Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager March 14 2013 Public Consultation Group Meeting No. 1 Nelson Edwards City Project Manager

Upload: others

Post on 28-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Cambrian Road Widening Environmental Assessment Study

Christopher Gordon, P. Eng.

Project Manager

March 14 2013

Public Consultation Group Meeting No. 1

Nelson Edwards

City Project Manager

Page 2: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Meeting Agenda

• Study Process

• Data Collection

• Existing Conditions

• Future Conditions

• Needs Assessment

• Project Need and Justification

• Next Steps

Page 3: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Introduction • Cambrian Road is the primary east-

west arterial within Barrhaven South

• Provides connectivity for the community to the north-south arterials crossing the Jock River (Cedarview, Greenbank, Jockvale)

• Through developer draft plans, designs have been completed and are in various stages of the approvals process and construction

Page 4: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Video

Page 5: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Study Process

• Phase 1 and 2 were completed as part of the Barrhaven South CDP in 2006

• This study will: o review and overview of

these phases o amalgamate reports

produced prior and after the CDP

o summarize the findings in the final Environmental Study Report

Page 6: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Data Collection Reports collected for inclusion in the review of MCEA Phase 1 & 2:

• Various City RMA reports for Cambrian, Jockvale and Greenbank

• City Basemapping and Aerial Photography

• South Barrhaven Recreation Complex – Views and Floor Plan

• Barrhaven South Master Servicing Study

• Corrigan Stormwater Management Facility Report and Design Brief

• Todd Pond Design Brief

• Jock River Reason One Subwatershed Study

• Geotechnical Investigation – Mattamy Lands

• Stage 1 & 2 Archaeological Assessment – Mattamy and Tamarack Lands

• Environmental Noise Assessment Barrhaven on Half Moon Bay – Mattamy Phase 1 & 3

• Phase 1 Environmental Site Assessment – Mattamy Lands

• Phase 1 Environmental Site Assessment – Monarch Lands

• Preliminary Tree Study and Conservation plan – Stonebridge Phase 10 North

• Tree Preservation & Protection Plan – Mattamy Phase 1

Page 7: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Data Collection Reports still outstanding:

• South Barrhaven Recreation Complex – Revised Site Plan

• Geotechnical Investigation – Monarch Lands

• Stage 1 & 2 Archaeological Assessment – Monarch Stonebridge Lands

• Environmental Noise Assessment Barrhaven – Monarch Stonebridge Lands

Page 8: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Future Design

Data Collection Existing Design – Summer 2013

Page 9: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Existing Conditions

Study Area

Page 10: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Needs Assessment • Barrhaven South is the primary growth area

within Barrhaven, with a projected build-out of over 10,000 residential units prior to the urban boundary expansion (Barrhaven South CDP)

• Monarch Stonebridge, Mattamy Homes Half Moon Bay North and South, Tamarack Half Moon Bay and Meadows and Minto Barrhaven South are current developing communities

• The transportation network crossing the Jock River has been assessed in the Barrhaven South CTS and the infrastructure needs were identified

• The east-west arterial needs were not included and potential solutions for the community need to be explored

Developments Mattamy Minto

- Half Moon Bay N - Barrhaven South

- Half Moon Bay S Tamarack

Monarch - Half Moon Bay

- Stonebridge - Meadows

Page 11: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Needs Assessment TMP Infrastructure • Phase 1:

• Jockvale Road – Widen to 4 lane road from Strandherd to the Jock River

• Phase 2:

• Jockvale Road – Widen to 4 lane road from Jock River to Prince of Wales

• Greenbank Road – New four lane road from Jockvale to Cambrian with dedicated center transit lanes

• Cambrian Road – Widen to 4 lanes from Re-Aligned Greenbank to Jockvale

Pedestrian Plan Infrastructure • No facilities identified in future network plans

Cycling Plan Infrastructure • Proposed paved shoulder on Cambrian, existing Greenbank and

south on Jockvale

• Shared use lane north on Jockvale

Map 6, Ottawa Transportation Master Plan 2008

Fig 3-5c, Ottawa Cycling Plan 2008

Schedule 12b, Ottawa Pedestrian Plan 2009

Page 12: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Needs Assessment Multi-Modal Form and Function: • Pedestrian:

• Arterial sidewalk facilities with connections to transit and recreational pathways

• Integrate community sidewalk connections

• Cycling:

• Community cycling route facilities to span the Barrhaven South community

• Integrate community cycling links

• Transit:

• Existing local route service with future connection to transitway facilities on Re-Aligned Greenbank Road

• Automobile:

• Satisfy capacity and geometric requirements for multi-modal service and community trips across to north-south arterial network

Page 13: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Project Need and Justification • Complete Phase 3 and 4 of the Municipal Class EA

process for Cambrian Road

• Explore the form and function of the ultimate design for Cambrian Road and its compliance with: o current City planning documents

o current City design guidelines

• Ensure Cambrian Road meets the needs of the developing community

Page 14: Cambrian Road Wideninghmbca.ca/wp-content/uploads/2013/03/pcg_presentation_1.pdf · Cambrian Road Widening Environmental Assessment Study Christopher Gordon, P. Eng. Project Manager

Next Steps • Consultation Group Meetings – March 12 and 14

• Existing Conditions Report Draft – March 26

• Needs Assessment Report Draft – March 26

• Public Open House – March 26

• Round 2 of Consultation – May / June