caltrans district 7 advanced transportation management system · caltrans district 7 advanced...

107
Caltrans District 7 Advanced Transportation Management System September 2008

Upload: others

Post on 20-May-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Caltrans District 7

Advanced Transportation

Management System

September 2008

Page 2: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 2

Los Angeles Transportation Management Center (LARTMC)

• The LARTMC serves forty three (43) distinct government functions and was designed with the technologies to support joint operations and act as the center for Intelligent Transportation Systems (ITS) and Emergency Response operations for the next 30 years.

Page 3: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 3

• Over 525 miles of monitored freeway in District 7 • 1,280 Traffic Monitoring Stations (TMS) • Over 12,000 Inductive Loops, 81 Speedinfo Sensors (plus

misc. RTMS Radar and Sensys magneto resistive detectors)

Page 4: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 4

I-5 S/B OFF-RAMP CLOSED • 125 CMS

• 960 RMS • 15 HAR systems • 485 CCTV

Page 5: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 5

ATMS Features • PC Browser user Interface • CMS Travel Times • CMS Message Library and History • CMS Scheduler • AMBER Alerts • Electronic Message Board Control • New VDS Interfaces (RTMS, Speedinfo, Sensys) • Digital HAR Interface • NTCIP CCTV Control w/presets • Enhanced SWARM w/performance measures • Duty Paging • Event Management enhancements • Automated CHP Event Interface • New Crystal Reports • External Agency Interface – RIITS • CCTV Cameras to cell phones (via RIITS) • Construction Project Impact Tracker • Work Zone TMS features

Page 6: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Agenda

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

Page 7: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 7

ATMS Application Web Page

Page 8: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 8

• Map of Region • Depicts Roadways

• Freeways, State Highways, Major & Minor Arterials • Shows Field Element Locations & Status

• Induction Loops, Ramp Meters, CMS, CCTV, HAR & Beacons

• Overview of All ATMS Operations • Freeway Congestion • Ramp Metering Operations • Current and Scheduled Planned Event Operations

ATMS “Base Map”

Page 9: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 9

Functionality of Base Map

• Map Manipulation • Multiple Pan & Zoom Options • Map Overview • New Map • Legend

• Control of Map Layers • Automatic “Decluttering” • User Controllable Views

Page 10: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 10

1 2 3 4 5

1. Top View Button (zoom = 1.0) 2. Continuous Zoom In 3. Continuous Zoom Out 4. Rectangular Zoom 5. Grabber Pan

6 7

6. Zoom Level 7. Filter Indication 8. Instruction Window

8

Page 11: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 11

Map - Layer Display

Sample: City Area On

Default On Off

Page 12: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

Agenda

• Failure Management • Data Normalization • Real-Time Display

Page 13: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 13

Phase I Failure Management Model • Detects failures in the

raw detector data • Eliminates need for using

historical data to determine status

• Segregates Detectors into Classes

• Segregates Freeway into Links with Similar Operating Characteristics

• Dynamic Thresholds

Page 14: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

NO RESPONSE

SOFT FAILED

SUSPECT

DISABLED (Operator can Disable

from any State)

OK

HARD FAILED

Fail Thresh x Times

Pass Thresh z Times

Fail Thresh Test

Pass Thresh Test

Fail Thresh y Times

Pass Thresh q Times

Operator Software

Software

Software Fail Daily Count Thresh

Software

Software

Loop Status State Diagram

Page 15: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 16

Occupancy Threshold Table

0

0

5

5

25

....

....

6

8

30

31

100

....

....

15

14

4

3

2

....

....

2

2

3

3

7

....

....

0

1

15

16

6

10

32

40

3

3

3

2

17

30

100

....

....

Avg Occ

Low Thresh

High Thresh

Suspect to Soft

Soft to OK

1

1

99

100

10

16

2

2

Metering Ramp (excl. greenball)

Not Enough Data

Page 16: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 17

Data Normalization

• Occupancy is normalized so that occupancy better represents the same condition regardless of the detector characteristics

Page 17: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 19

Traffic Surveillance - Real Time Data • Freeway Congestion Overview on Map

• Updated every polling cycle: 30 seconds • Station level display: Average estimated speed,

volume or occupancy • Lane level display: volume, occupancy, estimated

speed • Green, yellow, orange, red, gray color code

• Textual Data Display • Volume, Occupancy, Estimated Speed • Multiple Station Capability

Page 18: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 20

Station Average (Zoomed Out)

Lane-by-Lane (Zoomed In)

Vehicle Detection Station

Red Orange Yellow

Speed 0-20mph 20-35mph 35-50mph

Volume 18-1000 veh/30sec

9-18 veh/30 sec

Occupancy 30-100% 15-30%

Gray: no valid data (multiple causes)

Green

50-70mph

0-9 veh/30 sec

0-15%

Page 19: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

VDS Data Dialogue

Loop Location

Loop Status

Station Totals

30 Second Loop Data • Volume • Occupancy • Estimated Speed

Accumulated Loop Volumes (5, 15 min)

Page 20: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 22

Upstream Downstream Primary

VDS

Multiple Station Data Display

• Volume • Occupancy • Est. Speed • Status

Page 21: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 23

New VDS Sensors

• RTMS via loop emulator and FEPT • Direct ATMS-to-RTMS Interface using InfoTek

Wizard • Direct ATMS-to-RTMS Interface using Airlink

Modem • Sensys Networks via snap server • Direct ATMS-to-Sensys Interface • Speedinfo via RIITS

Page 22: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 24

New VDS Devices

Page 23: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Agenda

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

• CMS • CCTV

• HAR • RMS

Page 24: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 26

I-5 S/B OFF-RAMP CLOSED

Device Control • Changeable Message Signs

• Operational Status • Manual User Control • System Scheduled

• RMS • Operational Status (Mode, Rate) • Central Algorithm Configuration (SWARM)

• HAR & Beacons • Operational Status

• CCTV • Camera Selection (point and click) • Pan / Tilt / Zoom / Iris • Video Wall Control • Video Snapshot Configuration

Page 25: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Field Devices - Icon Display

Page 26: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 28

CMS Manual Control

Page 27: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 29

CMS System Scheduler

Page 28: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 30

CMS Scheduler Detail

Page 29: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 31

CMS Message History

Page 30: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 32

CMS Message Library

Page 31: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 33

CMS Detailed Mode

Page 32: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 34

Ramp Metering

• Manual Control • Traditional Time of Day & Local Responsive • Controller Memory Configuration

• Multiple “Automated” Modes • 3 Central Algorithms

• Swarm 1 - Adaptive System-wide • Swarm 2a - Headway-based local responsive • Swarm 2b - Density-based local responsive

Page 33: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 35

RMS Control

Metering Rate Statistics

RMS Loop Enable/Disable

SWARM 1 Details

SWARM 2a Details

SWARM 2b Details

Configure Controller Memory

TOD Table

TOD Holiday

CRVOL Plans

Platooning Plans

Select Metering Mode

SWARM

<> SWARM 1 <> SWARM 2a <> SWARM 2b

Configure SWARM Control

Minimum Rate Control

TOD

Absolute Minimum

Default Rate Control

TOD

Absolute Maximum

SWARM Startup Strategy

Only during TOD

Anytime

MODE Local TOD/LMR

Manual SWARM

MANUAL RATE 13 vpm/lane 12 vpm/lane

.

. 3 vpm/lane

Memory Page

Tables Insert /Append

/Edit

All Memory

Flow of RMS Windows

Page 34: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 36

Ramp Metering Control

Page 35: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 37

CCTV Interface

Video Wall Display Control

Page 36: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 38

CCTV Functionality – NTCIP and Presets

• Iris Control Auto Open Close

• Focus Control Auto Near Far

Page 37: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 39

• Preset 10 Positions Preset 1 is

Default

CCTV Functionality – NTCIP and Presets

Page 38: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 40

CCTV Snapshot Configuration

Page 39: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 41

Digital HAR

Digital HAR

Page 40: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 42

Digital HAR Interface

Page 41: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 43

Electronic Message Board (EMB)

Page 42: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 44

EMB Event (for LARTMC)

Page 43: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Agenda

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

• Signing Configuration • Signing Scheduler • Target Selection

Page 44: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 46

Congestion Signing/Travel Times

• Current Operations 50 signs 12 hours/day 7 days/week

• Non-contiguous Freeway signing Freeway-to-freeway

pivots

Page 45: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 47

Congestion Signing Configuration

Page 46: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 48

Congestion Signing Scheduler

Page 47: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 49

Target Selection

Page 48: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 50

Sample Travel Time Message

Page 49: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Agenda

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

• SWARM • Incident Detection • Event Management

Page 50: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 52

System Wide Adaptive Ramp Metering

• Develops metering rates based on real time conditions • SWARM 1 - Network

• Looks at the complete system • Forecasts traffic conditions x minutes into the future • Changes metering rates now to avoid predicted future problems

• SWARM 2 • Looks at local traffic conditions near ramp • Based on current data • SWARM 2a - Headway (time between vehicles) • SWARM 2b - Storage

Page 51: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 55

SWARM 1 VDS Locations

Selected Metered On Ramp

Upstream Mainline VDS

Downstream Mainline Bottleneck VDS

Metering rates are determined based on conditions at downstream bottlenecks

Page 52: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 56

SWARM 1Forecasting

1 2 3 4 5 6 7 8 9 10 11 12 13 14

TIME

DE

NS

ITY

SATURATION DENSITY

Actual Density

Tcrit

Reduction in density required during next Tcrit time periods

.

Forcasted Density at Bottleneck

Corrective Trend at time t+1

Page 53: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 59

RMS Advanced Management Dialog

Page 54: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 60

RMS Scheduler - SWARM

Page 55: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 61

Dynamic Bottlenecks

Page 56: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 62

Performance Measures – RMS

Page 57: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 63

Performance Measures – RMS

Page 58: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 64

Performance Measures – RMS

Page 59: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 65

Metering Mode screen

Page 60: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 66

Set controls that govern how SWARM rates are determined and implemented

Configure SWARM Control

Page 61: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 67

Metering Rate statistics

Page 62: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 68

Configure controller memory

Page 63: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 69

Memory page

Page 64: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 70

TOD Tables

Page 65: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 71

TOD Holiday Tables

Page 66: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 72

CRVOL plan

Page 67: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 73

Platooning Parameters

Page 68: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 74

Automatic Incident Detection

• Uses APID: All Purpose Incident Detection algorithm

• Algorithm considers Prevailing Congestion Levels • Algorithm Tuned for Each Mainline VDS • Operator “Alarmed” for Potential Incident

Page 69: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 75

Upstream detector: rising occupancy, falling speed

Downstream detector: extraordinary decreases in occupancy, rising speed

Traffic flow

. Incident

APID • Compare upstream and downstream stations for

differences in occupancy • Test individual stations for rates of increase and

decrease in occupancy • Test upstream stations for extraordinary increases in

occupancy

Page 70: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 76

INCIDENT DETECTED

CONFIRMED?

DEFINE INCIDENT CONDITIONS

GENERATE RESPONSE PLAN

SEND RESPONSE PLAN

MONITOR EVENT/ CONDITIONS

CONDITIONS CHANGED?

TERMINATED?

EVENT ENDED

TERMINATE RESPONSE

FALSE ALARM

Yes

Yes

No

Yes

No No

Typical Event Management Process

Page 71: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 78

Event Details

Page 72: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 79

Response Plan Generation

• Expert System Generated • Rules-based system for generating responses to a

complex set of conditions • Provides a scaleable, adaptable solution • Developed utilizing agency expertise for operational

responses • Aids operators in management of complex events • Standardized responses

• Operator Scripted

Page 73: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 80

Response Plan Elements

ATMS Response

Plan ATIS

Advisories to Web Page

Freeway CMS

HAR notepad

Operator Actions

ATIS Advisories

to Web Page Interface to output advisories to WEB Page

HAR notepad

Record which HAR is used and message content

Operator Actions

• Recommend to Dispatch FSP

• Contact TMC Senior and Lead Officer

• Notify Duty Officer • Advise Local Agencies • Advise Adjacent Districts

• Request Sigalert • Issue Traffic Advisory • Advise TMT Leader • Notify Headquarters

Communications • Advise Maintenance

Freeway CMS

• Selects which signs to use

• Determines exact message content

Page 74: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 81

Expert System Response Plan Generation

Response P lan

• Time of Day • Clearance Time • Traffic Impact

• High • Medium • Low

System-Generated Properties

• Location • Time • Event Type • Details

• Blockage Pattern • # of Vehicles • # of Injuries/

Fatalities • Other attributes

Operator-Input Details

Page 75: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 82

Traffic Impact: Peak Period

Clearance Time (min)? 0-29 30-59 60+

Lanes Blocked MAINLINE EXIT/CONN MAINLINE

HOV Total Partial None 2+ One None

Lanes Blocked MAINLINE EXIT/CONN MAINLINE

HOV One or more None 1+ None

Lanes Blocked MAINLINE EXIT/CONN MAINLINE

HOV Total Partial None 2+ or

1 of 2 One None

Incident Type

Load Fire Vehicle Fire

Any Others

Incident Type Load Fire Vehicle Fire Adj. Fire Out. Rwy Gawk. Fog Wind Flood

Any Others

Incident Type

Load Fire Vehicle Fire

Any Others

Incident Type

Load Fire Vehicle Fire

Any Others

Incident Type Incident Type

Load Fire Vehicle Fire

Any Others

Incident Type Incident Type Load Fire Vehicle Fire Adj. Fire Out. Rwy Gawk. Opp. Dir. Gawk. Fog Wind Sweeping Flood Post Incident

Any Others

M

L

M

H H

M

M

H H

L M

H H

L

M

H H H H H H

L M

Load Fire Vehicle Fire Adj. Fire Out. Rwy Gawk. Fog Wind Flood

Any Others

M L

Load Fire Vehicle Fire Adj. Fire Out. Rwy Gawk. Opp. Dir. Gawk. Fog Wind Sweeping Flood Post Incident

Any Others

L M

Page 76: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 83

Automated CHP Event Interface

CHP Event icons

Page 77: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 84

CHP Functionality

• CHP Events Unconfirmed events Located on map if

valid coordinates Listed in CHP

section of Event Summary window

• Event Summary CAD Code Field CAD # Field CHP Events

Page 78: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 85

CHP Functionality

• CHP Events Unconfirmed events ATMS Operator to

confirm location/event

Icon changes to ATMS red confirmed icon

CHP CAD Comments continue to populate

Page 79: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 86

CHP Functionality

• CHP Events Comments continue

from CAD log.

Page 80: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 87

Duty Page

From the toolbar, launch the general Duty Page

• General Paging • Scheduling • Predefined Messages • History

Page 81: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 88

Duty Page • General Paging

Able to select Recipients/Groups

Able to select predefined messages

Able to enter message Tally of number of

characters Able to schedule messages

Page 82: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 89

Duty Page • General Paging - History

Recently sent pages. Includes all pages, whether event or general

Page 83: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 90

Duty Page • Event Duty Page

3 types Initial (only one) Update (multiple) Final (only one)

Response Plan element Duty Page Officer

automatically assigned

Page 84: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 91

AMBER alert

Can select all signs and send messages with single mouse click

Page 85: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Agenda

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

Page 86: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 93

Types of Reports (36 total reports)

• Traffic Data Reports • Traffic Data Plots • System Performance Reports • Special Applications Reports • Ramp Metering Reports

Page 87: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 94

New Reports (Crystal)

Page 88: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 95

New Reports (Crystal)

Page 89: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 96

Sample Report Output

Page 90: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 97

Sample Special Applications Report: CMS Message Approval

Page 91: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Agenda

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

Page 92: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 99

Browser and Editor

• Allows user to view information from the database

• Filters can be used to narrow the number of records to be viewed

• Users with proper access privileges may edit information

Page 93: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 100

Travel Time Failure Management

Page 94: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 101

Defining Travel Time Targets

Page 95: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 102

Configure Travel Time Calculation

Page 96: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Agenda

Regional Integration

Browse Edit

Reports

Advanced Management Functions

Travel Time

Field Device Control

Traffic Data

Map Overview

Page 97: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 104

CHP

LACFD

MTA Bus & Rail Caltrans ATMS

Caltrans CTNET

Long Beach Transit

LACDPW IEN

ASI

LADOT

LAPD

Port of LA

Port of Long Beach

LAX

LA Regional Network/ Internet

LAX

Santa Monica Transit SCAG

Regional 511 and ISPs

MTA Trip Planner

Other Providers

All Regional Freeway, Arterial, Bus, Rail, and Emergency Response data

Page 98: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 105

RIITS

Page 99: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 106

Caltrans Freeway Data Set

Freeway Congestion Data: o Route o Cross street o Direction o Lane Count o ID o Geo-location (lat/long) o Occupancy Value (average

of all mixed-flow lanes) o Volume Value (average of

all mixed-flow lanes) o Speed Value (average of

all mixed-flow lanes) o Speed Value (HOV lane)

Freeway Changeable Message Sign Data:

o Route o Cross Street o ID o Geo-location (lat/long) o Display Content o Operational Status o Travel Times

Page 100: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 107

Caltrans Freeway Data Set Event Data:

o ID o Route o Cross Street 1 o Cross Street 2 o Direction o City o Event Type o Vehicle Type o Vehicle Count o Injury Level o Contact Name o Contact Phone Number o Event Responders (highway

patrol, county fire, hazmat, etc.)

o Severity o Start Date o Start Time o Clear Date o Clear Time o Event Status

Freeway CCTV Data: o ID o Route o Cross Street o Geo-location (lat/long) o Snapshot image file name o Streaming Video

Page 101: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 108

Current Information Service Providers

• ClearChannel (Airwatch) • Eeminder • Fox-TV • Inrix • KABC-TV • KKTV Fox-11 • KCOP UPN-13 • Mobility Technologies

(traffic.com)

• Jaytu Technolgies (sigalert.com)

• Traveler Advisory News Network

• TrafficGauge, Inc. • Westwood One

Page 102: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 109

CCTV to Cell Phones

• 3rd Dimension (www.freetrafficcams.com)

Page 103: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 110

Coming Soon

• Work Zone TMS Features • Dynamic Lane Management

Page 104: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 111

Variable Speed Limit Signing

When variable speed limit signs such as this are used to alert motorists to slowed or stopped traffic, the incidence of rear-end collisions occurring in work zones is reduced.

Page 105: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 112

Dynamic Lane Management

110 110 110

NORTH NORTH NORTH NORTH

Page 106: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 113

Dynamic Lane Management

110 110

NORTH NORTH PASADENA

Page 107: Caltrans District 7 Advanced Transportation Management System · Caltrans District 7 Advanced Transportation Management System September 2008 . Slide # 2 Los Angeles Transportation

Slide # 114

Questions