cambicci associates portfolio
DESCRIPTION
Our work for 20 yearsTRANSCRIPT
Cambicci+Associates
page 2
This page was intentionally left blank
Company profile 2012
page 3 out of 129
CCCooonnnttteeennntttsss Short presentation
Portfolio
Organisation
Qualifications
Curriculum Vitae
Contact
Cambicci+associates consulting engineers co Mechanical Electrical Plumbing Energy & Industrial Studies; security; lighting design; photovoltaics; renewable energy; energy inspections;
engineer & management services; supervisions; licensing; certifications
Cambicci+Associates
page 4
This page was intentionally left blank
Company profile 2012
page 5 out of 129
SSShhhooorrrttt ppprrreeessseeennntttaaatttiiiooonnn
The M.E.P. (mechanical, electrical and plumbing) studies office with the title Cambicci+Associates was founded in February 2007 by Gerasimos Kampitsis (Yerasimo Cambicci), Mechanical Engineer of the Aristotle University of Thessaloniki, following his work experience in electromechanical design and supervision since February 1992. Furthermore the office was manned with electrical and mechanical en-gineers aiming at the technologically sufficient and on time preparation of m.e.p. studies and supervisions. A consulting and engineering services company was legally constituted in 2012. The scope of our office in its current form is: • The elaboration of m.e.p. installations studies, for all types of projects (buildings, urban design and infrastructure). • Renewable energy systems design • Nearly zero energy buildings design • Energy feasibility inspections and evaluation of buildings • Obtaining permits and licences for buildings and installations • Lighting Studies • Supervision for all of the above subjects. • Consulting Services as a Project Manager
Cambicci+Associates
page 6
Our services are provided either by choice, or via competition in the premises of either the “Design & Construct System” or the Greek S.D.I.T. system(collaborations of the public and private sector). The engineering studies that are elaborated pertain to buildings to be constructed or renovations and extensions of existing ones. The mechanical electrical & plumbing studies, referred as mep studies (or building services or electrical mechanical studies) are an im-portant component of the whole of the technical studies necessary for the completion of all projects, and they can be divided into the fol-lowing categories: Mechanical Electrical & Plumbing Studies Buildings
• Water Supply (pipe networks of potable water, hot-cold water supply networks and recirculation networks, production of hot water, solar panel systems(classical or of “void” type), storage tanks and pumping systems.
• Irrigation (irrigation with pop-up sprinklers, underground irrigation) • Rainwater Draining (using typical gravity networks, siphonic systems, under ground pumping systems.) • Sewage (sewage pipe networks, sewage pumping systems, water-oil seperators, fat-collectors, gasoline-collectors) • Heating-Airconditioning (Typical heating systems with a boiler, single pipe systems, two-pipe and four-pipe systems, underfloor
heating and floor cooling systems, central air-conditioning systems with air/water heatpumps or water/water cooling towers, air handling units, fan-coil networks, central and local split unit systems, VAV systems, geothermal systems, seawater het pumps, ex-haust and airing systems)
• Expense allocation for a central heating system • Gas fueled systems (natural gas(low and high pressure)and LPG networks) • Lifting systems (lifts, elevators, rolling stairs, traffic studies) • Swimming pools (public and private, open or closed type) • Medium Voltage private substation (medium voltage panels, power transformers, γlow voltage panels, main and auxiliary input
electrical generators, central and local U.P.S. systems, central safety lighting systems) • Heavy current electrical installation systems(lighting, plugging, in-rush current, electrical distribution in TN-C, TN-Sand IT systems) • Lightning Protection(Faraday cage and Franklin design systems, special grounding systems) • Light current electrical installation systems (phone-date networks, sound and pa installations, central R-TV-SAT, central clock sys-
tems, conference systems, translation systems, real time transmittion systems, hotel management systems, building management systems, remote control systems, control rooms systems)
• Antitheft protection (alarm, Access Control, C.C.T.V., vehicle stoppage systems, peripheral plot and building protection) • Fire safety (alarm, fire detection, security lighting ang signs, CO2, FM-200, Dry powder, Inergen, Argonite, water droplet automatic
fire suppression systems, fire hose networks, sprinklers systems, foam systems, freezing systems, mobile fire stoppage devices)
Company profile 2012
page 7 out of 129
• Pneumatic tube systems • Central vacuum
Specifically for Greek Public Sector works (and for the private sector if required): • Elaboration of studies of all stages (preliminary, final, and construction) • Formulation of technical reports and specifications reports for the materials used in the study • Formulation of a general and specific obligations report for all parties involved in the project • Formulation of Cost analysis reports • •
Furthermore, in shopping malls and retail markets: • Formulation of a report of the renter’s obligations • Monitoring the observance of the renter’s obligations • Optical sign systems • Sound systems • Video Wall systems • •
Furthermore in Hotels: • Hotel room management systems • SPA, Jacuzzi, Sauna, Thalasotherapie systems • •
Furthermore in Hospitals: • Medical Gas networks (Oxygen, Nitrogen Protoxide, Vacuum, High and Low pressure air, sleeping gas exhaust) • Special electrical installations for operating theaters and intensive care units (conductive floors, earthing systems, isolation moni-
toring device for earthing systems, IT networks) • Medical equipment studies (Operating theaters, Intensive care units, Recovery units, Central Sterilization systems, linear accelera-
tor studies, special medical examination devices studies) • Steam networks • •
Furthermore in car parking buildings: • Exhaust networks for underground parking areas • Carbon monoxide detection systems • Management and electric signage systems for parking areas • Automatic management systems for parking areas (without a driver)
Cambicci+Associates
page 8
•
Furthermore in industrial buildings: • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Piping Design Installations for gases & petroil sites • Antiexplosive installations • Industrial fluid and gases networks (pressurized air, petrol, oil, lubricants etc.) • Exhaust networks for spaces and machinery • Industrial equipment studies • Steam networks
M.E.P. infrastructure studies
Road Works • Highway and general road lighting works, overpass and intersection works • Electric signage • Special tunnel lighting of every form (drill, cut & cover) and underpass lighting • Lighting of all types of works • Tunnel exhaust installations • Electrical supply networks, of low medium and high voltage • Fire detection systems and tunnel fire safety • Tunnel monitoring networks (safety networks, height excess detection, emergency phones, safety lighting) • Tunnel servicing buildings • Central control stations for road works – control rooms • Sewage and garbage processing works • Primary, secondary and post secondary processing of liquid waste from sewage treatment facilities • Landfills and waste transportation centers • Solid waste processing units • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Central control installation networks • Pump stations • Hydraulic networks for the transportation of water from pumbing stations • Pumbstation electrical installations
Company profile 2012
page 9 out of 129
Renewable resources studies • Solar panel systems for hot water production • Photovoltaic systems • Photovoltaic parks • Wind energy • Smal hydroelectric works • Systems integrating co-production of energy •
Licencing • Of industrial buildings & Installations • Private parking areas • Private filling stations(liquid or gas fuel) • •
Lighting design • Interior lighting • Lighting of public or private outdoor areas • Buildings beautification lighting • Monument lighting • Lighting of picturesque landscapes • Urban lighting plans
•
Safety studies • Risk analysis • Safety procedures and protocolls • Safety devices and measures • Passive safety devices and measures •
Supervisions • Technical supervision (technical specifications and obligations observance monitoring, material inspection, monitoring of the con-
struction, testing and adjustments) • Technical and fiscal supervision (technical supervision and auditing of accounts, validation of new prices, fiscal auditing of certifica-
tions) • M.E.P. installations certification
Cambicci+Associates
page 10
Energy feasibility studies • Green building studies • Evaluation reconstruction and upgrade studies for existing buildings • Studies according to the Greek Regulation for the energetic evaluation of buildings • Evaluation of the energy requirements for heating systems • Thermography of buildings
Management and consulting services • Licensing coordination and control • Organizing competitions for the assignment of studies • M.E.P. studies managment • Organizing competitions for foster constuctors • Screening of candidates, objection managment • Project construction control • Timetable observance • Management of the obligations that are not in the initial agreement • Temporary and final undertaking of a project
Company profile 2012
page 11 out of 129
Our offices are in Pylaia, Thessaloniki and we undertake projects in the whole of Greece and the neighboring countries. Outside of Thes-saloniki we have offices-contact points in Athens, Thessalia & Thrace. The office is fully equipped in personnel and technological equipment for the elaboration of mep projects. In our organogram there is an administration division, an engineering studies division, a services division, a cost analysis division, a quality control division and a secre-tarial services division. The electronical equipment of our offices, regarding computer based devices and software, is based on the princi-ple of optimal available and reliable technology and includes a sufficient number of work spaces, computers, a network Server, and high quality software. There is software for the electromechanical design, software regarding Legislation and scientific literature (International and Greek) and software for the cost analysis of Public Sector Projects.
Cambicci+Associates
page 12
This page was intentionally left blank
Company profile 2012
page 13 out of 129
PPPooorrrtttfffooollliiiooo
Cambicci+Associates
page 14
Our office associates and personell have successfully taken part in a sufficient number of projects in Greece and other countries and are notably experienced in the fields that our office specializes in. In this process all engineers in our office have been part of small or bigger groups for the elaboration of simple or complicated works in a variety of areas in Greece and abroad. For the completion of our projects we have the capacity to obtain all necessary Permits and certifications. Our customers can be multinationals or smaller companies, technical firms, investment groups, private entrepreneurs and the Greek Pub-lic sector in all its legal forms and ehelons. Hereupon, some typical projects our office and engineers have been part of, are cited:
Category of projects pages Category of projects pages
Services 15 to 24 Housing 77 to 84
Culture 25 to 30 Urban 85 to 90
Hotels 31 to 40 Industry, Oil & Gas Installations 91 to 98
Education 41 to 46 Infrastructure 99 to 104
Health 47 to 52 Energy 105 to 110
Shoping malls & retail stores 53 to 68 Security 111 to 114
Recreation 69 to 72 Project management 115
Sports 73 to 76
Company profile 2012
page 15 out of 129
SSSeeerrrvvviiiccceeesss
Cambicci+Associates
page 16
Bank o f Greece Bu i ld ing in Thessa lon ik i , G reece
Project owner
Bank of Greece SA
Project design parties
Construction manager
Decathlon SA, D.Papazoglou
Architectural study & construction supervision
P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis
Structural study and construction supervision
Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos
Mep study and construction supervision
Y. Cambicci (*) BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos
Study period: 2004-2006
Construction details
General contractor: DOMOTECHNIKI SA
Construction period: 2007-2009
Construction status: in operation
Short description of project-services
The project subject is the design and supervi-sion for the construction of the new building of Money Circulation and Vaults of the National Bank of Greece in Thessaloniki
metrics
Buildings surface: 5.500m2
Plot size: 35.000m2
Budget: 5.000.000 €
(*) co-designer 33% for planning & construction supervision
Company profile 2012
page 17 out of 129
Of f i ce Bu i ld ing Renovat ion in A thens , Greece
Project owner
Henkel Hellas SA
Project design parties
Construction manager
A.Drazinou-N.Prounias
Architectural study
Tsigarida Architects
Structural study
Mep study
Cambicci+Assoc iates
Study period: 2008
Construction details
General contractor: ΤΕΚΜΑ SA
Construction period: 2009
Construction status: in operation
Short description of project-services
The project scope was the transformation of the existing office building into a modern mul-tinational corporation office building in Greece, with a hairdressing Academy, an auditorium and an underground closed parking.
metrics
Buildings surface: 8.500m2
Plot size: 4.100m2
Mep budget: 1.100.000 €
Cambicci+Associates
page 18
Po l i ce Admin i s t ra t ion Bu i ld ing in Kozan i , Greece
Project owner
MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT
Project design parties
Project management
KED SA
Architectural study
406 Studies group, Vasileios Pappas
Structural study
I.Mavrakis and Associates SA
Mep construction study
Cambicci+Assoc iates
Study period: 2008-2009
Construction details
General contractor: ANDREADIS ZISIADIS SA
Construction period: 2009-2011
Construction status: in operation
Short description of project-services
The project scope was the construction study, for the auction of the new office building con-struction and underground parking area for the accommodation of the peripheral Police divi-sions of Western Macedonia prefecture, in
Greece. Google
metrics
Buildings surface: 5.200m2
Plot size: 4.000m2
Mep budget: 2.000.000 €
Company profile 2012
page 19 out of 129
Manda l ide io Endowment a t N ik i s Avenue , Thessa lon ik i , G reece
Project owner
Company for the exploitation of AUTh real estate
Project design parties
Project management
AUTh Technical Department
Architectural study
NIMAND Architects
Structural study
Ioannis Poulios
Mep study
Cambicci+Assoc iates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the transformation of the existing building in Nikis Avenue in Thessaloni-ki into a Multiple Purpose Hall of the Aritoteleion Univercity of Thessaloniki (A.U.Th.) at Thessaloniki seafront.
metrics
Buildings surface: 1.600m2
Plot size: 260m2
Mep budget: 800.000 €
Cambicci+Associates
page 20
Of f i ce bu i ld ing in Thessa lon ik i
Project owner
Grigorios Karidas limited
Project design parties
Project management
Architectural study
Panetsos Panagiotis
Structural study
G&G Penelis Consulting Engineers SA
Mep study
Cambicci+Assoc iates
Study period: 2007
Construction details
General contractor: ARCON Constructions
Construction period: 2008-2009
Construction status: in operation
Short description of project-services
The project scope is the transformation of the existing building in Dragoumi Street in Thes-saloniki into a modern office building.
metrics
Buildings surface: 1.100m2
Plot size: 300m2
Mep budget: 500.000 €
Company profile 2012
page 21 out of 129
MAKEDONIA In t .A i rpor t Termina l i n Thessa lon ik i , G reece
Project owner
OPPE Thessaloniki 97 – EYDE of Northern Greece Airports
Project design parties
Project management
OPPE Thessaloniki 97
Architectural study
Polis SA, G.Papakostas, J.Vlahos
Structural study
Concept Consultant-Engineers limited
Mep study
Y. Cambicci (*)
Study period: 1997-2006
Construction details
General contractor: ZINON ATHANASIADIS SA DOMOTECHNIKI SA – ANASTILOTIKI SA ANDREADIS ZISIADIS SA
Construction period: 1997-2008
Construction status: in operation
Short description of project-services
Renovation of existing building and new ex-pansions for a new Makedonia Airport Terminal
in Thessaloniki Greece Google
metrics
Buildings surface: 46.000m2
Plot size: 160.000m2
Mep budget: 40.000.000 €
(*) co-designer 25-50% (depending of the phase)
Cambicci+Associates
page 22
Nat iona l Bank and Cu l tu ra l Center in Nor thern Greece
Project owner
National Bank of Greece SA
Project design parties
Project management
Andreadis-Zisiadis SA
Architectural study
Polis SA, G.Papakostas, J.Vlahos
Structural study
Concept Consultant-Engineers limited
Mep study
Cambicci+Assoc iates
Study period: 2006
Construction details
General contractor: ANDREADIS ZISIADIS SA
Construction period: 2007-2008
Construction status: in operation
Short description of project-services
Expansion of an existing building.
metrics
Buildings surface: 3.600m2
Plot size: 800m2
Mep budget: 800.000 €
Company profile 2012
page 23 out of 129
Town Ha l l o f Py la ia
Project owner
Municipality of Pylaia
Project design parties
Architectural study
K.Antoniou,E.Kastro,E.Disli,N.Barbari
Structural study
K.Anastasiadis, P.Panetsos
Mep study
Y. Cambicci (*)
Mep study advisor
Dr K.Pattas AUTh Proffessor
Study period: 1994-1996
Construction details
General contractor:
Construction period: 1997-2000
Construction status: in operation
Short description of project-services
Office building with 2 underground parking levels in Pylaia, Thessaloniki.
metrics
Buildings surface: 2.700m2
Plot size: 900m2
Mep budget: 1.000.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 24
Of f i ce bu i ld ing in Thessa lon ik i
Project owner
Αsea Βrown Βoveri (ABB) ΑΕ
Project design parties
Architectural study
N.Ktenas
Structural study
OMETE & ASSOCIATES SA
Mep study
Y. Cambicci (*)
Mep construction supervisor
Thomas Kolivopoulos
Study period: 1998-2000
Construction details
General contractor: ERGO3
Construction period: 2002-2004
Construction status: in operation
Short description of project-services
New ABB offices & whole sales building in North Greece
metrics
Buildings surface: 4.000m2
Plot size: 6.200m2
Mep budget: 1.100.000 €
(*) co-designer 33% for planning
Company profile 2012
page 25 out of 129
CCCuuullltttuuurrreee
Cambicci+Associates
page 26
P lovd iv Opera Renovat ion in Bu lgar ia
Project owner
Oblast Plovdiv
Project design parties
Project management
ΑΚΤΟΡ BULGARIA SA
Architectural study
ΜΜΤ SΑ
Structural study
Concept Ltd
Mep study
Cambicci+Assoc iates
Study period: 2007
Construction details
Gen. contr: AKTOR SA & AKTOP BULGARIA SA
Construction period: 2008-ongoing
Construction status: under construction
Short description of project-services
The project scope was the full renovation of the existing historical building and it’s trans-formation to a modern Opera House, the for-mation of a Cultural Centre, the addition of a commercial building and an automated under-ground car parking area.
metrics
Buildings surface: 14.000m2
Plot size: 8.000m2
Mep budget: 4.000.000 €
Company profile 2012
page 27 out of 129
Thermi Mun ic ipa l Aud i to r ium, Thessa lon ik i Greece
Project owner
Municipality of Thermi
Project design parties
Project management
Thermi Municipal TD
Architectural study
ΜΜΤ SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Assoc iates
Study period: 2009-2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
Project scope is the construction study and the formulation of auction documents for the con-struction of a new conservatoire in the munici-pality of Thermi, Thessaloniki.
metrics
Buildings surface: 1.600m2
Plot size: 1.700m2
Mep budget: 800.000 €
Cambicci+Associates
page 28
Cu l tura l Cent re a t Tagarades , Thessa lon ik i , G reece
Project owner
Municipality of Thermi
Project design parties
Project management
Thermi Municipal TD
Architectural study
ΜΜΤ SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Assoc iates
Study period: 2009-2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the Study of a new Cultur-al Center with Theatre in the municipality of Thermi, Thessaloniki.
metrics
Buildings surface: 4.800m2 Plot size: 4.600m2
Mep budget: 1.000.000 €
Company profile 2012
page 29 out of 129
Michan iona Cu l tu ra l Cent re in Thessa lon ik i , G reece
Project owner
Municipality of Michaniona
Project design parties
Architectural study
E.Disli, X.Kiros, A.Xaritopoulos, Th.Theodoridis
Structural study
Concept Engineers Ltd
Mep study
Cambicci+Assoc iates
Mep study associate
G. Klepkos
Study period: 2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the construction study and the compilation of auction documents for the construction of the cultural center in the mu-nicipality of Michaniona, Thessaloniki.
metrics
Buildings surface: 1.200m2
Plot size: 4.000m2
Mep budget: 900.000 €
Cambicci+Associates
page 30
Vyzant ine Museum o f Ver ia , G reece
Project owner
Ministry of Culture
Project design parties
Project management
ΑΡΧΙΤΕX SA
Architectural study
G.Anifantis-S.Anifantis, Κ.Asamopoulos,E.Skaltsa,D.Kontargiris,
Α.Lampakis
Structural study
S.Kounadis, L.Kounadis, M.Zarkadoula & Associates
Mep study
Y. Cambicci (*)
Study period: 1998-2000
Construction details
General contractor: ARXITEX SA
Construction period: 2001-2003
Construction status: in operation
Short description of project-services
Reconstruction and building expansion of an existing old factory building (mill) in Veria.
metrics
Buildings surface: 2.500m2
Plot size: 2.400m2
Mep budget: 1.300.000 €
(*) co-designer 30% for planning
Company profile 2012
page 31 out of 129
Macedon ic Museum o f Modern Ar t i n Thessa lon ik i , G reece
Project owner
Macedonian Museum of Contemporary Art
Project design parties
Project management
ΑΡΧΙΤΕΤ ΑΤΕ
Architectural study
K.Antoniou-E.Kastro
Structural study
DELCO, N.Deligiannidis
Mep study
Y. Cambicci (*)
Study period: 1998-2000
Construction details
General contractor: ΑRΧΙΤΕΧ SΑ
Construction period: 2001-2003
Construction status: in operation
Short description of project-services
Renovation and expansion of a museum for modern art in Thessaloniki.
metrics
Buildings surface: 4.400m2
Plot size: 4.150m2
Mep budget: 1.600.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 32
Cu l tura l Cent re o f the Labour Cent re o f Komot in i
Project owner
Labor Center of Komotini
Project design parties
Project management
S.Agathakis & F.Stratos
Architectural study
G.Mademlis, Telis Vasiliadis
Mep study
Y. Cambicci (*)
Acoustical study
N.Mparkas-D.Keramidas
Study period: 2001
Construction details
General contractor: AGATHAKIS-STRATOS
Construction period: 2002-2003
Construction status: in operation
Short description of project-services
Renovation of an existing Theater in Komotini Greece.
metrics
Buildings surface: 800m2
Plot size: 1.300m2
Mep budget: 400.000 €
(*) co-designer 33% for planning
Company profile 2012
page 33 out of 129
HHHooottteeelllsss
Cambicci+Associates
page 34
Restaurants AMMOS-ASTERIAS and Bousou las a t San i Resor t in Ha lk id ik i
Project owner
SANI SA
Project design parties
Architectural study
NIMAND Architects
Structural study
Mep study
Cambicci+Assoc iates
Study period: 2010
Construction details
General contractor: SANI SA
Construction period: 2012
Construction status: in operation
Σύντομη περιγραφή έργου-υπηρεσιών
Renovation of 2 beach-bars & restaurants at Sani resort in Halkidiki Greece.
Μετρητικά στοιχεία
Buildings surface: 500m2
Plot size: m2
Mep budget: €
Company profile 2012
page 35 out of 129
Open Theat re and mu l t i - func t ion a rea a t the San i Resor t in Ha lk id ik i
Project owner
SANI SA
Project design parties
Architectural study
NIMAND Architects
Structural study
Mep study
Cambicci+Assoc iates
Lighting design
G-Lights
Study period: 2010
Construction details
General contractor: SANI SA
Construction period: 2010
Construction status: in operation
Short description of project-services
The project scope was the construction of a new outdoor function area with a sheltered stage, auxiliary areas and adequate opticoacoustic equipment for the organization of cultural events in the SANI RESORT area
metrics
Buildings surface: 2.500m2
Plot size: m2
Mep budget: 500.000 €
Cambicci+Associates
page 36
Hote l renovat ion & expans ion in Ha lk id ik i , G reece
Project owner
Eisaei SA
Project design parties
Project management
ΜΜΤ SA
Architectural study
NIMAND SA – MMT SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Assoc iates
Study period: 2010
Construction details
General contractor: SYNTHESIS SΑ
Construction period: 2009-ongoing
Construction status: under construction
Short description of project-services
The project scope was the extension, recon-struction, and upgrade of a 300-bed existing hotel in Ouranoupolis, Halkidiki, Greece.
metrics
Buildings surface: 9.500m2
Plot size: 25.000m2
Mep budget: 2.500.000 €
Company profile 2012
page 37 out of 129
Congress Ha l l a t A lexander Beach Hote l i n A lexandroupo l i , G reece
Project owner
Xatzikonstantinou Bros SA
Project design parties
Architectural study
A&B Stylianidis
Structural study
K.Xatzikonstantinou
Mep study
Y. Cambicci
Mep construction supervisor
Ν . Gemitzakis
Study period: 2006
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2007
Construction status: in operation
Short description of project-services
The project scope was the construction of a new versatile E.O.T. approved congress hall, the formation of the outdoor area of the Hotel, and the updgrade of the m.e.p. installations of the Hotel
Μετρητικά στοιχεία
Buildings surface: 1.200m2
Plot size: 10.000m2
Mep budget: 1.800.000 €
Cambicci+Associates
page 38
Cas ino in Por to Car ras Grand Resor t , Ha lk id ik i Greece
Project owner
CASINO MAGIC PORTO CARRAS SA
Project design parties
Project management
ΑΡΧΙΤΕΧ SA
Architectural study
P.Makridis + Associates
Structural study
Mep study
Y. Cambicci (*)
Study period: 1996
Construction details
General contractor: ARXITEX SA
Construction period: 1996
Construction status: in operation
Short description of project-services
New Casino making in an existing Hotel Build-ing in Porto Carras Grand Resort.
metrics
Buildings surface: 1.500m2
Plot size: m2
Mep budget: 2.000.000 €
(*) co-designer 33% for planning
Company profile 2012
page 39 out of 129
Smal l Hote l i n Santor in i , G reece
Project owner
Project design parties
Project management
Architectural study
I.Vlahos
Structural study
Mep study
Y. Cambicci (*)
Study period: 2000
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Small Hotel Construction in Fira, Santorini, Greece.
metrics
Buildings surface: 700m2
Plot size: 8.000m2
Mep budget: 400.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 40
This page was intentionally left blank
Company profile 2012
page 41 out of 129
ΕΕΕddduuucccaaatttiiiooonnn
Cambicci+Associates
page 42
Extens ion o f the Pedagogy Depar tment o f the Ar i s to t le Un ivers i ty o f Thessa lon ik i
Project owner
Aristotle University of Thessaloniki
Project design parties
Architectural study
Ν.Kalogirou Professor Dpt. Arch. Α.U.Th. Α.Vasiliadis,Κ.Giatas,D.Koliakos,L.Mavridis
Structural study
Κ.Stylianidis Professor Dpt. Civ.Eng. Α.U.Th. Ch.Ignatakis Professor Dpt. Civ.Eng. Α.U.Th. S.Baxevanis
Mep construction study
Cambicci+Assoc iates Mep study consultant: Κ.Andreou Lecturer Dpt.
El.Eng. Α.U.Th.
Mep study advisor
Κ.Andreou Lecturer Dpt. El.Eng. Α.U.Th.
Study period: 2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope was the costruction study for the expansion of the pedagogy Department of the A.U.Th with the addition of two new teach-ing room wards as well as an auditorium
metrics
Buildings surface: 18.500m2
Plot size: 10.000m2
Mep budget: 5.500.000 €
Company profile 2012
page 43 out of 129
A.U .Th Congress Ha l l i n Po ly techn ic Schoo l , Greece
Project owner
Company for the exploitation of A.U.Th. Real Estate
Project design parties
Project management
A.U.Th TD
Architectural study
ΝΙΜΑΝD Architects
Structural study
Ι.Poulios
Mep study
Cambicci+Assoc iates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope was the construction study and the compilation of auction documents for the renovation of the existing central auditori-ums of the Polytechnic School and the con-struction of a modern conference center in
U.A.T. Google
metrics
Buildings surface: 3.200m2
Plot size: m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 44
L ight ing o f the A .U .Th Ph i losophy Depar tment
Project owner
A.U.Th
Project design parties
Project management
A.U.Th TD
Architectural study
Ν.Μ.Andreadi Professor Dept.Arch.A.U.th.
Mep study
Cambicci+Assoc iates
Lighting design
G-Lights - M.Gourogiannis
Study period: 2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the architectural lighting of the facades of the landmark building of the Philosophy Dept of the A.U. of Thessaloniki.
metrics
Buildings surface: m2
Plot size: 4.000m2
Mep budget: 500.000 €
Company profile 2012
page 45 out of 129
Bisse l l Co l l ege L ib rary in Thessa lon ik i , G reece
Project owner
Board of the American College of Thessaloniki
Project design parties
Project management
P.Makridis
Architectural study
P.Makridis + Associates
Structural study
Mep study
Y. Cambicci (*)
Study period: 1996
Construction details
General contractor: DOMOTECHNIKI SA
Construction period: 1997-1998
Construction status: in operation
Short description of project-services
New Library Building in American College of Thessaloniki.
metrics
Buildings surface: 4.000m2
Plot size: 10.000m2
Mep budget: 2.150.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 46
Reconst ruc t ion o f p r i va te schoo l in Thessa lon ik i , G reece
Project owner
American College ‘Anatolia’ of Thessaloniki
Project design parties
Project management
P.Makridis
Architectural study & construction supervision
P.Makridis + Associates SA
Structural study
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2010
Construction details
General contractor:
Construction period: 2010
Construction status: in operation
Short description of project-services
Elaboration of the construction study and the cost analysis reports.
metrics
Buildings surface: 1.500m2
Plot size: 20.000m2
Mep budget: 300.000 €
Company profile 2012
page 47 out of 129
HHHeeeaaalllttthhh
Cambicci+Associates
page 48
Rehab i l i t a t ion Cent re in Ser res , Greece
Project owner
ANANEOSI SA
Project design parties
Project management
SYNTHESIS SA
Architectural study
ΜΜΤ SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Assoc iates
Study period: 2010
Construction details
General contractor:
Construction period: 2009
Construction status: in operation
Short description of project-services
The project scope was the study of a rehabili-tation center in the municipality of Emmanouil Pappas in Serres.
metrics
Buildings surface: 5.200m2
Plot size: 6.700m2
Mep budget: 2.000.000 €
Company profile 2012
page 49 out of 129
Renovat ion o f the B lue Cross C l in i c in Thessa lon ik i , G reece
Project owner
EUROMEDICA SA ‘KIANOYS STAYROS’ SA
Project design parties
Project management
EUROMEDICA TD
Architectural study
POLIS SA, MEIONENA
Structural study
K.Makedos
Mep study
Y. Cambicci (*)
Study period: 2000-2001
Construction details
General contractor: AKTOR SA
Construction period: 2001-2002
Construction status: in operation
Short description of project-services
Tottaly reconstruction of a major clinik in Thes-saloniki.
metrics
Buildings surface: 5.800m2
Plot size: 1.300m2
Mep budget: 3.000.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 50
Cent ra l MEP Ins ta l l a t ions renovat ion a t P r i va te Genera l C l in i c in Thessa lon ik i
Project owner
EUROMEDICA SA GENIKI KLINIKI SA
Project design parties
Project management
EUROMEDICA TD
Architectural study
Structural study
Mep study
Y. Cambicci (*)
Study period: 2001-2002
Construction details
General contractor: ERGO3
Construction period: 2002-2003
Construction status: in operation
Short description of project-services
Reconstruction of the central MEP networks in a general clinik in Thessaloniki.
metrics
Buildings surface: 8.000m2
Plot size: 1.800m2
Mep budget: 1.000.000 €
(*) co-designer 33% for planning
Company profile 2012
page 51 out of 129
New Surgery and Admin i s t ra t ion Bu i ld ing in AHEPA Hosp i ta l i n Thessa lon ik i , G reece
Project owner
Ministry of Health
Project design parties
Project management
AHEPA TD
Architectural study
X.Kouloukouris,A.Tseranidis Ε.Ε. TROPALIS E.T.E.
Structural study
Mep study
Y. Cambicci (*)
Study period: 2001-2002
Construction details
General contractor:
Construction period:
Construction status: postponed
Short description of project-services
New Surgeries, Central Sterilise Department, Intensive Care Department and administration building for a General Hospital in Thessaloniki.
metrics
Buildings surface: 5.800m2
Plot size: m2
Mep budget: 5.600.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 52
E .D . and B lood Donat ion Cent re a t Ippokra te io Hosp i ta l i n Thessa lon ik i , G reece
Project owner
DEPANOM SA
Project design parties
Project management
J&P AVAX SA
Architectural study
METE SYSM SA
Structural study
METE SYSM SA
Mep study
Y. Cambicci (*)
Study period: 2004
Construction details
General contractor: J&P-AVAX SΑ
Construction period: 2004-2006
Construction status: in operation
Short description of project-services
Reconstruction of existing building for emer-gency department and making of a new build-ing for blood donation center.
metrics
Buildings surface: 2.500m2
Plot size: m2
Mep budget: 1.100.000 €
(*) co-designer 33% for planning
Company profile 2012
page 53 out of 129
SSShhhoooppppppiiinnnggg mmmaaallllllsss &&& RRReeetttaaaiiilll ssstttooorrreeesss
Cambicci+Associates
page 54
Shopp ing Center a t Xanth i , G reece
Project owner
ALPHA RETAIL PARKS SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Assoc iates
Study period: 2010
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
New Shopping Center Flamingo in Xanthi.
metrics
Buildings surface: 18.500m2
Plot size: 80.000m2
Mep budget: 2.200.000 €
Company profile 2012
page 55 out of 129
Hypermarket a t Xanth i , G reece
Project owner
PRAKTIKER HELLAS ΑΕ
Project design parties
Project management
Leonidas Athanasiadis
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Assoc iates
Study period: 2010
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
Hypermarket in Flamingo Shopping Center in Xanthi. The fire study was inspected and ap-proved by VdS.
metrics
Buildings surface: 4.500m2
Plot size: 5.500m2
Mep budget: 1.200.000 €
Cambicci+Associates
page 56
Eas t Thessa lon ik i Shopp ing Center
Project owner
ΦΑΜ ΑΕ
Project design parties
Development, Project & Construction management
Alexander Kalatzis
Architectural study
S.Suchomel-Τ.Kalatzis-Μ.kalatzis
Structural study
G.Papargyris-A.Kardoula & Associates
Mep study
Cambicci+Assoc iates
Study period: 2009
Construction details
General contractor: ΜΑΚΤ SΑ
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
New Shopping Center East Plazza in eastern Thessaloniki.
metrics
Buildings surface: 9.300m2
Plot size: 30.000m2
Mep budget: 1.800.000 €
Company profile 2012
page 57 out of 129
Eas t Thessa lon ik i Hypermarket
Project owner
SATURN-MEDIA MARKT ΑΕ
Project design parties
Project management
MAKT SA-LDK SΑ
Interior Architectural study
LDK ΑΕ
Mep study
LDK SΑ - Cambicci+Assoc iates
Mep construction supervision
LDK SΑ - Cambicci+Assoc iates
Study period: 2009
Construction details
General contractor: ΜΑΚΤ SA
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
Fire safety construction study and MEP super-vision in Saturn Hypermarket in east Thessalo-niki.
metrics
Buildings surface: 6.400m2
Plot size: m2
Mep budget: 1.400.000 €
Cambicci+Associates
page 58
West Thessa lon ik i Hypermarket
Project owner
HELLINIKI ETERIA IDIOKATASKEVON SA
Project design parties
Project management
ECC Engineering Construction Consulting SA
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Assoc iates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: under development
Short description of project-services
Mep study for making of a new hypermarket in Western Thessaloniki.
metrics
Buildings surface: 10.300m2
Plot size: 49.000m2
Mep budget: 1.600.000 €
Company profile 2012
page 59 out of 129
Hypermarket in T i rana , A lban ia
Project owner
Megatek ShA
Project design parties
Project management
Dionis Teqja
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Assoc iates
Study period: 2007
Construction details
General contractor: ZAlba SA
Construction period: 2008-2009
Construction status: in operation
Short description of project-services
Retail & Whole Sale Building for MEGATEK ShA and new office bulding for DIONIS TEQJA Companies in Tirana-Durred Highway in Alba-nia.
metrics
Buildings surface: 25.200m2
Plot size: 75.000m2
Mep budget: 2.600.000 €
Cambicci+Associates
page 60
Hypermarket in Lar i ssa , Greece
Project owner
HELLINIKI ETERIA IDIOKATASKEVON SA
Project design parties
Project management
Focal Project Managers
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Initial mep study
Α.Koutsikos SA
Mep construction study
Cambicci+Assoc iates
Study period: 2008-2009
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2009
Construction status: in operation
Short description of project-services
Modofications in construction study for a new hypermarket in Larissa Greece.
metrics
Buildings surface: 7.900m2
Plot size: 38.000m2
Mep budget: 1.400.000 €
Company profile 2012
page 61 out of 129
Hypermarket in Vo los , Greece
Project owner
MAKRO Cash & Carry SA
Project design parties
Project management
John Ninos
Architectural study & construction supervision
archigraph architecture_interiors
Structural study & construction supervision
Statoras
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2007
Construction details
Gen. contractor:ΑRΧΙΚΟΝ SA-ANAPLASEON SA
Construction period: 2008
Construction status: in operation
Short description of project-services
Mep Study and construction supervision for a new makro hypermarket in Volos, Greece.
metrics
Buildings surface: 4.200m2
Plot size: 29.000m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 62
Hypermarket in Ver ia , Greece
Project owner
Kalpakis Panagiotis Co
Project design parties
Initial Architectural study
A.Sidiropoulos
Construction Architectural study
Κ.Papastergiou
Structural study
S.Diamantopoulos
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2007
Construction details
General contractor: EGERSIS Limited
Construction period: 2007-2008
Construction status: in operation
Short description of project-services
New factory and sales center for Kalpakis De-sign Company in Veria, Greece.
metrics
Buildings surface: 5.800m2
Plot size: 5.200m2
Mep budget: 1.500.000 €
Company profile 2012
page 63 out of 129
Hypermarket in Xanth i , G reece
Project owner
MAKRO Cash & Carry SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study & construction supervision
archigraph architecture_interiors
Structural study & construction supervision
Statoras
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2006-2007
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2008
Construction status: in operation
Short description of project-services
Mep Study and construction supervision for a new makro hypermarket in Xanthi, Greece
metrics
Buildings surface: 4.200m2
Plot size: 22.800m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 64
Shopp ing center in Thessa lon ik i , G reece
Project owner
Carrefour Hellas SA
Project design parties
Development, Project & Cosntruction management
MAKT SA – Alexander Kalatzis
Architectural construction supervision
S.Vergopoulos, N.Dimtsas
Structural construction supervision
G.Papargyris
Mep construction supervision
Cambicci+Assoc iates
Study period: 1998-1999
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 1999-2000
Construction status: in operation
Short description of project-services
MAKEDONIA Major Shopping Center in Thessa-loniki. In the center exists Carrefour Hyper-market, Cinema Complex, Shopping Mall, and Recreational area building.
metrics
Buildings surface: 35.000m2
Plot size: 140.000m2
Mep budget: 4.800.000 €
Company profile 2012
page 65 out of 129
West Thessa lon ik i Hypermarket
Project owner
MAKRO Cash & Carry SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study & construction supervision
archigraph architecture_interiors
Structural study & construction supervision
Statoras
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2004
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2004-2005
Construction status: in operation
Short description of project-services
Mep Study and construction supervision for a new makro hypermarket in Western Thessalo-niki Area, Greece.
metrics
Buildings surface: 4.200m2
Plot size: 22.000m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 66
Eas t Thessa lon ik i E lec t r i ca l Hypermarket
Project owner
ΤΑΚ AE
Project design parties
Development, Project & Construction management
MAKT SA - Alexander kalatzis
Architectural study
Μ.Kalatzis-Τ.Kalatzi-S.Suchomel
Structural study & construction supervision
G.Papargyris
Mep construction supervision
Cambicci+Assoc iates
Study period: 2005
Construction details
General contractor: ΜΑΚΤ SΑ
Construction period: 2004-2005
Construction status: in operation
Short description of project-services
Mep construction supervision for a new hyper-market in Thessaloniki.
metrics
Buildings surface: 7.200m2
Plot size: 17.500m2
Mep budget: 900.000 €
Company profile 2012
page 67 out of 129
Hypermarket in Thessa lon ik i , G reece
Project owner
Diagonios SA
Project design parties
Project management
Architectural study
A.N Tombazis & Associates Architects- P.Makridis+Associates
Structural study
Ι.Poulios
Mep study
Y. Cambicci (*)
Study period: 2000
Construction details
General contractor: DIAGONIOS SA
Construction period: 2001
Construction status: in operation
Short description of project-services
New Shopping center EUROTECH for building materials stores in eastern Thessaloniki area.
metrics
Buildings surface: 8.000m2
Plot size: 20.000m2
Mep budget: 1.300.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 68
Duty F ree Shops in Border S ta t ions
Project owner
Hellenic Duty Free Shops SA
Project design parties
Project management
Architectural study
POLIS SA, G.Vlahos
Structural study
Concept SA
Mep study
Y. Cambicci (*)
Study period: 2004
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
New stores for Hellenic Duty Free Shops in Greece Border Stations at Kakavia, Promahona Rhodes Airport and Katakolo port (construction postponed).
Google 1 2 3 4 5
metrics
Buildings surface: 5.000m2
Plot size: m2
Mep budget: 650.000 €
(*) co-designer 33% for planning
Company profile 2012
page 69 out of 129
RRReeecccrrreeeaaatttiiiooonnn
Cambicci+Associates
page 70
Restaurant in Thessa lon ik i , G reece
Project owner
Clochard Restaurant
Project design parties
Project management
Architectural study & construction supervision
P.Makridis+Associates SA
Structural study
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2007
Construction details
General contractor:
Construction period: 2008
Construction status: in operation
Short description of project-services
Restaurant reconstruction in Thessaloniki cen-ter.
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
Company profile 2012
page 71 out of 129
Café & Res taurant in T i rana , A lban ia
Project owner
Albanian restaurants Sha
Project design parties
Project management
Vivartia TD-Goodys
Architectural study
archigraph architecture_interiors
Structural study
Mep study
Cambicci+Assoc iates
Study period: 2007
Construction details
General contractor:
Construction period: :
Construction status: postponed
Short description of project-services
Goodys & Flocafé stores in MEGATEK shopping center in Tirana Albania.
metrics
Buildings surface: 800m2
Plot size: m2
Mep budget: 250.000 €
Cambicci+Associates
page 72
This page was intentionally left blank
Company profile 2012
page 73 out of 129
SSSpppooorrrtttsss
Cambicci+Associates
page 74
Renovat ion o f Toumpa area in Thessa lon ik i , G reece
Project owner
Municipality of Thessaloniki
Project design parties
Project management
Thessaloniki Organisation
Architectural study
A.Panos M.Papadakis Architects, DEKATHLON SA
Structural study
Concept Engineers
Mep study
Y. Cambicci (*)
Study period: 2004
Construction details
General contractor:
Construction period: 2005-2008
Construction status: in operation
Short description of project-services
Open swimming pool, new cultural center, in Alana tis Toumpas area of Thessaloniki.
metrics
Buildings surface: 7.200m2
Plot size: 33.000m2
Mep budget: 2.700.000 €
(*) co-designer 33% for planning
Company profile 2012
page 75 out of 129
Indoor swimming poo l f ac i l i t y in Ver ia , Greece
Project owner
Municipality of Veria
Project design parties
Project management
Evripos SA
Architectural study
PETRA SINERGATIKI Consulting Engineers
Structural study
Concept Consulting Engineers
Mep study
Y. Cambicci (*)
Study period: 2006
Construction details
General contractor: EVRIPOS SA
Construction period:
Construction status: postponed
Short description of project-services
New major indoor swimming pool facility in Veria sports center.
metrics
Buildings surface: 11.000m2
Plot size: 28.000m2
Mep budget: 2.200.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 76
Ar t i f i c i a l l akes complex in Ka lamar ia , Thessa lon ik i
Project owner
Municipality of Kalamaria
Project design parties
Project management
Municipality of Kalamaria TD
Architectural study
Stamatis Koukopoulos
Structural study
Mep study
Cambicci+Assoc iates
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status: cancelled
Short description of project-services
Outdoor major swimming pool and icetrack in Kalamaria, Thessaloniki, Greece.
metrics
Buildings surface: 3.500m2
Plot size: 19.000m2
Mep budget: 1.200.000 €
Company profile 2012
page 77 out of 129
HHHooouuusssiiinnnggg
Cambicci+Associates
page 78
VIP V i l l a in Pe fkochor i Ha lk id ik i , G reece
Project owner
Project design parties
Project management
ΜΜΤ SA
Architectural study & construction supervision
Peter Schellinger Ε.Tzekakis, N.Manou-Andreadis
R.Papadakis, D.Aristotelidis
Structural study
Ι.Poulios
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2011
Construction details
General contractor:
Construction period: 2011-ongoing
Construction status: under construction
Short description of project-services
VIP Villas complex in Pefkochori Halikidiki, Greece.
metrics
Buildings surface: 700m2
Plot size: 16.000m2
Mep budget: 1.000.000 €
Company profile 2012
page 79 out of 129
Two count ry v i l l as a t Sk ia thos Is land , Greece
Project owner
Project design parties
Project management
P.Makridis+Associates SA
Architectural study & construction supervision
P.Makridis+Associates SA Petros Makridis
Thodoris Makridis Eleana Makridis
Structural study
Mep study & construction supervision
Cambicci+Assoc iates
Study period: 2010
Construction details
General contractor:
Construction period: 2012
Construction status: under construction
Short description of project-services
Two country villas in Skiathos town area.
Μετρητικά στοιχεία
Buildings surface: 220m2
Plot size: 4.000m2
Mep budget: €
Cambicci+Associates
page 80
Of f i ces & Houses Complex in Metaxourg io A thens , Greece
Project owner
GEK SA
Project design parties
Project management
Architectural study
Tsigarida Architects
Structural study
Α.Xenos
Mep study
Cambicci+Assoc iates
Study period: 2006
Construction details
General contractor:
Construction period:
Construction status:
Short description of project-services
1st prize in architectural contest in Metaxourgeio area in Athens, Greece
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
Company profile 2012
page 81 out of 129
Vi l l a in Mo l i vos , Lesvos Is land , Greece
Project owner
Project design parties
Project management
Architectural study
Tsigarida Architects
Structural study
Mep study
Cambicci+Assoc iates
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status:
Short description of project-services
Country Villa at Molivos in Lesvos Island, Greece.
Μετρητικά στοιχεία έργου
Buildings surface: 150m2
Plot size: 4.000m2
Mep budget: €
Cambicci+Associates
page 82
Vi l l a in Po t ida ia Ha lk id ik i , G reece
Project owner
Project design parties
Project management
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Assoc iates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
A seaside villa in Halkidiki, Greece
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
Company profile 2012
page 83 out of 129
P lag ia r i S .O .S . v i l l age fo r o rphan ch i ld ren in Thessa lon ik i , G reece
Project owner
SOS Village for Northern Greece
Project design parties
Project management
Architectural study
P.Makridis+Associates
Structural study
Mep study
Y. Cambicci (*)
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
MEP Study for a full village construction, com-posed of houses, main multipurpose building, sports areas, roads and infrastructure.
metrics
Buildings surface: 4.000m2
Plot size: 13.000m2
Mep budget: 1.100.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 84
P ress V i l l age fo r A thens O lympic Games in Marous i A thens , Greece
Project owner
Municipality of Amarousion
Project design parties
Project management
Architectural study
Structural study
Mep study
Y. Cambicci (*)
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Complete mep study for village buildings made for the Olympic Games.
metrics
Buildings surface: 8.000m2
Plot size: 30.000m2
Mep budget: €
(*) co-designer 50% for planning
Company profile 2012
page 85 out of 129
UUUrrrbbbaaannn
Cambicci+Associates
page 86
Whi te Tower square renovat ion in Thessa lon ik i , G reece
Project owner
Municipality of Thessaloniki
Project design parties
Project management
Architectural study
Tsigarida Architects
Mep study
Y. Cambicci (*)
Lighting design
Duillio Passariello Li-Dac Philips
Study period: 2005
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Mep study for the square of White tower, sym-bol of the city of Thessaloniki.
metrics
Buildings surface: 100m2
Plot size: 18.000m2
Mep budget: 500.000 €
(*) co-designer 33% for planning
Company profile 2012
page 87 out of 129
Kefa la r i sp r ings a rea in Drama, Greece
Project owner
DEPOS SΑ
Project design parties
Project management
DEPOS SA
Architectural study
George Triantafyllidis
Structural study
Mep study
Y. Cambicci (*)
Study period: 2005
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
metrics
Buildings surface: 500m2
Plot size: 16.000m2
Mep budget: 900.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 88
He l len i c garden in garden ing EXPO in Ch ina
Project owner
HELEXPO SA
Project design parties
Project management
HELEXPO SA
Architectural study
P.Nikiforidis, B.Cuomo
Structural study
Mar ia Stefanour i
Mep study
Y. Cambicci (*)
Study period: 2006
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
A garden for Shen Yang China International Hogricultural Exposition 2006.
metrics
Buildings surface: m2
Plot size: 1.200m2
Mep budget: €
(*) co-designer 50% for planning
Company profile 2012
page 89 out of 129
Refurb i shment o f the new promenade o f Thessa lon ik i , G reece
Project owner
Municipality of Thessaloniki
Project design parties
Architectural study
P.Nikiforidis, B.Cuomo, Atelier R.Castro-S.Denissof
Structural study
I.Lavasas-M.Stefanouri
Plants & trees arrangement study
I lor ik i
Mep study
Y. Cambicci (*)
Study period: 2006
Construction details
General contractor: SIDIRODROMIKA ERGA SA
Construction period: phase A+B: 2006-2008 Phase C: 2011-ongoing
Construction status: 50% in operation 50% under construction
Short description of project-services
Full renovation of Thessaloniki promenade.
metrics
Buildings surface: m2
Plot size: 280.000m2
Mep budget: 6.000.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 90
This page was intentionally left blank
Company profile 2012
page 91 out of 129
IIInnnddduuussstttrrriiiaaalll OOOiiilll &&& GGGaaasss iiinnnssstttaaallllllaaatttiiiooonnnsss
Cambicci+Associates
page 92
E lec t r i ca l sys tems manufac tur ing fac to ry in Ka lohor i , Thessa lon ik i , G reece
Project owner
SIAFARAS ELECTRICAL SYSTEMS SA
Project design parties
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Assoc iates
Energy study
Energy Technologies ΕΝΤΕ
Study period: 2008-2009
Construction details
General contractor: FRIGOSTAHL SΑ
Construction period: 2010-2011
Construction status: under construction
Short description of project-services
Expansion of existing factory in Thessaloniki
metrics
Buildings surface: 4.200m2
Plot size: 10.000m2
Mep budget: 800.000 €
Company profile 2012
page 93 out of 129
New fac tory -mi l l i n S indos indus t r ia l a rea , Greece
Project owner
E.DI.V.E. SA (Allatini Mill)
Project design parties
Project management
Architectural study
P.Makridis+Associates
Structural study
Mep study
Y.Cambicci (*)
Study period: 1995-1998
Construction details
Gen. contractor: ΕLLINIKI TECHNODOMIKI SA ΤΕΚ THESSALONIKI SΑ
Construction period: 1997-1998
Construction status: in operation
Short description of project-services
Mep study & supervision for a new factory in Sindos area.
metrics
Buildings surface: 9.100m2
Plot size: 33.000m2
Mep budget: 1.200.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 94
Car repa i r depot
Project owner
Municipality of Thessaloniki
Project design parties
Project management
ΑΡΧΙΤΕΧ SA
Architectural study
Anthi Katsika
Structural study
Parisis Mpillias
Mep study
Y.Cambicci (*)
Study period: 2004
Construction details
General contractor: ARXITEX SA
Construction period: 2004
Construction status: in operation
Short description of project-services
New car repair depot for Thessaloniki munici-pality.
metrics
Buildings surface: 5.300m2
Plot size: 4.700m2
Mep budget: 900.000 €
(*) co-designer 50% for planning
Company profile 2012
page 95 out of 129
F i shery p rocess ing fac tory in Kava la indus t r ia l a rea , Greece
Project owner
TRIFONIDIS SA
Project design parties
Project management
Architectural study
archigraph architecture_interiors
Structural study
G.Papargyris-A.Kardoula
Mep study
Y.Cambicci (*)
Study period: 2002
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2003
Construction status: in operation
Short description of project-services
New factory in Kavala area.
metrics υ
Buildings surface: 3.200m2
Plot size: 12.000m2
Mep budget: 500.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 96
Furn i tu re fac tory in Kava la r i , Thessa lon ik i , G reece
Project owner
N.KARAPIPERIDIS-S.PARITSIS Co
Project design parties
Project management
Architectural study
archigraph architecture_interiors
Structural study
G.Papargyris-A.Kardoula
Mep study
Y.Cambicci (*)
Study period: 2003
Construction details
General contractor:
Construction period: 2003
Construction status: in operation
Short description of project-services
New factory in Langadas area.
metrics
Buildings surface: 1.500m2
Plot size: 7.000m2
Mep budget: 200.000 €
Company profile 2012
page 97 out of 129
New meat fac tory in F lo r ina , Greece
Project owner
VASILEIOS SAVVOPOULOS SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study
archigraph architecture_interiors
Structural study
G.Papargyris-A.Kardoula
Mep study
Y.Cambicci (*)
Study period: 1997
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 1997
Construction status: in operation
Short description of project-services
New factory in Florina area.
metrics
Buildings surface: 2.000m2
Plot size: 8.000m2
Mep budget: 500.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 98
This page was intentionally left blank
Company profile 2012
page 99 out of 129
IIInnnfffrrraaassstttrrruuuccctttuuurrreee
Cambicci+Associates
page 100
Pot ida ia new H ighway Br idge in Ha lk id ik i , G reece
Project owner
EGNATIA ODOS SA
Project design parties
Project management
HELLINIKI TECHNODOMIKI SA
Συγκοινωνιακή μελέτη
GEOGNOSI SA
Structural study
VSL Systems AE
Mep study
Y.Cambicci (*)
Study period: 2001
Construction details
Gen. contractor: ELLINIKI TECHNODOMIKI SA
Construction period: 2001
Construction status: in operation
Short description of project-services
New potidaia bridge with connecting highway in Halkidiki.
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
(*) co-designer 50% for planning
Company profile 2012
page 101 out of 129
Cut & Cover underground tunne l in Thessa lon ik i -M ichan iona Avenue
Project owner
Region of Central Makedonia
Project design parties
Project management
Συγκοινωνιακή μελέτη
DIKTYO SA
Structural study
ΜΕΤΕ SYSM SA
Mep study
Y.Cambicci (*)
Study period: 2002
Construction details
General contractor:
Construction period:
Construction status: postponed
Short description of project-services
Preliminary mep study for a 3 lanes carriage-way tunnel, 314m long, in MAKEDONIA Airport area.
metrics
Buildings surface: m2
Plot size: m2
Mep budget: 3.000.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 102
Water t rea tment fasc i l i t y fo r Kozan i indus t r ia l a rea
Project owner
Prefecture of Kozani
Project design parties
Project management
ENCO Co
Χημικοτεχνική μελέτη
ENCO Co
Structural study
Kostas Chatzis
Mep study
Cambicci+Assoc iates
Study period: 2008
Construction details
General contractor: ITHAKI SA-MESOGEOS SA
Construction period: 2008
Construction status: in operation
Short description of project-services
Renovation and expansion of water treatment fascility center for an industrial area.
metrics
Buildings surface: m2
Plot size: m2
Mep budget: 500.000 €
Company profile 2012
page 103 out of 129
Water t rea tment fasc i l i t y fo r Amynta io , Greece
Project owner
Municipality of Amyntaio
Project design parties
Project management
ENCO CO
Chemical study
ENCO CO
Structural study
Kostas Chatzis
Mep study
Cambicci+Assoc iates
Study period: 2007
Construction details
General contractor: DISTILOS SA
Construction period: 2007
Construction status: in operation
Short description of project-services
Renovation and expansion of water treatment fascility center.
metrics
Buildings surface: m2
Plot size: m2
Mep budget: 650.000 €
Cambicci+Associates
page 104
I r r iga t ion ne twork o f Mess ian i , Kozan is , Greece
Project owner
Prefecture of Kozani
Project design parties
Project management
Anaptixiaki Kozanis
Hydraulic study
Horotechniki SA
Structural study
Akis Mystakidis
Mep study
Y.Cambicci (*)
Study period: 1998
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Pump stations for irrigation networks.
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
(*) co-designer 33% for planning
Company profile 2012
page 105 out of 129
ΕΕΕnnneeerrrgggyyy
Cambicci+Associates
page 106
Town Ha l l o f Py la ia
Project owner
Municipality of Pylaia
Project design parties
Architectural study
K.Antoniou,E.Kastro,E.Disli,N.Barbari
Structural study
K.Anastasiadis, P.Panetsos
Mep study
Y. Cambicci (*)
Mep study advisor
Dr K.Pattas AUTh Proffessor
Study period: 1994-1996
Construction details
General contractor:
Construction period: 1997-2000
Construction status: in operation
Short description of project-services
The first office building with geo-thermal ex-changers in Greece with Water to water Sourse Heat Pumps in coordination with the Mechani-cal Department of A.U.Th.
(*) co-designer 33% for planning
Company profile 2012
page 107 out of 129
Two V i l l as in Thermi , Greece
Project owner
Project design parties
Architectural study
Structural study
Mep study
Y. Cambicci (*)
Geothermie systems advisor
I.Mpousgolitis
Study period: 2004
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Two villas with sophisticated water to water heat pumps network and geothermal exchang-ers.
(*) co-designer 50% for planning
Cambicci+Associates
page 108
Res ident ia l Photovo l ta i c sys tems des ign
Project owner
Project design parties
Photovoltaic system study
Cambicci+Assoc iates
Study period: 2010-ongoing
Short description of project-services
Connected residential photovoltaic systems in northern and central Greece Systems installed power: 5 up to 10 kWp each Total installed power: 165kWp System status: in operation
Company profile 2012
page 109 out of 129
Major photovo l ta i c sys tems
Project owner
Project design parties
Photovoltaic system study
Cambicci+Assoc iates
Study period: 2011-ongoing
Short description of project-services
Connected photovoltaic systems, on rooftops and ground in northern and central Greece Systems installed power: 100 έως 2.000 kWp Total installed power: 2.400kWp System status: in various construction phases
Cambicci+Associates
page 110
This page was intentionally left blank
Company profile 2012
page 111 out of 129
SSSeeecccuuurrriiitttyyy
Cambicci+Associates
page 112
Bank o f Greece Bu i ld ing in Thessa lon ik i , G reece
Project owner
Bank of Greece SA
Project design parties
Construction manager
Decathlon SA, D.Papazoglou
Architectural study & construction supervision
P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis
Structural study and construction supervision
Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos
Mep study and construction supervision
Y. Cambicci BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos
Study period: 2004-2006
Construction details
General contractor: DOMOTECHNIKI SA
Construction period: 2007-2009
Construction status: in operation
Systems description
Sophisticated security systems including intru-sion control, central access control systems, closed circuit television networks, perimeter alarm systems, fully interconnected.
Company profile 2012
page 113 out of 129
Po l i ce Admin i s t ra t ion Bu i ld ing in Kozan i , Greece
MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT
Project design parties
Project management
KED SA
Architectural study
406 Studies group, Vasileios Pappas
Structural study
I.Mavrakis and Associates SA
Safety & Security study
Cambicci+Assoc iates
Study period: 2008-2009
Construction details
General contractor: ANDREADIS ZISIADIS SA
Construction period: 2009-ongoing
Construction status: under construction
Short description of project-services
Sophisticated security systems including intru-sion control, central access control systems, closed circuit television systems and risk anal-ysis study.
Cambicci+Associates
page 114
VIP V i l l a in Nor thern Greece
Ιδιώτης VIP πελάτης
Project design parties
Safety & security study
Cambicci+Assoc iates
Study period: 2011
Short description of project-services
Risk analysis study for the safety measures in VIP Villa in Northern Greece.
Company profile 2012
page 115 out of 129
PPPrrrooojjjeeecccttt mmmaaannnaaagggeeemmmeeennnttt
Cambicci+Associates
page 116
This page was intentionally left blank
Company profile 2012
page 117 out of 129
Project management services for the protection and upgrade of the suburban forest Seih-sou, in Thessaloniki, Greece.
Project owner
Region of Central Makedonia
Project design parties
Project management
OMICRON E.P.E. CONSORTIUM, I.Iosifidis, Y.Cambicci,
Services period: 2006-2009
Cambicci+Associates
page 118
This page was intentionally left blank
Company profile 2012
page 119 out of 129
ΟΟΟrrrgggaaannniiisssaaatttiiiooonnn
Our office has the following depertments:
Administration
Mechanological & Plumbing Studies
Electrical Studies
Energy Studies
Industrial Studies
Lighting Design
Security Studies
And Renewable energy systems studies We have offices also in:
• Alexandroupolis fir Thrace Projects • Larissa for Thessaly projects • Athens •
Cambicci+Associates
page 120
This page was intentionally left blank
Company profile 2012
page 121 out of 129
QQQuuuaaallliiifffiiicccaaatttiiiooonnnsss –––dddiiippplllooommmaaasss fffrrrooommm pppuuubbbllliiiccc ssseeeccctttooorrr ppprrrooojjjeeeccctttsss
Our office is equipped (as is necessary by Greek legislation) with a diploma for Public Sector projects in the following categories of Stud-ies: Mechanical-Electrical-Electronic Studies: Class C Diploma (Category 09) Environmental Studies: Class A Diploma (Category 27) Engineers who cooperate with our office have Diplomas in other categories.
EEEnnneeerrrgggyyy iiinnnssspppeeeccctttiiiooonnn DDDiiippplllooommmaaasss
The following engineers in our organization have been certified as Energy Inspectors: Yerasimo Cambicci (Class Β)
Cambicci+Associates
page 122
This page was intentionally left blank
Company profile 2012
page 123 out of 129
CCCuuurrrrrriiicccuuullluuummm vvviiitttaaaeee
Cambicci+Associates
page 124
1. General Data
Last Name: Cambicci First Name: Yerasimo Father’s name: Stylianos Year of birth: 1968 Place of birth: Xanthi, Greece Specialty: Diploma Mechanical Engineer A.U.TH. TCG No: 62405 Greek Public Works Degree (According to Greek Law 716/77) Number: 11263 Headquarters: Thessaloniki Valid thrued: 21.05.2008 Studies Categories: Category No 9: Degree Level C (MEP Studies)
Category No 27: Degree Level A (Enviromental Studies)
2. Studies
High School Degree Year of Graduation: 1985 Grade: Excellent High School: Xanthi 1st High School Mechanical Engineer Degree Year of Graduation: 1992 Grade: Good Thesis: Thermal Simulation of Artificial Water Tanks Thesis Grade: Excellent University: Aristoteleio University of Thessaloniki
Company profile 2012
page 125 out of 129
3. Seminars
Engineers & Personal Computers Carrier: TCG East Makedonia Section Period: 1992 Air Pollution Carrier: Energy Department- Section of Mechanical Engineers Polytechnic School - A.U.TH. Period: 1992 Ιnstallation Βus Compact Course Carrier: Siemens Training Center, Regensburg, Germany Period: 1997 Education In Lighting Carrier: Lightolier, USA Period: 2002 Lighting Technology Carrier: Rensesealer Polytechnic Institute, New York, USA Period: 2007
4. Foreign Languages
English Diploma: First Certificate in English Institute: University of Cambridge
Cambicci+Associates
page 126
5. Work Experience
5.1 Employer: North Aegean Petrol Company (NAPC) Kavala, Greece Position: Production Engineer Period: 1987 Duties: Monitoring of the petrol deposit and supervision of drilling repair works 5.2 Employer: Private & Public Works in Greece Office Gerasimos Kampitsis + Associates Position: MEP Design Engineer Period: 1993-Today Duties: MEP Design & Construction Supervision, as follows:
• Mechanical Electrical & Plumbing Installations design, for Buildings, Urban and infrastructure projects. • Lighting Design Projects • Supervision of the above studies at the construction phase. • Environmental Studies • Project Consultant • Project Management
6. Main Research Work
6.1 Research Program: New Pilaia Mayor Office – Energy Analysis Study Carrier: Pylaia Municipality, Polytechnic School of AUTH Position: Researcher Responsible Professor: Dr Konstantinos Pattas Period: 1994-1995 Project: Ground Source Heat Pumps
Company profile 2012
page 127 out of 129
6.2 Research Program: New Media Mass Medium Carrier: A.U.TH. Position: Researcher Period: 2003 Project: Preliminary Report of New Building MEP Installations Study 6.3 Research Program: Expansion of Pedagogigs Building Carrier: A.U.TH. Position: Researcher Period: 2004 Project: Preliminary Report of New Building MEP Installations Study 6.4 Research Program: Fire Safety Installations in Law School Building Carrier: A.U.TH. Position: Researcher Responsible Professor: Dr Nikolaos Kyriakis Period: 2006 Project: Fire Safety Installations execution study
7. Conventions
Urban Nightscape 2006, Hellenic Illumination Committee, September 2006, Goulandris Museum, Athens
8. Publications
Heating System for a Baby Farm, Designing for Hygiene and Security. D.Mpozis, P.Kikidis, Y.Cambicci, D.Giannaraki, Ktirio magazine, Issue 166, 2004.
Cambicci+Associates
page 128
9. Member of
TCG: Technical Chamber of Greece PSDMH: Hellenic Union of Dipl. Mechanical & Electrical Engineers SMHBE: Union of Northern Greece Mechanical & Electrical Engineers SMEDEKEM Union of Central Makedonia Public Projects Designers HIC: Hellenic Illumination Commitee ΕΙΒΑ/KNX: European Installation Bus Association (EIBA/KNX Partner). IESNA: Illuminating Engineering Society of North America. ASHRAE: American Society Of Heating Refrigerating and Air Conditioning, Hellenic Section Thessaloniki 2012 Γon behalf of Cambicci+Associates
Yerasimo Cambicci Dipl.Mechanical Engineer AUTh
Company profile 2012
page 129 out of 129
CCCooonnntttaaacccttt
Postal Address: 10 Riga Feraiou & Filikis Eterias, 6th floor P.C. GR-555 35 Pylaia, Thessaloniki Greece Phones & Fax: Tel: +30 2310 850 800 +30 2310 262 106 +30 6970 985 805 Fax:+30 2310 850 865
Internet Address: Email: [email protected] Site: www.cambicci.eu (.com .gr)
Skype: cambicci Facebook: Cambicci+Associates LinkedIn: Yerasimo Cambicci Driving Instructions
Think before you print.