capacity calculation 14

2
*** production capacity investigation Supplier code Recipient Supplier name Contact person : Mfg location e-mail : Department Writer TEL Capacity calculation standard; "Same or less than 95% of load ratio" based on following conditions 1) same or less than 22 working hours per day, 2) same or less than 5 working days per week Please consider reliable working time length condition. All blue column should be filled with data and calculation logic Production capacity and production preparation check sheet by supplier, with referencing Sample comments and logic Parts name Parts number P/C 1. Requirement and available supplies To consider delivery lead time, and decide N as not customer SOP but your SOP with volume to produce Unit : EA Sample N N+1 N+2 N+3 N+4 N+5 N+6 Month Feb-2013 Jan-1900 Mar-1900 Apr-1900 May-1900 Jun-1900 Jul-1900 0) Customer requirement volime 11,300 A) Requirement volume as your production 11,300 B) Actual available supplies quantity 11,491 0 0 0 0 0 0 0 C) Load ratio (A/B) 98.3% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! C) column should be same or less than 95% If C) is more than 95%, please describe proposed measures and reculculate capacity including them D) Available supplies quantity with meas 11,947 E) Load ratio with measures (A/D) 94.6% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! e.g. : D = B + 2(machine) * 5(day) * 1(H) * 60(pcs/H) * 80% * 95% = 11,947 EA Describe the reason of low capacity and proposed measures Equipment/line durability for model life (serviceable without renewal un To be selected Describe the following condition Actual available supplies quantity Sample Dec-1899 Jan-1900 Mar-1900 Apr-1900 May-1900 Jun-1900 Jul-1900 1. # of equipment or line 2 line line line line line line line line e.g. : 2 machine Ref; using general-purpose equipment/line or Exclusive use (producing for other vehicle/parts also e.g. : Exclusive use Ref; equipment/line total load ratio 90 % % % % % % % % (including production for other vehicle e.g. : 90% This total load ratio also should be same or less than 95% 2. # of operation days for this vehicle 21 day day day day day day day day (excluding operation days for other vehicle/ e.g. : 21 day Ref; # of shift per day 1 shif shif shif shif shif shif shif shif e.g. : 1 shift 3. # of working hours per day for this veh 6 hour hour hour hour hour hour hour hour (excluding operation hours for other vehicle e.g. : 6 hour 4. # of job per hour (JPH) 60 EA EA EA EA EA EA EA EA e.g. : 60 EA 5. Operation ratio (%) 80 % % % % % % % % (fill latest actual ratio, not wishful e.g. : 80% 6. Defect ratio (%) 5% % % % % % % % (fill latest actual ratio, not wishful e.g. : 5% 7. Mathematical formula ### EA 0 EA 0 EA 0 EA 0 EA 0 EA 0 EA 0 EA Describe bottleneck process PSW (or PPAP) status Concern & counter measures Machine : Tooling : Man power : Delivery : Design change : Quality : Material preparation : e.g. : = 2(machine) * 21(day) * 6(H) * 60(pcs/H) * 80% * 95% = 11,491 EA

Upload: loko99

Post on 22-Dec-2015

7 views

Category:

Documents


2 download

DESCRIPTION

Calculo de capacidad

TRANSCRIPT

Page 1: Capacity Calculation 14

*** production capacity investigation Supplier code

Recipient Supplier name

Contact person : Mfg location

e-mail : Department

Writer

TEL

Capacity calculation standard; "Same or less than 95% of load ratio" based on following conditions

1) same or less than 22 working hours per day, 2) same or less than 5 working days per week

Please consider reliable working time length condition.

All blue column should be filled with data and calculation logic

Production capacity and production preparation check sheet by supplier, with referencing Sample comments and logic

Parts name Parts number P/C

1. Requirement and available supplies To consider delivery lead time, and decide N as not customer SOP but your SOP with volume to produce

Unit : EA Sample N N+1 N+2 N+3 N+4 N+5 N+6

Month Feb-2013 Jan-1900 Mar-1900 Apr-1900 May-1900 Jun-1900 Jul-1900

0) Customer requirement volime 11,300

A) Requirement volume as your production 11,300

B) Actual available supplies quantity 11,491 0 0 0 0 0 0 0

C) Load ratio (A/B) 98.3% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

C) column should be same or less than 95%

If C) is more than 95%, please describe proposed measures and reculculate capacity including them

D) Available supplies quantity with measures 11,947

E) Load ratio with measures (A/D) 94.6% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

e.g. : D = B + 2(machine) * 5(day) * 1(H) * 60(pcs/H) * 80% * 95% = 11,947 EA

Describe the reason of low capacity and proposed measures

Equipment/line durability for model life (serviceable without renewal until EOP or not) To be selected

Describe the following condition

Actual available supplies quantity

Sample Dec-1899 Jan-1900 Mar-1900 Apr-1900 May-1900 Jun-1900 Jul-1900

1. # of equipment or line 2 line line line line line line line line

e.g. : 2 machine

Ref; using general-purpose equipment/line or not Exclusive use

(producing for other vehicle/parts also or not) e.g. : Exclusive use

Ref; equipment/line total load ratio 90 % % % % % % % %

(including production for other vehicle/parts) e.g. : 90% This total load ratio also should be same or less than 95%

2. # of operation days for this vehicle 21 day day day day day day day day

(excluding operation days for other vehicle/parts) e.g. : 21 day

Ref; # of shift per day 1 shift shift shift shift shift shift shift shift

e.g. : 1 shift

3. # of working hours per day for this vehicle 6 hour hour hour hour hour hour hour hour

(excluding operation hours for other vehicle/parts) e.g. : 6 hour

4. # of job per hour (JPH) 60 EA EA EA EA EA EA EA EA

e.g. : 60 EA

5. Operation ratio (%) 80 % % % % % % % %

(fill latest actual ratio, not wishful ratio) e.g. : 80%

6. Defect ratio (%) 5 % % % % % % % %

(fill latest actual ratio, not wishful ratio) e.g. : 5%

7. Mathematical formula 11,491 EA 0 EA 0 EA 0 EA 0 EA 0 EA 0 EA 0 EA

Describe bottleneck process

PSW (or PPAP) status

Concern & counter measures

Machine :

Tooling :

Man power :

Delivery :

Design change :

Quality :

Material preparation :

e.g. : = 2(machine) * 21(day) * 6(H) * 60(pcs/H) * 80% * 95% = 11,491 EA

Page 2: Capacity Calculation 14

L03F production capacity investigation Supplier code

Recipient Supplier name

Mfg location

Department

Writer

TEL

Capacity calculation standard; "Same or less than 95% of load ratio" based on following conditions

1) same or less than 22 working hours per day, 2) same or less than 5 working days per week

Please consider reliable working time length condition.

All blue column should be filled with data and calculation logic

Production capacity and production preparation check sheet by supplier, with referencing Sample comments and logic

Parts name COVER RECESS F RH / F LH / R RH / R LH Parts number BJS7-68424-02 / BJS768454-02 / BJS8-68424-02 / BJS868454-02 P/C 1

1. Requirement and available supplies To consider delivery lead time, and decide N as not customer SOP but your SOP with volume to produce

Unit : EA Sample N N+1 N+2 N+3 N+4 N+5 N+5

Month Mar-2014 Apr-2014 May-2014 Jun-2014 Jul-2014 Aug-2014 Sep-2014 Oct-2014

0) Customer requirement volime 7,200 6,560 7,040 7,520 11,840 14,400 15,120 16,720

A) Requirement volume as your production 7,200 6,560 7,040 7,520 11,840 14,400 15,120 16,720

B) Actual available supplies quantity 24,190 0 0 25,290 25,290 26,389 25,290 25,290

C) Load ratio (A/B) 29.8% #DIV/0! #DIV/0! 29.7% 46.8% 54.6% 59.8% 66.1%

C) column should be same or less than 95%

If C) is more than 95%, please describe proposed measures and reculculate capacity including them

D) Available supplies quantity with measures 24,440 0 0 25,290 28,689 28,788 26,439 26,439

E) Load ratio with measures (A/D) 29.5% #DIV/0! #DIV/0! 29.7% 41.3% 50.0% 57.2% 63.2%

e.g. : D = B + 2(machine) * 5(day) * 1(H) * 60(pcs/H) * 80% * 95% = 11,947 EA

Describe the reason of low capacity and proposed measures

* High scrap ratio at Paint process is the reason of low capacity.

To increase working shift 1 to 2, and add overtime work and working on hpliday.

Equipment/line durability for model life (serviceable without renewal until EOP or not) To be selected

Describe the following condition

Actual available supplies quantity

Sample Apr-2014 May-2014 Jun-2014 Jul-2014 Aug-2014 Sep-2014 Oct-2014

1. # of equipment or line 1 line 1 line 1 line 1 line 1 line 1 line 1 line 1 line

e.g. : 2 machine

Ref; using general-purpose equipment/line or not Exclusive use General-purpose General-purpose General-purpose General-purpose General-purpose General-purpose

(producing for other vehicle/parts also or not) e.g. : Exclusive use

Ref; equipment/line total load ratio 90 % %

(including production for other vehicle/parts) e.g. : 90% This total load ratio also should be same or less than 95%

2. # of operation days for this vehicle 22 day day day 23 day 23 day 24 day 23 day 23 day

(excluding operation days for other vehicle/parts) e.g. : 21 day

Ref; # of shift per day 3 shift shift 3 shift 3 shift 3 shift 3 shift 3 shift 3 shift

e.g. : 1 shift

3. # of working hours per day for this vehicle 22 hour hour 22 hour 22 hour 22 hour 22 hour 22 hour 22 hour

(excluding operation hours for other vehicle/parts) e.g. : 6 hour

4. # of job per hour (JPH) 60 EA EA 60 EA 60 EA 60 EA 60 EA 60 EA 60 EA

e.g. : 60 EA

5. Operation ratio (%) 85 % % 85 % 85 % 85 % 85 % 85 % 85 %

(fill latest actual ratio, not wishful ratio) e.g. : 80%

6. Defect ratio (%) 2 % % 2 % 2 % 2 % 2 % 2 % 2 %

(fill latest actual ratio, not wishful ratio) e.g. : 5%

7. Mathematical formula 24,190 EA 0 EA 0 EA 25,290 EA 25,290 EA 26,389 EA 25,290 EA 25,290 EA

Describe bottleneck process

PSW (or PPAP) status

Concern & counter measures

Machine :

Tooling :

Man power :

Delivery :

Design change :

Quality :

Material preparation :

e.g. : = 2(machine) * 21(day) * 6(H) * 60(pcs/H) * 80% * 95% = 11,491 EA

* Painting process is botleneck. Then to increase shift, add overtime work and working on holiday.

B2
Fill vehicle code (e.g. L42L, L12F, …)
D17
from SOP to 5 months after SOP
D19
Production volume informed from customer
D20
Supplier capacity for this vehicle (auto calculation)
D21
If same or less than 95%, it's no concern (auto calculation)
D24
To be completed with additional production logic/data as measures
E27
If C) is more than 95%, describe the reason and countermeasures
D57
Describe bottleneck process and measure
D58
Authorization status of PPAP or PSW (No need at 1st survey)
D60
Describe below, if you have any problems or concerns for coming SOP (No need at 1st survey)