calvin college engineering senior design team 10 march 28, 2008
TRANSCRIPT
![Page 1: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/1.jpg)
Calvin CollegeEngineering Senior Design
Team 10March 28, 2008
![Page 2: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/2.jpg)
OutlineIntroductionDesign
MFCPower RegulationSystem MonitoringFeed/Waste System
BudgetMoving Forward
![Page 3: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/3.jpg)
Jared Huffman
Brianna BultemaAchyut Shrestha
Chris Michaels
Team 10: Members
![Page 4: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/4.jpg)
Project DivisionFour Main Parts of
Our Biobattery ProjectMicrobial Fuel CellElectrical
MonitoringElectrical
RegulationFeeding and Case
Design
Introduction Design Budget Moving Forward
![Page 5: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/5.jpg)
How Microbial Fuel Cells (MFC) Work
Schematic courtesy of Derek R. Lovely Schematic courtesy of Derek R. Lovely (Microbial Energizers: Fuel Cells the Keep Going?)(Microbial Energizers: Fuel Cells the Keep Going?)
Introduction Design Budget Moving Forward
Story of Electrons:Anode
• Electrons from Acetate to Geobacter
• Geobacter sends electrons outside itself to electrode
Cathode• Electrons combine
with Oxygen and Protons to form water
![Page 6: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/6.jpg)
Microbial Fuel Cell DesignSpecies: Geobacter Metallireducens
Most Efficient Colonization and Power DensityWidely tested
Membrane: Cellophane vs NafionBalance Cost and Permeability
Electrode: Carbon Cloth vs Carbon Porous Block
Introduction Design Budget Moving Forward
![Page 7: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/7.jpg)
Design GoalsUSB Power output
5V, 5% tolerance0.1-0.5A
Refillable Food Supply with AlertSemi-Continuous
System MonitoringUser friendlyIndicates Failure Mode
Improved Power/Volume RatioAnode Cube
Introduction Design Budget Moving Forward
![Page 8: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/8.jpg)
Anode Cube
Food Input
Waste Output
Electrode Location
(Each Face)
MFC Design Regulation Monitoring Food/Waste Budget
![Page 9: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/9.jpg)
DesignFuel cell arrangement and composition
Will use a combination of serial and parallel circuit design Lower chance of battery and circuit failure
Introduction Design Budget Moving Forward
![Page 10: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/10.jpg)
DesignRegulation
Must output 4.75V-5.25V and 100mA-500mA for USB compatibility
Must overcome low current problemMust step up voltage from about 3.3V to 5VWill use the Maxim MAX1524 Boost Controller
Introduction Design Budget Moving Forward
![Page 11: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/11.jpg)
Introduction Design Budget Moving Forward
Fig. Regulator circuit
![Page 12: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/12.jpg)
Parallel vs. Series Configuration
MFC
Regulator
Monitor
Fault signalMFC
Regulator
Monitor
Fault signal
Fig. Parallel configuration Fig. Series configuration
Introduction Design Budget Moving Forward
![Page 13: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/13.jpg)
Parallel configurationParallel configuration of regulator and
monitor circuitsPreserve system integrity
Introduction Design Budget Moving Forward
![Page 14: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/14.jpg)
MFC Monitor DesignGoal
Monitor the status of the system and communicate relevant status to user
RequirementsUpdate user the system status
feed and waste removal voltage produced by MFC circuit integrity, for e.g. over-current, short circuit
Use minimum power to monitor the systemUser friendlyComponents RoHS compliant and lead free
Introduction Design Budget Moving Forward
![Page 15: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/15.jpg)
MFC Monitor Design
micro-controller
ADC
LCD
Voltage output from MFC
Feed/waste removal signal
Fault signal
Introduction Design Budget Moving Forward
Fig. Block diagram
![Page 16: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/16.jpg)
Monitor DesignInitial State
Vin MFC Waste Interrupt
Output interrupt
good bad
alert warning
Fig. State Machine
Introduction Design Budget Moving Forward
![Page 17: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/17.jpg)
MFC Monitor DesignAVR butterfly kit
Atmega169 micro-controller
10 bit ADC & LCDLow power
consumption: < 500µA
RoHS compliantNo speciality
hardware/software need for programming
Introduction Design Budget Moving Forward
Fig. Block diagram
![Page 18: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/18.jpg)
Feeding and Waste SystemFood Solution BladderTubes and Valves
Thumbscrew Valves to Control RateOne Way Valves to Prevent Backflow
Cubes Fed in Sets of 2, Bottom to TopWaste Tank
Introduction Design Budget Moving Forward
![Page 19: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/19.jpg)
Feeding and Waste System
Food Solution BladderFilled by User Periodically
CathodeTank
Waste TankEmptied by User Periodically
Anode Cube
Anode Cube
Anode Cube
Anode Cube
Introduction Design Budget Moving Forward
![Page 20: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/20.jpg)
Decision-Making Process1. Brainstorm (Group and Individual)2. Discuss Design Requirements3. Research4. Design5. Present Design to Team6. Refine Design7. Present Refined Design to Team8. Order Parts9. Assembly10. Testing
Introduction Design Budget Moving Forward
![Page 21: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/21.jpg)
BudgetPreliminary Budget estimation = $750Spent
Geobacter & mediaTesting components such as tubes,AVR butterfly kit$350
Introduction Design Budget Moving Forward
![Page 22: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/22.jpg)
BudgetPlanned
Electrodes and membraneFeeding and waste systemElectrical components$400
Introduction Design Budget Moving Forward
![Page 23: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/23.jpg)
BudgetDonation
Test equipments from chemistry and biology departments
Plexiglas, carbon cloth and membrane
Introduction Design Budget Moving Forward
![Page 24: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/24.jpg)
Obstacles and PlansCase design
Need to find a tank for the cathodeNeed to select and acquire a feed bladderMust find a waste tankMust select an appropriate feed rate
Introduction Design Budget Moving Forward
![Page 25: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/25.jpg)
Obstacles and PlansBacteria testing
Must have a bio-film formation on the electrode
Need to select a secondary, non-competitive aerobic bacteria
Plan to allow Geobacter to colonize electrodes before applying secondary bacteria
Plan to create a large supply of media
Introduction Design Budget Moving Forward
![Page 26: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/26.jpg)
Obstacles and PlansElectrical regulation
Need to order parts Need SchmartBoard to solder surface mount parts
Need to test circuit in labElectrical monitoring
Need to interface the different components with the monitoring system
Complete system test
Introduction Design Budget Moving Forward
![Page 27: Calvin College Engineering Senior Design Team 10 March 28, 2008](https://reader031.vdocuments.site/reader031/viewer/2022012918/56649e735503460f94b73a50/html5/thumbnails/27.jpg)