capability statement - paul e harris...
TRANSCRIPT
1
CAPABILITY STATEMENT - PAUL E HARRIS
QUALIFICATIONS 2010 Certificate 4 in training and Assesment
2006 Managing Successful Programmes Practitioner – A Programme Management Methodology developed in the UK
2003 Certified PRINCE2 Trainer
2002 Chartered Engineer Stage 2 Professional Engineer (CP Eng)
2000 Certified PRINCE2 Practitioner – A Project Management Methodology developed in the UK
1997 Certified Cost Engineer – The Association for the Advancement of Cost Engineers, USA
1984 Chartered Professional Engineer – IEA Aust
1976 Civil Engineering Degree, Honours, 2nd Class, Brighton, UK
PROFESSIONAL AFFILIATIONS
2007 Member Australian Institute of Management
2004 to 2007
Director PMI Melbourne
2004 to 2006
Member of the Australian Standards Review Committee for the creation of a Project Management Standard
2003 Member of the Australian Standards Review Committee for AS 4187-2005 Project Performance Measurement using Earned Value
2003 Member PMI, Project Management Institute
2000 to 2005
Primavera Authorized Partner – Primavera Systems Inc
1995 Member of AACE, The Association for the Advancement of Cost Engineers
1984-2006
Member Institution of Engineers Australia
CAPABILITY STATEMENT – PAUL E HARRIS
2
BOOKS PUBLISHED 2010 Planning and Control Using Microsoft Project 2010 and PMBOK Guide Fourth Edition
2010 PRINCE2 2009 Planning and Control Using Microsoft Project 2010
2010 Planning and Scheduling Using Microsoft Project 2010
2010 Project Planning & Control Using Primavera P6 - For all industries including Versions 4 to 7
2009 Planning and Control Using Microsoft Project and PMBOK Guide Fourth Edition - Including Microsoft Project 2000 to 2007
2009 Project Planning and Scheduling Using Primavera Contractor Version 6.1 Including Versions 4.1, 5.0 and 6.1
2008 Project Planning & Control Using Primavera P6 - For all industries including Versions 4 to 6
2007 99 Tricks and Traps for Microsoft® Office Project - Including Microsoft® Project 2000 to 2007
2007 Planning and Scheduling Using Microsoft Office Project 2007 - Including Microsoft Project 2000 to 2003
2007 Planning and Scheduling Using Microsoft Office Project 2007 - Including Microsoft Project 2000 to 2003
2007 PRINCE2 Planning & Control Using Microsoft Project - Updated for Microsoft Office Project 2007
2007 Planning and Control Using Microsoft Project and PMBOK® Guide Third Edition - Updated for Microsoft Office Project 2007
2006 Planning Using Primavera SureTrak Project Manager Version 3.0 Revised 2006
2006 Planning and Control Using Microsoft Project and PMBOK® Guide Third Edition
2005 PRINCE2 Planning & Control Using Microsoft Project
2005 Planning & Scheduling Using Primavera® Version 5.0 for IT Project Office
2005 Planning & Scheduling Using Primavera® Version 5.0 for Engineering & Construction
2005 Planning and Scheduling Using Primavera Version 4.1 - For Engineering & Construction and Maintenance & Turnover
2005 Planning and Scheduling Using Primavera Version 4.1 - For IT Project Office and New Product Development
2005 Planning and Scheduling Using Primavera Contractor Version 4.1 - For the Construction Industry
CAPABILITY STATEMENT – PAUL E HARRIS
3
2004 Planning and Scheduling Using Primavera Enterprise TeamPlay Version 3.5
2004 Planning and Scheduling Using Primavera Enterprise P3e & P3e/c Version 3.5
2004 PRINCE2 Planning & Control Using Microsoft Project
2004 Planning Using Microsoft Project 2003
2002 Planning Using Microsoft Project 2002
2002 Planning Using Microsoft Project 2000
2000 Planning Using Primavera Project Planner P3 Version 3.1
2000 Planning Using SureTrak Project Manager Version 3.0
2000 Planning Using Primavera Project Planner P3 Version 3.0
2000 Planning Using Primavera Project Planner P3 Version 2.0
1999 Project Planning Using Primavera SureTrak for Windows Version 2.0
PROFESSIONAL PAPERS
2010 Importing Microsoft Project files into Primavera P6. Presented at Logal projects client info session in November 2010.
2010 Practical Application of Earned Value Performance Measurement presented at ACES breakfast meeting in Perth 2010.
2010 Cashflowing with Expenses in P6 by importing for an excel spread sheet. - Presented by Paul E Harris at the Insync 10 conferance in Melbourne August 2010.
2010 Primavera Bars Tricks and Traps. - The defaults setting for the display of bars in Primavera P6 can be greatly improved with some formatting, this presentation outlines the issues and solutions. Presented by at the Primavera User Group in Melbourne June 2010
2009 Issues and Solutions facing Construction Contractors Implementing Primavera P6, presented at the my PRIMAVERA09 Peak Project Performance conference in Melbourne - June 2009.
2007 Principals of Planning – a one day training course aimed at the construction industry.
2005 Guidelines for Selecting and Training People in the use of Planning and Scheduling Software
2005 Guidelines for Implementing Planning and Scheduling Software
CAPABILITY STATEMENT – PAUL E HARRIS
4
2004 Corporate Governance How Will CLERP9 and Sarbanes-Oxley Change the Corporate Approach to Managing Projects – PMI Melbourne, ACES Melbourne
2002 Techniques for Managing Complex Projects with Planning and Scheduling Software – ICEC Conference, Melbourne.
2001 Managing Projects with P3 & PRINCE2, presented to P3 user conference, Sydney.
2001 The Practical Application of Earned value Performance Measurement, presented to ICOMS, Melbourne.
1999 Selecting Project Management Software, published in Earthmovers & Civil Contractor.
1998 Earned Value Performance Measurement Using P3 for Windows, presented to AACEI.
CAPABILITY STATEMENT – PAUL E HARRIS
5
EXPERIENCE
Paul E Harris a director of Eastwood Harris since 1993 providing Programme and Project management consulting to companies in the areas of establishing and running programme and project controls systems. This has included assisting in the evaluation, selection and implementation of programme and project controls software, training and the running of programme and project controls systems with a strong emphasis on the integration of Oracle Primavera Inc and Microsoft Project software into corporate programme and project management systems including:
Project Office setup using PRINCE2 methodology
Planning and scheduling
Schedule analysis for dispute resolution
Earned value performance measurement
Document control and record management
Estimating, contact management and project cost management
Training courses in PRINCE2TM, PMBoK© Based Project Management Courses, Primavera P3, Primavera Enterprise, Primavera SureTrak, Microsoft Project and Tilos.
Writing and publishing project management software books,PRINCE2 and other PM training material.
These services were provided to clients in government and private industry including the following industries:
Software development and implementation
Petrochemical
Machine development
Process plant
Mining and resource
Construction underground and surface
Claims management and
Change management.
Government.
Past member of the National committee of the Australian Cost Engineering Society, past Director of PMI Melbourne and has presented many project controls papers. Experience prior to establishing Eastwood Harris Pty Ltd:
3 years as estimator, planner and developing cost control systems on mining and resource based projects.
3 years as site project controls manager on an underground mine upgrade project.
5 years site civil construction engineering construction management and supervision on infrastructure and resource development projects.
CAPABILITY STATEMENT – PAUL E HARRIS
6
SPECIFIC AREAS OF COMPETENCE
Software Training & Implementation
Recently implemented for the following computer packages in large organisations with activities which include integration with other software, training, procedure writing and long term support:
Primavera Version 6.0, including previous versions and Primavera Contractor
Primavera Project Planner P3
SureTrak Project Manager
Microsoft Project 2000, 2002, 2003, 2007 and 2010
Asta Power Project
Tilos
Project Management Training
Conducting training courses in:
PRINCE2 Practitioners course
Fundamentals of Project Management
Advance Project Management
Project Management module of a Diploma in Business Management
Principles of Planning
Earned Value Performance Measurement
Programme and Project Planning & Scheduling
A thorough understanding of planning and scheduling of the design and construction of a wide variety range of projects using Microsoft Project all current versions, Primavera Project Planner P3, Primavera SureTrak, Primavera P6, Tilos and Asta PowerProject.
Prepared schedules for the following industries:
Software Implementation
Software Development
Offshore, Natural Gas & Petrochemical
Civil Engineering
Mining, Open Cut & Underground
Process Plants
R&D Machine Development for the Aluminium Industry
Corporate Training Programs
CAPABILITY STATEMENT – PAUL E HARRIS
7
Schedule Analysis for Dispute Resolution
The ability to reconstruct, review, analysis and comment on the level of detail, logic, resources and construction of a schedule and provide comprehensive reports on the schedule for litigation and dispute resolution. Methods understood and used are:
As-planned versus As-built comparison
Impacted As-planned
Collapsed As-built method
Window analysis
Project Management
A good understanding of managing projects from conception through to completion, with a sound knowledge of PRINCE2 methodology, PMBOK Fourth Edition and practical experience over a wide range of projects.
Cost Control
A thorough understanding of establishing and managing costs control systems for operating companies who wish to manage their own projects utilising their own accounting systems. This has included the writing of procedures, job descriptions and training of company personnel in the requirements of project cost control.
Cost Accounting
Extensive knowledge of cost accounting in association with project cost control including multi currency and escalation. The implementations included designing the system, writing the procedures and training the personnel including setting up and running earned value cost management systems.
Programme and Project Office Setup
Set up and running of Programme and Project Offices for organisations, including selecting systems, writing procedures and running the offices.
Document Control and Record Management
An understanding of the selection and implementation of systems in a large organisation, including the integration of paper, email, database and electronic storage methods to provide a complete record of project history.
Programme and Project Software Selection
Assisted companies in performing requirements analysis and requirements baseline use for the selection of commercially available software. Assisted in the research for appropriate software, the selection and implementation of the systems.
CAPABILITY STATEMENT – PAUL E HARRIS
8
Earned Value Performance Measurement
Member of the Australian Standards Review Committee for AS 4817-203 Project Performance Measurement using Earned Value, nominated by the Australian Cost Engineering Society.
Developed and run a number of Earned Value Performance Measurement Systems using P3, Excel and Access.
Written an Earned Value Performance Measurement one day training course.
Estimating
A broad experience in estimating projects that ranges from Order of Magnitude mining and resource based multi discipline projects to small detail estimates for the construction industry.
Use and teach an estimating software package from the USA called WinEst.
CAPABILITY STATEMENT – PAUL E HARRIS
9
COURSES ATTENDED BY PAUL E HARRIS
Year Course Name Duration Provider
2009 Asta Powerproject 2 day AEC Systems
2007 General Safety Induction (Construction Industry)
½ day CSTC Pty Ltd
2006 Managing Successful Programmes 5 day Codarra Advanced Systems
2005 Project Portfolio Management Course
4 day TrueCourse Solutions
2000 P3e Training Course 3 day Primavera Australia
2000 P3e Training Course 1 day Primavera Australia
2000 Prince2 training course 3 day Rational Management
1998 ProLog Manager, An integrated project management software package
3 day CBS Australia
1996 MS Access – Introduction 5 night Box Hill Institute
1996 MS Access – Advanced 5 night Box Hill Institute
1996 American Association of Cost Engineers
Self Education
Self Education
1995 P3 for Windows Advanced 3 day P3 Australia
1995 Introduction to Internet 4 night. Box Hill Institute
1994 Primavera P3 for Windows 2 day P3 Software
1994 WinEst Estimating Training 1 day CBS Australia
1993 JOBPAC, Project Management Software
5 day BCM Pty Ltd
1992 Lotus to Excel Conversion 1 day MERA
1992 Performance Measurement using Work Breakdown Structures
2 day Corporation Pty Ltd Technology Training
1992 Project Management and Project Selection
4 day CRA
1991 TimeLine Advanced 1 day MERA
1991 Staff Development 2 day Minenco
1991 Qwicknet Professional, 3 day 3 day Qwicknet
1990 Finance Course, 3 day 3 day Institute of Administration
1990 Project Management Conference 3 day International Exhibition Specialists
1990 Mining Industry Capital & Operating Cost Estimating Conference
3 day Pasminco
CAPABILITY STATEMENT – PAUL E HARRIS
10
Year Course Name Duration Provider
1990 Engineering Project Management & Contract Management
3 day International Exhibition Specialists
1989 Management Development, 3 day 3 day Corporate Consulting Services
CAPABILITY STATEMENT – PAUL E HARRIS
11
Company Start Finish Discipline Activity Project Description
Various Feb 95
Present Training Training Courses in P3, SureTrak,
Microsoft Project, Asta
Powerproject, Tilos, PRINCE2
and other project
management training courses.
None Running training courses for the following companies: Australian Institute of Management, Alstrom Power, Anglo Coal, Arup, Aspect Engineering, Ausenco, Australian Institute of Management, BHP, Burns Bridge, Burns and Roe Worley Pty Ltd, CaroMel Ocean Pty Ltd, Centrelink, ConocoPhillips, Davis Langdon, Defence Material Organisation, Department of Human Services, Effective Computer Solutions, Emergency Services Telecommunications Authority, Eroc, Evans & Peck, Furnace Engineering, GHD, Hansen Yunken Pty Ltd, Hazelwood Power, IDEAS, Infratec International Pty Ltd, International Power , ISIS, ITX Oz, JA Dodds, Johnstaff, John Holland Pty Ltd, Kane Constructions, KBR, Kempe International, Leed Engineering, Loy Lang Power, Lurgi, The Melbourne University, Mt Isa Mines, Murrindini Shire Council, Nacap, National Museum of Australia, Nexus Energy, Newton Manor Pty Ltd, Oaky Creek Coal, Orica, O&GS - Santos EPC Alliance, Powerplant Project Services, Primavera Australia, Probuild, Rational Management, Santos, Seafood Industry of Victoria, Sedgman, Shedden Uhde, Shell Refining, Silcar, Sinclair Knight Mertz, Southern Pacific Petroleum, Swinburn University of Technology ,Tenix, The Good Guys, The Universtity of Melbourne, Thiess, Transfield, TXU, Unisys, VicTrak, Western Corridor Recycled Water Project Eastern Alliance Power, Woodside Energy, Worley, Yallourn Energy.
CAPABILITY STATEMENT – PAUL E HARRIS
12
Company Start Finish Discipline Activity Project Description
Implementation of Primavera P6 and earlier versions
Jan 2005 onwards
P6 implementatio
n.
Assistance in the implementation, including writing
of procedures and integration
with other systems.
Airport Link, International Power, Thiess, John Holland, Novo Rail, Ausenco, Woodside, Sedgeman.
Thiess July 10 Oct 10 Rail Schedule development
Regional rail Link Assisting in the development of a the tender schedule for this 80km of new track from Little River to Spencer Street Station.
MetaPM November 09
December 09
Project Control System
Requirements analysis.
Various Assistance in writing the requirements analysis for a Works Program system for all forecasts forward at least 18-24 months by effective coordination of resources for Jemena.
Sunwater, Queensland
May 2009 Present P6 Implementatio
n
P6 implementation
Various Assisting in the implementation of a P6 client server and web based enterprise planning and scheduling system including the writing of a dedicated training manual. Assisting in the implementation of an Earned Value reporting system.
Infratec International Pty Ltd
July 09 August 09 Pipeline Implementation of Asta
Powerproject Scheduling
System
Various Selection of planning software and implementation of Asta Powerproject, including the writing of procedures, creating templates and training of 6 people
CAPABILITY STATEMENT – PAUL E HARRIS
13
Company Start Finish Discipline Activity Project Description
ISIS Group Holdings
June 09 Present Building Implementation of Microsoft
Project Scheduling
System
Various Implementation of a corporate planning and scheduling systems Australia wide using Microsoft Project, including the writing of procedures, creating templates and training of over 200 people in all states of Australia.
Emergency Services Telecommunications Authority
May 09 May 09 Communication
Project Management
Process review.
MDN 2014 Review of PRINCE2 project management process and the recommendation on how to improve their project and programme management processes.
Novo Rail April 09 May 09 Rail P6 implementation
Various The review of the current schedule and advising on how the standalone installation may be moved to a client server environment, training or users, writing of procedures and advising on the implementation of an Earned Value system.
Woodside April 09 April 09 Oil & Gas P6 implementation
Various The review of the current implementation and a report recommending how their current scheduling environment may be improved.
Ausenco Services
Sep 08 Present Mining Site schedule environment
establishment
Cadia Mine Conversion and integration of Newcrest and three contractors schedules into one combined P6 schedule including the training of users in the system and writing of schedule procedures.
Hydro Tasmania Feb 08 Mar 08 Water & Wind Power
Project Plan and Project safety
Plan development
Various The development of project plans for the development of Flinders Island Wind Farm, King Island Wind Farm, Ouse, Shannon and Clyde Catchments Development, Lake Margaret Hydro Scheme Development and other documents.
CAPABILITY STATEMENT – PAUL E HARRIS
14
Company Start Finish Discipline Activity Project Description
Conscium International Pty Ltd
Oct 07 No 07 Training Redevelop of PRINCE2 training
material
None Rewrite and redevelop the training material to suit the new PRINCE2 Practitioner exams.
Laing O’Rourke Aug 07 Sep 07 Construction Training material development
None The development of a one day planning course titled “Leading with the Plan” teaching project managers how to plan a project and manage a project with a plan.
Codarra Advanced Systems
Jul 07 Sep 07 Training Redevelop of PRINCE2 training
material
None Rewrite and redevelop the training material to suit the new PRINCE2 Practitioner exams.
International Power Hazelwood
Jun 07 Dec 2007 Power Primavera Version 5.0
Implementation scheduling software
None Eastwood Harris was appointed as the contractor to assisting in the implementation of Primavera Version 5.0 software, including advising on database configuration, administrator training, import of database information, writing of procedures, development of training material and training of users.
Western Corridor Recycled Water Project Eastern Alliance
Arp 07 Aug 07 Pipeline P3 Version 3.1 scheduling software
Implementation
Western Corridor Recycled Water Project
Setting up of a Primavera P3 scheduling environment including training of schedulers, writing and implementation of scheduling procedures and processes, establishing import and export processes from and to Tilos for the schedule management of work performed by this alliance.
SafeLink Alliance Mar 07 Apr 07 Scheduling Implementation of Scheduling
System
Ipswich Freeway Upgrade
Assisting in the implementation of an Asta Power Project scheduling system and one-to-one training of the lead scheduler.
CAPABILITY STATEMENT – PAUL E HARRIS
15
Company Start Finish Discipline Activity Project Description
SYPAQ Systems Pty Ltd
Mar 07 Mar 07 Scheduling Implementation of Scheduling
System
GIS II&S JP2064 Programme
Assisting in the implementation of a Microsoft Project scheduling process and one-to-one training of the lead scheduler.
Eastern Pipeline Alliance
Feb 07 Present Scheduling Implementation of Scheduling
System
Urbane water pipe construction in Brisbane
Training, implementation and support of a P3 Version 3.1 scheduling system for the planning and control of the Eastern Pipeline Alliance in Brisbane.
ConocoPhillips Humber Refinery, UK
Jan07 Jan 07 Training Training Primavera Version 3.0
material development
None The development of a 3 day Primavera Version training material tailored to the companies specific Turnaround project requirements
Thiess Contractors
Sep 06 Oct 06 Training Training material development
None The development of generic project planning material training material to instruct employees on the basics of planning and scheduling before teaching the use of scheduling tools.
Merri Creek Management Committee
Sep 06 Oct 06 Programme Management
Programme Management
Establishment of Programme Office
Assisting in setting up Microsoft Project to plan and report multiple projects including resources and costs
Hawker de Havilland Aerospace Pty Ltd
Jun-06 Jun-06 Programme Management
Programme Management
Establishment of Programme Office
Assistance in the setting up of Primavera Version 5.0 for the management of a programme of projects at the Hawker de Havilland Aerospace Pty Ltd factory in Port Melbourne.
CAPABILITY STATEMENT – PAUL E HARRIS
16
Company Start Finish Discipline Activity Project Description
VicTrak Jun-06 Sep-06 Programme Management
Programme Management
None Assisting in setting up of systems to manage and report the progress of a programme of railway crossing projects using SureTrak Project Manager.
Ahrens Pty Ltd May-06 May-06 Programme Management
Programme Management
None Assisting in the setting up of a portfolio management system in Primavera Version 5.0 for the management of a number of fabrication and construction project around Australia.
Kemp Sep-04 Aug-06 Schedule analysis
Schedule Analysis
Confidential Assisting with the preparation of As-build schedules from source data such as photos and site records and the preparation of documents for the delay analysis of a project in the Middle East.
The Denlin Construction Group Pty Ltd
Nov-05 Dec-05
Schedule analysis
Schedule Analysis
21 Eastbourne St Windsor
Preparation of a Windows Analysis for claims assessment on a building project
Officeworks May-05 Jun-05 Scheduling Project Control Systems Setuop
and Project Scheduling
Directworks SAP Implementation
The assistance in the rescheduling of this SAP implementation and setting up of a robust scheduling environment and reporting system.
Upstream Petroleum
Feb-05 May-05 Scheduling Scheduling Baska Manta Project
The scheduling for this large oil field development in the Bas Straight including the writing of procedures and the training of a scheduler for the project.
Kemp Sep-04 Present Scheduling Project Control Systems Setup
and Project Scheduling
Zinifex, Hindalco & Fjardall aluminium smelter projects
Creating and updating project schedules.
Assisting in the establishment of project templates, reporting and earned value control systems.
CAPABILITY STATEMENT – PAUL E HARRIS
17
Company Start Finish Discipline Activity Project Description
Agility Non-04 Dec-04 Construction Planning and scheduling the
design & construction of a
wind farm
Hallett Wind Farm
Creating a project planning document and schedule in SureTrak for the detailed design and construction of the wind farm. The schedule was used to verify that the construction target dates could not be achieved without some early design and procurement activities being complete before the main design and construct contracts was to be placed.
TXU Jul-04 Sep-04 IT Project Management
Systems
None Assistance in setting Microsoft Project 2000 for the management of a number of IT projects. Including running training courses, writing of procedures and customising of Microsoft Project templates.
John Holland Group
May-04 Jun-04 Building Claims Analysis State Bowls Centre & Training Velodrone
Assistance in the preparation of schedule related claims documentation.
Shedden Uhde Mar-04 Jun 04 Process Estimating Software selection
None The documentation of existing estimating processes design of an enhanced systems including the selection of an estimating database estimating software.
NEG Micon Nov-03 Jun 04 Construction Project Controls Wattle Point , Clements Gap, Emu Downs, Wattle Point and Yambuk Farm Wind Far Projects
The establishment of a project plan for the establishment of the project and project controls systems to manage the construction of the wind farms.
CAPABILITY STATEMENT – PAUL E HARRIS
18
Company Start Finish Discipline Activity Project Description
DMO Sep-03 Sep-03 Military/IT Project Health Checks
MISD projects. A desktop audit of each project to determine compliance with and effective use of the MISD Project Management Methodology (PMM) which is based on PRINCE2.
Wesley College Aug-03 Sep-03 Education Software Selection
Project office software implementation.
Assistance in the selection of project planning and scheduling software for the IT project office which is being used to assist in the implementation of PRINCE2 methodology.
Davis Langdon Jul-03 Jul-03 Building Schedule Analysis
RACV Reconstruction of the schedule from pdf files and analysis of the schedule and providing a report for the financiers of the project.
TOJV Jul-02 Jul-02 Driven Tunnel Estimate
Claims Analysis City Link Tunnel Providing advice in the litigation with reference to prior work preformed with TOJV.
Eroc May 02 May 02 Underground Mining
Software Implementation
Underground mining
The establishment of a fully levelled P3 schedule to plan and monitor the underground production of the Ridgeway Cadia Mine.
Davis Langdon Apr-02 May-02 Building Software Implementation
P3 Software The loading of P3 software in a Citrix environment and the writing of procedures and work instructions for the management of the software and projects on the Citrix environment.
CAPABILITY STATEMENT – PAUL E HARRIS
19
Company Start Finish Discipline Activity Project Description
Hazelwood Power
Mar-02 May-05 Power Station Planning and Project Initiation
West Field Development and Setting Up P3 in the organisation.
Playing an ongoing role in the organisation running P3 training courses, one to one training and assisting in the establishment of project processes using PRINCE2 methodology and scheduling for the Hazelwood West Mine Development Project. This included a review of the projects against the PRINCE2 Health Check list and on going Project Assurance roles for contractors schedules.
ABB Feb-02 Feb-04 Power Station Scheduling Instrument and Control Upgrade
Setting up the project management system including planning, scheduling, document management, document control and Earned Value Performance Measurement systems including aspects of PRINCE2 methodology for the management of I&C upgrade of the Yallourn Power Station.
Shedden Uhde Pty Ltd
Dec-01 Feb-02 Process Scheduling Shell HDS2 Unit in Geelong
Establishing project schedule for the design and construction of this plant.
Minter Ellison Oct-01 Aug-02 Building Schedule Analysis
Ballarat Police & Courts Complex
The review and report on the contractors original and as build schedule. The preparation of a delay schedule and analysis of this schedule.
Brown & Root Oct-01 Dec-02 Military Scheduling Air 87 Scheduling helicopter training courses over a 10 year period. The schedule was fully resources loaded and levelled.
Hinds Blunden May-01 Oct-01 Underground Construction
Claims Analysis Transfield V Hyde City Council
The evaluation of payroll and invoices, which are part of a claim against Ryde City Council.
CAPABILITY STATEMENT – PAUL E HARRIS
20
Company Start Finish Discipline Activity Project Description
Hinds Blunden May-01 Nov-01 Road Construction
Claims Analysis Melbourne to Geelong Freeway Upgrade
The review of contractors’ schedules to assist VicRoads in the assessment of claims.
Hinds Blunden May-01 Oct-01 Underground Construction
Claims Analysis Elgas V Geotech The review of various construction schedules and estimates to assist in the documentation of a counter claim.
Western Power Jan-01 Mar-03 Power Station Estimating and cost
management
IWC demonstration power plant in WA
Providing estimating, scope control and cost management for the design and construction of a power station being designed in Melbourne and built in WA.
DOI Dec-00 Apr-01 Software Software Implementation
Rail Projects Group
The selection and setting up of a range of project management software systems including software selection, implementation training, procedures and systems based on PRINCE2 included: 1. Estimating using WinEstimator, 2. Document Management procedures including incoming and outgoing mail, 3. Contact Management system using IT Factory and 4. Record Management using Domino.Doc.
DOI Sep-00 Apr-01 Infrastructure Project Controls Regional Fast Rail Project
Setting up an run a full set of Project Controls Systems based on PRINCE2 methodology including: Project Plans, Stage Plans, Risk and Issues log, filing systems in paper and electronic, setting up email and new starters induction using P3, Lotus Notes Discussion databases, MS word and Excel.
CAPABILITY STATEMENT – PAUL E HARRIS
21
Company Start Finish Discipline Activity Project Description
SKM Jul-00 Dec-00 Building Claims Analysis Ballarat Court and Police Complex.
The development of schedules for claims analysis by the prime contractor.
CAPABILITY STATEMENT – PAUL E HARRIS
22
CityLink Jul-00 Aug-00 Infrastructure Project Controls City Link Project This assignment involved the reimplementation of a P3 and SureTrak concentric scheduling system and involved: 1. Analysing the organisations needs. 2. Establishing a plan for the re-implementation of project scheduling system. 3. Restructuring of the Organisation required for scheduling projects. 4. Writing corporate scheduling procedures. 5. Training of people in the use of SureTrak and P3. 6. Assistance in running the help desk of a period of 6 months.
JJB Jun-00 Dec-00 Civil Scheduling Grampians Water Treatment Plant
Monthly updating of a P3/SureTrak schedule for the Grampians Water Treatment Project, including Setting up a Concentric Project Management Environment.
Mayne Nickless Limited
Apr-00 Jun-00 Software Scheduling GST Project The preparation on monthly progress reports of all 10 Business Units GST project implementation
Orica Mar-00 Jul-01 Process Scheduling Laverton Chloro-Alkalai Plant
Creating the Commissioning schedule and commissioning progress reporting processes and procedures.
Santos Nov-99 Apr-00 Oil & Gas Software Implementation
Implementation of a P3 and SureTrak.
The implementation of a Concentric environment for the management of 80 projects for the support services department, including setting up the software, converting data from MS Project, creating templates, writing procedures and training staff.
CAPABILITY STATEMENT – PAUL E HARRIS
23
Transmission Pipelines Australia
Oct-98 Dec-00 Oil & Gas Project Controls SW Pipeline Moomba Melbourne Augmentation Compressor Projects
Set up and ran project controls system for two projects. SW Pipeline Project $82,000,000 and MMA Compressor Project $74,000,000.
Transfield Pty Ltd
Oct-98 Oct-98 Process Scheduling Grampians BOOT Project
Schedule for the tender.
Thames Water Oct-98 Oct-98 Process Software Development
Software selection
Assist in selecting an integrated Project Controls System.
Quetada Pty Ltd Oct-98 Oct-98 Oil & Gas Software Development
Longford rebuild Set up a database for the commissioning of the Longford crude stabilisation plant.
Transfield Pty Ltd
Jul-98 Jul-98 Process Scheduling Coliban Water System
Schedule for the tender.
Kvaerner Oil & Gas
Jul-98 Dec-98 Oil & Gas Estimating Set up project controls database.
Set up an estimating database for use with WinEst, train users and review cost management systems.
IDEAS Jul-98 Jul-98 Mechanical Training Training Run in-house SureTrak training.
Shedden Uhde Pty Ltd
May-98 Oct-98 Process Software Development
Estimating & Tendering System
Requirements Analysis and Requirements Baseline for an Estimating & Tendering System.
Shedden Uhde Pty Ltd
May-98 Jun-98 Process Scheduling Orica Aust Ltd Chlor-Alkali Plant
Schedule for tender document
CAPABILITY STATEMENT – PAUL E HARRIS
24
Jones & Jones Engineering Design
May-98 Jun-98 Process Scheduling Upgrade at Pivot Yarraville Plant
Scoping, Planning & Estimating the project.
Stork ICM Australia Pty Ltd
Apr-98 Sep-98 Process Software Development
Software Development Training
Specification, implementation and training of Project Controls software for Queensland Ammonium Nitrate Project. Run in-house P3 training course.
Centrelink Aug-97 Apr-98 Software Project Controls Project Control Software
Requirements Analysis and Specification for the development of project controls software.
Transfield Maintenance
Jul-97 Jul-97 Maintenance Scheduling Quantas Service Tender
The scheduling for the resourcing of three major airports for the tender for a ground maintenance contract.
Maringa Management Group Pty Ltd
Jun-97 Jun-98 Defence Scheduling ADI - APDC File conversion of projects from MS Project to P3 and establishment of Cost Schedule reporting System.
Oil & Gas Venture
Apr-97 Sep-98 Oil & Gas Project Controls Project Controls Planning & Scheduling and cost management of major upgrade projects for ESSO Australia at Longford
TOJV Feb-97 Feb-97 Tunnelling Estimating City Link Project Review & report on the Tunnelling estimate.
TOJV Feb-97 Feb-97 Tunnelling Project Controls City Link Project Review of the current management reporting and the specification for the design and implementation of an Earned Value reporting system.
Len Ellis & Co Feb-97 Feb-97 Software Training MS Project & Earned Value Courses.
Development of courseware and running three one & half day courses as part of a project management course for a software development company
CAPABILITY STATEMENT – PAUL E HARRIS
25
Ajax Fasteners Jan-97 Jun-97 Mechanical Scheduling Project Phoenix Scheduling on P3 of the transfer of factory operations from Clayton & Richmond factories to a new factory in Braeside.
BCM Dec-96 Dec-96 Software Software Development
Software Development
Specifying the plant management modules for the Jobpac Cost Management System and other modules.
CRA Nov-96 Dec-96 Management Scheduling Continuous Improvement
Planning & Scheduling of “Continuous Improvement Projects” at a number of mine sites
Primavera Software
Aug-96 Present Software Scheduling Software Training Courses
Running training courses for:P3 Introduction, P3 Advanced, SureTrak Introduction and consulting services for their clients.
Thames Water Mar-96 Oct-96 Process Scheduling Two Water Treatment Plants
Planning, Scheduling and Earned Value reporting for the two projects valued at $10,000,000.Advising on the selection and implementation of cost management systems.
Roche Nov-94 Nov-94 Civil Estimating Ringwood bypass
Assistance in the tender estimating of this project, including quantity take off, subcontractor pricing and estimating.
CAPABILITY STATEMENT – PAUL E HARRIS
26
Lurgi & Lucon Sep-94 Dec-98 Process Scheduling Anaconda Acid Plant, Henan Town Gas Project, Hazlewood Power Station upgrade, three Bag Filter Plants, Olympic Dam Acid Plant, Queensland Nickel Project, WMF Fertiliser Project and Western Sands Project
Acting as part time planner & scheduler for Lurgi & Lucon, I have been involved in planning & scheduling many processing plant projects for both companies. I have run in-house training courses for P3 and SureTrak. I act as an expert adviser in Planning, Scheduling and earned value issues when requested.
Transfield Malaysia
Jul-94 Jul-94 Civil Contract Hydro Electric Scheme in Malaysia.
Review of contract documentation for the construction of a very large project and advising on the financial terns and conditions in the contract documentation and outlining the exposure and risks of the terms.
Shortrun Books Jan-94 Jan-03 Printing Software Development
Software Development
The development and maintenance of an estimating and management software for a book printer
Peak Gold Nov-93 Nov-94 Mining Scheduling Shutdowns Planning & scheduling of shutdowns.
Miscellaneous Nov-93 Nov-94 All Marketing Marketing The marketing of a range of estimating, planning and cost management software to contracting companies.
CAPABILITY STATEMENT – PAUL E HARRIS
27
Green & Associates
Nov-93 Nov-93 Civil Scheduling Brisbane Airport The scheduling of the construction of the airport apron.
Comalco Smelting
Jan-93 Jul-97 Mechanical Project Controls Butt Cleaner BSL, Butt & Thimble Press NZAS, Anode Casting Station NZAS, Butt & Thimble Press NZAS, On Line Rod Repair System NZAS
Supply of all project control services including estimating, planning, purchasing, invoice processing, cost management and R&D reporting of Smelting Rodding Room machine development projects valued between $2,000,000 and $4,000,000 each.