C a n y o n C o u r t - P r o j e c t S u m m a r y 1
BACKGROUND:
• Ecolighten became involved in this project after construction began but before the framing was complete.
• The Builder’s Project Manager wanted to detail duct routing before major beam and joisting was complete in order to acommodate any adjustments
where possible.
• Outdoor pool mechanical had not been determined due to too many conflicting recommendations from multiple sources.
SOLUTIONS & OUTCOMES:
DISCOVERY• Ecolighten engaged with Builder, Project Manager, and HVAC, Plumbing & Electrical Contractors over several boardroom meetings.
• Despite numerous conflicting recommendations, no load calculation or comparative cost analysis had been prepared.
CALCULATIONS• A detailed room-by-room load calculation was performed for the house and pool.
• Ecolighten calculated comparative costs and payback for geothermal, solar (pool mats, flat plate, evacuated tube, etc.), air-source heat pump, integrated and
independent conventional pool heating systems.
RECOMMENDATIONS• Ecolighten presented our summary of the load calculations with comment.
• We discovered the originally quoted system did not have the capacity for the cooling load.
• Ecolighten demonstrated the optimum system combination for the pool.
• Options for duct routing and sizing, based on our load calculations were negotiated.
• Equipment selection was now precise and not undersized as originally quoted.
DESIGN• Ecolighten in consultation with plumbing, HVAC, electrical contractors, and Project Manager drafted a 2-Line autoCAD design that coordinated structural
beams and joists with all duct routing, piping and terminations. (see illustration table below).
SOLUTIONS• Primary energy source for heating and cooling is a Bryant 5 ton heat pump.
• Distribution through three (3) independent zones using matching Evolution Control.
• Merv 11 pleated filter.
• Veissmann Vitodens 100 with Indirect Tank for DHW.
• Solar Pool panels with house boiler (Vitodens) as 2nd stage.
CANYON COURT Ӏ PROJECT SUMMARY
CLIENT: My House Design/Build Team PROJECT: Conyon Court – Coquitlam, BC
15356 Fraser Highway BUILDING TYPE: Custom Single-Family Home
Surrey, BC V4R 3P5 BUILDING SIZE: 5,800 sq. ft.
“Ecolighten consistently provides a high-quality Home Performance Design service that addresses
our clients custom home needs. Ecolighten has been an invaluable part of our team, to help us find
creative solutions that are acceptable to our clients and easily integrated into our projects with
reasonable construction costs.”
Steve Banai / Project Manager – My House
HIGHLIGHTS:
4 Load Calculations
4 Evaluation & Recommendations
4 2-Line AutoCAD design
4 Pool System Consultation
C a n y o n C o u r t - P r o j e c t S u m m a r y 2
UPSTAIRS DESIGN:
MAIN FLOOR DESIGN:
C a n y o n C o u r t - P r o j e c t S u m m a r y 3
ALL SERVICES ABOVE PROVIDED BY:
Ecolighten Energy Solutions
2304 - 1199 Seymour Street
Vancouver, BC
V6B 1K3
(P) 604.565.5952 (E) [email protected]
BASEMENT DESIGN: