canalis offer presentation
DESCRIPTION
Canalis offer presentation. Power LV Marketing Busway Feb. 2011. Agenda. The Canalis concept ? Applications Offer. Canalis Concept. Centralized & decentralized distributions. Decentralized distribution. Centralized distribution. The Canalis concept. Directional change. Line lengths. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/1.jpg)
Canalis offer presentationPower LV Marketing BuswayFeb. 2011
![Page 2: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/2.jpg)
Schneider Electric 2- Power LV Busway – S. Mangel – Feb. 2011
Agenda
●The Canalis concept ?
●Applications
●Offer
![Page 3: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/3.jpg)
Canalis Concept
![Page 4: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/4.jpg)
Schneider Electric 4- Power LV Busway – S. Mangel – Feb. 2011
Centralized & decentralized distributions
Centralized distribution Decentralized distribution
![Page 5: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/5.jpg)
Schneider Electric 5- Power LV Busway – S. Mangel – Feb. 2011
Power pack
Fire barrier
Line lengths
Devices for wall-mounting or suspension
Connectors and tap-off units
Closing end piece
Directional change
Trunking support
Canalis is a complete and coherent prefabricated busbar trunking system
The Canalis concept
![Page 6: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/6.jpg)
Schneider Electric 6- Power LV Busway – S. Mangel – Feb. 2011
Study without detailed knowledge of the installation
Adding, moving or replacing loads can be done quickly
Tap-off unit can be prepared in workshop to reduce the time on site
An innovative concept
![Page 7: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/7.jpg)
Schneider Electric 7- Power LV Busway – S. Mangel – Feb. 2011
Busbar trunking, tap-off units, circuit breaker & switchboards are fully
CoordinatedCompliant with IEC 60439-1/2 Factory-tested
And in addition:●High degree of protection IP55 ●Halogen free (no PVC)●Low combustible load● Inherent fire barrier●Without hazardous substances
A factory-tested concept
In the event of a fire, the busbar trunking does not emit any gas or toxic smoke
![Page 8: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/8.jpg)
Applications
![Page 9: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/9.jpg)
Schneider Electric 9- Power LV Busway – S. Mangel – Feb. 2011
For all markets
●Automotive industry, industrial plants…●Office buildings, hospitals… ●Shopping centers, airports, exhibition centers…●Data centers…●Petrochemical plants…●Shipyards…
![Page 10: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/10.jpg)
Schneider Electric 10- Power LV Busway – S. Mangel – Feb. 2011
For horizontal electrical distribution
Link between transformer and switchboards
Horizontal distribution
Transport
Lighting
![Page 11: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/11.jpg)
Schneider Electric 11- Power LV Busway – S. Mangel – Feb. 2011
Or for vertical rising main
Links
Vertical distribution
Lighting
![Page 12: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/12.jpg)
Schneider Electric 12- Power LV Busway – S. Mangel – Feb. 2011
Low voltage complete offer
![Page 13: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/13.jpg)
Offer
![Page 14: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/14.jpg)
Schneider Electric 14- Power LV Busway – S. Mangel – Feb. 2011
Canalis KDP20 A flexible busbar trunking
● Installation● In false ceiling when lights are
supported by building● In false floor as power sockets
● Tap-off centre-distances● In accordance with building
construction standards● Prefabricated cords to supply
a number of light from a single connector
● Degree of protection● IP55
![Page 15: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/15.jpg)
Schneider Electric 15- Power LV Busway – S. Mangel – Feb. 2011
Canalis KBA/KBB25-40 A rigid busbar trunking
● Dedicated to installations● Allowing large fastening
centre-distances● Heavy or numerous light fittings
● 1 or 2 circuits allowing● Twice the number
of lighting circuits● Creation of a circuit
for power sockets● Manage lighting by zones● Combination of lighting
and emergency lighting
● Degree of protection● IP55
![Page 16: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/16.jpg)
Schneider Electric 16- Power LV Busway – S. Mangel – Feb. 2011
Common tap-off units for KBA, KBB, KDP
● For instantaneous connection of electrical devices to the Canalis system:● On-load operation● PE connected before phase and neutral● Load balancing of 3-phase distribution by phase selection● Locking onto the Busway tap-off point
10A 2-pole connectors with phase selection
10A 2-pole connectors,direct connection
16A 2-pole or 4-pole connectors (option T)
10A single-phase connectors for lighting control
34
![Page 17: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/17.jpg)
Schneider Electric 17- Power LV Busway – S. Mangel – Feb. 2011
Canalis KN from 40 to 160 A
●Tap-offs by circuit-breaker or fuse units up to 160 A
●Aluminium conductors with silvered copper contacts
●Flat mounting on suspended edges or wall-mounted
●Color white RAL 9001
●Directional changes
●Degree of protection IP55
![Page 18: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/18.jpg)
Schneider Electric 18- Power LV Busway – S. Mangel – Feb. 2011
Canalis KS from 100 to 1000 A
●Tap-offs units disconnectable on-load
●Tap-offs by circuit-breaker or fuse units up to 400 A
●Mechanical and electrical jointing with expansion system
●Aluminium conductors with silvered copper contacts
●Color white RAL 9001●Degree of protection IP55
![Page 19: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/19.jpg)
Schneider Electric 19- Power LV Busway – S. Mangel – Feb. 2011
Canalis KT800A to 5000Aaluminium or copper IP55
![Page 20: Canalis offer presentation](https://reader036.vdocuments.site/reader036/viewer/2022081418/568159a0550346895dc6efab/html5/thumbnails/20.jpg)
Schneider Electric 20- Power LV Busway – S. Mangel – Feb. 2011
A large range of tap-off units
Plug-in tap-off units from 25 to 630 A Fixed tap-off units 400 to 1250 A Circuit-breakers or fuses protectionMonitoring and metering options
Contact excellenceThe silver-plated electrical contacts guarantee life long performance levels
The same range as for medium power KS as for high power KT