3,216FORCST (C) * * * * * * * * * 3,216 * * * * 3,216ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO111-1 36 FOOT ALUMINUM HULL LAUNCHEQVH 002 EQUIPMENT - VEHICLES 734 0 06/09

    111 PO111-10 AIR COMPRESSOR SYSTEMEQFN MC 004 EQUIPMENT AND FURNITURE MARINE CRAFT 62 0 06/09

    111 PO111-14 UNDERWATER COMMUNICATIONS SYSTEMEQFN MC 005 EQUIPMENT AND FURNITURE MARINE CRAFT 110 0 06/10

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 803WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO111-16 SURFACE AIR SUPPLY SYSTEMEQFN MC 004 EQUIPMENT AND FURNITURE MARINE CRAFT 57 0 06/11

    111 PO111-17 34' ALUMINUM LAUNCHEQFN MC 002 EQUIPMENT AND FURNITURE MARINE CRAFT 2,676 0 03/07

    111 PO111-19 ZODIAC BOAT (SCUBA)EQFN MC 003 EQUIPMENT AND FURNITURE MARINE CRAFT 45 0 03/07EQFN MC 004 EQUIPMENT AND FURNITURE MARINE CRAFT 57 0 06/11

    111 PO111-21 20 FOOT ALUMINUM AIR BOATEQVH 001 EQUIPMENT - VEHICLES 41 0 06/08

    111 PO111-25 25 FOOT FIBERGLASS BOATEQVH 001 EQUIPMENT - VEHICLES 147 0 06/08

    111 PO111-32 RAPID RESPONSE RIGID HULL INFLATABLE BOAT (SCUBA)EQVH 003 EQUIPMENT - VEHICLES 202 0 06/10EQVH 004 EQUIPMENT - VEHICLES 32 0 03/07

    111 PO111-6 DIESEL MARINE ENGINESEQFN MC 005 EQUIPMENT AND FURNITURE MARINE CRAFT 163 0 03/07EQFN MC 006 EQUIPMENT AND FURNITURE MARINE CRAFT 791 0 06/08EQFN MC 007 EQUIPMENT AND FURNITURE MARINE CRAFT 1,247 0 06/09

    CO#: A EQFN MC 009 EQUIPMENT AND FURNITURE MARINE CRAFT 49 0 03/07CO#: A EQFN MC 010 EQUIPMENT AND FURNITURE MARINE CRAFT 224 0 03/07

    111 PO111-8 SCUBA TEAM UNDERWATER CAMERAEQFN PH 003 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 27 0 03/07EQFN PH 004 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 111 0 06/10

    111 PO111-9 COLOR IMAGING SCANNING SONAR SYSTEMEQFN MC 004 EQUIPMENT AND FURNITURE MARINE CRAFT 93 0 06/10

    111 PO111LUMP HARBOR LUMP SUM FOR FY'12 & FY'13EQFN 001 EQUIPMENT AND FURNITURE 1,315 0 06/12EQFN 002 EQUIPMENT AND FURNITURE 1,355 0 06/13

    ------------------------------------------------------------------------------------------------------------------------------------

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 804WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    BUDGET LINE: PO-127 FMS #: 056 236 HELICOPTERSAVAILABLE BALANCE AS OF: 08/31/06 $18,870,000.10 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $25,075.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $35,841,016.90 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * 1,390 * * (C)* * 9,737 * 10,266 * *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * * * * * * * * * * *FORCST (C) * * * * * * * * * * * * *ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO127-1 AGUSTA HELICOPTERSEQFN AV 007 EQUIPMENT AND FURNITURE AVIATION 14,495 0 06/15

    111 PO127-4 BELL 412EP HELICOPTEREQFN AV 004 EQUIPMENT AND FURNITURE AVIATION 9,737 0 06/08EQFN AV 005 EQUIPMENT AND FURNITURE AVIATION 10,266 0 06/09

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-141 FMS #: 056 232 NEW 40TH PRECINCT STATION HOUSEAVAILABLE BALANCE AS OF: 08/31/06 $21,220,401.23 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $1,553,811.77 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * 3,080 * (C)* * 5,445 * * 18,855 *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * * * * * * * * * * *FORCST (C) * * * * * * * * * * * * *ACTUAL (C) * * * * * * * * * * * * *

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    850 PO141-001 NEW 40TH PRECINCT STATION HOUSE CONSCOMP 09/04 09/10DSGN 008 DESIGN 5,445 0 06/08CONS 009 CONSTRUCTION 18,855 0 06/10EQFN 010 EQUIPMENT AND FURNITURE 700 0 06/13

    ------------------------------------------------------------------------------------------------------------------------------------

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 805WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    BUDGET LINE: PO-163 FMS #: 056 227 ACQUISITION AND INSTALLATION OF COMPUTER EQUIPMENTAVAILABLE BALANCE AS OF: 08/31/06 $96,178,663.23 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $13,248,134.18 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $144,759,172.59 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * 16,265 * 4,925 * 10,536 * (C)* 56,236 * 21,068 * 4,925 * 10,536 *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * * * * * 4,500 * * 23,159 * * * 28,577 * 56,236FORCST (C) * * * 17 * * * * 4,500 * * 51,719 * * * * 56,236ACTUAL (C) * * 4,941 * * * * * * * * * * * 4,941

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 NYPD5RTCC NYPD Real Time Crime CenterCO#: B EQFN 002 EQUIPMENT AND FURNITURE 2,119 0 06/07

    EQFN 003 EQUIPMENT AND FURNITURE 6,118 0 03/07EQFN 007 EQUIPMENT AND FURNITURE 4,128 0 06/08

    111 PO163-CPU BACK-UP DATA STORAGE DEVICEEQFN ED 002 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,000 0 03/07EQFN ED 003 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,000 0 06/11

    111 PO163-LAB LABORATORY INFORMATION MANAGEMENT SYSTEM (LIMS)CO#: C EQFN ED 016 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 17 0 06/07CO#: H EQFN ED 016 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 2,437 0 06/07CO#: H EQFN ED 017 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,100 0 06/09

    111 PO163-PCL PROPERTY CLERK LAN SYSTEMEQFN ED 001 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 224 0 03/07

    111 PO163-SI SYSTEMS INTEGRATOREQFN ED 001 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 5,000 0 06/07

    111 PO163-11A TAPE DRIVES AND CONTROLEQFN ED 003 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 986 0 03/07EQFN ED 005 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,000 0 06/11

    111 PO163-18 MAINFRAME CPUEQFN ED 003 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 7,000 0 06/10EQFN ED 004 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 7,000 0 06/15EQFN ED 007 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 402 0 03/07

    111 PO163-2 ARREST PROCESSINGEQFN ED 029 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 3,982 0 06/08

    CO#: A EQFN ED 029 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,001 0 06/08EQFN ED 031 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,537 0 03/07EQFN ED 032 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,000 0 06/08EQFN ED 033 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 2,000 0 06/09

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 806WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    EQFN ED 036 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,000 0 06/10

    111 PO163-26 TELECOMMUNICATIONS CONTROLLERS-2EQFN ED 014 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 754 0 03/07EQFN ED 015 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 75 0 03/07

    111 PO163-3 POLICE ACADEMY LANSEQFN ED 027 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 500 0 06/09

    111 PO163-36 OLWS - PHOTO IMAGING SYSTEMEQFN ED 002 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 3,000 0 06/07EQFN ED 006 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 481 0 03/07EQFN ED 008 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 5,000 0 06/11

    111 PO163-6A DASD MAINFRAMEEQFN ED 008 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 99 0 03/07EQFN ED 011 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 75 0 03/07EQFN ED 012 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 75 0 06/08EQFN ED 013 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 75 0 06/09EQFN ED 014 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 2,000 0 06/10EQFN ED 015 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 100 0 06/11EQFN ED 016 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 100 0 06/12EQFN ED 017 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 100 0 06/13EQFN ED 018 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 100 0 06/14EQFN ED 019 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 2,000 0 06/15

    111 PO163AFIS AUTOMATED FINGERPRINT IDENTIFICATION SYSTEM - CRDEQFN ED 005 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,250 0 06/09EQFN ED 006 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 400 0 06/12EQFN ED 007 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 1,450 0 06/14

    111 PO163CARD SMART IDENTIFICATION CARD SYSTEMEQFN 001 EQUIPMENT AND FURNITURE 4,500 0 01/07

    111 PO163CASE CASE MANAGEMENT PROJECTEQFN 001 EQUIPMENT AND FURNITURE 4,200 0 03/07EQFN 002 EQUIPMENT AND FURNITURE 1,772 0 03/07

    111 PO163CFOR COMPUTER FORENSICS SYSTEMEQFN 001 EQUIPMENT AND FURNITURE 1,773 0 03/07

    111 PO163LNWN LAN/WAN NETWORK INFRASTRUCTURE UPGRADEEQFN 010 EQUIPMENT AND FURNITURE 104 0 03/07EQFN 011 EQUIPMENT AND FURNITURE 3,000 0 03/07EQFN 013 EQUIPMENT AND FURNITURE 4,026 0 06/07EQFN 020 EQUIPMENT AND FURNITURE 10,882 0 06/08CTGY 021 CONTINGENCY 30,000 0 12/06

    111 PO163MCMS MAINTENANCE CONTROL MANAGEMENT SYSTEM - FSDEQFN ED 002 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 536 0 06/10EQFN ED 003 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 684 0 06/15EQFN ED 005 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 49 0 03/07

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 807WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO163PTDS PARKING TICKET DEVICE SYSTEMCO#: C EQFN 001 EQUIPMENT AND FURNITURE 213 0 06/07

    111 PO163SECR SECURITY IMPROVEMENTS FOR COMPUTER NETWORKEQFN 002 EQUIPMENT AND FURNITURE 6,810 0 06/07

    CO#: A EQFN 002 EQUIPMENT AND FURNITURE 46 0 06/07CO#: C EQFN 002 EQUIPMENT AND FURNITURE 4,909 0 06/07

    111 PO163WDNS WIRELESS DATA NETWORKING SYSTEMCO#: A EQFN 006 EQUIPMENT AND FURNITURE 510 0 03/07

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-185 FMS #: 056 253 VEHICLES OF AT LEAST $35,000 AFTER NOVEMBER 1, 1999AVAILABLE BALANCE AS OF: 08/31/06 $21,539,965.09 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $10,099,035.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $44,941,963.91 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * 5,226 * 8,636 * 3,157 * (C)* 20,593 * 5,367 * 8,636 * 3,157 *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * 80 * * * 193 * * * 10,951 * * * 9,369 * 20,593FORCST (C) * 383 * 717 * 405 * * * 193 * * * 18,895 * * * * 20,593ACTUAL (C) * 383 * 8,797 * * * * * * * * * * * 9,179

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO185-ATT APPREHENSION TACTICAL TEAM (ATT)/ESU VANSEQVH VN 005 EQUIPMENT - VEHICLES VANS 546 0 06/09EQVH VN 006 EQUIPMENT - VEHICLES VANS 244 0 06/15

    111 PO185-OIL DIESEL HEATING OIL TRUCKEQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 80 0 09/06

    111 PO185-1A CANINE VEHICLEEQFN ED 003 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 272 0 06/08

    111 PO185-10A CAT CAREQVH AU 003 EQUIPMENT - VEHICLES AUTOMOBILES 168 0 03/07EQVH AU 006 EQUIPMENT - VEHICLES AUTOMOBILES 230 0 03/07EQVH AU 007 EQUIPMENT - VEHICLES AUTOMOBILES 241 0 06/09EQVH AU 011 EQUIPMENT - VEHICLES AUTOMOBILES 560 0 06/13

    111 PO185-10C PHOTO OBSERVATION TRCKEQVH TK 002 EQUIPMENT - VEHICLES TRUCKS 482 0 06/09

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 808WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO185-11B TEMP HEADQUART VEH-SMEQVH EM 005 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 164 0 06/07EQVH 008 EQUIPMENT - VEHICLES 81 0 03/07

    111 PO185-11D TEMPORARY HEADQUARTERS VEHICLE-LARGEEQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 383 0 06/07EQVH EM 002 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 158 0 03/07

    111 PO185-11E COMMAND POSTEQVH EM 002 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 171 0 06/09

    111 PO185-11F THV TRAILER SMALLEQVH EM 002 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 90 0 06/11

    111 PO185-11J LARGE TOTAL CONTAINMENT VESSEL AND FORD VEHICLEEQVH EM 002 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 244 0 06/09

    111 PO185-11K LINESCAN AUTOVANEQVH EM 002 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 407 0 06/09

    111 PO185-12 REMOTE MOBILE INVESTIGATOR VEHICLEEQVH EM 004 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 190 0 06/08

    111 PO185-12B ESU TRUCKEQVH EM 007 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 880 0 03/07EQVH EM 008 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 86 0 03/07EQVH EM 009 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 1,999 0 06/08EQVH EM 010 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 599 0 06/09

    111 PO185-13A HIGH CUBE VANEQVH VN 002 EQUIPMENT - VEHICLES VANS 281 0 03/07

    111 PO185-13C VAN BODY TRUCKEQVH VN 006 EQUIPMENT - VEHICLES VANS 96 0 03/07EQVH VN 007 EQUIPMENT - VEHICLES VANS 454 0 06/09

    111 PO185-13D 18 FOOT SHREDDER TRUCKEQVH 001 EQUIPMENT - VEHICLES 193 0 12/06

    111 PO185-14 LIGHT TRUCKEQVH TK 003 EQUIPMENT - VEHICLES TRUCKS 320 0 03/07EQVH TK 004 EQUIPMENT - VEHICLES TRUCKS 239 0 03/07EQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 387 0 06/12

    111 PO185-14A ESU (HELP) SUBURBANSEQVH EM 003 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 460 0 03/07EQVH EM 004 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 121 0 06/09EQVH EM 005 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 647 0 06/14

    111 PO185-15C 18' RACK CREW CABEQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 452 0 03/07EQVH TK 007 EQUIPMENT - VEHICLES TRUCKS 2,160 0 06/10EQVH TK 008 EQUIPMENT - VEHICLES TRUCKS 312 0 06/13

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 809WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO185-16 6 HORSE VAN (3)EQVH VN 003 EQUIPMENT - VEHICLES VANS 454 0 06/10EQVH VN 004 EQUIPMENT - VEHICLES VANS 84 0 03/07

    111 PO185-18C MEDIUM TOW TRUCKSEQVH TK 011 EQUIPMENT - VEHICLES TRUCKS 325 0 06/07EQVH TK 012 EQUIPMENT - VEHICLES TRUCKS 196 0 03/07EQVH TK 013 EQUIPMENT - VEHICLES TRUCKS 1,288 0 06/12EQVH TK 014 EQUIPMENT - VEHICLES TRUCKS 316 0 06/09EQVH TK 015 EQUIPMENT - VEHICLES TRUCKS 166 0 06/10EQVH TK 016 EQUIPMENT - VEHICLES TRUCKS 436 0 06/11EQVH TK 017 EQUIPMENT - VEHICLES TRUCKS 1,919 0 06/14

    111 PO185-18E 30 TON TOW TRUCKEQVH TK 002 EQUIPMENT - VEHICLES TRUCKS 269 0 06/09

    111 PO185-19C PATROL WAGONSEQVH TK 012 EQUIPMENT - VEHICLES TRUCKS 717 0 06/07EQVH TK 013 EQUIPMENT - VEHICLES TRUCKS 1,161 0 06/14

    CO#: TA EQVH TK 013 EQUIPMENT - VEHICLES TRUCKS 1,039 0 03/07EQVH TK 014 EQUIPMENT - VEHICLES TRUCKS 1,039 0 06/08EQVH TK 015 EQUIPMENT - VEHICLES TRUCKS 955 0 06/09EQVH TK 016 EQUIPMENT - VEHICLES TRUCKS 1,155 0 06/11EQVH TK 017 EQUIPMENT - VEHICLES TRUCKS 568 0 06/12EQVH TK 018 EQUIPMENT - VEHICLES TRUCKS 284 0 06/13

    111 PO185-20C RAMP BODY TRUCK 2 CAR CARRIEREQVH TK 008 EQUIPMENT - VEHICLES TRUCKS 187 0 03/07

    CO#: DT EQVH TK 009 EQUIPMENT - VEHICLES TRUCKS 94 0 03/07EQVH TK 010 EQUIPMENT - VEHICLES TRUCKS 103 0 03/07

    CO#: DT EQVH TK 011 EQUIPMENT - VEHICLES TRUCKS 197 0 03/07EQVH TK 012 EQUIPMENT - VEHICLES TRUCKS 357 0 06/09

    111 PO185-23 AERIAL BUCKET TRUCK- ELECTRONICS SECTION & TARUEQVH EM 003 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 98 0 03/07

    CO#: TU EQVH EM 005 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 185 0 06/08

    111 PO185-26G BMS TRUCKEQVH TK 002 EQUIPMENT - VEHICLES TRUCKS 147 0 06/10

    111 PO185-29 UTILITY TRUCKEQVH TK 009 EQUIPMENT - VEHICLES TRUCKS 94 0 06/08EQVH TK 011 EQUIPMENT - VEHICLES TRUCKS 230 0 06/10EQVH TK 012 EQUIPMENT - VEHICLES TRUCKS 328 0 06/11

    111 PO185-3B TUGEQVH TK 003 EQUIPMENT - VEHICLES TRUCKS 132 0 06/09

    111 PO185-3C HI LO (SMALL)EQVH TK 006 EQUIPMENT - VEHICLES TRUCKS 108 0 03/07EQVH TK 007 EQUIPMENT - VEHICLES TRUCKS 117 0 03/07EQVH TK 011 EQUIPMENT - VEHICLES TRUCKS 46 0 06/09

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 810WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO185-3E HIGH-LO MEDIUMEQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 218 0 03/07

    CO#: DT EQVH TK 006 EQUIPMENT - VEHICLES TRUCKS 235 0 03/07EQVH TK 007 EQUIPMENT - VEHICLES TRUCKS 49 0 06/08

    CO#: DT EQVH TK 008 EQUIPMENT - VEHICLES TRUCKS 109 0 06/08EQVH TK 009 EQUIPMENT - VEHICLES TRUCKS 329 0 06/09

    111 PO185-30 9 HORSE TRAILEREQVH TK 003 EQUIPMENT - VEHICLES TRUCKS 279 0 06/11

    111 PO185-31A DUMP TRUCKEQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 114 0 03/07EQVH TK 006 EQUIPMENT - VEHICLES TRUCKS 83 0 03/07EQVH TK 007 EQUIPMENT - VEHICLES TRUCKS 176 0 06/09

    111 PO185-32 TRACTOR TRUCKEQVH TK 007 EQUIPMENT - VEHICLES TRUCKS 481 0 06/11EQVH TK 009 EQUIPMENT - VEHICLES TRUCKS 98 0 03/07EQVH TK 010 EQUIPMENT - VEHICLES TRUCKS 116 0 03/07

    111 PO185-33A FUEL TANKER TRUCKEQVH TK 008 EQUIPMENT - VEHICLES TRUCKS 572 0 06/11

    111 PO185-34 GENERATOR TRUCKEQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 424 0 06/11EQVH TK 006 EQUIPMENT - VEHICLES TRUCKS 500 0 06/13

    111 PO185-36 40 PASSENGER BUSEQVH BU 008 EQUIPMENT - VEHICLES BUSES 207 0 03/07EQVH BU 012 EQUIPMENT - VEHICLES BUSES 137 0 03/07EQVH BU 014 EQUIPMENT - VEHICLES BUSES 384 0 06/12EQVH BU 015 EQUIPMENT - VEHICLES BUSES 790 0 03/07

    111 PO185-37 RACK CRANE TRUCKEQVH TK 001 EQUIPMENT - VEHICLES TRUCKS 137 0 03/07EQVH TK 003 EQUIPMENT - VEHICLES TRUCKS 202 0 06/09EQVH TK 004 EQUIPMENT - VEHICLES TRUCKS 223 0 06/15

    111 PO185-39 HAZMAT TRUCKEQVH TK 002 EQUIPMENT - VEHICLES TRUCKS 387 0 03/07EQVH TK 003 EQUIPMENT - VEHICLES TRUCKS 118 0 06/08EQVH TK 004 EQUIPMENT - VEHICLES TRUCKS 193 0 06/12

    111 PO185-39A HAZMAT SHOWER TRUCKEQVH EM 002 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 635 0 06/12

    111 PO185-4A 10' RACK VEHICLEEQVH VN 001 EQUIPMENT - VEHICLES VANS 27 0 03/07EQVH VN 002 EQUIPMENT - VEHICLES VANS 80 0 06/08EQVH VN 003 EQUIPMENT - VEHICLES VANS 72 0 06/12EQVH VN 004 EQUIPMENT - VEHICLES VANS 113 0 06/15

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 811WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO185-40 SCUBAEQVH TK 003 EQUIPMENT - VEHICLES TRUCKS 434 0 06/12

    111 PO185-41 10 TON TOW TRUCKSEQVH TK 007 EQUIPMENT - VEHICLES TRUCKS 107 0 03/07EQVH TK 008 EQUIPMENT - VEHICLES TRUCKS 550 0 06/09EQVH 009 EQUIPMENT - VEHICLES 100 0 03/07

    111 PO185-42 FRONT END LOADERSEQVH TK 004 EQUIPMENT - VEHICLES TRUCKS 691 0 06/09

    111 PO185-45 4X4 SUBURBAN W/PLOW & TA SUBURBANSEQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 42 0 03/07

    CO#: TA EQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 69 0 03/07EQVH TK 006 EQUIPMENT - VEHICLES TRUCKS 250 0 06/08

    CO#: TA EQVH TK 008 EQUIPMENT - VEHICLES TRUCKS 51 0 06/08

    111 PO185-47 BOMB SQD RESPONSE VEHICLEEQVH EM 003 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 77 0 03/07EQVH EM 004 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 114 0 06/08EQVH EM 005 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 108 0 06/13EQVH EM 006 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 160 0 06/15

    111 PO185-48 PARCEL DELIVERY VANCO#: A EQVH VN 004 EQUIPMENT - VEHICLES VANS 18 0 03/07

    EQVH VN 005 EQUIPMENT - VEHICLES VANS 56 0 06/13EQVH VN 006 EQUIPMENT - VEHICLES VANS 578 0 06/08EQVH VN 007 EQUIPMENT - VEHICLES VANS 135 0 06/09EQVH VN 008 EQUIPMENT - VEHICLES VANS 150 0 03/07

    111 PO185-49 SHOP SWEEPEREQVH TK 004 EQUIPMENT - VEHICLES TRUCKS 53 0 03/07EQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 55 0 03/07EQVH TK 006 EQUIPMENT - VEHICLES TRUCKS 86 0 06/15

    111 PO185-50 PRISONER TRANSPORT VANS (API)EQVH TL 003 EQUIPMENT - VEHICLES TRAILERS 723 0 06/09

    111 PO185-53B INCIDENT COMMAND POST VEHICLE ("SPRINTER VEHICLE")EQVH EM 001 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 217 0 03/07

    111 PO185-54 ASBESTOS TRUCKEQVH EM 003 EQUIPMENT - VEHICLES EMERGENCY VEHICLES 99 0 06/09

    111 PO185-6C 2 HORSE TRAILER PULLERSEQVH TK 005 EQUIPMENT - VEHICLES TRUCKS 37 0 03/07EQVH TK 006 EQUIPMENT - VEHICLES TRUCKS 509 0 03/07EQVH TK 008 EQUIPMENT - VEHICLES TRUCKS 360 0 03/07EQVH TK 009 EQUIPMENT - VEHICLES TRUCKS 239 0 06/08

    111 PO185-64 MEDIUM TOW TRUCK - DOT (REPLACES 4-TON TOW TRUCKS)EQVH TK 004 EQUIPMENT - VEHICLES TRUCKS 7,780 0 06/07EQVH TK 007 EQUIPMENT - VEHICLES TRUCKS 10,618 0 06/11

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 812WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO185-66 MOBILE ARREST VEHICLE - TAEQVH TK 002 EQUIPMENT - VEHICLES TRUCKS 934 0 03/07EQVH TK 004 EQUIPMENT - VEHICLES TRUCKS 391 0 06/09

    ------------------------------------------------------------------------------------------------------------------------------------

    BUDGET LINE: PO-187 FMS #: 056 255 PURCHASE OF NEW EQUIPMENT FOR POLICE DPT. USEAVAILABLE BALANCE AS OF: 08/31/06 $15,677,431.66 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $768,982.22 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $23,674,211.12 (CITY) $.00 (NON-CITY)

    * FY 07 * FY 08 * FY 09 * FY 10 * * FY 07 * FY 08 * FY 09 * FY 10 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 2,104 * 1,771 * 1,896 * 2,062 * (C)* 13,551 * 1,771 * 1,896 * 2,062 *APPROPRIATIONS* * * * * COMMITMENT PLAN * * * * *

    (N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2007

    JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 07____________________________________________________________________________________________________________________________________PLAN (C) * * * 53 * * * 120 * * * 7,778 * * * 5,600 * 13,551FORCST (C) * * * * * * 120 * * * 8,049 * * * 5,382 * 13,551ACTUAL (C) * 105 * * * * * * * * * * * * 105

    * * * * * * * * * * * * *PLAN (N) * * * * * * * * * * * * *FORCST (N) * * * * * * * * * * * * *ACTUAL (N) * * * * * * * * * * * * *____________________________________________________________________________________________________________________________________

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO185-50M ENTRANCE DOOR CRSEQFN PE 002 EQUIPMENT AND FURNITURE POWER EQUIPMENT 51 0 03/07

    111 PO187-FIP FORENSIC IMAGE PROCESSING SYSTEMEQFN LB 005 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 110 0 06/08EQFN LB 007 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 128 0 06/13

    111 PO187-IAB IAB--PHOTO PRINTER/PROCESSOREQFN 002 EQUIPMENT AND FURNITURE 115 0 03/07EQFN 003 EQUIPMENT AND FURNITURE 147 0 06/12

    111 PO187-LRW LABORATORY ROBOTICS WORKSTATIONEQFN 003 EQUIPMENT AND FURNITURE 89 0 06/11

    111 PO187-MT0 DECAL AND SIGN MANUFACTURING EQUIPMENTEQFN PE 007 EQUIPMENT AND FURNITURE POWER EQUIPMENT 50 0 03/07

    111 PO187-MT4 FRAME STRAIGHTENEREQFN PE 006 EQUIPMENT AND FURNITURE POWER EQUIPMENT 130 0 06/10EQFN PE 007 EQUIPMENT AND FURNITURE POWER EQUIPMENT 167 0 06/15EQFN PE 008 EQUIPMENT AND FURNITURE POWER EQUIPMENT 29 0 03/07

    111 PO187-MT8 FRONT END ALIGNMENT KITSEQFN PE 008 EQUIPMENT AND FURNITURE POWER EQUIPMENT 150 0 06/15

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 813WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO187-OCE PLOTTER/COPIER & ACCESSORIES FOR CARTOLOGY & GRAPHICS UNITEQFN DP 002 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 50 0 06/09

    111 PO187-PC8 MODULAR SHELVING-KINGSLAND AVE WAREHOUSEEQFN BD 003 EQUIPMENT AND FURNITURE ORIGINAL FURNISHINGS (BED 117 0 06/09

    111 PO187-PC9 SECURITY SYSTEM- PEARSON PLACE/KINGSLAND AVE WAREHOUSESEQFN 001 EQUIPMENT AND FURNITURE 377 0 03/07

    111 PO187-PH2 CUSTOM ENLARGER AND PROCESSOREQFN PH 001 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 132 0 03/07

    111 PO187-PH3 LONG ROLL FILM PROCESSOREQFN DP 002 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 73 0 03/07

    111 PO187-PH5 MINI LAB ENLAR STA AND FILM PROCEQFN PH 001 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 263 0 03/07

    111 PO187-PH6 MINI LAB LONG ROLLEQFN PH 002 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 242 0 03/07EQFN PH 003 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 269 0 06/11

    111 PO187-PH7 LASER COPIEREQFN FF 001 EQUIPMENT AND FURNITURE OFFICE FURNITURE 252 0 03/07

    111 PO187-PL4 FOURIER TRANSFORM INFRARED MICROSPECTROMETEREQFN LB 002 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 111 0 03/07EQFN LB 004 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 159 0 03/07EQFN LB 005 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 174 0 06/10EQFN LB 006 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 184 0 06/12

    111 PO187-PR2 PHOTO POST SCRIPT RIPEQFN DP 003 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 86 0 06/09

    111 PO187-PR3 MBO FOLDER 26" X 50"EQFN DP 002 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 122 0 06/09

    111 PO187-PR4 HALM JPWOD SINGLE COLOR JET PRESSEQFN DP 002 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 100 0 06/11

    111 PO187-PR6 STANDARD 9 STAGE COLLATOREQFN 001 EQUIPMENT AND FURNITURE 100 0 06/14

    111 PO187-PR9 SUPER WEB SERIES 180 PRESSEQFN DP 003 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 390 0 06/10

    111 PO187-VCM VIDEO COMPARISON MICROSCOPEEQFN 002 EQUIPMENT AND FURNITURE 340 0 06/10

    111 PO187-VSC VIDEO SPECTRAL COMPARATOREQFN 001 EQUIPMENT AND FURNITURE 55 0 03/07EQFN 002 EQUIPMENT AND FURNITURE 64 0 06/08EQFN 003 EQUIPMENT AND FURNITURE 74 0 06/13

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 814WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO187-VSM VIDEO STEREO MICROSCOPEEQFN 001 EQUIPMENT AND FURNITURE 38 0 03/07EQFN 002 EQUIPMENT AND FURNITURE 79 0 03/07EQFN 003 EQUIPMENT AND FURNITURE 44 0 06/08EQFN 004 EQUIPMENT AND FURNITURE 91 0 06/09EQFN 005 EQUIPMENT AND FURNITURE 51 0 06/13

    111 PO187-XRD X-RAY DIFFRACTOMETEREQFN LB 002 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 158 0 03/07EQFN LB 003 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 183 0 06/08EQFN LB 004 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 212 0 06/13

    111 PO187-XRF X-RAY FLUORESCENCE SPECTROMETEREQFN 002 EQUIPMENT AND FURNITURE 185 0 03/07EQFN 003 EQUIPMENT AND FURNITURE 215 0 06/11

    111 PO187-1 DOCUMENT IMAGE SCANNER/OPTICAL DISK AND STORAGE SYSTEMEQFN PH 003 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 54 0 03/07EQFN PH 004 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 60 0 06/11

    111 PO187-20B READERS PRINTERSEQFN ED 012 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 100 0 03/07EQFN ED 013 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 128 0 06/12

    111 PO187-25 OCCB PHOTOEQFN PH 002 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 120 0 12/06EQFN PH 005 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 140 0 06/14EQFN PH 006 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 68 0 06/15

    111 PO187-3 EXEC. ELEV. CARD ACCESS SYSTEMEQFN SR 002 EQUIPMENT AND FURNITURE SECURITY SYSTEMS 68 0 03/07EQFN SR 003 EQUIPMENT AND FURNITURE SECURITY SYSTEMS 86 0 03/07

    111 PO187-32 COMPUTERIZED RECORDS ARCHIVING SYSTEMEQFN LB 003 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 96 0 06/11

    111 PO187-36 HASHIMOTO 2 COLOR PERFECTOR PRESSEQFN DP 003 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 350 0 06/15

    111 PO187-36B PRINT PRESSEQFN DP 004 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 225 0 06/08EQFN DP 005 EQUIPMENT AND FURNITURE PRINTING/DUPLICATING 318 0 06/14

    111 PO187-41 BOMB ROBOTEQFN WE 003 EQUIPMENT AND FURNITURE WEAPONRY AND RELATED EQUI 156 0 03/07EQFN WE 005 EQUIPMENT AND FURNITURE WEAPONRY AND RELATED EQUI 248 0 06/09

    111 PO187-43 LONG ROLL PAPER PROCESSOREQFN PH 003 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 357 0 03/07EQFN PH 004 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 367 0 06/11EQFN PH 005 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 215 0 06/11

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 815WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO187-43A LONG ROLL PRINT SYSTEMEQFN PH 002 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 244 0 03/07EQFN PH 004 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 383 0 03/07EQFN PH 005 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 397 0 06/11

    111 PO187-5 HQS--REM & REPL 10 TURNSTILES & INSTL SECURITY DESKEQFN ED 002 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 191 0 06/08

    111 PO187-6 CENTRAL MONITORING SYSTEMEQFN ED 001 EQUIPMENT AND FURNITURE COMPUTERS AND PERIPHERAL 759 0 03/07

    111 PO187-60 COMPARISON MICROSCOPEEQFN LB 005 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 39 0 03/07EQFN LB 007 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 46 0 06/10EQFN LB 008 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 94 0 06/11EQFN LB 010 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 41 0 03/07EQFN LB 011 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 48 0 06/12

    111 PO187-65 ROTARY HIGH TECH MICROFILMEQFN PH 006 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 100 0 03/07EQFN PH 007 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 128 0 06/12EQFN PH 008 EQUIPMENT AND FURNITURE PHOTOGRAPHIC EQUIPMENT 88 0 06/15

    111 PO187-66 37" PREFECTOR PRESSEQFN 001 EQUIPMENT AND FURNITURE 600 0 06/13

    111 PO187-76 PISTOL LICENSE FILING SYSTEMEQFN 003 EQUIPMENT AND FURNITURE 353 0 06/15EQFN 004 EQUIPMENT AND FURNITURE 66 0 03/07

    111 PO187-77 PISTOL PERMIT AND LONG GUN ID CARD SYSTEMEQFN 001 EQUIPMENT AND FURNITURE 115 0 06/10EQFN 002 EQUIPMENT AND FURNITURE 129 0 06/15

    111 PO187-8 DELTA CRASH BARRIERSEQFN SR 001 EQUIPMENT AND FURNITURE SECURITY SYSTEMS 76 0 06/08

    111 PO187-8C FTIR SPECTROPHMETER WITH DIAMOND CELL ACCESSEQFN LB 005 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 104 0 03/07EQFN LB 007 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 83 0 03/07EQFN LB 009 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 44 0 06/08EQFN LB 010 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 97 0 06/11EQFN LB 011 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 51 0 06/13

    111 PO187CALE CALEA COMPLIANT SURVEILLANCE SYSTEM - TARUCO#: A EQFN 002 EQUIPMENT AND FURNITURE 53 0 09/06

    111 PO187CEMS CAPILLARY ELECTROPHORESIS/MASS SPECTROMETEREQFN 002 EQUIPMENT AND FURNITURE 201 0 06/10

    111 PO187CT7 TRACS DETECTION SYSTEMEQFN 001 EQUIPMENT AND FURNITURE 944 0 03/07CTGY 002 CONTINGENCY 2,000 0 12/06

    SOLIMAR SOLASC JL132 NONE

  • FY 2007 AUTHORIZED COMMITMENT PLAN PAGE: 816WITH FY 2007 PLAN AND FORECAST AND ACTUALS

    ($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)

    MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________

    111 PO187FIBF FIBER FINDEREQFN LB 002 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 89 0 06/08EQFN LB 003 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 103 0 06/13

    111 PO187GCHA GAS CHROMATOGRAPH WITH HEADSPACE ANALYZEREQFN 002 EQUIPMENT AND FURNITURE 78 0 03/07EQFN 003 EQUIPMENT AND FURNITURE 81 0 03/07EQFN 004 EQUIPMENT AND FURNITURE 91 0 06/10

    111 PO187GCMS GAS CHROMATOGRAPH/MASS SPECTROMETERSEQFN LB 008 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 418 0 06/08EQFN LB 009 EQUIPMENT AND FURNITURE LABORATORY AND TEST EQUIP 645 0 06/09